USS LEWIS B. PULLER SHIP CHECK
ID: N6817125R0001Type: Special Notice
Overview

Buyer

DEPT OF DEFENSEDEPT OF THE NAVY

NAICS

Ship Building and Repairing (336611)

PSC

NON-NUCLEAR SHIP REPAIR (EAST) (J998)
Timeline
    Description

    The Department of Defense, through the NAVSUP Fleet Logistics Center Sigonella, is soliciting proposals for the maintenance and repair of the USS Lewis B. Puller (ESB-3) as part of the Force Generation Risk Reduction initiative. The procurement encompasses a comprehensive scope of work, including Regular Overhaul Dry Dock (ROH-DD), Lay Berth services, and Mid-Term Availability (MTA), requiring contractors to provide labor, materials, and management to ensure the vessel's operational readiness and compliance with safety regulations. This project is critical for maintaining the integrity and functionality of naval operations, reflecting the government's commitment to maritime safety and efficiency. Interested contractors must submit their proposals by January 8, 2025, and can direct inquiries to Yarinee Tafur at yarinee.tafur.civ@us.navy.mil or Julian Thornton at julian.r.thornton.civ@us.navy.mil.

    Point(s) of Contact
    Files
    Title
    Posted
    The document pertains to the Request for Proposal (RFP) for the maintenance and repair of the USS Lewis B. Puller, emphasizing the requirements for a comprehensive Force Generation Risk Reduction (FGRR) program comprising three phases: Repair Overhaul with Dry Dock (ROH-DD), Layberth, and Maintenance Phase (MTA). It details contractor responsibilities, including performance location in the Sixth Fleet Area of Responsibility (C6F AOR), vessel draft specifications, and subcontractor obligations. Queries from potential contractors regarding operational details, equipment specifications, and crew requirements are addressed, providing clarification on minimum drafts, manning plans, and material provisions. Additionally, the document establishes the necessity of concurrent phases for operational efficiency and outlines specific materials and equipment responsibilities. The document reflects the process of government procurement, emphasizing comprehensive planning and adherence to military standards for vessel maintenance, demonstrating the government's commitment to maintaining naval operational readiness while facilitating contractor engagement through detailed guides and timelines.
    The USS Lewis B. Puller FY25 ROH-DD RFP seeks proposals for the maintenance and repair of the vessel, detailing specific work items and requirements for contractors. Key information includes the place of performance, which falls within the Command Sixth Fleet Area of Responsibility, spanning a significant portion of the Atlantic Ocean. The document outlines technical parameters, such as minimum draft specifications for dry dock arrival and clearance requirements. Contractors are instructed that the government will provide certain materials, while others must be procured by them. Clarifications are offered regarding manning requirements, operational conditions during the Layberth phase, and specific work items that may necessitate scaffolding or additional documentation. A critical detail is that proposals must encompass the entire scope of services, as partial proposals will not be accepted. The document emphasizes clear communication between the government and potential contractors, with a focus on maintaining safety and compliance throughout the work. This RFP reflects the government's commitment to ensuring the effective upkeep of naval vessels while fostering a cooperative atmosphere for bidding and execution.
    The document presents a comprehensive price analysis for the USS Lewis B. Puller's maintenance work scheduled from May to July 2025, focusing on various Work Items (WIs) categorized as Category A and B under the Military Sealift Command (MSC) and Forward Deployed Regional Maintenance Center (FDRMC). It outlines detailed work descriptions, unit measurements, quantities, and estimated prices for essential ship services, including general technical, logistic, and quality assurance requirements, along with specific repair and safety plans. Subcontractor details for significant work items exceeding $50,000 are required, emphasizing compliance with mandatory source verifications. The total project estimates encapsulate essential services like shore power, waste disposal, and information technology support, with an emphasis on maintaining operational safety and efficiency aboard the vessel. The overall fiscal planning adheres to federal standards, ensuring that all categories of work are sufficiently supported and priced, ultimately reflecting the government's commitment to uphold its naval capabilities and operational readiness through strategic maintenance and repair efforts.
    The document outlines a price analysis toolkit related to the USS Puller's lay berth requirements for Military Sealift Command (MSC) work items. It includes various work items categorized with specific descriptions, units, and estimated quantities. Key components consist of general services like mooring, electrical safety procedures, fire protection, and hazardous material disposal, among others. Each work item is associated with a specific unit price, quantity, and total estimated costs, emphasizing necessary subcontractor involvement and material burdens. The purpose of this file is to provide a comprehensive framework for evaluating the costs associated with the operational and technical support services required for the USS Puller. This aligns with the federal government's procurement processes, ensuring transparency and accountability in spending. The document reflects the structured approach of government RFPs, emphasizing detailed project requirements, timeline expectations, and a clear delineation of service needs necessary for effective contract execution amidst considerations of safety and compliance in maritime operations. Overall, it serves as a crucial tool for estimating costs, planning resources, and facilitating contractor selection in federal projects related to naval operations.
    The document outlines the Price Analysis Toolkit for the USS Puller 2026 (ESB-3) Mid Term Availability (MTA) project, detailing various categories of work items, estimated quantities, and costs associated with maintenance and logistics support tasks. Each work item, categorized under standard operations, technical requirements, and safety procedures, specifies the required units, quantities, and options for subcontractors involved in the execution. The document emphasizes compliance with technical standards for ship safety and operational readiness. Key services include general services for the ship, information technology services, logistics support, and hazardous waste disposal, all critical for the vessel's maintenance during the defined period of performance. The financial framework suggests extensive collaboration with subcontractors and adherence to mandatory sourcing requirements for specific labor and material costs, ensuring a thorough overview of anticipated expenses. Overall, the document serves as a comprehensive guide for potential vendors to understand the project's scope and obligations under the federal RFP context.
    The file outlines work specifications for various maintenance and repair tasks aboard the USS Lewis B Puller (ESB 3), managed by the Department of the Navy under specification number BAHR-005-25. It details the procedures and standards required for shipboard operations, including environmental compliance, quality management, and safety protocols. Key tasks include inspections, replacements, and repairs of various ship components, such as deck plating, air conditioning units, and door mechanisms. The document specifies the required materials, references various standards, and emphasizes compliance with established regulations, particularly relating to hazardous materials. Each work item involves a visual inspection, corrective actions, and operational testing to ensure proper functionality and safety. The overarching aim is to uphold the operational integrity and safety of the vessel while adhering to Navy and federal regulations.
    The Engineering Report for the USS Lewis B. Puller (ESB 3) outlines the scope of work required for corrective maintenance and overhaul due to an ROH/DD scheduled for January 2025. Included is an extensive Work Item Index Report detailing various tasks categorized under sections such as General Services, Hull and Structural, Propulsion Machinery, Electrical, Auxiliary Machinery, Habitability Oufitting, HVAC, and Drydocking. The report specifies labor, materials, safety protocols, and compliance with regulatory standards like GTRs and ABS requirements. It emphasizes contractor responsibilities for inspections, waste management, and technical oversight during repairs. Key points include ensuring safe mooring and approach routes for the ship, maintaining compliance with environmental regulations, and identification of hazardous materials. This document serves as a crucial guide for contractors involved in the maintenance of the vessel, emphasizing quality assurance and the importance of detailed planning in maritime operations.
    The document focuses on the MSC Corrective Maintenance Engineering Report for the USS Lewis B. Puller (ESB 3), detailing the maintenance work required as part of the Royal Navy’s repair and overhaul program. It outlines specific work items organized into categories covering general services, hull and structural needs, propulsion machinery, electrical systems, communication and navigation, auxiliary machinery, habitability and HVAC systems, all aimed at ensuring the ship's operational readiness and safety. The document establishes requirements for contractors, including the provision of technical and manufacturer representatives during critical operations, adherence to safety regulations, and ensuring unobstructed access to moorage and berthing areas. Each work item requires compliance with the General Technical Requirements (GTRs) while detailing responsibilities for inspections, material provision, and environmental safety measures concerning hazardous materials. The overall purpose of this document is to ensure that contractors understand the extensive scope and responsibilities of maintaining and refurbishing the vessel, as well as the quality and regulatory standards necessary to complete the work efficiently and safely within the timeframes set by the Military Sealift Command.
    The USS Lewis B. Puller (ESB 3) document outlines the requirements for inspecting, testing, and certifying machinery space cranes and hoists as part of a five-year contract (Contract No. ATP-xxxxxxxx). The main purpose is to ensure the functionality, safety, and compliance of the cranes using references such as ASME guidelines and technical manuals. The inspection covers various components, including operational mechanisms, structural integrity, wiring, and safety features, requiring non-destructive testing where applicable. The document details the process for periodic inspections, maintenance tasks, load testing, and reporting any deficiencies, followed by necessary repairs and certifications. Safety procedures, including lockout/tagout protocols, are emphasized due to the high-voltage electrical systems onboard. The document serves as a crucial guideline for contractors to maintain operational standards while aiming to meet government safety regulations. The thoroughness required in inspections and the need to document findings underline the commitment to ensuring efficient and safe operations of the USS Lewis B. Puller's machinery systems.
    The MSC Corrective Maintenance Engineering Report outlines the general services and requirements for maintenance work on the USS Lewis B. Puller (ESB 3) during its layberth period starting May 1, 2026. The document details the scope, general requirements, and definitions imperative for the contracted work. Key sections include safety measures for high-voltage electrical systems, testing and quality assurance protocols, as well as handling hazardous waste. Each work item is categorized either as nontenderable (NSP) or as a fixed-price contract (Category A). The report emphasizes the contractor's responsibility for protection, inspection, and reporting, ensuring compliance with Marine Technical Standards and government regulations. Emphasis is placed on the importance of providing safe berthing and mooring, along with a documented approach for vessel transit to the contractor's facility. The rigorous guidelines set forth ensure accountability and adherence to safety standards, critical for the operational readiness of the naval vessel. The document serves as a comprehensive guide for contractors, highlighting essential practices and regulatory needs vital for successful project implementation within the scope of federal maritime operations.
    The document details various repair and maintenance tasks for the USS Lewis B Puller (ESB 3), organized under separate item numbers that specify the scope of work and associated requirements. Key items include inspections, environmental compliance, fire protection operations, and management of hazardous materials. Each section outlines specific actions—such as visual inspections, cleaning, repair tasks, and testing protocols—needed to ensure the ship’s operational readiness. The tasks also cover aspects like the maintenance of ventilation systems, confined space entry procedures, and the proper handling of toxic substances in compliance with federal regulations. Emphasis is placed on safety protocols, documentation, and adherence to standards set by international traffic regulations regarding export-controlled data. The overall purpose of the document is to facilitate organized and compliant maintenance work on the USS Lewis B Puller, ensuring all activities meet operational, safety, and environmental standards as dictated by government regulations. This reflects the importance of thorough oversight in federal RFPs concerning maritime safety and maintenance operations.
    The MSC Corrective Maintenance Engineering Report outlines the requirements and procedures for the maintenance and repair work on the USS Lewis B. Puller (ESB 3). It is structured into various sections detailing general services, hull and structural work, electrical systems, auxiliary machinery, and habitability outfitting. Each section comprises specific work items categorized by their nature and requirements, distinguishing between required services and optional enhancements. Key components include the need for compliance with General Technical Requirements (GTRs), safety procedures for handling hazardous materials, and ensuring safe berthing and mooring conditions for the vessel. The document emphasizes the importance of thorough inspections, regulatory compliance, and quality assurance throughout the repair and maintenance processes. Additionally, the roles of technical representatives and government oversight during critical operations are highlighted, ensuring that all maintenance tasks are performed to meet established safety and operational standards. The report serves as a comprehensive guide for contractors participating in the maintenance of the USS Lewis B. Puller, delineating the expectations and required qualifications for successful project execution.
    The government file outlines the requisition for maintenance and repair parts related to the USS Lewis B. Puller, scheduled for availability from May 28, 2025, to July 27, 2025. The document provides details on various components required, including spare parts for hatches, oil rings, hydrostatic hoses, and several types of pipe loops, totaling a significant array of maintenance requirements necessary for the ship’s operational integrity. Port Engineer James Kelley oversees the project, with GFM report submissions scheduled by Debra Daniel for July 25, 2024. The request emphasizes compliance and safety in equipment maintenance, reflecting established protocols as part of federal contract engagements. Tracking and procurement dates for parts reflect careful planning and adherence to military operational readiness standards. The financial breakdown indicates exact pricing for each component, which underlines the emphasis on budget control in government procurements. This thorough documentation serves to ensure that the USS Lewis B. Puller maintains high operational capacity while complying with fiscal and contractual obligations inherent in government RFP processes.
    The MSC Ship Repair Facility Survey document serves as a comprehensive questionnaire for shipyards seeking validation for their repair facilities. It gathers essential details, including the shipyard's contact information, layout, services, launching capabilities, and available equipment. Key sections include specifications on building ways, dry docks, berths, cranes, and principal shops, detailing dimensions, capacities, and certifications. The form requires submitting a plot plan, certified water depth, and records of past repair jobs to affirm the facility's capability. The survey also addresses labor availability, zoning classifications, and navigational restrictions, ensuring compliance with federal standards. Ultimately, this document aims to facilitate the Military Sealift Command's evaluation of ship repair facilities to support government RFPs and grants for ship repairs, ensuring readiness and compliance with operational requirements. The careful collation of data ensures that qualified contractors can be identified for potential government projects, fostering efficient and effective ship repair services.
    The document outlines the pre-proposal inquiry process for Offerors interested in submitting proposals related to solicitation number N6817125R0001. It explicitly states that questions regarding the work requirements or contractual terms must be submitted via email to the designated Contracting Officer and Contract Specialist by December 14, 2024. Verbal inquiries are not permitted. The government retains the discretion to address questions submitted post-deadline. Furthermore, the responses to inquiries will be disseminated to all interested parties through the European Navy Electronic Commerce Online (EuroNECO) website and the System for Award Management (SAM.gov). This procedural guidance underscores the importance of formal communication in the RFP process, ensuring that all Offerors have equitable access to information and clarification regarding the solicitation. Compliance with these guidelines is essential for participation in the proposal process.
    This document is an amendment to a solicitation, specifically modifying Contract ID N6817125R0001. Its primary focus is to extend the due date for Pre-Proposal Questions and to provide responses to those questions. All terms and conditions from the referenced document remain unchanged, and the amendment is part of the procedural requirements typical in government RFPs to ensure clarity and compliance. The contracting officer has indicated that submissions must acknowledge this amendment prior to the specified deadline to avoid rejection. This modification reflects normal operations within federal contracting, highlighting the continuous communication between issuers and potential contractors. The document retains a formal tone consistent with government standards, demonstrating the importance of adhering to procedural integrity in public procurement processes.
    The document is an amendment to a government solicitation, extending the proposal submission deadline from December 20, 2024, to January 8, 2025, and incorporating additional regulations. The solicitation is for a contract with NAVSUP FLC SIGONELLA concerning ship repair work, outlining specific requirements for proposal submissions. Key changes include detailed instructions for electronic submission, specific proposal content, technical capability assessment, and past performance evaluations. Bidders must provide comprehensive documentation including a technical proposal, past performance references, and a pricing volume, all adhering to strict submission guidelines. The evaluation will focus on technical capability, past performance, and price, with emphasis on the understanding of the work package, ability to perform, management control, and quality assurance. The document emphasizes compliance with all requirements and the necessity for an acceptable proposal to be considered for the award. Overall, it underscores the government's commitment to ensuring quality execution of ship repairs through meticulous evaluation of bidders’ proposals.
    The document outlines a Request for Proposal (RFP) for a contract concerning the maintenance and overhaul of the USS Lewis B. Puller (ESB-3). The project involves three phases: Regular Overhaul-Dry Dock (ROH-DD), Lay Berth services, and Mid-Term Availability (MTA). Key responsibilities include providing labor, management, and materials for maintenance, repair, and operational readiness. The contractor is expected to follow numerous Work Item (WI) categories, ensuring compliance with quality and safety regulations. The specified performance location must be within the Commander Sixth Fleet Area of Responsibility, with a projected duration from May 28, 2025, to September 30, 2026. Each phase has well-defined timelines. The contractor must prepare for potential unplanned repairs, with growth work procedures in place. The document also emphasizes the importance of maintaining high safety standards, employing adequate quality control measures, and ensuring effective communication with government representatives. This RFP exemplifies the government's commitment to thorough and efficient naval maintenance while upholding regulatory compliance.
    The document concerns a government request for proposal (RFP) for the Regular Overhaul Dry Dock (ROH-DD) and maintenance of the USS Lewis B. Puller (LBP) by a contractor. It outlines the contract's three phases: Phase 1 involves preparation and execution of the ROH-DD, Phase 2 encompasses the lay berth and industrial assistance, and Phase 3 covers Mid-Term Availability (MTA). The contractor must provide facilities, labor, materials, and management for substantial repairs and maintenance as mandated by the Military Sealift Command (MSC) and Forward Deployed Regional Maintenance Center (FDRMC). The document includes details on pricing, the period of performance from May 2025 to September 2026, and the importance of compliance with Federal Acquisition Regulation clauses. It also specifies that the contractor will be responsible for various work categories, mandatory quality assurance measures, and procedures for managing changes during contract execution. The thoroughness of these requirements highlights the government’s emphasis on maintaining military vessel integrity and readiness while navigating the complexities of federal contracting.
    The government solicitation N6817125R0001 outlines a contract for the Regular Overhaul-Drydock (ROH-DD) and maintenance of the USS Lewis B. Puller (ESB-3). The contract consists of three phases: Phase 1 focuses on ROH-DD, Phase 2 addresses lay berth and industrial assistance, and Phase 3 pertains to mid-term availability (MTA). The contractor is responsible for providing facilities, labor, materials, and management to ensure the smooth execution of maintenance and repair tasks as specified in multiple attachments. The project involves 274 work items categorized into base and optional work items, with an emphasis on quality control, timely completion, and adherence to federal regulations. The contractor must also navigate the complex administrative requirements outlined in the contract, including price proposals for any additional work discovered during the process. The period of performance extends from May 2025 to September 2026, with key responsibilities centered on maintaining safety standards, staff supervision, and effective project management. The aim is to enhance the vessel’s maintenance status while complying with strict federal regulations related to ship repair and maintenance.
    The document outlines a Use and Non-Disclosure Agreement (NDA) related to the USS Lewis B. Puller solicitation (#N6817125R0001). The Recipient, identified as an authorized representative of a company, requests access to restricted technical data from the Government, which is essential for proposal support. The Recipient agrees to strictly limit the use of this data to the proposal and to not disclose it without the Contracting Officer’s permission. Key obligations include establishing security measures to protect the data, accepting it "as is" without modifications, and ensuring that no ineligible individuals access the information. Additionally, the document requires recipients to indemnify the Government against any misuse claims. Non-U.S. companies must adhere to U.S. laws, and all unsuccessful proposal participants must destroy the data post-process. The NDA's terms remain effective until the conclusion of the procurement process, and violations may prompt legal actions by the Government. The agreement encapsulates essential confidentiality and usage stipulations critical for maintaining the integrity of restricted government data within the context of federal solicitations and proposals.
    The document outlines a comprehensive list of maintenance procedures and inspections for various equipment and systems relevant to government operations. It includes details on tasks such as cleaning and inspecting air filters, lubricating mechanisms, inspecting and testing electrical equipment, and servicing various mechanical systems like pumps, motors, and generators. Each procedure is categorized by item number and code, indicating specific tasks, like inspecting gas indicators or cleaning refrigeration systems. The focus of these procedures is to ensure the reliability, safety, and operational efficiency of equipment used in federal and local government facilities. This systematic approach not only facilitates compliance with safety regulations but also prolongs equipment lifespan and minimizes downtime, highlighting the importance of maintaining government assets. Such detailed guidelines are essential for contractors responding to Requests for Proposals (RFPs) or grants, ensuring that these critical maintenance tasks are performed diligently for optimal operational continuity.
    The document outlines a comprehensive list of maintenance procedures for various equipment and systems, highlighting the critical importance of regular inspections, cleaning, and servicing to ensure operational efficiency and safety. Each entry is categorized by an item number, maintenance code, and procedure title, covering areas such as air filters, heat exchangers, pumps, engines, electrical systems, and fire safety equipment. Specific steps for maintenance tasks include inspection, cleaning, testing, lubrication, and replacement of components as needed. This detailed maintenance framework aligns with federal and state standards for equipment upkeep and safety protocols, reflecting a commitment to compliance and operational excellence. The emphasis on systematic maintenance procedures aims to prevent equipment failure, enhance longevity, and ensure safety across operations, crucial for government-funded projects and programs. The structured format facilitates efficient tracking and accountability of maintenance activities, underscoring the necessity for rigorous oversight in government operations.
    The document outlines the Quality Assurance Checklist solicitation for the maintenance and repair of the USS Lewis B. Puller (ESB-3) during its scheduled maintenance periods in 2025 and 2026. It specifies the required documentation for contractors to demonstrate compliance with Work Package specifications as per FDRMC Code 300 QA. Key submissions include a Quality Manual, lists of qualified inspectors, access control plans, calibration records for testing equipment, various certifications, and a Test and Inspection Plan (TIP). The TIP must detail scheduled inspections, test types, and relationships to significant project milestones, ensuring thorough oversight and government notification at key inspection points. Essential inspection criteria, including acceptance standards and documentation requirements, are emphasized to maintain quality during the contract execution. Contractors must also prepare to update the TIP in real-time as work progresses. This structured approach aims to ensure that maintenance activities align with regulatory standards and best practices, ultimately contributing to the efficiency and safety of naval operations.
    The document pertains to the Foreign National Access Control Plan for the USS Lewis B. Puller Force Generation Risk Reduction (FGRR) project, emphasizing security protocols for contractors and foreign national personnel. It outlines specific requirements ensuring rigorous identification and control measures, such as the use of recognizable badges and strict accountability for lost or damaged identification. Contractors must comply with entry control procedures, including potential searches and the obligation to stay with escorts at all times. Background checks are mandatory for all contracted personnel, and any foreign national data changes must be reported to the Contract Administration Officer. Furthermore, it clarifies that without written authorization from the commanding officer, foreign nationals will be denied access, and noncompliance with the Access Control Plan (ACP) could lead to contract termination. The document underscores the U.S. government's authority to cancel contracts deemed not in its best interest and holds contractors accountable for the actions of their subcontractors. Overall, the document serves to enhance security measures for naval operations and ensure compliance with federal regulations regarding foreign national access.
    The document outlines the regulations for granting foreign nationals access to U.S. Navy vessels undergoing construction, conversion, overhaul, or repair. Access is forbidden without approval from the Contracting Officer's Representative (COR), who will assess requests based on national interest. Contractors must submit an Access Control Plan (ACP) detailing employee identification systems, background checks, and compliance measures for foreign nationals. The ACP must include employee data such as citizenship and job position and ensure subcontractor adherence to these guidelines. The contractor is accountable for security and must prevent unauthorized access by foreign nationals. Violation of access protocols can lead to contract termination. Overall, the document emphasizes strict security measures regarding foreign national employment in sensitive naval operations, reinforcing the necessity for compliance and oversight to protect government interests.
    The USS Lewis P. Puller (ESB 3) Attachment S-5 outlines the necessary past performance and Contractor Performance Assessment Reporting System (CPARS) requirements for offerors involved in contracts related to the vessel. Contractors must provide essential details such as contract reference numbers, completion status of CPARS, contract types, total award amounts, performance periods, and points of contact from the procuring agency. Additionally, offerors need to describe the work performed, highlighting similarities with the current work specification package. Key focus areas include ship systems, hull/structural repairs, preservation efforts, dry-docking activities, materials control, quality assurance, facilities utilized, management of the contract, scheduling, and any growth or new work during the contract's duration. This document is vital for assessing the contractor's relevant past performance, critical for making informed decisions in the federal and local procurement processes.
    The NAVSUP Fleet Logistics Center Sigonella is soliciting offers for ship repair and maintenance on the USS Lewis B. Puller (ESB-3) utilizing a dry-dock. This document outlines the evaluation criteria for past performance, requiring offerors to have their current or former customers complete a Past Performance Questionnaire. Key details include the ship's dimensions, anticipated arrival conditions, and instructions for submitting the questionnaire, emphasizing the importance of timeliness and accuracy in responses. The form is divided into sections for both the offeror and the evaluator, soliciting information on contract performance, customer satisfaction, responsiveness, cost control, and overall contractor reliability. The collected feedback will inform the source selection decision while maintaining confidentiality about individual responses. The questionnaire aims to ascertain the offeror's capability to meet contract requirements effectively, ensuring the Department of the Navy engages only with qualified contractors for this critical maintenance task.
    The document outlines comprehensive requirements for contractors regarding fire and safety plans in a shipyard context. It includes a detailed list of responsibilities and protocols mandated by federal regulations, specifically referencing various sections of 29 CFR concerning fire safety. Key points include the necessity for a written Fire and Safety Plan, detailing the contractor's responsibilities, liaison with local fire departments, and emergency response strategies for fire, flooding, and medical situations. Additionally, the plan must describe equipment measures such as portable fire extinguishers and mitigation actions for fixed fire suppression systems. Training requirements for shipyard personnel and specific safety procedures for disabling fire systems are also outlined. The document serves as a crucial framework aimed at ensuring compliance with regulatory standards, promoting safety, and facilitating effective emergency response in shipyard operations. Ultimately, it reflects the government's commitment to maintaining rigorous safety protocols in operational environments involving potential fire hazards.
    The MSC Dry Dock Evaluation document serves as a standardized form for evaluating shipyards and their dry docking facilities for the Military Sealift Command (MSC). It is divided into several parts: Part A is filled out by MSC, detailing the characteristics of the ship, while Part B is to be completed by all shipyards, providing specifics on the dry dock including its certification status, dimensions, and available services. Key elements include electrical power supply, sewage connections, fire main systems, fresh water, and safety response plans. The form also requires shipyards to report on their experience, insurance status, past incidents, and measures taken to prevent future accidents. Compliance with certain safety standards is emphasized throughout, particularly for dry docks not certified by recognized agencies. Ultimately, the document ensures that shipyards meet necessary criteria before being selected for dry docking operations, reinforcing safety and operational integrity within federal and military contexts. The form’s structure highlights the importance of detailed data collection for efficient decision-making regarding ship repairs and maintenance.
    The Vessel Status Report for the General Cargo Vessel "Lewis B Puller," dated May 3, 2024, outlines the operational status and findings from various surveys conducted on the vessel owned by the Military Sealift Command. The report confirms that the vessel is active and classed, providing a comprehensive overview of its compliance with safety and regulatory standards. Key sections include the vessel's specifications, survey summaries for class, statutory, and special service surveys, alongside detailed findings regarding the condition of critical systems and necessary modifications. Open conditions highlight outstanding recommendations, such as updates required for fire suppression systems, ballast piping repairs, and the installation of alarms in refrigerated containers. All survey tasks have established due dates, many extended due to operational urgency related to military missions. Recommended actions focus on ensuring modifications, final tests, and repairs are conducted per regulatory standards. The report reflects the commitment to maintaining maritime safety through ongoing inspections and adherence to the American Bureau of Shipping protocols, amidst challenges faced in the region impacting maintenance schedules. This documentation is vital for ensuring operational readiness and compliance with maritime safety statutes.
    Similar Opportunities
    USNS GUADALUPE ROH/DD Solicitation
    Active
    Dept Of Defense
    The Department of Defense, through the Department of the Navy's Military Sealift Command in Norfolk, is soliciting proposals for the USNS GUADALUPE FY25 Repair and Overhaul/Deferred Maintenance (ROH/DD) project. This procurement aims to secure services related to the repair and maintenance of the USNS GUADALUPE, which is crucial for maintaining the operational readiness of the Navy's fleet. The selected contractor will be responsible for ensuring that the vessel meets all necessary standards and requirements for continued service. Interested parties can reach out to Caren Edanol at caren.l.edanol.civ@us.navy.mil or by phone at 757-341-6709 for further details regarding the solicitation process.
    FY25 USS OAK HILL (LSD 51) Docking Selected Restricted Availability (DSRA).
    Active
    Dept Of Defense
    The Department of Defense, through the Naval Sea Systems Command (NAVSEA), is soliciting proposals for the FY25 USS OAK HILL (LSD 51) Docking Selected Restricted Availability (DSRA). This procurement aims to secure a contractor capable of executing necessary repairs and alterations to ensure the ship's operational readiness following a 20-month availability period, scheduled from August 2025 to February 2027. The services required include comprehensive maintenance tasks such as the overhaul of propulsion engines and upgrades to onboard systems, reflecting the Navy's commitment to maintaining its maritime capabilities. Interested contractors must submit their proposals by January 8, 2025, with the anticipated contract award date set for May 2025. For further inquiries, potential offerors can contact Jourdan Jenkins at jourdan.e.jenkins.mil@us.navy.mil or Brian Han at brian.s.han3.civ@us.navy.mil.
    USS NEW YORK (LPD 21) FY25 Selected Restricted Availability
    Active
    Dept Of Defense
    The Department of Defense, through the Naval Sea Systems Command (NAVSEA), is soliciting proposals for the execution of the FY25 Selected Restricted Availability (SRA) for the USS NEW YORK (LPD 21). This procurement involves comprehensive maintenance, modernization, and repair services, necessitating a contractor with substantial facilities and resources capable of managing complex ship maintenance tasks. The contract is expected to be awarded to a single contractor, with the work anticipated to commence in September 2025 and conclude by September 2026. Interested parties must register in the System for Award Management (SAM) and may contact Jhalin Anderson at jhalin.d.anderson.civ@us.navy.mil for further details and access to solicitation attachments.
    USS SOMERSET (LPD 25) FY25 Docking Selected Restricted Availability (DSRA)
    Active
    Dept Of Defense
    The Department of Defense, through the Naval Sea Systems Command (NAVSEA), is soliciting proposals for the FY25 Docking Selected Restricted Availability (DSRA) of the USS SOMERSET (LPD 25). This contract will encompass a comprehensive range of maintenance, modernization, and repair services, necessitating a contractor with substantial facilities and skilled personnel capable of managing multiple facets of ship maintenance and repair. The solicitation is open to contractors on the West Coast, with a single contract expected to be awarded to one qualified bidder. Interested parties should contact Chika Chikezie at chikachasi.a.chikezie.civ@us.navy.mil or Courtney Schlusser at courtney.j.schlusser.civ@us.navy.mil for access to necessary attachments and further details, ensuring to include their SAM Unique Entity Identifier (UEI) number in their requests.
    USS PEARL HARBOR (LSD 52) FY26 DSRA AND USS O’KANE (DDG 77) FY26 DSRA
    Active
    Dept Of Defense
    The Department of Defense, through the Naval Sea Systems Command (NAVSEA), is conducting market research for potential contractors to perform Drydocking Selected Restricted Availability (DSRA) maintenance and modernization on the USS Pearl Harbor (LSD 52) and USS O’Kane (DDG 77) during fiscal year 2026. The procurement aims to identify industry capabilities for extensive repair and technological upgrades, including structural welding, electrical, and piping systems, with a focus on small business participation. The anticipated work includes approximately 183,000 man-days for the USS Pearl Harbor and 124,000 man-days for the USS O’Kane, emphasizing the importance of maintaining naval fleet readiness and modernizing aging vessel infrastructure. Interested parties must submit their letters of interest by 4 PM Local Time on December 23, 2024, to the designated contacts, Courtney Schlusser and Meghan Walsh, with further details available in the sources sought announcement.
    USNS ROBERT E. PEARY FY25 MTA
    Active
    Dept Of Defense
    The Department of Defense, through the Department of the Navy, is seeking proposals for the mid-term availability of the USNS ROBERT E. PEARY (T-AKE 5), with a contract performance period anticipated from July 5, 2025, to August 26, 2025. The selected contractor will be responsible for preparing and executing the necessary work as outlined in the solicitation and work item package, which will be made available on or about January 2, 2025. This contract is crucial for maintaining the operational readiness of the vessel and is set aside exclusively for small businesses, reflecting the agency's commitment to fostering competition among smaller firms. Interested parties should contact Cameron Alvey at cameron.s.alvey.civ@us.navy.mil or 757-341-6232 for further details, and must complete a Non-Disclosure Agreement to access sensitive technical data related to the project.
    USS HOWARD DDG-83 FY25 5C1 SRA BUNDL2 (Yokosuka Japan)
    Active
    Dept Of Defense
    The Department of Defense, through NAVSUP Fleet Logistics Center Yokosuka, is soliciting proposals for maintenance and repair work on the USS Howard (DDG-83) as part of the Fiscal Year 2025 Selected Restricted Availability (SRA) Bundle 2. The project involves comprehensive cleaning, inspection, repair, and preservation of various fuel tanks aboard the vessel, with a focus on ensuring structural integrity and compliance with safety and environmental regulations. This maintenance is critical for maintaining the operational readiness and safety of naval vessels, particularly in relation to fire zone boundaries and the use of non-flammable materials during repairs. Interested contractors must submit their proposals by January 17, 2025, with the work scheduled to commence on April 7, 2025, and conclude by November 17, 2025. For further inquiries, potential bidders can contact Takayo Shiba at takayo.shiba.ln@us.navy.mil or Ai Gillard at ai.gillard.ln@us.navy.mil.
    N00024-25-R-4421 USS THE SULLIVANS (DDG 68) FY25 DSRA
    Active
    Dept Of Defense
    The Department of Defense, through the Naval Sea Systems Command (NAVSEA), is soliciting proposals for the FY25 Docking Selected Restricted Availability (DSRA) of the USS THE SULLIVANS (DDG 68). This contract will encompass a comprehensive range of maintenance, modernization, and repair services, necessitating a contractor with substantial facilities and resources capable of managing complex ship maintenance tasks. The procurement is significant for ensuring the operational readiness of naval vessels and will be awarded to a single contractor, with the anticipated contract award occurring around June 2025. Interested parties must register in the System for Award Management (SAM) and can request additional information and attachments by contacting Zachary Sullivan or Brian Romano via email.
    DRYDOCK: USCGC FREDERICK HATCH DD FY25
    Active
    Homeland Security, Department Of
    The Department of Homeland Security, specifically the U.S. Coast Guard, is seeking qualified contractors for the drydocking and maintenance of the USCGC Frederick Hatch (WPC-154) for Fiscal Year 2025. The contract involves comprehensive repairs, including tank cleaning, preservation of hull and superstructure, and the replacement of degraded components, with work expected to be performed at the contractor's facility. This maintenance is crucial for ensuring the operational readiness and safety of the vessel, which plays a vital role in the Coast Guard's mission. Interested contractors must submit their proposals by December 27, 2024, at 12:00 PM EST, and can direct inquiries to Torrie Jones at Torrie.M.Jones@uscg.mil or Jaime R. Smith at Jaime.R.Smith@uscg.mil.
    USS HOWARD DDG83 FY25 5C1 SRA Bundle 4 (YOKOSUKA, JAPAN)
    Active
    Dept Of Defense
    The Department of Defense, through NAVSUP Fleet Logistics Center Yokosuka, is soliciting proposals for the repair and maintenance of the USS Howard (DDG-83) as part of the FY25 5C1 SRA Bundle 4, to be conducted at Yokosuka Naval Base in Japan. The procurement encompasses a comprehensive package of work items, including inspections, repairs, and preservation tasks across various systems and compartments of the vessel, with a focus on maintaining operational readiness and safety standards. This initiative is critical for ensuring the integrity and functionality of naval assets, reflecting the Navy's commitment to rigorous maintenance practices. Interested contractors must submit their offers by January 20, 2025, with the performance period scheduled from April 7, 2025, to November 17, 2025. For further inquiries, contact Kumi Matsumoto at kumi.matsumoto.ln@us.navy.mil or Ai Gillard at ai.gillard.ln@us.navy.mil.