Installation of Bedrock Wells at Booster Neutrino Beam (BNB)
ID: ESH_351002_DAType: Solicitation
Overview

Buyer

ENERGY, DEPARTMENT OFENERGY, DEPARTMENT OFFERMILAB - DOE CONTRACTORBatavia, IL, 60510, USA

NAICS

All Other Specialty Trade Contractors (238990)

PSC

CONSTRUCTION OF OTHER NON-BUILDING FACILITIES (Y1PZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)
Timeline
    Description

    The Department of Energy, through the Fermi National Accelerator Laboratory (Fermilab), is soliciting proposals for the installation of three bedrock monitoring wells at the Booster Neutrino Beam (BNB) facility located in Batavia, Illinois. The project requires the selected subcontractor to provide all necessary supervision, labor, materials, tools, and equipment to install the wells to a depth of approximately 67 feet below ground surface, ensuring compliance with detailed technical specifications and safety protocols. This initiative is crucial for monitoring potential contamination from tritiated water produced by high-energy physics experiments, reflecting the government's commitment to environmental safety and regulatory compliance. Proposals are due by February 5, 2025, at 5 PM CT, and interested parties can contact Danielle Amico at damico@fnal.gov or by phone at 630-840-3207 for further information.

    Point(s) of Contact
    Files
    Title
    Posted
    The Request for Proposal (RFP) ESH_351002_DA seeks submissions for the installation of bedrock wells at the Booster Neutrino Beam (BNB) facility, with a focus on small business participation under NAICS code 238990. The document outlines the invitation process, pre-proposal meetings, submission requirements, and a detailed construction schedule that starts with a Notice to Proceed and culminates with project completion in 75 days. Proposals are evaluated on a Lowest Price Technically Acceptable basis, requiring both technical and business management components. Specific qualifications, including extensive drilling experience and required certifications, are outlined for key personnel. Additional compliance measures such as the Davis-Bacon Act regarding wages, a Buy American requirement for construction materials, and bonding and insurance stipulations are included in the proposal guidelines. The proposal due date is set for February 5, 2025, with considerations for exceptions and regulations to ensure proper documentation and accessibility during site visits. This RFP exemplifies government procurement efforts aimed at engaging small businesses while adhering to federal labor standards and construction regulations.
    The document is a Request for Proposal (RFP) issued by Fermilab regarding the installation of Bedrock Wells at the Booster Neutrino Beam (BNB) facility. It specifies that interested bidders must provide a comprehensive proposal that includes all necessary costs associated with the labor, materials, equipment, and services required for the project. The proposal must be valid for 90 days following the submission deadline unless a longer period is specified by the offeror. It includes sections for the proposing company’s name, signature, and contact information. The RFP underscores the importance of adhering to specifications and documentation, indicating Fermilab’s commitment to a detailed and regulated bidding process for this significant undertaking. Overall, this document serves as a formal solicitation for bids to ensure proper installation of critical infrastructure at the facility.
    The document provides instructions for attending a Pre-Proposal Meeting and Site Visit related to an RFP at Fermilab, scheduled for January 7, 2025. Attendees must register in advance, filling out a business visitor access request form by December 31, 2024, preferably as U.S. citizens, due to security protocols. Directions to the Aspen East Welcome & Access Center and MI-12/BNB building are included, with detailed instructions for both the West and East Gate entrances. Key steps for access include approval by the Point of Contact and, for non-U.S. citizens, additional verification by the Foreign National Access Program. Successful applicants will receive further instructions via email concerning their access status. On-site visitors need to present valid identification and will collect their visitor badges upon arrival. The document emphasizes the need for accurate completion of the access request form, detailing personal and contact information requirements. Overall, it underlines the importance of compliance with visitor procedures for security and access management in the context of federal contracting processes.
    Fermi National Accelerator Laboratory (Fermilab) is soliciting bids from qualified drilling contractors for the installation of three bedrock monitoring wells in Batavia, Illinois. These monitoring wells, to be installed to a depth of approximately 67 feet, will serve to monitor potential contamination from tritiated water produced by high-energy physics experiments at the facility. The contractor will be required to mobilize equipment, hand-clear drilling locations, and execute drilling and monitoring well construction according to defined protocols. The project involves several stages, including site preparation, drilling to bedrock, installing a steel casing, grouting, and completing the wells with protective structures. Key responsibilities will include managing drilling fluids and investigation-derived waste, coordinating necessary permits, and ensuring personnel safety through appropriate protective equipment. The successful bid will require adherence to FRA's specifications regarding drilling methods and reporting requirements. This RFP reflects Fermilab's commitment to environmental safety and regulatory compliance in its operational procedures.
    The document outlines the general requirements for the installation of bedrock wells at the Booster Neutrino Beam (BNB) site at Fermilab. It serves as a comprehensive guide for subcontractors, detailing responsibilities, safety measures, and operational protocols to ensure project success. Key elements include the necessary supervision, labor, and materials required for constructing groundwater monitoring wells to assess potential tritium migration. The subcontractor must comply with environmental, safety, and health standards throughout the installation process. Specifics include site location instructions, project descriptions, condition adherence, and documentation requirements for transparency and accountability. Additionally, it emphasizes the importance of quality control, the procurement of materials adhering to the Buy American Act, and coordination with the Fermilab Construction Management Office. The document's structured format includes general requirements, execution details, and attachments for further clarification. Ultimately, these guidelines ensure the project's completion within established timelines and regulatory expectations, illustrating the federal government's commitment to environmental monitoring and safety at Fermilab.
    The FRA ES&H Requirements document outlines the Environment, Safety, and Health (ES&H) protocols mandated by the Fermi Research Alliance for subcontractors engaged in construction activities at Fermilab. The main focus is to ensure the safety of all stakeholders, including workers and the public, while adhering to federal and state regulations. Key sections include the ES&H policy, applicable codes and regulations, training requirements, and incident reporting protocols. Subcontractors must submit comprehensive safety plans before work commencement, ensuring hazard analyses and training records are established. It emphasizes the importance of maintaining a safe work environment through proper equipment, regular inspections, and maintaining incident documentation. Specific policies on personal protective equipment and emergency response plans are also detailed. The document functions as both a guideline and a compliance framework for subcontractors to follow, reflecting the federal government’s commitment to environment, safety, and health management in construction projects. Ensuring adherence to these guidelines mitigates risk and enhances overall project safety and environmental responsibility.
    The document outlines the General Terms and Conditions for construction contracts between Fermi Research Alliance, LLC (FRA) and subcontractors under the U.S. Department of Energy's Prime Contract. It details the scope of the subcontract, definitions, payment terms, roles and responsibilities, changes, modifications, indemnifications, insurance requirements, and compliance with laws and regulations. Key aspects include the Subcontractor’s obligation to perform work in compliance with specifications, maintain licenses, and provide timely progress payment requests that are substantiated through detailed breakdowns. Termination rights for breaches, including non-compliance with safety regulations, are emphasized. The document establishes a clear procedure for handling changes, including requisite notice and potential adjustments in cost and time allowances. Furthermore, it mandates adherence to the Davis-Bacon Act regarding wages and includes various clauses from federal acquisition regulations, ensuring rigorous oversight and accountability. The overarching purpose is to govern the contractual relationship between FRA and subcontractors while ensuring alignment with federal regulations, protecting the interests of the government and standardizing project execution across contractual agreements.
    The document outlines the insurance requirements for construction subcontracts at the Fermi National Accelerator Laboratory (Fermilab). It stipulates that subcontractors must procure and maintain specified insurance coverages through reputable insurers before commencing work. The key coverages include Commercial General Liability at $1 million each occurrence and an aggregate of $2 million, Automobile Liability coverage of $1 million, Worker’s Compensation as per Illinois law, and Contractor’s Pollution Liability at $1 million. Additional supplemental coverages may include Aircraft Liability, Builder's Risk, and Installation floater insurance. All policies exclude certain claims and must name specific entities, including the Fermi Research Alliance, LLC, as additional insureds. Subcontractors are also responsible for ensuring that their sub-subcontractors adhere to similar insurance requirements. The document emphasizes indemnification responsibilities for non-compliance with these insurance requirements. Overall, this text serves as part of federal and local RFP processes, ensuring that contractors are adequately insured to mitigate risks associated with construction projects at a federally funded laboratory.
    The document serves as a bid bond form used in government contracting, specifically for proposals submitted to Fermi Research Alliance, LLC. The principal (the bidder) is required to provide pertinent information, including their legal name, organizational type, and incorporation details. The form outlines the conditions under which the bond is valid, specifying that it becomes void if the principal executes further contractual documents and secures required bonds within specified timeframes upon bid acceptance. Additionally, provisions allow for extensions up to 60 days without impairing the surety's obligations. Key details include the penal sum of the bond, which is tied to the bid price, and the responsibilities of the sureties, who must be approved entities. Multiple sureties can be involved, and each must declare its liability limit and execute the bond accordingly. The document emphasizes the bond's role in protecting the government’s interests during the bidding process and ensures that necessary steps are taken if the bid is accepted. The instructions elaborate on the bond execution requirements, underscoring the importance of correct procedures to uphold legal obligations in federal contracting.
    The document outlines the payment bond requirements under federal law, specifically referencing the obligations of the Principal and Surety in relation to subcontracting work. It highlights that the bond secures payment to persons providing labor and materials as part of a subcontract with Fermi Research Alliance, LLC. The Principal and Surety are jointly accountable for the penal sum listed in the bond, which is applicable if the Principal fails to pay those owed for their contributions. Key components of the bond include filling out the legal name and address of the Principal, identifying the type of organization, and listing Sureties with their liability limits. Conditions state that the bond is void if payment obligations are met promptly to all involved parties. The document includes instructions for execution, emphasizing the need for corporate seals and proofs of authority for individual signers. Overall, this standard form serves as a critical tool in ensuring compliance with payment obligations in the context of federal RFPs and grants, protecting subcontractors and suppliers engaged in federally funded projects.
    The document is a Performance Bond form required for subcontracts associated with Fermi Research Alliance, LLC. Its primary purpose is to ensure that the Principal, who is the contractor, adheres to the terms of the subcontract with the government, specifically the U.S. Government. The bond stipulates conditions that must be met for the obligation to be void, including the performance of all duties and payment of taxes relating to the subcontract. Critical sections of the bond include the identification of the Principal and Surety(ies), specifying the penal sum, and detailing the responsibilities of all parties involved. It outlines conditions under which the bond remains in effect, emphasizing the necessity for compliance with all contractual terms and any modifications without requiring notification to Sureties. The instructions provided ensure accurate completion of the form by the Principal, such as specifying corporate identities and signing requirements, which can include individual and corporate sureties, and the inclusion of seals where needed. This formal documentation plays a crucial role in fulfilling government contractual requirements and mitigating risk associated with subcontract performance in federally funded projects.
    The Fermilab ES&H Manual outlines requirements for subcontractor injury and illness data reporting. This questionnaire collects essential safety-related information from subcontractors, including the company's injury experience over the last three years, workers' compensation details, and records of incidents reported via the OSHA 300 log. Subcontractors must provide metrics such as Total Recordable Cases, Total Recordable Case Rate, Days Away from Work, and details of any workplace fatalities. Additionally, they are required to compute averages for these data points over the specified years. The form emphasizes the importance of accurate safety representation, suggesting that individuals knowledgeable about safety should complete it. There is a strong focus on compliance, record-keeping, and maintaining safety standards critical for government contracts and grants, underlining Fermilab's commitment to safe operational practices for all engaged subcontractors. Properly filling out this questionnaire is essential for assessing safety performance and risk management in alignment with federal guidelines.
    The document pertains to a subcontract award under a prime contract related to the installation of bedrock wells at the Booster Neutrino Beam (BNB) site near Batavia, Illinois. It outlines necessary information for both the prime contractor, Fermi Research Alliance LLC, and the subcontractor, detailing contractual obligations and compliance with labor standards. Included are stipulations about the performance of work, safety requirements, and acknowledgment of any intermediate subcontractors. The document certifies that essential labor clauses from the prime contract are applicable to the subcontractor's responsibilities. Compliance requirements such as the Contract Work Hours and Safety Standards Act are also highlighted. The significance of the submission lies in its adherence to federal regulations outlined in the Paperwork Reduction Act, as indicated by the OMB Control Number for tracking and managing federal documentations. Overall, it encapsulates the crucial role of contractual compliance in federal projects and outlines the responsibilities expected from all parties involved in this government-funded initiative.
    The Proposal Certifications document (PUR-466) is a formal guideline for offerors participating in government solicitation processes, ensuring compliance with various federal regulations. It outlines mandatory certifications based on the proposal's dollar value, with specific emphasis on compliance with export/import controls, the Buy American Act, independent pricing, and anti-trafficking regulations. Key sections require offerors to disclose information regarding dual-use military items, compliance with domestic material preferences, and certifications against kickbacks and influence in federal transactions. For proposals exceeding $150,000, independent pricing determinations and responsibility matters must be certified. Additionally, significant proposals (≥$500,000) demand compliance plans for trafficking in persons. The document reinforces the importance of transparent and ethical practices in federal contracting. It also serves as a crucial mechanism to gather necessary information from potential contractors, ultimately aiding government decision-making in awarding contracts. By mandating these certifications, the government aims to uphold standards of integrity, promote accountability among contractors, and ensure that taxpayer funds are utilized appropriately.
    The Subcontractor Annual Representations & Certifications (SARC) form by Fermi Research Alliance, LLC is designed to ensure compliance with federal contracting requirements for subcontractors. The form collects essential business information, including ownership status, accounting systems, and federal registration details. It mandates specific certifications on aspects such as executive compensation, affirmative action, and compliance with export/import regulations. The document emphasizes the importance of notifying FRA of any changes in the information provided within 15 days. Key sections include representations regarding business size classifications, executive compensation disclosure requirements, and adherence to anti-trafficking laws. The form must be completed in its entirety for validations related to government contracts and subcontracts. Overall, the SARC form serves as a critical compliance tool, ensuring subcontractors meet federal regulations and standards necessary for conducting business with U.S. government agencies. Its comprehensive structure addresses transparency, ethical operations, and responsible business practices crucial for maintaining integrity within federal contracts.
    The document outlines various federal and state/local Requests for Proposals (RFPs) and grants, primarily focusing on essential guidelines and procedures for agencies seeking funding. It discusses the significance of adhering to specific federal standards and local regulations when preparing grant applications. Key points include the necessity for thorough documentation, compliance with environmental and safety regulations, and collaboration among different government entities. Each proposal must highlight the project's objectives, budgeting strategies, and expected outcomes to secure funding effectively. The document serves as a crucial resource for agencies aiming to participate in federal grant programs, emphasizing the importance of transparency, accountability, and effective project management to achieve desired goals. This framework ensures that public funds are utilized efficiently while addressing community needs through various funded initiatives.
    The subcontract document outlines a firm fixed-price agreement between Fermi Research Alliance, LLC (FRA) and a subcontractor for the construction of bedrock wells at the Booster Neutrino Beam (BNB) facility. It establishes the scope of work, requiring the subcontractor to provide all labor, materials, and equipment necessary for the project located at the Fermi National Accelerator Laboratory in Batavia, Illinois. The work must adhere to high professional standards and safety requirements specified in incorporated documents. The duration for project completion is to be specified upon receipt of the Notice-to-Proceed. Compensation terms include monthly progress payments based on a FRA-approved schedule, with specific documentation required for invoice submissions. Payments include retention clauses and stipulate conditions under which payments may be withheld to protect FRA from potential losses. Additionally, the document outlines the procedures for subcontract administration, communication, and completion of required reports, including monthly progress updates. It integrates an array of relevant documents, including health and safety requirements and wage rates, emphasizing compliance with federal guidelines. This subcontract ultimately reflects the government’s structured approach to facilitate construction projects while ensuring oversight and accountability within federal grants and contracts.
    The document outlines the geographical layout of the BNB / MI-12 Building Area, detailing its location through a map which includes key streets, bodies of water, and significant landmarks. The area encompasses various ponds and ditches, such as Casey's Pond and Kress Creek, along with vital roadways like Wilson Street and Butterfield Road. This visual representation serves as an essential component for understanding land utilization and planning within the context of federal RFPs and grants. The map likely aids stakeholders in assessing proximity, access, and environmental considerations pertinent to potential project proposals. This document contributes to broader governmental efforts to streamline processes for infrastructure developments or environmental projects in the area.
    The document outlines the proposed locations for monitoring wells related to environmental assessment at the Fermi National Accelerator Laboratory in Kane County, Illinois. It discusses the establishment of both existing glacial till monitoring wells and new proposed bedrock monitoring wells. The measurements indicate specific distances in both miles and kilometers, providing a detailed geographical context for the monitoring efforts. The project, associated with federal and possibly state/local RFPs or grants, is likely aimed at ensuring environmental compliance and evaluating groundwater conditions. The positioning of these wells is crucial for understanding hydrological interactions and potential contamination, supporting ongoing scientific research and safety protocols at the facility. This initiative reflects the government’s commitment to environmental stewardship and regulatory adherence in scientific endeavors.
    The Illinois Environmental Protection Agency’s Well Completion Report contains essential information regarding the drilling, construction, and completion of a well in Illinois. The document includes a structured format detailing the site specifications such as the site name, county, coordinates, well number, drilling contractor, and consulting firm. Key sections outline annular space details, including elevations and depths related to various well components, as well as specifications about the surface seal and sealant types. Further sections provide comprehensive data on casing measurements and well construction materials, emphasizing the selection of specific materials for protective casing, riser pipe, and screens. The report serves as a crucial tool for ensuring compliance with state regulations and standards for environmental protection. By detailing the drilling methods and materials used, the report aids in monitoring the integrity and safety of groundwater resources in Illinois. Overall, this report is instrumental for state-level assessments and grants related to environmental protection initiatives in well construction and ground water management.
    The document outlines the requirements for submitting proposals in response to a federal Request for Proposal (RFP) related to environmental drilling services. It consists of two primary parts: the Technical Proposal and the Business Proposal. In the Technical Proposal, offerors must demonstrate a minimum of five years of experience in environmental drilling and provide examples of three relevant projects completed within the last decade. Key personnel, such as the Lead Driller and Driller’s Helper, need to meet specific experience criteria and training requirements, notably holding current OSHA HAZWOPER certifications. The Business Proposal includes a firm fixed price bid, mandatory submission of a bid guarantee amounting to 20% of the proposal price, and completion of several forms including the Subcontractor Annual Representations & Certifications (SARC) and Proposal Certifications (Form PUR-466). Additional required documents include data on past workers' compensation, safety certifications, and insurance verification. Overall, this solicitation seeks qualified contractors with significant expertise in environmental drilling, ensuring compliance with safety regulations and demonstration of proven project success.
    Lifecycle
    Title
    Type
    Similar Opportunities
    Fermilab LBNF NSCF Construction - Beamline Complex RFP
    Active
    Energy, Department Of
    The Department of Energy, through the Fermi Research Alliance, LLC, is soliciting proposals for the construction of the Long-Baseline Neutrino Facility (LBNF) Near Site Conventional Facilities Beamline Complex in Batavia, Illinois. The project aims to select a subcontractor to provide comprehensive construction services, including site preparation, structural work, and installation of various systems necessary for the facility's operation. This initiative is critical for advancing neutrino research and enhancing scientific infrastructure at Fermilab, reflecting the federal government's commitment to supporting significant scientific endeavors. Proposals are due by February 12, 2025, with a mandatory pre-proposal conference scheduled for July 11, 2024; interested parties can contact Brian Quinn at bquinn@fnal.gov for further details.
    Fermilab LBNF NSCF Construction - Near Detector Complex RFP
    Active
    Energy, Department Of
    The Department of Energy, through the Fermi Research Alliance (FRA), is seeking a qualified subcontractor for the construction of the Near Detector Complex as part of the Long-Baseline Neutrino Facility (LBNF) project located in Batavia, Illinois. The procurement involves comprehensive construction services, including the development of a service building, shafts, and utilities necessary to support the LBNF Near Detector, with a focus on adhering to strict safety and environmental regulations. This project is critical for advancing neutrino research and requires contractors to demonstrate relevant experience and compliance with federal guidelines, including the Buy American Act. Proposals are due by February 7, 2025, and interested parties should direct inquiries to Brian Quinn at bquinn@fnal.gov or Craig Schmitz at schmitzc@fnal.gov.
    LBNF Argon Receiving System
    Active
    Energy, Department Of
    The Department of Energy, through Fermi Research Alliance LLC, is soliciting proposals for the engineering, manufacturing, installation, and testing of an Argon Receiving System for the Long-Baseline Neutrino Facility (LBNF) located at the Sanford Underground Research Facility (SURF) in Lead, South Dakota. This system is critical for the delivery and processing of liquid argon (LAr), which will support the Deep Underground Neutrino Experiment (DUNE) by facilitating the storage, vaporization, and transfer of argon to underground detectors. The project aims to enhance scientific research capabilities in neutrino physics, with a focus on safety, quality, and compliance with federal regulations. Proposals are due by January 8, 2025, and interested parties should direct inquiries to Jeremy R. Duncan at jeremyd@fnal.gov or call 865-300-0443.
    LBNF Argon Distribution Equipment IDIQ
    Active
    Energy, Department Of
    The Department of Energy, through Fermilab, is seeking proposals for the procurement and installation of Argon Distribution Equipment as part of the Long-Baseline Neutrino Facility (LBNF) project in Lead, South Dakota. The primary objective is to establish a comprehensive system for transferring gaseous and liquid argon and nitrogen throughout the underground facility, which is critical for the Deep Underground Neutrino Experiment (DUNE) aimed at advancing neutrino science. This project is essential for supporting the infrastructure necessary for massive neutrino detectors located 4850 feet below the surface, facilitating groundbreaking research in particle physics. Interested contractors must submit their proposals by December 20, 2024, and direct inquiries to Jeremy R. Duncan at jeremyd@fnal.gov or by phone at 865-300-0443.
    Fire House Generator and ATS Replacement
    Active
    Energy, Department Of
    The Department of Energy, through the Fermi National Accelerator Laboratory (Fermilab), is soliciting proposals for the replacement of a generator and an automatic transfer switch (ATS) at the Fire House located in Batavia, Illinois. The project requires the selected contractor to provide all necessary supervision, labor, materials, and equipment to complete the work as outlined in the technical specifications and drawings, ensuring compliance with safety and regulatory standards. This procurement is critical for maintaining operational safety and infrastructure at Fermilab, reflecting the federal government's commitment to modernizing essential facilities. Proposals are due by January 13, 2025, at 5 PM CT, and interested parties can contact Danielle Amico at damico@fnal.gov or 630-840-3207 for further information.
    Leak Detectors
    Active
    Energy, Department Of
    The Department of Energy, through Fermilab, is soliciting proposals for the procurement of leak detectors, with a focus on enhancing leak detection capabilities. The request includes specific equipment such as remote control units, pumps, and sniffer probes, which are critical for ensuring precision and reliability in leak detection operations. This procurement is vital for Fermilab's scientific and operational missions, emphasizing compliance with federal regulations and quality assurance. Interested vendors must submit their proposals by December 30, 2024, at 4 PM CT, and can direct inquiries to Sharon Duchaj at sduchaj@fnal.gov or by phone at 630-840-8693.
    Semiconductor Parameter Analyzer
    Active
    Energy, Department Of
    The Department of Energy, through the Fermi Research Alliance, LLC, is seeking proposals for a Semiconductor Parameter Analyzer to support research at the Fermi National Accelerator Laboratory in Batavia, Illinois. The procurement aims to acquire a commercial product that includes an analyzer mainframe, medium-power source measurement units, a pulse measurement unit, and a capacitance-voltage unit, all essential for advanced semiconductor testing and analysis. This equipment is critical for enhancing research capabilities in energy-related projects, ensuring compliance with federal regulations and standards. Interested vendors must submit their quotes, including completed certifications (SARC and PUR-466), by January 27, 2025, and can direct inquiries to Cathleen Stadler at cstadler@fnal.gov or by phone at 630-840-2763.
    APS-U Repurposing of Shielded Transport for Beamline 34-ID
    Active
    Energy, Department Of
    The Department of Energy, through UChicago Argonne, LLC, is soliciting proposals for the fabrication and installation of shielded transports for X-ray delivery at the Advanced Photon Source's Beamline 34-ID in Lemont, Illinois. The project involves modifying an existing transport section, constructing support pedestals, and making necessary enclosure modifications, all in accordance with specified requirements. This work is crucial for the effective transport of hard X-ray beams between shielded experimental enclosures, enhancing the capabilities of the synchrotron beamlines. Proposals are due electronically by January 10, 2025, following a pre-proposal meeting on December 18, 2024, with contract awards expected around January 31, 2025, and project completion by April 30, 2025. Interested bidders should contact Robert K Kman at kman@anl.gov or 630-252-6488 for further details and access to the proposal documents.
    Notice of Intent to Extend and Compete the Management and Operating Contract for the Fermi National Accelerator Laboratory (FNAL)
    Active
    Energy, Department Of
    Notice of Intent to Extend and Compete the Management and Operating Contract for the Fermi National Accelerator Laboratory (FNAL) The Department of Energy (DOE) intends to award a one-year noncompetitive contract extension to Fermi Research Alliance, LLC (FRA) for the management and operation of Fermi National Accelerator Laboratory (FNAL). This extension is necessary to maintain an essential engineering, research, and development capability provided by FNAL. FNAL is a single-purpose laboratory that leads the nation in the construction and operation of world-leading accelerator and detector facilities for particle physics research. The primary mission of FNAL is to deliver breakthrough science and technology in the area of high energy particle physics. The current contract expires on December 31, 2023, and the extension will cover the period of January 1, 2024, through December 31, 2024. The purpose of this extension is to allow DOE sufficient time to conduct a full and open contract competition for the management and operation of FNAL. The contract competition is anticipated to commence during the first quarter of FY 2023. DOE aims to ensure transparency in the solicitation process and will issue a pre-solicitation notice subsequent to the competition kickoff. Interested sources will be invited to submit Expressions of Interest. Overall, this notice pertains to the extension and competition of the management and operating contract for the Fermi National Accelerator Laboratory (FNAL), which is a leading facility for high energy particle physics research.
    Rapid Response Department Site Wide General Construction Blanket Purchase Agreement (BPA)
    Active
    Energy, Department Of
    The U.S. Department of Energy, through UChicago Argonne, LLC, is seeking qualified contractors to provide general construction services under a Rapid Response Department Site Wide General Construction Blanket Purchase Agreement (BPA) at Argonne National Laboratory in Illinois. The procurement aims to secure contractors capable of performing modifications, repairs, and installations, with individual firm fixed-price Task Orders not exceeding $250,000 and a total projected value of up to $4 million per BPA over a one-year term, with an option for a one-year extension. Proposals will be evaluated based on technical merit, cost, safety, and compliance with federal regulations, with a virtual pre-proposal meeting scheduled for January 6, 2025, and a submission deadline of January 13, 2025. Interested parties can contact Nick Hitzler at nhitzler@anl.gov for further information and access to the RFP documents.