The Presolicitation Notice, posted by the Department of Veterans Affairs, seeks responses from qualified Service-Disabled Veteran Owned Small Business (SDVOSB) architectural and engineering (A/E) firms. Firms are requested to submit Standard Form 330 qualification packages, detailing their competence and experience. This notice is a preliminary step, with the actual solicitation process to begin later. The project involves replacing the HVAC system and improving the switch gear room in Building 1 at the Colmery O'Neil VAMC in Topeka, Kansas. The A/E services required include design completion, site investigation, and preparation of drawings and specifications. The work is divided into two parts: Part One involves design and pre-construction activities, while Part Two covers construction period services, which are optional. Firms will be evaluated based on their team's qualifications, previous experience, proximity to the project site, project control mechanisms, workload capacity, estimating effectiveness, and other criteria. Responses are due by 2:00 PM CST on August 23, 2024.
The document outlines a Request for Qualifications (RFQ) for architectural and engineering services to replace the HVAC system in the Switch Gear Room (Room A14) at the Colmery-O'Neil VA Medical Center in Topeka, Kansas. It specifies that the procurement is exclusively available to Service-Disabled Veteran-Owned Small Businesses (SDVOSBs) and follows the Brooks Act and FAR guidelines for selection. Interested firms must submit a completed Standard Form 330 (SF330), which will be evaluated based on specific criteria such as team qualifications, previous experience, project management capability, and geographic proximity to the medical center. The scope includes designing a new air-conditioning system capable of maintaining specific temperature and humidity levels while considering the existing conditions. The anticipated design work budget ranges from $25,000 to $100,000, and the estimated project duration is 123 calendar days. Key requirements include adherence to safety protocols and participation in the E-Verify program. The document emphasizes that actual contract awards depend on fund availability and cites specific compliance requirements for contractors. Overall, this announcement serves as a preliminary step before a formal RFP process.