NATIONAL MULTIPLE AWARD CONSTRUCTION CONTRACT III - POOL ONE (NMACC III – Pool 1): BASE SEATTLE SLIP 36 COMPREHENSIVE ENVIRONMENTAL RESPONSE COMPENSATION AND LIABILITY ACT (CERCLA) CLEAN UP AND WATERFRONT RECAPITALIZATION PHASE 1A
ID: 20312361Type: Solicitation
Overview

Buyer

HOMELAND SECURITY, DEPARTMENT OFUS COAST GUARD13TH COAST GUARD DISTRICT OFFICESEATTLE, WA, 98174, USA

NAICS

Commercial and Institutional Building Construction (236220)

PSC

CONSTRUCTION OF MISCELLANEOUS BUILDINGS (Y1JZ)
Timeline
    Description

    The Department of Homeland Security, through the U.S. Coast Guard, is soliciting proposals for the National Multiple Award Construction Contract III - Pool One, specifically for the Base Seattle Slip 36 Comprehensive Environmental Response Compensation and Liability Act (CERCLA) cleanup and waterfront recapitalization Phase 1A project. This project entails a Design-Bid-Build approach that includes the demolition of existing structures, upgrading utilities, dredging contaminated sediment, and constructing new facilities to support the homeporting of new USCG Polar Security Cutters, with an estimated budget of approximately $190 million. The procurement is critical for enhancing operational capabilities while ensuring compliance with environmental standards, reflecting the government's commitment to environmental remediation and facility modernization. Interested contractors must submit non-price proposals by April 29, 2025, and price proposals by May 7, 2025, with inquiries due by March 13, 2025; for further information, contact Ms. Mathuei M. Kenneybrew at mathuei.m.kenneybrew@uscg.mil.

    Point(s) of Contact
    Ms. Mathuei M. Kenneybrew
    mathuei.m.kenneybrew@uscg.mil
    Files
    Title
    Posted
    The Biological Assessment for the Base Seattle Slip 36 area, prepared by Arcadis U.S., Inc. for the U.S. Coast Guard, evaluates the potential impacts of proposed actions on federally and state-listed threatened or endangered species within the Harbor Island Superfund Site in Seattle, Washington. The assessment details the purpose and scope of the proposed action, which includes dredging, pier demolition, and replacement to accommodate new Polar Security Cutters. It identifies species potentially affected, including steelhead, Chinook salmon, bull trout, and various rockfish, while also noting species unlikely to be impacted due to habitat incompatibility. The assessment outlines the planned construction activities, including sediment removal and infrastructure improvements, aimed at addressing contamination and increasing operational depth. Best Management Practices and conservation measures are proposed to minimize impacts to aquatic life, particularly during construction phases in designated in-water work windows. Overall, this document serves to fulfill legal requirements under the Endangered Species Act, ensuring informed consultation with wildlife services while promoting environmental protection during facility enhancements.
    This document is an amendment regarding a solicitation for offers related to a federal contract. It specifies that offers must acknowledge the amendment receipt prior to the established deadline. Two methods for acknowledgment are provided: completing specified items on the form or sending a separate letter or electronic communication referencing the solicitation and amendment numbers. The amendment extends the due date for non-price proposals from April 15, 2025, at 4:00 PM (PST) to April 22, 2025, at the same time. All other terms and conditions of the solicitation remain unchanged. The amendment is prepared under the authority outlined in the government’s Federal Acquisition Regulation (FAR), maintaining compliance with established protocol for contract modifications. The document includes standard form requirements and information sections for contract identification and modification details. Overall, this amendment serves to inform potential contractors of the extended submission deadline while ensuring adherence to procedural standards.
    This government document amends solicitation number 70Z05025R43000001, announcing extensions for the submission of proposals. Non-price proposals are now due by April 29, 2025, and price proposals by May 7, 2025. The amendment includes new policy provisions relevant to contract terminations over $1,000,000, requiring contractors to maintain work products after termination and outlining penalties for non-compliance. Additionally, it addresses concerns regarding pricing instability due to tariffs, explaining that while some tariff recovery is possible under FAR Clause 52.229-3, additional price protection measures requested by contractors will not be implemented for this firm-fixed-price project. Overall, the document ensures that project timelines are extended while clarifying obligations and conditions pertaining to contract modifications and pricing strategies amidst prevailing economic fluctuations. All other contract terms remain unchanged.
    The file concerns solicitation No. 70Z05025R43000001, detailing a federal contract amendment for the U.S. Coast Guard (USCG) related to a construction project at Base Seattle. The primary objective aims to procure a professional-grade time-lapse camera system, essential for documenting construction activities, specifically for the demolition and enhancement of waterfront structures. Key specifications include a 16-megapixel camera with substantial memory capacity for image buffering, capable of automatically generating time-lapse footage and offering remote viewing capabilities. The contractor is responsible for the system's operational aspects throughout the project duration, including installation and maintenance. Revised pricing proposals address specific inquiries regarding various materials necessary for the project, including armor stone, geotextile material, reactive core mats, and fish mix, highlighting allowances for estimated quantities and unit pricing. Clarifications included the requirement for a comprehensive price proposal, indicating that innovations must be incorporated into total costs, while ensuring all images and videos generated remain without branding and are owned by the USCG. This procurement process reflects standard governmental practices for maintaining fair opportunity and efficiency in awarding contracts, emphasizing compliance and quality in project execution.
    The solicitation document (70Z05025R43000001) outlines amendments and responses to inquiries related to a construction project at USCG Base Seattle. Key amendments include updates to drawing specifications and the removal of certain notes related to project logistics and requirements. The document addresses various inquiries (PPIs) from prospective bidders, clarifying critical project details such as laydown area availability, water quality criteria for dredging, and contractor responsibilities concerning tribal fishing nets and historical resource protection. Key points include a proposed award date of August 2025, with a performance period set for 1,200 calendar days post-award. Bidders are informed that specific documents, such as the Preliminary Water Quality Monitoring Plan, and certified marine surveyor requirements are being revised, ensuring clarity on contractor obligations. Additionally, responses highlight that the contractor must navigate fluctuating material prices without additional price protection mechanisms due to fixed-price contract stipulations. Overall, the document is a comprehensive amendment to the original RFP, aimed at refining project specifications while addressing bidder concerns to facilitate a smooth bidding process for potential contractors.
    The memorandum from Gabriel D. Perez, Contracting Officer at the U.S. Coast Guard, requests approval for assigning DO-N5 law enforcement priority ratings on task orders under the National Multiple Award Construction Contract III (NMACC III). This priority rating is essential for the procurement of critical electrical infrastructure components, such as transformers and shore tie equipment, that support the Coast Guard's mission of law enforcement and border security. These components enable cutters to connect to shore power while in port, thereby ensuring easier access to maintenance and reducing crew fatigue during operations. Delays in acquiring these items have historically impacted operational readiness, sometimes extending projects beyond a year. The memorandum emphasizes the importance of timely procurement and installation of these components to maintain the Coast Guard's operational capabilities. The task orders placed under the NMACC III will include required delivery dates and are in accordance with the Defense Priorities and Allocations System (DPAS) regulations to facilitate expedited service. The document further outlines contract terms, selection procedures, and addresses issues related to long lead times that have hindered previous operations, underscoring the necessity for efficient contracting processes within the Coast Guard's civil engineering community.
    This amendment pertains to a federal solicitation, outlining necessary changes and updates to the original proposal submission requirements. Offers must formally acknowledge the receipt of this amendment by specific methods, including completion of designated items or through written communication. A key point includes the extension of the Non-Price Proposal deadline from March 31, 2025, to April 8, 2025, at 4:00 PM PST. Additionally, the amendment specifies the inclusion of various attachments, such as building plans and flow charts. While the due date has changed, all other terms and conditions of the original solicitation remain unchanged and enforceable. This amendment emphasizes the importance of compliance in acknowledging changes in procurement processes and encourages submissions to meet new timelines while maintaining adherence to established regulations.
    The document serves as an amendment to a solicitation issued by the U.S. Coast Guard for construction projects at Seattle's Base. It highlights changes related to the amendment's acknowledgment procedures, emphasizes the requirements for submitting offers, and includes relevant project details and technical specifications. The purpose of this amendment is to add a previously excluded attachment regarding temporary construction facilities and controls. The document includes prerequisites for contractor submissions, safety regulations, traffic maintenance strategies, and details about necessary temporary utilities and safety equipment. It sets out guidelines for administrative field offices, project storage, and equipment provisions, emphasizing conformity to federal safety regulations. The amendment ultimately aims to ensure both compliance with government standards and effective management of construction operations, prioritizing safety and communication throughout the process.
    Gravity Marine, LLC was contracted by AECOM to conduct a comprehensive debris survey at Slip 36 of the USCG base in Seattle, Washington. The survey utilized advanced techniques, including a multibeam echosounder (MBES), side scan sonar (SSS), magnetometer, and sub-bottom profile (SBP), to update bathymetric data and identify any debris that may require removal before dredging operations. Conducted on January 17th and 18th, 2023, the study included precise QA/QC measures to ensure the accuracy of data collection and processing. The survey identified 34 debris targets mainly consisting of logs, broken pilings, and concrete. The magnetometer survey showed minimal significant anomalies due to interference from nearby port facilities. The SBP survey also revealed various sediment layers and identified 13 potential debris targets, with most corresponding to previously identified targets from the MBES and SSS data. This memorandum serves to summarize the study methodology, data acquisition details, and the subsequent findings, underscoring the need for detailed assessments before dredging activities at the site.
    The document outlines specifications for translucent wall panels required for a government project. It mandates the submission of manufacturer's data sheets, layout drawings, and the necessity of approval from the Contracting Officer Representative (COR) prior to fabrication. Key performance criteria include a flexural strength of 13,500 pounds per square inch, specific light transmission limits, and weather resistance standards, tested in compliance with various ASTM standards. For installation, panels must meet specified thickness requirements and use stainless steel fasteners as indicated in a referenced structural sheet. The document emphasizes the panels' durability, including restrictions on discoloration, haze, and loss of tensile strength over a ten-year period, as well as class A fire safety ratings. Overall, these details underscore the importance of compliance with stringent quality and performance benchmarks for successful project outcomes in government procurement contexts.
    The document outlines a Dredging Plan under a federal solicitation, detailing the new dredge areas (7 and 8) as well as the post-dredging cover plan and the new placement area (9). It indicates that a scale of 1" = 50' is used for the plans presented. The graphic visuals highlight designated areas for dredging operations, essential for maintaining and improving navigable waterways, potentially addressing environmental and infrastructure needs. Additionally, it references details such as solicitation and contract numbers, emphasizing procedural compliance associated with federal RFP guidelines for project execution. The focus is on the effective management of dredged materials and sustainable practices in waterway maintenance, reflecting a broader commitment to environmental stewardship and regulatory adherence. The document serves as a guideline for contractors responding to this RFP, ensuring that they understand the critical areas and plans involved in the dredging process.
    The document amends Solicitation No. 70Z05025R43000001, detailing modifications to technical specifications, drawings, and work requirements for a construction project involving the rebuild of Pier 36. Key amendments include updates to demolition plans, electrical systems, environmental controls, and clarifications regarding the procedures for relocating or removing existing facilities. The RFP outlines specific planned changes such as demolishing the existing air compressor, relocating eco block barriers and clear instructions for removal versus on-site relocation of structures. The document highlights parameters for in-water work and reaffirms compliance with regulatory environmental standards. Additionally, it includes responses to inquiries regarding material specifications, construction procedures, and vendor clarifications, intending to guide contractors accurately during the project execution. This amendment fosters clarity, ensures adherence to updated standards, and emphasizes the importance of comprehensive planning for this significant infrastructure project, aligning with federal and local procurement requirements.
    The document serves as an amendment to a solicitation for a project handled by the U.S. Coast Guard (USCG) Base Seattle, specifically addressing inquiries received regarding specifications. It outlines essential details about the contract ID, effective date, and the process for bidders to acknowledge receipt of the amendment. The amendment primarily addresses two Project Performance Inquiries (PPIs) which pertain to operational requirements for waterborne vessels and the use of vibratory hammers for pile installation. Regarding PPI #229, it clarifies that there are no specific berthing restrictions for larger vessels during dredging and modifications, with flexibility for future changes based on operational needs. PPI #230 confirms that vibratory hammer usage is permissible for initial pile installation, alongside compliance with biological impact assessments. Overall, this document emphasizes the importance of clear communication and compliance in government contracting processes, particularly in project specifications and environmental considerations. It synthesizes responses to queries while ensuring regulations and requirements remain transparent and comprehensible for potential contractors.
    The document outlines the amendment of a solicitation pertaining to the U.S. Coast Guard's funding project for the Base Seattle Slip 36 area, detailing instructions for submitting acknowledgment of the amendment and changes in proposal deadlines. It emphasizes the need for contractors to acknowledge receipt of amendments, outlining the repercussions of failing to submit these acknowledgments on time. The amendment aims to include a Biological Assessment report, addressing environmental impacts on state and federally listed species and their habitats due to proposed construction activities. Key changes include extensions for the Pre-Proposal Inquiries and Price Proposal submission deadlines. A thorough review of affected species and their habitats is provided, with an emphasis on measures to minimize impacts during construction. The document also outlines the proposed action, including dredging and pier replacements, necessary for supporting future U.S. Coast Guard operations. Additionally, conservation measures will be implemented during construction to protect these species. The overall aim is to improve operational facilities while ensuring environmental compliance and protecting critical habitats throughout the project.
    This document amends solicitation 70Z05025R43000001 for a project associated with the US Coast Guard at Base Seattle. It outlines an extension of the Pre-Proposal Inquiry (PPI) deadline to March 21, 2025, in response to multiple requests for more time due to the complex nature of the project. Additionally, it confirms that no proprietary products or Controlled Unclassified Information (CUI) are involved in this solicitation. The amendment states that the Price Proposal deadline has been pushed to April 30, 2025, while the Non-Price proposal deadline remains unchanged at March 31, 2025. The document serves to provide clarity to contractors regarding deadlines and the scope of the project as they prepare submissions, ensuring adequate time for inquiries and competitive proposals. Overall, the amendment emphasizes the Coast Guard's intent to facilitate a fair bidding process while maintaining pace with project timelines.
    This document outlines an amendment to a solicitation pertaining to a government contract, primarily focusing on procedures for acknowledging the amendment and the implications of changing a submitted offer. It explicitly states that contractors must acknowledge receipt of this amendment by a specified deadline to avoid rejection of their offers. The amendment introduces a Biological Assessment report and extends deadlines for both the Price Proposal and Pre-Proposal Inquiries (PPI). Moreover, it clarifies that contractors are not required to sign the document but must complete certain items or send communications referencing the amendment. Additional instructions detail modifications related to contract identification and a structured approach for organizing amendments or modifications under an established format. Overall, the document emphasizes compliance with the amendment's terms while ensuring the integrity of the solicitation process remains intact.
    The document is an amendment to solicitation 70Z05025R43000001, detailing updates and clarifications regarding construction specifications and tasks involved in a government contract. It includes a new version of the Specification Section on Temporary Construction Facilities and Controls. Key revisions encompass updates to drawings, such as the gangway length, utility references, and electrical details. The amendment addresses specific technical queries from contractors, providing clarifications on project elements, including demolition limits, material specifications, and equipment requirements. Significant questions raised about project details include discrepancies in gangway dimensions, fencing details, and permit costs. Answers clarify technical aspects like required materials (e.g., stainless versus galvanized steel), proper equipment specifications, and site access protocols. The document underscores the importance of clear communication between contractors and the contracting agency, ensuring compliance with safety and operational guidelines throughout the construction process. This amendment emphasizes procedural adjustments necessary for addressing potential conflicts and ensuring successful project execution, reflecting the rigorous standards inherent in governmental solicitations.
    The U.S. Department of Homeland Security has issued a memorandum waiving the requirement for project labor agreements (PLAs) on large-scale federal construction projects, as specified in FAR subpart 22.5 and 36.104(c). This decision follows a 2025 ruling by the U.S. Court of Federal Claims, which found that the PLA requirements violated the Competition in Contracting Act. Effective immediately, contracting officers are prohibited from using PLAs for projects exceeding $35 million and must amend existing solicitations to remove any related requirements. This class deviation applies to all solicitations and remains in effect until rescinded. The memorandum underscores a significant shift in federal contracting policy regarding labor agreements, ensuring compliance with recent legal precedents. Additionally, queries can be directed to a designated DHS contact for further clarification on this deviation.
    This memorandum from the U.S. Coast Guard's Facilities Design & Construction Center requests authorization for a Defense Priorities and Allocations System (DPAS) priority rating of DO-N5 for electrical transformers, switching gear, and related components essential for task orders under the National Multiple Award Construction Contract III (NMACC III). These components are critical to ensure the operational capability of U.S. Coast Guard cutters during port stays, allowing them to connect to shore power, thus reducing onboard personnel while conducting maintenance. The document outlines the importance of these installations to avoid generator reliance, which increases fire risk and personnel fatigue. It also emphasizes a need to procure these items promptly due to persistent long lead times affecting operational readiness. The estimated contract capabilities, ordering procedures, and particular compliance requirements are further detailed, ensuring that task orders support national defense and law enforcement operations. The memorandum concludes by affirming that proper procurement processes must be followed to maintain efficiency and effectiveness in meeting mission requirements.
    The U.S. Coast Guard's Facilities Design & Construction Center issued a notification regarding a priority-rated order under the Defense Production Act for Solicitation No. 70Z05025R43000001, designated for the Seattle CERCLA PSC Homeport PH1A project. This contract supports USCG law enforcement activities and specifies a critical requirement for Electrical Shore Tie materials, with a delivery deadline of October 1, 2028. The order carries a DO-N5 priority rating, mandating contractors, subcontractors, and suppliers to prioritize this contract over other commercial and lower-priority orders. Compliance with the Defense Priorities and Allocations System (DPAS) regulation is required, including mandatory acceptance policies for rated orders. Questions can be directed to Adam L. Parga, the point of contact for this notification. This document underscores the importance of national defense priorities in contract fulfillment, ensuring essential materials are delivered on time for USCG operations.
    The document outlines the Request for Proposal (RFP) for the Phase 1A of the CERCLA Polar Security Cutter (PSC) Homeport project at Base Seattle by the U.S. Coast Guard. The aim is to facilitate waterfront improvements and undertake environmental cleanup necessitated by the installation of new PSCs. This Design-Bid-Build procurement involves demolition of existing structures, upgrading utilities, dredging contaminated sediment, and constructing new facilities, with an estimated budget of $190 million. Notable deadlines for submissions include project inquiries due by March 13, 2025, technical proposal by March 31, 2025, and price proposal by April 14, 2025. The evaluation process will weigh both price and other non-price factors, such as environmental compliance and project management scheduling. Respondents must submit inquiries in writing, and a site visit will only serve for informational purposes, with no questions allowed during the visit. The project's goal emphasizes a strategic approach to environmental remediation, critical for the Coast Guard’s operational needs.
    The document is an amendment to a solicitation for government contracts, specifically addressing required responses from contractors regarding an upcoming proposal. It outlines the acknowledgment process for the amendment, stipulating that offers must reference the solicitation and amendment numbers and be submitted by the specified deadline to avoid rejection. The amendment introduces a new form related to contractor-proposed cyber/IT solutions and clarifies that the deadline for non-price proposals has been extended from April 8, 2025, to April 15, 2025. All other terms and conditions of the original solicitation remain unchanged. The amendment showcases the need for compliance with procedural requirements in federal contracting, emphasizing the importance of timely communication and document submission for contractors. Ultimately, this amendment serves to refine the solicitation process while ensuring all interested parties have access to the updated requirements and deadlines.
    The document outlines a federal procurement announcement for the National Multiple Award Construction Contract III (NMACC III – Pool 1), specifically addressing a task order for the comprehensive environmental cleanup and waterfront recapitalization at Base Seattle, WA, under the Comprehensive Environmental Response Compensation and Liability Act (CERCLA). The project, valued at approximately $190 million, involves the demolition of existing structures, upgrading utilities, and dredging contaminated sediment. Key deadlines include pre-proposal inquiries due by March 13, 2025, and submissions for non-price and price proposals by March 31 and April 14, 2025, respectively. The performance period is set at 1,200 calendar days post-award. Offerors are advised to inspect the work site and ensure compliance with labor regulations, including wage determinations. The procurement is governed by specific clauses, including requirements for compliance with environmental standards and construction labor regulations. The award process emphasizes the best overall value based on price and non-price factors. Overall, this announcement serves to inform potential contractors about requirements and procedures for engaging in the significant design-bid-build effort at Base Seattle, reflecting the government's commitment to environmental remediation and facility modernization.
    The document outlines a federal contractor proposal for cyber/IT-related solutions and construction activities at Base Seattle under project #20312361. It initially requires details on any hardware, software, or services linked to Coast Guard data processing, indicating there are none in this instance. The primary focus shifts to construction tasks at Base Seattle, which involve demolishing structures, upgrading mooring utilities, and dredging activities in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). The price proposal requires unit prices for ecological treatment, dredging, and stone placement, detailing costs per cubic yard or short ton based on estimated quantities. The document emphasizes that no amendments or betterments will be accepted and that all creative solutions must be incorporated into the total bid price. It concludes with spaces for the offeror's details and acknowledges amendments. This proposal reflects the federal government's effort to ensure compliance, environmental responsibility, and efficient spending in project planning and execution.
    The document outlines procedures for addressing the inadvertent discovery of archaeological resources and human remains during construction activities, specifically under U.S. Coast Guard (USCG) regulations. Upon such discoveries, workers must immediately stop work, notify an archaeological monitor or cultural resources specialist, and establish a protective buffer zone of 100 feet. Confidentiality must be maintained throughout the process. For archaeological finds, the monitor assesses their significance and notifies relevant authorities, while workers must avoid disturbing the site. Compliance with federal and state laws is mandatory before resuming work in the affected area. In the case of human remains, new protocols include notifying local law enforcement and ensuring the remains are covered and secured. Coordination with tribes and other stakeholders is emphasized, especially regarding preservation and legal compliance under federal laws like NAGPRA. This document serves as a guideline for construction projects to ensure careful handling of sensitive discoveries, reflecting a commitment to cultural resource protection in alignment with governmental oversight and regulatory compliance. It is crucial for maintaining the integrity of historical and archaeological findings during federal and state-funded projects.
    Similar Opportunities
    USCGC GEORGE COBB DS FY 26
    Homeland Security, Department Of
    The Department of Homeland Security, through the U.S. Coast Guard, is seeking proposals from qualified contractors for dockside repair services for the USCGC GEORGE COBB (WLM 564) as part of the FY 2026 maintenance schedule. This procurement, identified by RFQ70Z08526QIBCT0011, requires a Firm Fixed Price Definitive Contract and emphasizes the importance of technical capability and past performance over price in the evaluation process. The scope of work includes various repair and maintenance tasks, such as fire prevention, inspection of hydraulic systems, and cleaning of exhaust piping, all critical for maintaining the operational readiness of the vessel. Interested parties must submit their proposals via email by January 9, 2026, with an anticipated award date of February 17, 2026. For further inquiries, contact Ou Saephanh at Ou.T.Saephanh@uscg.mil or Sandra Martinez at Sandra.A.Martinez@uscg.mil.
    FY26 Willapa Harbor Maintenance Dredging
    Dept Of Defense
    The Department of Defense, specifically the U.S. Army Corps of Engineers Seattle District, is preparing to solicit bids for the FY26 Willapa Harbor Maintenance Dredging project in Washington. This project involves the mechanical dredging of approximately 180,000 cubic yards of sediment from three federal navigation features in Willapa Bay, with work expected to commence in July 2026 and conclude by February 15, 2027. The dredged material will be disposed of at designated open-water locations, and contractors should be aware of the challenging marine conditions and potential risks associated with the project. Interested parties can reach out to Geraldine L. Kemp or Kimberly M. Robinson for further inquiries, and the estimated contract value ranges between $5 million and $10 million. Contractors must be registered in the System for Award Management (SAM) prior to contract award.
    FY26 Willapa Bay Maintenance Dredging Bid Opening Details
    Dept Of Defense
    The Department of Defense, through the U.S. Army Corps of Engineers, Seattle District, is soliciting bids for the maintenance dredging of the Willapa Harbor in Washington. The project aims to dredge the Bay Center, Nahcotta, and Tokeland Federal Navigation Channels to their authorized depths, with an estimated total of up to 180,000 cubic yards to be dredged using mechanical clamshell methods. This dredging is critical for ensuring safe navigation in an area known for significant hazards due to shifting shoals and unpredictable weather conditions. Interested contractors should note that the estimated construction price range is between $5 million and $10 million, with work expected to commence in summer 2026. For further details, including submission instructions, please contact Geraldine Kemp at geraldine.l.kemp@usace.army.mil or Kimberly M. Robinson at Kimberly.M.Robinson@usace.army.mil.
    Repair and Abate Boat Maintenance Facility (BMF) at USCG Sector Southeastern New England, Woods Hole, Massachusetts
    Homeland Security, Department Of
    The Department of Homeland Security, through the U.S. Coast Guard, is soliciting bids for the Repair and Abate Boat Maintenance Facility (BMF) at the USCG Sector Southeastern New England in Woods Hole, Massachusetts. The project involves comprehensive maintenance and repairs, including the repair of exterior siding, roofing, doors, and windows, as well as the abatement of lead-based paint and concrete repairs. This initiative is critical for maintaining the operational integrity of the facility, ensuring compliance with safety and environmental regulations. Interested small businesses must submit their bids by January 7, 2026, at 2:00 PM EST, and can direct inquiries to Cam Ormiston at cameron.h.ormiston@uscg.mil or Simon W. Leung at simon.w.leung@uscg.mil. The estimated contract value ranges between $1,000,000 and $5,000,000, with a completion timeline of 300 calendar days from the notice to proceed.
    52000QR260001642 USCGC FLORENCE FINCH HULL CLEANING
    Homeland Security, Department Of
    The Department of Homeland Security, specifically the U.S. Coast Guard, is seeking qualified contractors for the hull cleaning and zinc renewal of the USCGC FLORENCE FINCH, scheduled to take place from January 13-16, 2026. The contractor will be responsible for cleaning the vessel's underwater body, renewing bolt-on zinc anodes, and ensuring thorough cleaning of underwater surfaces while adhering to specified maintenance procedures. This procurement is crucial for maintaining the operational readiness and longevity of the vessel, which is vital for Coast Guard missions. Interested vendors must submit their firm-fixed price quotations by January 8, 2026, and can direct inquiries to Timothy Ford or Joshua Miller via the provided email addresses.
    USCGC REEF SHARK DD FY26
    Homeland Security, Department Of
    The Department of Homeland Security, specifically the U.S. Coast Guard, is seeking qualified contractors for drydock repairs to the USCGC REEF SHARK (WPB 87371), which is homeported in Auke Bay, Alaska. The procurement involves extensive repair work, including hull plating preservation, tank cleaning, engine realignment, and various mechanical and structural repairs, with an anticipated performance period of 92 days from June 2 to September 2, 2026. This opportunity is critical for maintaining the operational readiness of the vessel, which plays a vital role in maritime safety and security. Interested parties must submit detailed information, including business size and past performance, by November 5, 2025, and must be registered in SAM to participate. For further inquiries, contact Taylor Cregan at Taylor.S.Cregan@uscg.mil or LaToya Sorrell at Latoya.N.Sorrell@uscg.mil.
    52000QR260001486 USCGC JOHN WITHERSPOON HULL CLEANING AND ZINC RENEWAL
    Homeland Security, Department Of
    The Department of Homeland Security, specifically the U.S. Coast Guard, is seeking qualified small businesses to provide underwater hull inspection, cleaning, and zinc renewal services for the CGC JOHN WITHERSPOON. The procurement requires trained personnel to conduct thorough inspections and cleaning of the vessel's hull, coating system, and associated components, along with the replacement of zinc anodes, including 12 additional stern tube zincs not covered in standard procedures. This maintenance is critical for ensuring the operational readiness and longevity of the vessel and is scheduled to take place between February 10 and March 10, 2026, at USCG Base Ketchikan, Alaska. Interested vendors must submit their quotes by January 8, 2025, and can reach out to the primary contacts, Timothy Ford and Joshua Miller, via email for further inquiries.
    Deck Preservation FY26 on USCGC USCG STONE (WMSL 758)
    Homeland Security, Department Of
    The Department of Homeland Security, specifically the U.S. Coast Guard, is seeking proposals for the Deck Preservation FY26 project on the USCGC USCG STONE (WMSL 758). This procurement involves renewing the slip-resistant deck covering in designated areas, including the Fore Deck, Bridge Wings, and Amidships 01 Deck, utilizing MIL-PRF-24667D Type V Comp. G/D/L Non-skid coating, along with extensive surface preparation and quality assurance measures. The work is critical for maintaining the vessel's operational integrity and safety, with the contract set to be awarded based on the Lowest Price Technically Acceptable (LPTA) method. Proposals are due by December 18, 2025, with the performance period scheduled from January 12, 2026, to February 17, 2026. Interested parties can contact Kiya Plummer-Dantzler at kiya.r.plummer-dantzler@uscg.mil or by phone at 510-501-5550 for further details.
    CGC HARRY CLARIBORNE DRYDOCK REPAIRS
    Homeland Security, Department Of
    The Department of Homeland Security, specifically the U.S. Coast Guard, is seeking qualified contractors for dry dock repairs on the USCGC Harry Claiborne (WLI-642) during Fiscal Year 2026. The scope of work includes extensive hull preservation, tank cleaning and inspection, machinery overhauls, piping maintenance, and various structural and electrical repairs, all to be performed at the contractor's drydock facility over an anticipated period of approximately 90 calendar days, from May 5, 2026, to August 3, 2026. This procurement is critical for maintaining the operational readiness of the vessel and ensuring compliance with safety and performance standards. Interested parties must submit their capabilities, including business size and certifications, by December 16, 2025, at 10:00 AM EST, via email to Tobi Provenzano and Sandra Martinez, as this notice serves for market research purposes only and does not constitute a solicitation.
    CGC NORTHLAND FY26 UPDS MDE RENEWAL
    Homeland Security, Department Of
    The Department of Homeland Security, specifically the U.S. Coast Guard, is seeking contractors for the unplanned dockside main diesel engine renewal of the CGC NORTHLAND (WMEC-904) for Fiscal Year 2026. The project entails the renewal of the 1 (Starboard) Main Diesel Engine, which may involve either a complete assembly replacement or a component-based build-in-place approach, adhering to detailed specifications and standards outlined in the associated documentation. This renewal is critical for maintaining the operational readiness and performance of the vessel, which plays a vital role in maritime safety and security. Interested parties can reach out to Monica Paul at monica.w.paul@uscg.mil or by phone at 206-815-3361 for further details regarding the procurement process.