ARCENT Readiness Training Center Microgrid Project - Camp Buehring, Kuwait
ID: W912QR24R0046Type: Solicitation
Overview

Buyer

DEPT OF DEFENSEDEPT OF THE ARMYW072 ENDIST LOUISVILLELOUISVILLE, KY, 40202-2230, USA

NAICS

Power and Communication Line and Related Structures Construction (237130)

PSC

CONSTRUCTION OF OTHER UTILITIES (Y1NZ)
Timeline
    Description

    The Department of Defense, through the U.S. Army Corps of Engineers, is soliciting proposals for the construction of a microgrid project at Camp Buehring, Kuwait, aimed at enhancing energy resilience for the ARCENT Readiness Training Center. The project involves the installation of a 700 kW solar photovoltaic system and a 1.5 MW/1.5 MWh battery energy storage system, with an estimated construction cost ranging from $10 million to $25 million. This initiative is crucial for improving power reliability and sustainability in military operations, reflecting the government's commitment to modernizing energy infrastructure in overseas facilities. Interested contractors must submit their proposals electronically by October 4, 2024, and can direct inquiries to Jessica Stone at jessica.m.stone@usace.army.mil or by phone at 502-315-6137.

    Point(s) of Contact
    Files
    Title
    Posted
    The document appears to center around parking regulations pertaining to a specific facility or area, denoted by the codes "SS-604" and "SS6096." It emphasizes essential policies, including no smoking and guidelines for non-traditional vehicles (NTV) parking, indicating a focus on maintaining a safe and clean environment. Although the text lacks extensive detail, the mention of designated parking protocols suggests compliance with community standards and regulatory requirements, likely tied to federal grants or state and local RFPs. This summary encapsulates the main ideas while highlighting the regulatory aspects pertinent to public safety and environmental health, supporting the overall governance within the jurisdiction of the specified facility.
    The document is a memorandum from the U.S. Army Corps of Engineers concerning a pre-bid site visit at Camp Buehring, Kuwait, scheduled for June 10, 2024. It includes a sign-in sheet listing attendees from various companies, indicating their need for escorted access during the visit. The memorandum outlines the purpose of the visit, allowing these representatives to view the site in relation to potential bidding opportunities. Key attendees represent a range of international and local firms involved in construction and contracting, with their details, including names, company associations, and addresses cataloged comprehensively. This pre-bid site visit is a standard practice that facilitates the forthcoming bidding processes for federal projects, ensuring that involved parties are familiar with project requirements and the site conditions before submitting proposals. The document reflects the structured approach of the government in managing contract procurement and emphasizes adherence to security protocols during site visits in sensitive locations.
    This document outlines a solicitation for the installation of a microgrid project at Camp Buehring, Kuwait, featuring a 700KW solar photovoltaic system and a 1500KW battery energy storage system (BESS). It falls under the federal government's Engineering Related Construction and Improvements Program (ERCIP) for fiscal year 2024. The file includes certified final designs and as-built drawings for reference. The project utilizes a Design-Bid-Build structure and is associated with P2: 506498, requiring maintenance of records for 15 years post-construction. Supporting documentation provides detailed construction and elevation drawings relevant to the microgrid and backup power systems, alongside contact details for the local contracting company, Mushrif Trading & Contracting Co. Overall, the solicitation serves as a formal request for proposals from contractors to implement sustainable energy solutions at the military facility, emphasizing the government's commitment to enhancing its energy resilience and environmental practices in an international context.
    The document outlines the ERCIP 506498 (FY24) project, which involves the installation of a 700 kW Solar PV system and a 1.5 MW/1.5 MWh Battery Energy Storage System (BESS) at Camp Buehring, Kuwait. This microgrid project is part of the U.S. Army Corps of Engineers' efforts to modernize energy infrastructure and improve energy resilience in military operations. Key components of the project include site plans, electrical layouts, and specifications for integrating the solar panels and battery system with existing electrical systems, while adhering to safety protocols and building codes. The document includes necessary electrical and structural notes, along with compliance requirements for installation practices and materials, ensuring that all work aligns with military standards and operational needs. The project showcases the Army's commitment to sustainability and energy efficiency within deployed environments.
    The document pertains to a federal Request for Proposal (RFP) issued under the W912QR24R0046 project, likely concerning a construction or architectural endeavor given the mention of "Plans." It outlines the intent to solicit bids for a project that may involve infrastructure improvements, compliance with safety standards, and coordination among multiple contractors. Key components include assessments of working conditions, adherence to federal and state regulations, and the potential for environmental hazard evaluations. The structure of the document supports project management practices by highlighting timelines, necessary qualifications for contractors, and guidelines for bid submissions. It emphasizes collaboration, safety protocols, and sustainability in fulfilling project objectives, ensuring that proposals align with federal expectations for grants and RFPs. This aligns with broader government initiatives aimed at enhancing facility integrity and operational efficiency.
    The document outlines the Microgrid Project planned for Camp Buehring, Kuwait, under the jurisdiction of the U.S. Army Corps of Engineers. This initiative focuses on the installation of 700 kW solar photovoltaic (PV) systems and a 1.5 MW/1.5 MWh battery energy storage system (BESS), aimed at enhancing energy efficiency and sustainability in military operations. The project will include the construction of carports to support the PV installations while ensuring safety protocols related to existing underground utilities and electrical distribution systems. Key components of the project include a comprehensive site plan, electrical layouts, and structural details relevant to both the PV system installation and various electrical systems. General notes detail the requirements for contractor coordination with utility authorities and adherence to the National Electrical Code (NEC) for grounding and equipment installation. Safety measures during construction, such as signage and personnel limits on rooftops, are emphasized. The document serves not only as a technical guide but also as a formal response to an RFP, showing the commitment of the Army Corps to sustainable initiatives and efficient energy management within military facilities in a foreign deployment context.
    The document outlines the electrical designs for a Solar Photovoltaic (PV) and Battery Energy Storage System (BESS) installation at Camp Buehring, Kuwait, as part of the US Army Corps of Engineers' microgrid project (ERCIP 506498). It details the balance of electrical loads, grounding systems, and interconnections between various components, including inverters, a generator, and switchboards. Key specifications include a proposed 1.5 MW generator and a BESS with a capacity of 1.5 MWh, underscoring the microgrid's focus on energy management and resilience. The project aims to enhance camp power reliability while supporting sustainability objectives through renewable energy sources. Additionally, it notes compliance with relevant electrical codes and standard engineering practices. Proper implementation of this system is crucial for optimizing energy efficiency and ensuring safety within the installed infrastructure.
    The document pertains to the electrical infrastructure plan for the Solar PV and 1.5MW/1.5MWH battery energy storage system installation at Camp Buehring, Kuwait. The project, overseen by the U.S. Army Corps of Engineers, aims to enhance the electrical capabilities of the microgrid, incorporating a 700kW solar photovoltaic system and substantial battery storage. Essential elements include detailed electrical one-line diagrams for new equipment, such as inverters, switchboards, and generators, ensuring compliance with safety standards and electrical codes. Key components involve the interconnection of various electrical systems, grounding methodologies, and requirements for operational modes of the microgrid. Specific notes outline the responsibilities of the contractor regarding equipment specifications, installation standards, and operational parameters during peak load periods. The interconnected nature of the systems is designed to optimize power generation, support efficient energy storage, and provide a reliable primary power source for the camp. This document serves as a technical guide to facilitate bidding and compliance with federal requirements for the anticipated electrical projects within the military installation.
    The document outlines the solicitation for a construction project involving a microgrid installation at Camp Buehring, Kuwait, which includes the development of a 700kW solar PV system and a 1500kW Battery Energy Storage System (BESS). The estimated construction cost ranges between $10 million and $25 million with an unrestricted procurement status. Proposals must be submitted electronically through the Procurement Integrated Enterprise Environment (PIEE) and be accompanied by various certifications and bonding proof. The submission involves a two-volume proposal detailing past performance, management approach, and pricing. The evaluation of proposals will be based on a tradeoff process, considering past performance as the primary factor, followed by the management approach and pricing. The government emphasizes that proposals must demonstrate an understanding of the project and efficient management of resources. As funding is not currently available, contract awards will be contingent on appropriation. This solicitation reflects the government's initiative to enhance energy resilience through modern infrastructure in overseas military facilities.
    This document is an Amendment to Solicitation W912QR24R0046 for the Camp Buehring Microgrid Project, issued by the U.S. Army Engineer District, Louisville. Key modifications include the rescheduling of a site visit to June 10, 2024, at 10:00 AM local Kuwait time. It delineates processes for bidder inquiries via the ProjNet system, emphasizing that bids should not be submitted through this platform. Offerors are required to provide personal and vehicle information for site access by May 29, 2024, and must comply with specific guidance regarding attendance and site conduct. The amendment underscores the importance of acknowledging its content prior to submitting proposals. It also outlines that changes to the solicitation will be formally issued through Standard Form 30 amendments, maintaining the integrity of the solicitation process. This document serves as a critical reference for contractors interested in participating in the project, ensuring they are informed of procedural updates and requirements necessary for successful proposal submission and site visitation.
    The document outlines the amendments to the solicitation for the Camp Buehring Microgrid Project (Contract ID: W912QR24R0046). Key changes include an extension of the proposal due date from July 1 to July 8, 2024, and modifications to the Price Breakout Schedule and Special Contract Requirements. The amendments also detail the replacement of several electrical plan sheets and the addition of specification sections related to telecommunications cabling. Essential contract administration procedures are specified, including payment regulations, insurance requirements, workflow for submitting invoices, and obligations regarding contractor performance evaluations. The document serves as a critical update to contractors regarding administrative changes and compliance requirements. Its structure includes sections on contract modification, general provisions, detailed project requirements, and specific guidelines for compliance with host country laws. The purpose of this amendment is to ensure clarity and adjustment of expectations for all parties involved in the execution of the microgrid project, contributing effectively to the military's energy resilience capabilities in Kuwait.
    The document outlines Amendment 0005 to the solicitation for the Camp Buehring Microgrid Project, managed by the U.S. Army Engineer District, Louisville. The main purpose of the amendment is to extend the proposal due date from August 5, 2024, to August 15, 2024, and to update various contract specifications and plan sheets due to printing errors. Key changes include the replacement and updating of numerous electrical plan sheets, modifications to critical specification sections, and clearer instructions for electronic proposal submission via the Procurement Integrated Enterprise Environment (PIEE). Additionally, the document details the project's scope, which aims to supply resilient power to the ARCENT Readiness Training Center at Camp Buehring through the installation of a diesel generator, solar panels, and a battery energy storage system. The amendment also highlights the need for various infrastructure components like fencing, structural evaluations, and as-built drawings. Compliance with local and U.S. regulations is emphasized throughout the project, and all amendments must be acknowledged to avoid rejection of offers. This comprehensive update enhances the submission process and clarifies project requirements, reflecting the government's aim for efficiency and clarity in federal contracting.
    The document is an amendment to the solicitation for the Camp Buehring Microgrid Project, extending the proposal due date from August 15, 2024, to August 28, 2024. Key changes include revisions to several plan sheets due to errors and updates to specification sections including the Project Table of Contents and Price Breakout Schedule. The project, situated at Camp Buehring, Kuwait, aims to supply resilient power to the ARCENT Readiness Training Center. This involves connecting the center to a power plant, installing a new diesel generator, a microgrid system with solar panels, and battery storage. The contractor must provide all necessary equipment, labor, and materials to complete the project, ensuring compliance with local and U.S. codes. Specific tasks include site surveys, grading, installation of security fencing, and creating as-built drawings. This amendment highlights the commitment to enhancing energy infrastructure while addressing intricate logistical considerations within a military context, vital for fulfilling operational readiness goals. The amendment also underscores the need for careful planning and management of resources throughout the project's lifecycle to meet government objectives for sustainability and efficiency.
    This government document is an amendment to Solicitation W912QR24R0046 for the Camp Buehring Microgrid Project, confirming changes to certain specifications, including an extension of the offer acceptance period from 90 to 120 calendar days. It outlines the scope of work, including the installation of a microgrid system featuring a 1.2 MW diesel generator, 700 KW solar PV panels, and a 1.5 MWH Battery Energy Storage System (BESS). The project aims to enhance energy resilience for the ARCENT Readiness Training Center at Camp Buehring, Kuwait. Key tasks include laying out electrical distribution systems, security fencing, drainage systems, and structural analysis of existing buildings to support the new loads from the solar installations, while adhering to local and U.S. codes. The contractor is responsible for site security, material transport, and compliance with working hour protocols. This amendment ensures all parties are aware of the adjustments and requirements necessary for project execution, emphasizing the importance of thorough coordination and adherence to regulations throughout the construction process.
    The document outlines an amendment to the solicitation for the Camp Buehring Microgrid Project, extending the proposal due date from September 5, 2024, to October 4, 2024, and revising key plans and specifications. The project aims to provide resilient power to the ARCENT Readiness Training Center by installing a microgrid system, which includes a 1.5 MW diesel generator, a battery energy storage system, and 700 KW of solar PV panels. The new electrical infrastructure will connect to Camp Buehring's existing power system, ensuring compliance with local and U.S. codes. Details include mobilization, surveys, fencing, and installation of various electrical systems, all structured under a price breakout schedule with job classifications for each task. Security measures and access regulations are emphasized due to the project's location in Kuwait, requiring careful planning for site work and scheduling to avoid disruptions. The amendment reinforces the project's commitment to modernizing energy capabilities and ensuring safety and reliability in military installations.
    The document serves as an amendment for the solicitation W912QR24R0046 pertaining to the Camp Buehring Microgrid Project. The primary change communicated is the extension of the proposal due date from July 8, 2024, to July 17, 2024, at 1:00 PM Eastern Time. Contractors are required to acknowledge this amendment before the specified date to ensure their proposals are considered valid. All other terms and conditions of the solicitation remain unchanged. The amendment is issued by the U.S. Army Engineer District, Louisville, and emphasizes adherence to formal acknowledgement protocols. This amendment reflects standard procedures in federal contracting, maintaining transparency and offering contractors equitable opportunities to submit their proposals. The document's structure provides clear sections detailing the amendment notices, including specifics on signatures required from both the contracting officer and the contractor. Compliance with these formalities is crucial in the context of government RFP processes.
    The document is an amendment to Solicitation W912QR24R0046 for the Camp Buehring Microgrid Project issued by the U.S. Army Engineer District, Louisville. The key change communicated in this amendment is the extension of the proposal due date from July 17, 2024, to August 5, 2024, at 10:00 AM Eastern Time. The amendment specifies that all received offers must acknowledge this change to avoid rejection. The formal notice outlines that other terms and conditions of the original solicitation remain unchanged, and highlights the importance of responding to this amendment to ensure compliance with the solicitation requirements. This document illustrates the procedural nature of government contracting, reinforcing the need for transparency and adherence to deadlines within the federal procurement process.
    The document is an amendment to the solicitation for the Camp Buehring Microgrid Project (Solicitation No. W912QR24R0046) issued by the U.S. Army Engineer District, Louisville. The key update is the extension of the proposal submission deadline from August 28, 2024, to September 5, 2024, at 10:00 AM Eastern Time. All applicants must acknowledge this amendment to ensure their proposals are considered; failure to do so may result in rejection. The amendment states that all other terms and conditions of the original solicitation remain unchanged. Furthermore, it details methods for acknowledging receipt of the amendment, including completion of specified forms or letters. This amendment reflects the government’s standard protocol for adjustments in RFPs while maintaining transparency and compliance in the procurement process.
    Similar Opportunities
    Cape Cod Space Force Station Power Generation Microgrid in Bourne, MA
    Active
    Dept Of Defense
    The Department of Defense, through the U.S. Army Corps of Engineers, New England District, is seeking construction services for a Power Generation Microgrid at Cape Cod Space Force Station in Bourne, Massachusetts. This project aims to enhance the existing power infrastructure by incorporating new electrical components, backup power generation equipment, and renewable energy technologies, while ensuring minimal disruption to ongoing operations within a secured area. The estimated construction cost ranges from $100 million to $250 million, with the project planned for issuance in Summer 2026 and construction expected to commence in Fall 2026. Interested firms must submit a capabilities package by November 20, 2024, to Tyler Maryak at tyler.s.maryak@usace.army.mil, including proof of bonding capability and comments on the potential use of a Project Labor Agreement.
    FY25 Electric Vehicle Charging Facility on Red River Army Depot, Texas
    Active
    Dept Of Defense
    The Department of Defense, through the U.S. Army Corps of Engineers, Fort Worth District, is seeking qualified contractors for the installation of Electric Vehicle Charging Facilities at the Red River Army Depot in Texas. The project involves establishing 22 charging hubs with a total of 50 Level 2 chargers to support a fleet of approximately 171 zero-emission vehicles, with a focus on ensuring compliance with FedRamp Certification and integration with Wex card systems. This initiative is part of the government's commitment to sustainable infrastructure and enhancing electric vehicle capabilities, with an anticipated construction cost between $5 million and $10 million. Interested firms must submit their capabilities and past project experience by November 14, 2024, to Shenika Lewis at shenika.m.lewis@usace.army.mil.
    Platoon Power Generation (PPG)
    Active
    Dept Of Defense
    The Department of Defense, specifically the Army Contracting Command at Aberdeen Proving Grounds, is seeking information from vendors regarding the Platoon Power Generation (PPG) program. The objective is to identify a lightweight, soldier-portable power source capable of generating between 2 to 5 kilowatts, which will support operational and tactical missions by recharging batteries in austere environments for up to 72 hours. This initiative is crucial for maintaining the operational capabilities of platoons, as the increasing reliance on digital platforms and autonomous systems has heightened power demands on the battlefield. Interested vendors are invited to submit white papers by November 18, 2024, at 12:00 PM Eastern Time, to the designated contacts, Kadi-Jah Sheridan and Jessica L. Wright, with specific submission guidelines outlined in the request for information.
    Construction of Multipurpose Training Range (MPTR), Fort Campbell, TN
    Active
    Dept Of Defense
    The Department of Defense, through the U.S. Army Corps of Engineers (USACE) Louisville District, is soliciting proposals for the construction of a Multipurpose Training Range (MPTR) at Fort Campbell, Tennessee. The project encompasses the Design-Bid-Build construction of various facilities, including a range operations control area, control tower, and supporting amenities, with a focus on compliance with Department of Defense standards for safety, sustainability, and accessibility. This initiative is crucial for enhancing military training capabilities and ensuring operational readiness, with an estimated contract value between $25 million and $100 million. Interested contractors must submit their proposals electronically by December 12, 2024, and can direct inquiries to Contract Specialist Jacob Pridemore at jacob.s.pridemore@usace.army.mil or 502-315-6228.
    Design-Build Construction of a Network Enterprise Center in Fort Hunter Liggett, CA
    Active
    Dept Of Defense
    The Department of Defense, through the U.S. Army Corps of Engineers, is soliciting proposals for the design-build construction of a 21,500 square foot Network Enterprise Center at Fort Hunter Liggett, California. The project aims to create a state-of-the-art facility that includes various operational spaces such as a command center, administrative offices, and technical support areas, while also ensuring compliance with Department of Defense standards for safety and environmental considerations. This initiative is critical for enhancing military communication and operational capabilities, with an estimated construction cost between $25 million and $100 million. Interested contractors must submit their proposals electronically by November 8, 2024, and can direct inquiries to Bonny Dylewski at bonny.c.dylewski@usace.army.mil.
    CY24 LCS, WP MATOC, Install HV Back feeding Cables Across South Loop, Kunsan AB.
    Active
    Dept Of Defense
    The Department of Defense, specifically the Department of the Army, is soliciting proposals for the installation of high-voltage back feeding cables across the South Loop at Kunsan Air Base as part of the CY24 LCS Work Plan MATOC. The contractor will be responsible for providing all necessary supervision, labor, tools, materials, and transportation to fulfill the requirements outlined in the Statement of Work and accompanying drawings. This project is critical for enhancing the electrical infrastructure at the base, ensuring reliable power supply for operational readiness. Interested contractors who are part of the specified MATOC work-plan contractors must contact Kyong Ko at kyong.o.ko.ln@army.mil or call 011-82-503-355-9315 for further details and to submit proposals.
    Uninterrupted Power Supply Maintenance - Caven Point
    Active
    Dept Of Defense
    The Department of Defense, through the U.S. Army Corps of Engineers (USACE), is seeking proposals for a service contract to provide maintenance for the Uninterrupted Power Supply (UPS) at the Caven Point Marine Terminal in Jersey City, New Jersey. The contract will cover one base year, from December 16, 2024, to December 15, 2025, with options for four additional years, focusing on preventative maintenance and inspections, including both annual and semi-annual requirements. This maintenance is critical for ensuring the reliability of electrical and electronic equipment components, which are essential for the terminal's operations. Interested contractors must comply with federal security regulations and submit proposals that demonstrate cost-effectiveness, with a focus on small business participation, including service-disabled veteran-owned and women-owned businesses. For further information, potential bidders can contact Adrian Stafford-Browne at adrian.j.stafford-browne@usace.army.mil or Matthew Lubiak at matthew.e.lubiak@usace.army.mil.
    U.S. Embassy Baghdad Power Plant Remediation
    Active
    State, Department Of
    The U.S. Department of State is seeking qualified firms to provide Design-Build Services for the Power Plant Remediation Project at the U.S. Embassy in Baghdad, Iraq. This project aims to address significant operational challenges of the existing central power plant, which has been underperforming since 2018, with a construction budget estimated between $68 million and $83 million. Firms must demonstrate relevant experience by providing proof of previously completed contracts of similar scope and complexity valued at least $56,250,000, and all submissions must adhere to U.S. diplomatic security regulations. Interested parties must submit their qualifications by November 18, 2024, and can contact Chrissie Fields at FieldsSc@state.gov or Keith Aiken at AikenK@state.gov for further information.
    REQUEST FOR PROPOSALS FOR THE DEVELOPMENT OF RENEWABLE ENERGY GENERATION AT THE FORMER NAVAL ACADEMY DAIRY FARM
    Active
    Dept Of Defense
    The Department of Defense, through the Naval Facilities Engineering Command Washington, is soliciting proposals for the development of renewable energy generation at the former Naval Academy Dairy Farm, located in Maryland. The project aims to lease approximately 857 acres for clean energy initiatives, integrating solar energy production with local agricultural practices while ensuring compliance with environmental and historical regulations. This initiative is part of the Navy's broader commitment to achieving net-zero greenhouse gas emissions by 2050 and enhancing climate resilience. Interested parties must submit their proposals by December 2, 2024, and can direct inquiries to Kara Lynn Noya at kara.l.noya.civ@us.navy.mil or Christine Hays at christine.a.hays.civ@us.navy.mil.
    Substation (Primary 4), Redstone Arsenal, AL
    Active
    Dept Of Defense
    The Department of Defense, through the U.S. Army Engineer District Mobile, is seeking information from qualified contractors for the construction of a high voltage Electrical Primary Substation at Redstone Arsenal, Alabama. This project involves the installation of electrical power transmission lines connecting the new substation to existing facilities and the future Tennessee Valley Authority 161,000 volt transmission feed, with a construction contract value anticipated between $25 million and $100 million. Interested firms are encouraged to respond to this Sources Sought Notice by providing details on their capabilities, past performance, and bonding capacity, with submissions due electronically by November 14, 2024, to Ariel Chamberlain and Stephanie Scalise at the provided email addresses.