127EAW24R0071 -Road 6N06 Slide Repair
ID: 127EAW24R0071Type: Solicitation
Overview

Buyer

AGRICULTURE, DEPARTMENT OFFOREST SERVICEUSDA-FS, CSA SOUTHWEST 6Albuquerque, NM, 871023498, USA

NAICS

Highway, Street, and Bridge Construction (237310)

PSC

CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS (Y1LB)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)
Timeline
    Description

    The U.S. Department of Agriculture's Forest Service is soliciting bids for the Road 6N06 Slide Repair project located in the Six Rivers National Forest, California. The project involves significant road reconstruction, including the removal of existing asphalt, construction of a mechanically stabilized earth wall, installation of culverts, and implementation of erosion control measures, with an estimated contract value between $500,000 and $1 million. This procurement is crucial for restoring and enhancing the resilience of the affected road infrastructure following storm damage. Interested contractors must submit their proposals by the specified deadlines, attend a mandatory site visit on August 27, 2024, and direct all inquiries to Contracting Officer Greg Cunningham at gregory.cunningham@usda.gov.

    Point(s) of Contact
    Files
    Title
    Posted
    The government seeks a contractor to repair a forest road and two wire-faced retaining walls on the Six Rivers National Forest's Trinity River Ranger District in California. The work involves significant road reconstruction, including removing existing surfaces, constructing a new MSE structure, and repaving with a 3" hot asphalt layer. Contractors must also remove and replace culverts, provide traffic control, and ensure thorough site cleanup. The project has a 180-calendar day deadline. Contractors must attend to physical site conditions, work week restrictions, and equipment cleaning, with an emphasis on noxious weed removal. Standard specifications for federal highway projects apply, along with supplemental project specifications. Erosion control, hazardous spill, fire, construction, safety, and traffic control plans are required. The RFP includes a pre-bid tour and emphasizes the contractor's responsibility for protecting cultural resources.
    The government seeks bids for road repair and restoration on the Six Rivers National Forest's FSR 6N06. The project entails removing asphalt, constructing a mechanically stabilized earth wall, installing culverts and drains, and implementing erosion control measures. With an estimated value between $500,000 and $1 million, the contract requires strict adherence to specifications and industry standards. Offerors must submit detailed proposals, including pricing for all items, with a focus on timely performance and compliance with numerous government regulations. Site visits are organized, and bidders are encouraged to attend. The winning contractor will be responsible for providing all necessary personnel, equipment, and materials, with work set to commence within 10 days of receiving notice. Bonding and insurance requirements are outlined, and successful bidders must meet stringent financial and legal obligations, including compliance with labour and environmental regulations.
    The government agency seeks bids for road repair and rehabilitation works on Road 6N06, encompassing two sites. The base construction site requires tasks like traffic control, excavation, asphalt removal, and installation of various drainage systems. Option 1 covers additional repairs at a second site, involving similar tasks but with some variations in materials and quantities. Contractors must submit pricing for all items, with notes emphasizing field verification of quantities and a single award anticipated. The agency emphasizes that bond premiums are included in the contract price. The document invites bids by providing details on the scope, expectations, and requirements for the project, awaiting contractor proposals with pricing details.
    The document outlines the schedule of items and construction tasks for the Road 6N06 Slide Repair projects under federal RFPs. It details two main sites (Site 1 and Site 2) with various construction items, estimated quantities, and unit costs, emphasizing the need for contractors to provide pricing for all listed items. Key activities include mobilization, traffic control, erosion control, and the installation of culverts, with specific measurements for excavation and materials such as riprap and asphalt concrete. The document specifies that one award will be made from the solicitation, and contractors are responsible for verifying quantities to meet project specifications. Payment conditions are also noted, indicating that bond premiums will not be included in the contract price. The intent of this RFP is to solicit bids for the necessary construction work to repair and improve the road infrastructure, ensuring compliance with federal standards and project requirements.
    The file details rigorous specifications for a Route 6 ERFO project, outlining construction requirements, quality control procedures, and acceptance criteria. It covers a range of tasks, from excavation and embankment construction to traffic control, surveying, and soil erosion prevention. The project aims to enhance roadway infrastructure, emphasizing compliance with US Forest Service guidelines and FP-14 standards for road and bridge construction. Contractors will face detailed mandates and assessments, including quality control manager qualifications and testing protocols, ensuring the work's technical proficiency and adherence to stringent specifications.
    This file details a fire management plan for construction and service contracts within the Forest Service's jurisdiction. It outlines the respective responsibilities of contractors and the Forest Service in preventing and managing fires within the contract area. The plan is comprehensive, covering topics from tools and equipment requirements to state law compliance and emergency measures. Contractors must adhere to stringent standards, especially during the fire precautionary period. These standards include fire prevention protocols, such as equipping engines and flues with spark arresters and providing fire-fighting tools and equipment. Additionally, the plan establishes project activity levels (PALs) that dictate specific precautions and restrictions based on fire danger predictions. Contractors must conform to these PALs daily, and the Forest Service reserves the discretion to change them based on changing fire risks. The file also designates points of contact for fire reporting and provides a climatology analysis for expected days at each PAL value.
    The file details a procurement for the United States Department of Agriculture's Forest Service, specifically concerning storm damage repair on the Six Rivers National Forest's Lower Trinity District. It encompasses various sites along FSR 6N06, requiring asphalt removal, retaining wall construction, and culvert installation. The project aims to mitigate the impact of storms and enhance the resilience of the affected areas. The file contains detailed drawings, specifications, and logistics for bidders, outlining the work required at each site, including road closures, traffic management, and the installation of MSE walls and drainage systems. Significantly, it emphasizes the need for site excavation and the use of geotextiles, geomembranes, and geocomposites in the construction process.
    This lengthy file contains detailed wage information for various construction and labour categories in specific California counties (Del Norte, Humboldt, Lake, and Mendocino), essential for contractors bidding on government projects in these regions. The rates, effective from various dates, are divided into categories such as carpenters, electricians, operators, and truck drivers, with distinctions based on location and type of work. There's also guidance on additional pay for specialized work and provisions for paid sick leave. It's a comprehensive resource for contractors, ensuring they're aware of the prevailing wages needed to conform to government contracts in these California counties.
    The Request for Information (RFI) 127EAW24R0071 seeks repairs for Road 6N06, with particular attention to addressing a slide issue. Potential offerors must submit all inquiries to the Contracting Officer, Gregory Cunningham, via email in a specified editable format. The US Forest Service (USFS) will respond to these RFIs via beta.SAM.gov, creating a transparent and auditable trail of communication. This process ensures clarity and equality in the procurement process.
    This document serves as an amendment to a solicitation issued by the USDA Forest Service, outlining the requirements for vendors to acknowledge receipt of this amendment by specified methods before the deadline. It reveals that failure to submit this acknowledgment may result in the rejection of proposals. Additionally, the amendment communicates the posting of responses to Round 1 of Requests for Information (RFI) and includes a revised schedule of items that must be used in any subsequent contract award. Vendors must incorporate these revised documents into their proposals to be considered responsive. The purpose of this amendment is to ensure clarity and adherence to updated requirements for proposals related to construction services. The amendment is administered by the USDA Forest Service's Procurement & Property Services. Ensuring compliance with these guidelines is crucial as it affects contract eligibility and procurement processes.
    The document outlines responses to a Request for Information (RFI) related to the Road 6N06 Slide Repair project (RFP 127EAW24R0071) issued by the U.S. Forest Service (USFS). It addresses key inquiries about project specifics. Notable responses include the requirement of 30 tons of asphalt for Site #2 and a projected start date of June 9, 2025. Additionally, it clarifies that the removal and replacement of a 24-inch culvert is included in a line item and procedural adjustments are needed to formally include roadway excavation, base rock, and asphalt in the schedule of options. An amendment to the original solicitation will follow to update the schedule of items accordingly. This document serves as an official communication for prospective contractors involved in the bidding process, ensuring clarity on project requirements and timelines.
    Lifecycle
    Title
    Type
    Similar Opportunities
    O'Neil Creek Bridge Repairs
    Active
    Agriculture, Department Of
    The Department of Agriculture, specifically the Forest Service, is seeking qualified contractors for the O'Neil Creek Bridge Repairs project located in Klamath National Forest, California. The project involves the removal and replacement of damaged concrete deck slabs and steel railings, with a total small business set-aside contract valued between $250,000 and $500,000. This initiative is crucial for restoring infrastructure following damage from the 2022 McKinney Fire, ensuring compliance with safety and environmental standards throughout the repair process. Interested parties must submit sealed bids electronically to the designated Contract Specialist, Tanya Torres, by the deadline, with all Requests for Information due by August 30, 2024.
    OR ERFO FS UMPQU 615-2022-2(1), Umpqua ERFO Repairs 2022
    Active
    Transportation, Department Of
    The Department of Transportation, through the Federal Highway Administration, is seeking qualified contractors for the Umpqua ERFO Repairs 2022 project located in the Umpqua National Forest, Oregon. The project involves the repair of a 0.19-mile aggregate roadway, including ditch regrading, slope stabilization, and the construction of a mechanically stabilized earth wall, with a focus on environmental compliance and infrastructure integrity. This initiative is part of federal efforts to maintain and improve infrastructure in natural areas, ensuring safety and environmental protection while promoting public access. The contract is a total small business set-aside, with an estimated price range between $700,000 and $2,000,000, and is anticipated to be solicited in winter 2024/2025. Interested vendors can contact the Contracts G. Office at wfl.contracts@dot.gov or call 360-619-7520 for further details.
    12363N24R4022 - Cedar DxP IRSC - Solicitation
    Active
    Agriculture, Department Of
    The U.S. Department of Agriculture's Forest Service is soliciting proposals for the Cedar DxP Integrated Resource Stewardship Contract (IRSC) aimed at managing hazardous fuels and restoring access in areas affected by the 2022 Cedar Creek fire in Oregon. The project encompasses approximately 3,308 acres and includes critical activities such as cutting and removing hazardous trees, slash disposal, and extensive road reconstruction to enhance safety and usability of affected road systems. This initiative is vital for ecological restoration and public safety, reflecting the government's commitment to sustainable forest management practices. Interested contractors must submit sealed bids by September 11, 2024, with an estimated contract value between $1 million and $5 million, and can direct inquiries to Eduardo Cortez at eduardo.cortez@usda.gov or Mark Phillipp at mark.phillipp@usda.gov.
    Project WV ERFO FS MNGAH921 2018-1(1) - Monongahela National Forest
    Active
    Transportation, Department Of
    The Department of Transportation, specifically the Federal Highway Administration's Eastern Federal Lands Highway Division, is seeking qualified small businesses for a construction project in the Monongahela National Forest, West Virginia. The project involves trail and road repairs, culvert replacements, and bridge reconstructions across 29 repair sites, necessitated by damage from significant storms, with an estimated total cost between $12 million and $15 million. This initiative aims to enhance infrastructure resilience and promote small business participation in federal contracting opportunities. Interested prime contractors must submit their qualifications by September 25, 2024, to Mr. Michael Sun at EFLHD.Contracts@dot.gov, adhering to specific formatting guidelines for their submissions.
    Z--Folsom Right Wing Dam Ditch Bypass Modification
    Active
    Interior, Department Of The
    The Department of the Interior, through the Bureau of Reclamation, is seeking potential sources for the Folsom Right Wing Dam Ditch Bypass Modification project, located approximately 12 miles north of Folsom, California. This procurement involves a large construction effort estimated to cost between $5 million and $10 million, focusing on various tasks such as mobilization, site preparation, utility management, excavation, and ecological restoration. The project is critical for enhancing infrastructure and environmental management within the Central Valley Project, adhering to federal guidelines throughout its execution. Interested parties must submit their qualifications and relevant information to Contract Specialist Ron Gamo at rgamo@usbr.gov by 5:00 PM PDT on September 13, 2024, to be considered for this opportunity.
    127EAX24Q0045 – Granite Basin & Mingus Mountain Road NFSR 374 & 104
    Active
    Agriculture, Department Of
    The Department of Agriculture, specifically the Forest Service, is seeking qualified contractors for the Granite Basin and Mingus Mountain Road project, identified by solicitation number 127EAX24Q0045. The procurement involves significant repairs and improvements to National Forest Service Roads 374 and 104 in Prescott, Arizona, focusing on adding culverts, reconditioning ditches, repaving, and implementing erosion control measures along approximately 1.5 miles of roadway. These enhancements are crucial for maintaining access to popular recreational areas and ensuring road safety following damage from heavy runoff events. Interested contractors must submit their proposals by September 12, 2024, and are encouraged to attend a mandatory site visit on August 14, 2024. The project has an estimated value between $1 million and $5 million, and all inquiries should be directed to Michelle Bahr at michelle.l.bahr@usda.gov.
    FY24 Grave Creek Road Maintenance
    Active
    Agriculture, Department Of
    The Department of Agriculture, specifically the Forest Service, is seeking qualified small businesses to provide road maintenance services for approximately 36 miles of roads within the Kootenai National Forest as part of the FY24 Grave Creek Road Maintenance project. The procurement involves a range of tasks including grading, shaping, roller compaction, heavy brushing, and ditch reconditioning, all aimed at ensuring safe and accessible roadways while adhering to environmental standards. This contract, scheduled for performance from October 1, 2024, to September 30, 2025, emphasizes the importance of maintaining infrastructure within national forest lands and requires contractors to submit comprehensive technical proposals that include equipment and timelines. Interested parties can contact Shawn Trout at shawn.trout@usda.gov or by phone at 802-613-7644 for further details.
    Rivbulio Fire Recovery IRSC
    Active
    Agriculture, Department Of
    The U.S. Department of Agriculture's Forest Service is soliciting proposals for the Rivbulio Fire Recovery Integrated Resource Stewardship Contract (IRSC) in the Mount Hood National Forest, Oregon. This procurement aims to address post-fire recovery efforts, including hazardous tree removal, road maintenance, and reconstruction to enhance public safety and reduce fire risks in the affected areas. The project encompasses approximately 2,314 acres and is critical for restoring forest health and ensuring safe access for the community following disaster declaration FEMA-4562-DR. Interested contractors must submit their proposals by the specified deadlines, with a performance period extending until December 31, 2027. For further inquiries, contact Matt Daigle at matthew.daigle@usda.gov or call 605-415-9057.
    CA ERFO DEVA 2022-1(2) Salt Creek Interpretive Trail
    Active
    Transportation, Department Of
    The Department of Transportation, through the Federal Highway Administration, is soliciting bids for the reconstruction of the Salt Creek Interpretive Trail in Death Valley National Park, California. This project involves replacing a 2,871-foot-long, ADA-accessible raised timber boardwalk trail that was destroyed by flash flooding in August 2022, along with debris removal, roadway reconstruction, and parking lot improvements. The initiative is crucial for restoring visitor access while adhering to environmental standards and ensuring safety in sensitive cultural and natural resource areas. Interested small businesses must submit sealed bids by 2:00 PM on October 3, 2024, with an estimated project value between $5 million and $10 million. For further inquiries, contact Kelly Palmer at cflcontracts@dot.gov.
    Crazy Woman Creek Corridor Updates - Forest Service Rd. 33 Repairs
    Active
    Agriculture, Department Of
    The U.S. Department of Agriculture, specifically the Forest Service, is soliciting proposals for the Crazy Woman Creek Corridor Updates project, which involves significant repairs to Forest Service Road 33 in the Bighorn National Forest, Wyoming. The primary objectives include the replacement of a bridge at milepost 1.70, rehabilitation of additional bridges and road segments, and culvert replacements, all aimed at enhancing infrastructure integrity and ensuring compliance with federal standards. This project is crucial for maintaining safe and efficient transportation routes within national forest lands, reflecting the government's commitment to environmental stewardship and infrastructure improvement. Interested small businesses must submit sealed bids by October 3, 2024, with a performance period scheduled from January 1, 2025, to July 1, 2026. For further inquiries, potential bidders can contact Mark Reed at mark.reed@usda.gov.