Z1DA--578-20-002 Renovations to Building 217 (CON) at Edward Hines Jr. VA Hospital, Hines, IL.
ID: 36C25225B0014Type: Presolicitation
Overview

Buyer

VETERANS AFFAIRS, DEPARTMENT OFVETERANS AFFAIRS, DEPARTMENT OF252-NETWORK CONTRACT OFFICE 12 (36C252)MILWAUKEE, WI, 53214, USA

NAICS

Commercial and Institutional Building Construction (236220)

PSC

MAINTENANCE OF HOSPITALS AND INFIRMARIES (Z1DA)

Set Aside

Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14) (SDVOSBC)
Timeline
    Description

    The Department of Veterans Affairs is seeking qualified contractors for the renovation of Building 217 at the Edward Hines Jr. VA Hospital in Hines, Illinois, under solicitation number 36C25225B0014. The project, identified as 578-20-002, involves comprehensive renovations to enhance the Community Living Center, including the construction of a new multi-purpose room, upgrades to patient care areas, and improvements to mechanical, electrical, and plumbing systems. This initiative is crucial for modernizing healthcare infrastructure to better serve veterans, ensuring compliance with safety and regulatory standards throughout the renovation process. Interested contractors, particularly those classified as Service-Disabled Veteran-Owned Small Businesses (SDVOSB), must submit their bids by June 10, 2025, with an estimated project cost between $5 million and $10 million. For further inquiries, contact Contracting Officer Juan C. Gaytan at juan.gaytan@va.gov or call 224-610-3644.

    Point(s) of Contact
    Juan C. GaytanContracting Officer
    (224) 610-3644
    juan.gaytan@va.gov
    Files
    Title
    Posted
    The "Contractor Parking" document outlines the transportation and parking requirements for contractors working on federal and state projects. It establishes guidelines to ensure that contractor vehicles are parked in designated areas to avoid disruptions and maintain safety on project sites. Key points include the necessity of securing parking permits, adhering to specified parking zones, and following local regulations to prevent penalties. The document stresses the importance of efficient traffic management, including the impact on site operations and accessibility. Compliance with these parking regulations not only facilitates contractor activities but also supports overall project goals by minimizing logistical challenges. This framework is vital for maintaining organized work environments and addressing the practicalities of contractor operations in various governmental projects.
    The Pre-Construction Checklist outlines essential procedures for contractors engaged in government projects, specifying roles, requirements, and responsibilities. The Contracting Officer holds exclusive authority to bind the U.S. Government, with the VA Project Manager acting as the technical supervisor. Contractors must submit progress schedules and payment requests monthly, detailing costs and work performed. Safety protocols emphasize the protection of personnel and property, with the VA Safety Officer empowered to halt work for safety violations. Any changes to the contract must be proposed through the Contracting Officer, adhering to specified guidelines, including detailed cost breakdowns for projects exceeding $1,000. Labor standards necessitate posting wage rates on-site, with apprentices required to follow certified programs. Additionally, all contractor correspondence must clearly identify contract details. The document serves as a comprehensive guide to ensure compliance, safety, and accountability in government contracting processes, emphasizing the need for thorough documentation and communication throughout the project lifecycle.
    The VHA Pre-Construction Risk Assessment (PCRA) document outlines procedures and requirements for assessing risks associated with construction, renovation, and maintenance activities within Veterans Health Administration facilities. It emphasizes the importance of categorizing activities according to their potential safety risks to patients, employees, and contractors, requiring regular communication and coordination with impacted areas throughout the planning and execution phases. Different activity types are defined, ranging from inspection/upkeep to large-scale projects, each requiring specific control measures to mitigate risks such as noise, vibration, and potential hazards related to construction activities. Furthermore, the document mandates that adjacent areas are assessed to ensure operational continuity and compliance with safety regulations, including the incorporation of an Infection Control Risk Assessment (ICRA) when necessary. A permit form is included, designed to be posted at the construction site, detailing project specifics such as location, manager contact information, and required safety protocols. Overall, the PCRA serves as a crucial governance framework for ensuring safety and risk management during facility projects, demonstrating the VHA's commitment to maintaining a safe healthcare environment.
    The Standard Operating Procedure (SOP-578-21-21-606) established by the Edward Hines Jr. VA Hospital outlines the implementation of Interim Life Safety Measures (ILSM) to address hazards from Life Safety Code deficiencies and construction activities. Effective from October 20, 2020, the SOP delineates responsibilities for enforcing these measures, including the Safety Section's oversight, the roles of construction chiefs, and police service inspections. The document specifies eleven ILSMs aimed at ensuring unobstructed exits, maintaining fire alarm systems, and conducting additional fire drills as necessary during construction phases. Prior to any project initiation, an assessment will be conducted, and appropriate protocols for signage, safety drills, and equipment inspections will be established based on potential fire safety impacts. Any changes during construction must be documented and managed collaboratively among service chiefs and safety personnel. The SOP will undergo periodic reviews, with a recertification schedule set for October 2025, ensuring ongoing compliance with safety standards and regulations as dictated by the Joint Commission and the NFPA Life Safety Code. This policy underscores the Hospital's commitment to maintaining a safe environment for patients, staff, and visitors throughout all construction activities.
    The VHA Infection Control Risk Assessment (ICRA) for construction, renovation, and maintenance serves as a guideline for performing facility assessments to prevent infection risks. The document outlines steps to categorize activities into four distinct levels (A, B, C, D) based on their patient risk and duration. Assessment involves identifying affected areas and determining necessary infection control precautions, which range from Level I to IV, with increased stringency for higher risk categories. Key measures for infection control include maintaining dust-free environments, using barriers, and managing airflow with HEPA filtration. After project completion, areas must be cleaned and inspected to ensure safety and compliance with health guidelines. This template is crucial for ensuring that construction activities in healthcare facilities minimize infection risks while complying with regulations. The document is particularly relevant in the context of government RFPs and funding arrangements aimed at improving healthcare infrastructure while safeguarding patient health.
    The document details the renovation project for Building 217 at the Edward Hines Jr. Veterans Affairs Medical Center. It outlines architectural and engineering specifications, as well as procedural requirements for contractors and subcontractors involved in the project. The renovation focuses on improving the facility to meet health and safety standards, with emphasis on infection control, fire protection, and plumbing upgrades. Key milestones for project phases include schematic design, design development, and full construction documentation by December 6, 2024. Contractors must adhere to various regulatory guidelines and ensure all work is coordinated among teams to prevent disruptions and ensure compliance with VA standards. The document emphasizes the importance of thorough site assessments, safety measures, and appropriate handling of existing utilities, indicating a structured approach to modernizing the facility while maintaining high safety and operational standards for veterans' health services. Overall, it reflects the VA's commitment to enhancing infrastructure to better serve its community.
    The document outlines comprehensive renovation plans for Building 217 at the Edward J. Hines Jr. VA Medical Center. The renovations encompass various spaces, including patient rooms, offices, and common areas, with a focus on updating existing structures to meet modern healthcare standards while ensuring compliance with fire and safety regulations. Key elements include detailed floor plans, section drawings, and specifications for construction practices, such as maintaining acoustic ratings and ensuring accessibility. The project aims to enhance the functionality and safety of the facility, improving patient care environments through upgraded mechanical, electrical, and plumbing systems. Significant features highlight planned layouts, room sizes, and the installation of specialized clinical areas, including bariatric patient rooms. The timeline outlines multiple phases of development, from schematic design to construction completion, scheduled for December 2024. This renovation project is significant for advancing the quality of care within VA facilities, reflecting a commitment to modernizing medical infrastructure in alignment with federal standards. The detailed plans and specifications emphasize the thoroughness of the approach, ensuring an organized execution of the construction process while adhering to strict guidelines for the health and safety of patients and staff.
    This document provides general guidelines for contractors regarding fire protection and sprinkler system installations at the Edward J. Hines Jr. Veterans Affairs Medical Center, specifically for Building 217 renovations. The primary focus is on compliance with fire safety standards, including adherence to NFPA codes and requirements set by relevant authorities. Contractors are instructed to assess project documents meticulously, coordinate work with other trades, manage logistics for equipment handling, and ensure all installations comply with federal, local, and safety codes. Key responsibilities include the submission of detailed shop drawings and hydraulic calculations, maintenance of existing systems during construction, and thorough inspections and testing of new installations. The document emphasizes the need for licensed and experienced contractors, as well as compliance with life safety and infection control measures throughout the project. Overall, this serves as a comprehensive directive ensuring that fire protection systems are efficiently and safely integrated into the facility’s renovations, reinforcing the VA's commitment to operational excellence and facility safety.
    The document outlines the plumbing general notes, materials, and procedures for the renovation of Building 217 at the Edward J. Hines Jr. VAMC. It emphasizes compliance with all applicable local, state, and federal codes, detailing responsibilities for contractors to review project documents fully, coordinate with various trades, and ensure all installations adhere to specified standards. Key aspects include adherence to equivalency substitution protocols for materials and equipment, submission of shop drawings for approval, and maintaining safe working conditions. It specifies meticulous installation requirements such as pipe support, slope for drainage, service valves at all branch piping, and proper venting of systems. Additionally, the document highlights demolition procedures, asserting that existing fixtures and associated piping must be properly handled and documented during renovation. The contractor is responsible for all aspects of the plumbing system from installation to as-built documentation upon project completion. This comprehensive guidance is crucial for ensuring the project meets safety standards and operational efficiency while facilitating proper coordination in a multi-trade environment. Overall, the document serves as a crucial reference for contractors to ensure compliance and effective coordination during construction.
    The document outlines the mechanical renovation plans for Building 217 at the Edward J. Hines Jr. VA Medical Center, detailing specifications for the removal and replacement of HVAC systems and ductwork. It emphasizes compliance with current federal building codes and safety regulations, including the necessity of maintaining uninterrupted operations of the existing facilities during renovations. Key tasks include examining project drawings, coordinating with other trades, and adhering to specific installation requirements for mechanical systems. The contractor must ensure all materials are protected and properly stored and is required to provide as-built drawings upon project completion. This comprehensive plan reflects the commitment toward improving healthcare facility infrastructure while ensuring the safety and operational efficiency of the facility throughout the renovation process.
    The document outlines the electrical general notes and requirements for the renovation of Building 217 at the Edward J. Hines Jr. VA Medical Center. It establishes guidelines for demolition, installation, and electrical work, emphasizing compliance with various codes, including the National Electrical Code and ADA regulations. Key points include required mounting heights for electrical devices, specific wiring and conduit sizes based on distances, and the necessity for coordination among trades during installation. The contractor is responsible for ensuring safety measures, maintaining electrical service during construction, and adequately conducting site inspections before bidding. Additionally, the document details equipment handling, installation procedures, and the responsibility for maintaining a clean and safe work environment. Overall, the notes emphasize adherence to standards, safety, and thorough communication with relevant authorities, reflecting the VA's commitment to high-quality and compliant renovations.
    The Edward Hines Jr. VA Medical Center is initiating renovations for Building 217 under contract 36C25223C0071. This project, referenced as Station Project No. 578-20-002, includes comprehensive construction efforts outlined in detailed architectural and engineering documents. Key components consist of demolition, construction of new structures and systems, and emphasis on safety and compliance with VA standards. The project entails various divisions including general requirements, existing conditions, finishes, specialties, equipment, plumbing, and HVAC systems, emphasizing sustainable practices and adherence to quality control measures. Security protocols are crucial, ensuring all personnel follow strict access and safety regulations. Contractors are required to develop an organized logistics plan detailing personnel, material storage, and project timelines. Moreover, ongoing coordination with the VA medical center is essential to minimize disruptions to operations, maintaining healthcare services throughout the renovation. This undertaking reflects the VA’s commitment to enhancing facility infrastructure and ensuring a safe environment for veterans and staff alike, demonstrating the significance of infrastructure improvements in government projects.
    The document details the renovations planned for Building 217 at the Edward Hines Jr. VA Hospital, focusing on upgrading the Community Living Center (CLC). The project encompasses a comprehensive design strategy, including schematic and construction documents provided by Bancroft Architects + Engineers. Key objectives include remodeling areas such as the entrance lobby, dining rooms, and specialized units for patients, specifically targeting the enhanced needs of dementia, bariatric, and high-risk fall patients. Key components of the project involve upgrading dining options, creating a new multi-use space, and ensuring compliance with relevant codes and standards, including various safety and accessibility guidelines. Additional considerations include innovative interior design to promote comfort and well-being, especially for dementia patients, through familiar and calming environments. The renovations aim to improve patient care facilities by modernizing infrastructure to meet evolving needs, reflecting the VA's commitment to providing high-quality care in supportive living environments. This approach aligns with federal grant frameworks for veterans' health services and infrastructure development, emphasizing both functionality and the enhancement of patient experience.
    The Edward Hines Jr. VA Hospital is set to undergo significant renovations in Building 217, aimed at enhancing patient care and experience. This project entails the refurbishment of various facilities, including the Primary Care Clinic, a Dementia Unit, and associated dining areas. Key features include modernized mechanical, electrical, and plumbing systems designed according to stringent federal and industry codes, supporting safe and efficient operations. The renovation will introduce new HVAC systems, fixtures, and accessibility improvements, ensuring compliance with safety regulations, including fire protection and electrical standards. Special consideration is given to the needs of patients with dementia, incorporating design principles that aid navigation and comfort, such as minimizing overstimulation and enhancing familiar settings. Additionally, the project includes the installation of modernized data and telecommunication systems to facilitate advanced healthcare delivery. The overarching goal is to create a supportive, healing environment that meets the practical needs of patients and their families, while complying with VA guidelines and fostering a collaborative atmosphere for patient care.
    The document outlines technical specifications for air distribution products and mechanical load calculations related to the renovation of the VA Hines facility in Illinois. It describes two main types of air distribution systems: the High Capacity Drum Louvers (HCD) and the Linear Slot Diffusers (SDS), both engineered for effective airflow control in architectural applications. The HCD features adjustable vanes in a rotatable drum, while the SDS offers customizable airflow patterns with various frame options to enhance aesthetic appeal. Furthermore, the report details the air system sizing for the ATRIUM AHU project, summarizing load calculations including total coil loads, airflow requirements, and specific equipment details essential for effective heating, ventilation, and air conditioning (HVAC) operations. The calculations indicate the building's airflow needs based on a variety of operational conditions, emphasizing the importance of VAV (Variable Air Volume) systems for maintaining comfortable indoor environments. The document serves as a technical reference for proposals in government contracts and grants, highlighting the precision needed in HVAC system design to meet both operational efficiency and regulatory standards.
    The Calm-Branches product, part of the Calm Collection created by FACT.DESIGN, aims to reduce stress through visually calming natural fractal patterns, inspired by tree canopies. The design utilizes a three-part line that is consistently repeated and rearranged to evoke similar eye movements as one would experience under a tree's branches, fostering relaxation and concentration in various environments, including commercial and educational spaces. Key specifications include a 9mm polyester felt material, sized at 24” x 24” x 0.7”, weighing 3.5 lbs, and backed by a 3-year warranty. The product is flammability certified and comprises 60% pre-consumer recycled content, offering eco-friendly benefits. Installation is straightforward, requiring standard construction-grade adhesive, while maintenance involves simple dusting or vacuuming. The tiles exhibit color variations and can show seams due to material characteristics, highlighting the importance of sample verification before installation. This product aligns with government procurement focuses on wellness and sustainability within public and educational environments, potentially qualifying for bids in federal grants and local RFPs aimed at enhancing community health through thoughtful design solutions.
    The document outlines a Request for Proposal (RFP) regarding the update of capital assets inventory records for the Edward Hines, Jr. VA Hospital, identified by project number 578-14-012. Issued on January 18, 2016, the RFP details the operational areas across two floors of the facility, including specifications of space allocations for departments such as Primary Care, Beds CLC (Nursing Home Care Unit), Dental, Emergency Medical Services (EMS), Engineering, Linen Service, Nutrition/Food, Pharmacy, and Rehabilitation Medicine. Key information includes the total gross area measures: approximately 119,094 square feet for Level 01 and 56,187 square feet for Level 02. Each departmental area is specifically detailed with its corresponding square footage. It emphasizes tracking and managing capital assets effectively within the VA system, underscoring the importance of precision in healthcare facilities’ operations to enhance patient care and service delivery. The document serves as a foundational component of the proposal process, ensuring compliance with federal standards for facility management and funding oversight.
    The document outlines the construction plans for renovations to Building 217 at the Edward J. Hines Jr. Veterans Affairs Medical Center, focusing on architectural partition types and their installation requirements. It details the specifications for metal framing, gypsum board application, sound attenuation measures, and structural guidelines, emphasizing that partitions must meet acoustic ratings and extend to the structure above for the integrity of fire-rated systems. Additional directives include securing walls to the existing concrete slab, installing galvanized steel sheets, and considerations for new subsurface floor preparations. The file specifies coordination with plumbing, mechanical, and electrical plans and highlights safety measures required during construction. It reflects a thorough approach to improving patient care environments while ensuring regulatory compliance and safety standards in VA facilities. This project represents the federal commitment to enhancing healthcare infrastructure for veterans.
    The document outlines the requirements and procedures for submitting a fingerprint request form for contractors involved in engineering service project planning in conjunction with the Department of Veterans Affairs (VA). Applicants must provide original identification documents, complete necessary fields, and attend a designated fingerprint location. Several identification documents are accepted, while specific documents such as student IDs and temporary licenses are not. The form also includes sections for personal information, employment history, and disclosures related to military service and criminal convictions. Additionally, a declaration confirms the applicant's eligibility and truthfulness of responses concerning federal employment. Overall, this process is critical for ensuring proper identity verification and security clearance for those working on federal contracts or in capacity affecting veterans’ healthcare services.
    The document is an emergency contact list related to the Donation Renovations project at Building 217. It includes critical contact information for Hines VA Police, Fire, and Safety Office, highlighting their significance during emergencies. Additionally, the list outlines key personnel involved in the project, such as the Superintendent, Alternate Superintendent, Project Manager, Safety Manager, Hines VA Contracting Officer Representative (COR), and Backup COR. This contact information aims to enhance communication and ensure quick responses to any incidents during the project's undertaking. The list is a vital resource to maintain safety and operational efficiency in alignment with federal guidelines for project management within the context of government contracts and grants.
    The presolicitation notice outlines the upcoming renovation project for Building 217 at Edward Hines Jr. VA Hospital in Hines, Illinois. The project, identified by solicitation number 36C25225B0014, involves enhancements to the Community Living Center to improve the healing environment for patients, visitors, and staff. It consists of 11 separate contract line item numbers (CLINs), with CLINs 1 and 2 designated as the base bid. The project requires verification of all measurements and dimensions by the contractor. The anticipated period of performance is 750 days from the Notice to Proceed (NTP), which is expected around 14 days post-award contingent on necessary bonding and insurance. This solicitation is set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB). Bids must be submitted by June 10, 2025, and the project cost is estimated between $5 million to $10 million. The solicitation will be available on SAM.gov starting April 28, 2025, and bidders must monitor for any amendments. This document emphasizes the federal government's support for veteran-owned businesses and outlines the necessary qualifications for bidders participating in the procurement process.
    The document is an amendment to solicitation number 36C25225B0014 pertaining to Project 578-20-002, which involves renovations to Building 217 at the Edward Hines Jr. VA Hospital. The purpose of this amendment is to incorporate a revised Statement of Work (SOW) dated May 12, 2025, and to provide additional details regarding the clinic facilities located in Building 217. Key details include a request for bidders to acknowledge receipt of the amendment, instructions on how to update their offers if they have already been submitted, and references to attached documents that provide further specifications. The amendment also notes that the deadline for bid submission remains unchanged unless stated otherwise. Overall, this document indicates the U.S. Department of Veterans Affairs’ ongoing commitment to improving healthcare facilities, ensuring that all amendments and necessary documents are clearly communicated to potential contractors.
    The document is an amendment to solicitation 36C25225B0014 for renovations to Building 217 at Edward Hines Jr. VA Hospital, administered by the Department of Veterans Affairs. It incorporates details such as pre-bid conference sign-in sheets from two sessions held in May 2025 and updates to include clauses regarding biobased and sustainable products. Specifically, Clause 52.223-2 requires contractors to report on biobased products purchased, while Clause 52.223-23 outlines the standards for sustainable products and services, including energy efficiency and the use of materials with recycled content. Contractors must adhere to these sustainability requirements throughout the contract duration, demonstrating compliance through reports and ensuring that specified products and services are delivered in a manner that meets federal guidelines. This amendment underscores the government's focus on environmental sustainability in federal construction projects, highlighting the importance of responsible sourcing and resource conservation.
    The document outlines Amendment 0003 to Solicitation 36C25225B0014 for Project 578-20-002, which entails renovations at Building 217 of Edward Hines Jr. VA Hospital. The amendment serves to address specific inquiries submitted by bidders (RFI questions) and includes a new attachment detailing the "SOW Requirements for AC Shop" dated April 13, 2023. The amendment extends the timeline for offer submissions and emphasizes that all previous terms and conditions remain unchanged unless otherwise specified. By including responses to the RFI and clarified requirements, the amendment aims to ensure transparency and facilitate informed bidding. Overall, the document reflects the government's effort to maintain clear communication with contractors engaged in federal projects while adhering to procurement protocols.
    The amendment to solicitation number 36C25225B0014 addresses the renovation of Building 217 at the Edward Hines Jr. VA Hospital. Issued by the Department of Veterans Affairs, this amendment incorporates several essential updates, including responses to Requests for Information (RFIs) as of May 30, 2025. It denotes the finality of RFI responses and includes multiple attachments related to these responses: "578-20-002_Addendum1_Specifications_060225," "578-20-002_Addendum2_06102025," and the "HINES VA SITE PLAN - Contractor Parking." These documents aim to clarify project specifications and contractor site logistics. The solicitation reflects ongoing efforts by the Department of Veterans Affairs to manage renovations effectively while ensuring all stakeholders are informed and coordinated, emphasizing transparency and adherence to established protocols in government contracting.
    The Edward Hines Jr. VA Hospital is implementing a new smoke-free policy aimed at promoting a healthier environment for its patients, visitors, and staff. Effective October 1, 2019, all forms of smoking and tobacco use are prohibited on hospital grounds, encompassing cigarettes, cigars, pipes, chewing tobacco, and vaping devices. Non-compliance may result in issuance of federal citations. The hospital advises visitors to refrain from bringing tobacco products and may require storage in certain areas to mitigate fire risks in proximity to oxygen and other medical gases. Additionally, Hines VA offers support services for veterans who wish to quit tobacco use, encouraging them to reach out to their Primary Care Team for assistance. This policy reflects the hospital's commitment to ensuring a safe and healthy atmosphere for all individuals on its campus.
    The Policy Memorandum 578-12-138A-076 (R-2) outlines safety and health protocols for construction activities at the Edward Hines Jr. VA Hospital, emphasizing the need for systematic planning, regular inspections, and compliance with safety standards. The memorandum details key responsibilities, including the establishment of a Multi-Disciplinary Construction Safety Committee to oversee safety training and enforce guidelines. Responsibilities are assigned to various personnel, including the Hospital Director, Engineering Services, and Contracting Officers. Key updates focus on revised titles and training requirements, mandating a minimum of 30 hours of Construction Safety Training and periodic oversight of construction activities. Additionally, the document integrates environmental concerns by stipulating adherence to the Green Environmental Management System (GEMS) principles and mandates compliance with OSHA regulations. The policy affirms the goal of protecting patients, staff, and visitors from potential hazards while reducing liability associated with construction activities. Emphasizing clear communication, risk assessments, and documentation, the memorandum underscores the commitment to safety during all construction operations, aligning with federal and state regulations while prioritizing health and environmental standards.
    The file details the renovations planned for Building 217 at the Edward Hines Jr. VA Medical Center in Hines, IL, under Contract No. 36C25223C0071. The project, managed by Bancroft Architects + Engineers, includes comprehensive construction work outlined in a single volume of 100% construction documents organized into various divisions. The renovations encompass all necessary aspects from demolition to new construction, ensuring adherence to safety, environmental controls, and quality standards. Notable areas of focus include general requirements, structural work, installation of HVAC systems, plumbing, electrical systems, and fire suppression measures. The project's success hinges on meticulous planning for logistics, safety measures, and compliance with VA security protocols, requiring coordination with multiple stakeholders. This undertaking reflects the VA's commitment to improving its facilities to better serve veterans while managing operational continuity throughout the renovations.
    The Renovations to Building 217 project, overseen by the U.S. Department of Veterans Affairs, involves a comprehensive update through a series of architectural and structural improvements articulated in Addendum 2, dated June 10, 2025. This addendum addresses pre-bid RFIs and introduces updates to various architectural and structural drawings, including framing plans, elevations, and electrical layouts vital for accommodating modern healthcare needs. Key specifications include the installation of new mechanical, electrical, and plumbing (MEP) systems, reinforced structural elements, and enhanced safety features adhering to the International Existing Building Code 2021. The project mandates close coordination among multiple contractors and involves meticulous planning for safety and compliance during construction, ensuring minimal disruption. Overall, this undertaking reflects the commitment to enhancing healthcare infrastructure while meeting regulatory requirements and improving patient care environments within the veteran community.
    The document outlines the installation and operational parameters of a Dwyer DigiMag manometer used for monitoring room pressure in a controlled environment, likely related to healthcare or laboratory settings. It emphasizes the connection of a poly line to the positive side of the device to ensure accurate pressure readings. Additionally, it notes that a HEPA filter machine must be actively exhausting air from the room to maintain appropriate air quality and pressure differentials. Key terms referenced, such as ICRA (Infection Control Risk Assessment) and PCRA (Post-Construction Risk Assessment), suggest the document pertains to infection control standards during construction or renovation projects in sensitive areas. Overall, the content underscores the importance of adhering to stringent pressure monitoring and air flow protocols to safeguard public health during facility management and construction activities.
    The VA Hospital in Hines, IL has issued Policy Memorandum 578-03-001-089 (R-2) to establish safety protocols for cutting, welding, and other hot work operations in non-designated areas, effective March 27, 2013. The policy aims to minimize fire risks during such activities by strictly regulating where cutting and welding can occur. Designated areas for these operations include specific Facilities Management Service shops, while work in non-designated areas requires obtaining a hot work permit from the Safety Section. Key responsibilities are assigned to the Safety Section, Facilities Management Service, contracting representatives, and contractors to ensure compliance with safety procedures, including conducting fire watches when necessary. Special precautions must be taken to secure work areas and protect against fire hazards, including clearing combustible materials and utilizing fire-resistant covers. The policy mandates rigorous inspections post-operation and provides guidelines for emergency procedures in case of fire incidents. This memorandum underscores the importance of safety in construction and maintenance work within VA facilities, reflecting a commitment to protecting personnel and property from fire hazards.
    The Policy Memorandum 578-12-138A-079 (R-2) outlines procedures for managing Above Ceiling Entry and Wall Construction Permits at the VA Hospital in Hines, IL, to uphold infection control and fire safety within patient care areas. It mandates that Facilities Management Service (FMS) staff and contractors secure relevant permits before performing any construction activities that pose risks to health and safety. Key components of the policy include conducting an Infection Control Risk Assessment, utilizing mobile containment systems for potential hazards, and ensuring compliance with established fire safety standards. Responsibilities are defined for FMS, service chiefs, contractors, and supervisory staff to enforce the safety measures effectively. The document includes comprehensive requirements for documenting activities, conducting inspections, and maintaining records of compliance to avoid contamination and ensure a fire-safe environment. This policy serves not only to comply with Joint Commission standards but also to prioritize patient safety during construction activities. In essence, the memorandum emphasizes the critical nature of infection control and safety protocols when conducting maintenance and renovation work in healthcare settings, reflecting the VA's commitment to safeguarding public health.
    The document outlines the specifications for the installation and renovation of voice and data communication lines at Edward Hines Jr. VA Hospital. It details the contractor's responsibilities, which include the design, management, and execution of installations, specifically for connection jacks, cabling, conduits, and compliance with infection control measures. Key requirements include obtaining a minimum 25-year transferable warranty on materials, ensuring installations meet VA Master Specifications, and using Systimax-certified equipment. Submittal requirements involve submitting product information, CAD drawings, and detailed documentation of all installations. Specific standards for cabling, including the use of Cat-6 equipment for data lines, and the proper labeling and testing procedures are also emphasized. The overarching purpose is to ensure standardization, quality, and compliance with VA regulations during the upgrade of communication infrastructure, reflecting a commitment to maintaining high operational standards in healthcare settings. This initiative aligns with government contracts and federal standards for facility management and infrastructure improvement.
    The document outlines various parking lot locations across multiple states, including Tennessee, Iowa, Indiana, Texas, Oklahoma, and Florida. It lists specific parking lots labeled by letters and designated areas such as North Parking, South Parking, Visitor Parking, and more, hinting at their potential relevance for federal projects or RFPs. Each lot is identified by specific labels such as Lot A, Lot B, Lot C, etc. The layout appears systematic, suggesting an organized mapping of available parking spaces likely intended for use in federal or local initiatives. The structure indicates a focus on logistical support for personnel or operations aligning with government activities. Overall, this inventory of parking facilities may serve as a reference for project planning or resource allocation, ensuring adequate access to necessary locations for stakeholders involved in government contracts or grants.
    The document outlines the Statement of Work (SOW) for the renovation of Building 217 at the Edward Hines Jr. VA Hospital, funded through a donation. The project aims to improve the Community Living Center by renovating spaces, including constructing a new multi-purpose room and upgrading various patient care areas. It details essential project requirements, including safety protocols, renovation processes, and compliance with federal regulations. Key points include constructing timelines, phasing the work to minimize disruption, and adhering to infection control measures during construction. The renovations are categorized into four distinct requirements, each assigned a separate Contract Line Item Number (CLIN). Safety and operational continuity during construction are emphasized, along with strict adherence to VA standards for materials and workmanship. Additionally, the document specifies responsibilities for the contractor, including pre-construction inspections, reporting existing conditions, and complying with various safety certifications. The timeline for completing the work is projected at a total of 330 calendar days. Overall, this renovation project demonstrates the VA's commitment to enhancing healthcare facilities for veterans through careful planning and execution, ensuring compliance and safety throughout the process.
    The document appears to encompass various government-related materials, potentially including requests for proposals (RFPs), grants, and associated administrative documents. It likely details guidelines and criteria pertinent to federal and state grants or RFPs, highlighting the processes for submission, evaluation, and funding. Key elements may involve compliance with eligibility requirements, deadlines, financial accountability, and procedural methodologies to ensure transparency and accountability in public spending. It also signifies the commitment to enhancing governmental operations through adherence to established protocols, aiming to foster effective partnerships with organizations seeking government funding. The structure of the document likely includes introductory remarks, detailed instructions regarding application processes, and explanatory notes on funding criteria, supplemented by regulatory references and supportive charts or tables outlining key deadlines and assessment metrics.
    The document outlines the Statement of Work for the renovation of Building 217 at the Edward Hines Jr. VA Hospital, detailing a construction project funded by a donation from the Serwa family. The project includes extensive renovations to enhance the Community Living Center, addressing critical deficiencies in the facility's infrastructure. Key objectives involve the construction of a new multi-purpose room, renovation of the entrance lobby, primary care suites, and updates to the dining area and outdoor patio. The scope encompasses four distinct phases, with strict adherence to safety and infection control protocols, ensuring minimal disruption to ongoing operations. The contractor is responsible for all labor, materials, and compliance with federal safety regulations while coordinating closely with hospital representatives. This initiative reflects the VA's commitment to improving the living environment for veterans, showcasing necessary upgrades while adhering to environmental and safety standards throughout the project lifecycle.
    The document details the Request for Information (RFI) responses for the renovations of Building 217 at the Edward Hines Jr. VA Hospital (Solicitation #36C25225B0014). Key aspects addressed include clarification of required specifications, notably additions and removals in the specifications table, and confirmation that the pre-bid meetings were not mandatory. The existing control system for HVAC was clarified to be Johnson Controls Facility Explorer, not Metasys, and contractors are instructed to use existing equipment rather than installing new systems. The file also outlines standards for personnel on-site, including the requirement for dedicated superintendents and the necessity for background checks and health regulations, such as mandatory influenza vaccinations for personnel. Questions regarding construction logistics, utility work timing, and the submission of bids are answered, confirming that the bids must employ a lump-sum approach for pricing. The document emphasizes compliance with VA specifications, particularly concerning contractor qualifications and security requirements. This RFI serves as a critical resource for contractors preparing bids and ensures adherence to VA guidelines during the renovation project.
    The document addresses the Request for Information (RFI) related to the renovations described in Solicitation #36C25225B0014 at the Edward Hines Jr. VA Hospital, specifically concerning Building 217. It includes responses to several inquiries regarding project specifications. The pre-bid conferences are outlined, confirming that attendance is not mandatory, with scheduled meetings on May 13 and 14, 2025. Key points include clarifications about the existing direct-digital control system, which utilizes Johnson Controls Facility Explorer rather than Metasys, and guidance on using the existing BACnet ECC instead of installing a new one. The document emphasizes that a separate system integrator is not required, as current maintenance contractor TL Services fulfills this role, provided all specifications are met. Additionally, the Hines AC Shop Controls Requirements are confirmed as applicable to the project. Overall, the RFI aims to offer clarifications necessary for potential bidders to understand project expectations and requirements, thus facilitating a smoother bidding process in alignment with VA renovation standards. The careful specification of technical details underscores the project’s complexity and the importance of adherence to clearly defined standards.
    The file outlines the Statement of Work (SOW) requirements for an A/C shop focused on the implementation of new Building Automation Controls (BAS) at the Edward Hines Jr. VAMC and Joliet CBOC locations. The contractor must be a Johnson Controls Authorized Building Controls Specialist with validated credentials and significant controls experience. Key deliverables include non-proprietary control systems compliant with BACnet/SC standards, room level displays for strict temperature and humidity monitoring, and necessary device instance IDs managed by the AC Shop Supervisor. The document specifies installation details for freeze protection devices, averaging sensors, differential pressure transducers, and control actuators, all requiring comprehensive testing and adherence to design specifications. Additional requirements focus on VFD integration, outdoor electrical components fitted in NEMA-rated enclosures, and detailed piping and pump specifications, including variable speed control and enhanced safety measures. Overall, the RFP aims to establish precise technical standards for the upgrade of HVAC systems while ensuring compliance with safety, efficiency, and automation protocols, reflecting the government's commitment to enhancing facility operations through rigorous engineering practices.
    Similar Opportunities
    Y1DA--589-703 Construct Addition and Renovate Community Living Center, Building 60 (VA-24-00028736)
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is seeking contractors for the construction of an addition and renovation of the Community Living Center, Building 60, under project VA-24-00028736. This procurement aims to enhance facilities for veterans, aligning with the VA's mission to improve care and living conditions. The estimated project cost is approximately $24.4 million, with bids received ranging from $18 million to nearly $20 million, emphasizing a competitive bidding process. Interested parties should contact Contract Specialist Joshua Slapnicker at joshua.slapnicker@va.gov, and note that responses to the solicitation must be submitted by the specified deadline, with all bids archived 90 days afterward.
    Z2DA--695-22-117 CN New Audiology Clinic 5BN
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is soliciting bids for the renovation of Building 111 Audiology Clinic 5BN at the Clement J. Zablocki VA Medical Center in Milwaukee, WI. This project, valued between $5 million and $10 million, involves extensive demolition and installation of new mechanical, electrical, and plumbing (MEP) systems, along with architectural improvements and new windows, to modernize the facility for better service delivery to veterans. The procurement is set aside for Service-Disabled Veteran-Owned Small Business (SDVOSB) firms, with a bid guarantee of 20% of the bid price required, not exceeding $3 million. Bids are due by January 8, 2026, at 1:00 PM CST, and must be submitted via email to the designated Contract Specialist and Contracting Officer, with a virtual bid opening scheduled for the same day at 2:00 PM CST. For further inquiries, interested parties can contact Contracting Officer Stacy G. Hoover at Stacy.Hoover2@va.gov.
    Z1DA--Renovate B26 for Mental Health - 538-23-102 Chillicothe VAMC
    Veterans Affairs, Department Of
    The Department of Veterans Affairs (VA) is seeking qualified contractors for the renovation of Building 26 for Mental Health at the Chillicothe VA Medical Center, under Project 538-23-102. This project, exclusively set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB), involves a partial renovation of approximately 19,000 square feet of the existing Sustained Behavioral Treatment Unit (SBTU), including necessary architectural, mechanical, electrical, and plumbing upgrades, as well as the construction of a new basement floor for an Air Handling Unit (AHU). The estimated project duration is 320 calendar days, with a funding range between $2,000,000 and $5,000,000, and a solicitation is anticipated to be issued around November 12, 2025. Interested parties should contact Contract Specialist Jeremy Nee at jeremy.nee@va.gov for further information and ensure they are registered on the appropriate government websites to participate in the procurement process.
    Z2DA--Renovate MICU/SICU 539-20-104
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is soliciting bids for the renovation of the Medical Intensive Care Unit (MICU) and Surgical Intensive Care Unit (SICU) at the Cincinnati VA Medical Center, under project number 539-20-104. The project entails comprehensive renovations covering approximately 11,000 square feet, including demolition, new layouts, fixtures, finishes, and the installation of a HEPA pandemic filtration system, with an estimated construction value between $5,550,000 and $7,250,000. This procurement is particularly significant as it aims to modernize critical care facilities, ensuring compliance with safety and infection control standards while maintaining operational efficiency. Interested Service-Disabled Veteran-Owned Small Businesses (SDVOSB) must submit their bids by 1:00 PM EST on January 8, 2026, following a mandatory site visit scheduled for November 3, 2025. For further inquiries, contact Ronald T. Heidemann at Ronald.Heidemann@va.gov.
    Z1DA--Remodel Building 1, Marion 610-21-101
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is soliciting bids for the "Remodel Building 1" project at the VA Northern Indiana Healthcare System in Marion, Indiana. This comprehensive renovation project, estimated to cost between $10 million and $20 million, involves the remodeling of approximately 20,000 square feet, including hazardous material abatement, structural modifications, and upgrades to HVAC, electrical, and IT/security systems. The project is critical for consolidating various services within the facility while ensuring compliance with safety and environmental regulations, particularly concerning the removal of hazardous materials such as asbestos and lead-based paints. Bids are due by January 30, 2026, at 9:00 AM EST, with a mandatory pre-bid site visit scheduled for January 6, 2026. Interested contractors should contact Elizabeth A. Finley at Elizabeth.Finley1@va.gov for further information.
    Z1DA--RENOVATE BLDG 143 4J SHOWER FLOORS
    Veterans Affairs, Department Of
    The Department of Veterans Affairs, through the Network Contracting Office 6, is soliciting bids for the renovation of shower floors in Building 143, specifically within the 4J section, at the Salem VA Medical Center. The project, identified as number 658-26-102, aims to enhance safety and prevent water escape in 20 patient bathrooms by performing general construction, plumbing, mechanical, and electrical work, with a total project value estimated between $100,000 and $250,000. This renovation is critical for maintaining operational safety and efficiency within the medical facility, which will remain open during the construction period. Interested contractors must submit their bids by December 23, 2025, with electronic submissions due by December 22, 2025, and can direct inquiries to Contract Specialist Intern Chanel C Johnson at Chanel.Johnson@va.gov.
    Z1DA-- Renovate OR for Hybrid Installation
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is soliciting proposals for the renovation of operating rooms for a hybrid installation at the VA Northern California Healthcare System in Mather, California. This project involves the comprehensive renovation of approximately 12,500 square feet of existing operating room space, including the upgrade of four operating rooms and the addition of a fifth hybrid operating room, with a focus on adhering to current VHA Design Guides. The renovation is crucial for enhancing surgical capabilities and ensuring compliance with modern healthcare standards. Interested contractors, particularly those classified as Service-Disabled Veteran-Owned Small Businesses (SDVOSB), must submit their proposals by January 29, 2026, following a mandatory site visit on December 11, 2025. For further inquiries, contractors can contact Contract Specialist Charee Harris at charee.harris@va.gov or by phone at 775-788-5511. The estimated project value ranges between $10 million and $20 million.
    Y1DZ--EHRM Infrastructure Upgrades Tier 1 Construction 695-21-700 Milwaukee
    Veterans Affairs, Department Of
    The Department of Veterans Affairs (VA) is seeking proposals for the EHRM Infrastructure Upgrades Tier 1 Construction project at the Clement J. Zablocki VA Medical Center in Milwaukee, Wisconsin. This project involves a single firm-fixed-price contract for design-bid-build infrastructure improvements, including electrical upgrades, HVAC assessments, communication infrastructure enhancements, and physical security upgrades across multiple buildings on the campus. The solicitation is set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) and is anticipated to be issued in early to mid-January 2026, with a performance period of approximately 1,460 calendar days and an estimated construction magnitude between $50 million and $100 million. Interested parties should direct all inquiries to Contract Specialist Bailey Donato at bailey.donato@va.gov.
    Y1DA--36C257-26-AP-0163 | NEW CON FY26 | CTX 674-16-016 - Remodel Amphitheater (VA-26-00003450)
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is soliciting bids for the "Remodel Amphitheater Project 674-16-016" at the Olin E. Teague Veterans Medical Center in Temple, Texas. This project, set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB), involves extensive renovations, including reconfigurations of electrical, mechanical, and plumbing systems within Building 163, with an estimated construction magnitude between $2,000,000 and $5,000,000. The project is critical for enhancing the facility's functionality and aesthetics, ensuring compliance with strict safety and infection control protocols due to its operation within a 24/7 healthcare environment. Proposals are due by January 6, 2026, following a mandatory site visit on December 3, 2025, at 9:00 AM CST, with all inquiries directed to Contract Specialist Jose P Portalatinrivera at jose.portalatinrivera@va.gov.
    Z2DA--519-23-908 EHRM Tier 2 Data Center Construction - Big Springs
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is soliciting bids for the EHRM Tier 2 Data Center Construction project located at the West Texas VA Health Care System in Big Spring, Texas. This procurement is a 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside, requiring contractors to provide all necessary tools, equipment, materials, labor, and supervision to complete the renovation within 225 calendar days. The project is crucial for enhancing the data management capabilities of the VA, with an estimated cost between $5,000,000 and $10,000,000. Interested bidders must submit their proposals electronically by January 8, 2026, at 12:00 PM EST, and can direct inquiries to Contract Specialist Devin M. Russell at devin.russell@va.gov.