AK PFH 59(3), Snug Harbor Road Gulley Remediation and Erosion Control
ID: 69056725Q000008Type: Solicitation
Overview

Buyer

TRANSPORTATION, DEPARTMENT OFFEDERAL HIGHWAY ADMINISTRATION690567 WESTERN FEDERAL LANDS DIVVANCOUVER, WA, 98661, USA

NAICS

Engineering Services (541330)

PSC

NATURAL RESOURCES/CONSERVATION- LAND TREATMENT PRACTICES (F006)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)
Timeline
  1. 1
    Posted Jan 16, 2025, 12:00 AM UTC
  2. 2
    Updated Jan 31, 2025, 12:00 AM UTC
  3. 3
    Due Feb 18, 2025, 10:00 PM UTC
Description

The Department of Transportation, through the Federal Highway Administration, is seeking qualified contractors for the Snug Harbor Road Gulley Remediation and Erosion Control project in Cooper Landing, Alaska. The primary objective of this firm-fixed-price contract is to address erosion issues by remediating gullies and repairing existing erosion control measures without the use of construction equipment on the slope. This project is critical for maintaining infrastructure integrity and environmental stewardship, as it aims to prevent further erosion and enhance roadway conditions along Snug Harbor Road. Interested small businesses must submit their quotes electronically by February 16, 2025, and can direct inquiries to WFL Simplified Acquisition at WFL.Purchasing@dot.gov or by phone at 360-619-7738.

Point(s) of Contact
WFL Simplified Acquisition
(360) 619-7738
WFL.Purchasing@dot.gov
Files
Title
Posted
Jan 31, 2025, 10:04 PM UTC
The document serves as Amendment No. A0002 for Solicitation No. 69056725Q000008 concerning the Snug Harbor Road Gulley Remediation and Erosion Control project overseen by the Federal Highway Administration. The amendment primarily extends the offer due date from February 11, 2025, to February 16, 2025, outlines revisions to the Statement of Work (SOW), and details associated tasks, such as permitting, erosion control measures, turf establishment, and cleanup procedures. Key tasks under the SOW include obtaining lane closure permits, removing existing erosion control products, placing topsoil, installing erosion control blankets, and establishing turf using a hydraulic method. Requirements for materials like fertilizers and biotic soil amendments are specified, along with guidelines for their application. The document emphasizes compliance with safety standards, contractor responsibilities, deliverables submission timelines, and performance periods. Additionally, it addresses insurance requirements and the inspection process for ensuring material quality. The main objective of the document is to facilitate the execution of erosion control and remediation work while ensuring compliance with federal regulations and standards for environmental protection. This amendment illustrates the government's ongoing commitment to infrastructure integrity and ecological responsibility.
Jan 31, 2025, 10:04 PM UTC
The U.S. Department of Transportation's Federal Highway Administration (FHWA) has issued a Request for Quotation (RFQ) for the Snug Harbor Road Gulley Remediation and Erosion Control project in Alaska. This project aims to remediate erosion and control gullies formed after previous construction efforts, following significant rainfall that compromised the initial work. The procurement scope includes the provision of various services and supplies, such as topsoil, straw fiber rolls, erosion control blankets, and turf establishment materials. Key procedures outlined in the solicitation include prerequisites for contractor participation, submission of material sources for approval, adherence to a Hazardous Spill Plan, and mandatory traffic control measures during operations. The RFQ emphasizes that it is a Total Small Business Set-Aside, and electronic submissions of quotes are required by the due date of February 11, 2025. The document is structured around solicitation details, including an offering schedule, contract clauses, a statement of work, and reminder notes for bidders. Overall, this solicitation illustrates the government’s commitment to maintaining infrastructure integrity while incorporating environmental safeguards in transportation projects.
Jan 31, 2025, 10:04 PM UTC
The Quoter Work Experience Form is designed for bidders to detail their past or current contracts relevant to evaluation criteria in federal and state RFPs. The form requires comprehensive information, including company details, contract specifics, and performance descriptions. Quoters must specify if they were the prime contractor and provide relevant financial data such as original and final contract values. The documented experience is limited to five pages per contract, aiming to streamline the evaluation process by focusing on relevant work history. By outlining project responsibilities and outcomes, the form aids decision-makers in assessing the qualifications and capabilities of potential contractors, thus ensuring compliance and successful project execution in government contracting.
Jan 31, 2025, 10:04 PM UTC
The document is a Past Performance Reference Questionnaire intended for the evaluation of contractors submitting bids for government contracts, in alignment with federal regulations (FAR 2.101 and FAR 3.104). It requires the contractor's reference to provide a rating on several performance criteria, including quality of workmanship, adherence to schedules, cost management, and compliance with laws. The evaluation uses a structured rating system from "Exceptional" to "Unsatisfactory," with specific definitions and justifications required for each rating. Key sections include ratings on technical abilities and effectiveness in managing subcontractors, with a narrative justification necessary to support each evaluation. Additionally, references must indicate their relationship to the contracted services, provide contact information, and recommend the contractor for future requirements. The completion and return instructions emphasize a deadline for submission, essential for the assessment process of the contractor’s past performance, which is a critical factor in securing government contracts. Overall, the document seeks to facilitate a thorough review of contractor performance to ensure high standards in public procurement practices.
Jan 31, 2025, 10:04 PM UTC
The document outlines the project plans for the Snug Harbor Road Paving and Bike Lane, Phase III, identified as AK PFH 59(3). It includes detailed measurements of erosion survey data, focusing on distances from the ditch and the respective depths of erosion at various points along the roadway. Fill volumes required to address erosion are specified in cubic yards for multiple locations. The project aims to improve roadway and bike lane conditions while addressing erosion issues that threaten infrastructure integrity. The inclusion of measures such as the placement of fiber rolls and fasteners over fill material signifies a comprehensive approach to controlling erosion. The plans demonstrate adherence to safety and environmental regulations, indicating a structured methodology for execution. This document serves as a vital reference in federal and state RFPs, highlighting local infrastructure improvement efforts that align with broader governmental objectives of community safety and environmental stewardship. The detailed data provided is essential for those involved in project execution, including potential contractors and grant reviewers, to ensure informed decision-making and effective project management.
The document presents an assessment of existing erosion conditions at specific sites, particularly around Station 309+00 and Station 308+00. It details the presence of gulleys caused by erosion, with observations that these features are obscured by grass and exposed erosion control products, which may be contributing to the ongoing erosion issues. Additionally, it highlights the need for the contractor to clean up non-functional erosion control devices that hinder vegetation recovery, particularly noted at Station 306+50. The direction for cleanup will be provided by the Contracting Officer (CO) as other problematic locations within the project limits may also require attention. The report serves as a critical element in the context of environmental management and restoration efforts as part of larger governmental proposals or contracts, ensuring the maintenance and improvement of site conditions while addressing erosion-related concerns effectively.
Jan 31, 2025, 10:04 PM UTC
The file titled "Attachment 0005-A" contains project plans associated with a construction contract executed by Drennon Construction & Consulting Inc. The project, which commenced on June 21, 2021, was substantially completed by June 9, 2022. Key individuals involved include contractor representative Roy Drennon and the government representative Tara Walter. The document appears to include as-built drawings relevant to the project, although the text is largely obscured by repetitive and unclear information. Despite the confusion, the overall purpose of the file within the context of federal RFPs is to provide necessary documentation regarding the completion of a construction project and to ensure compliance with outlined federal and local standards. This process is crucial for accountability, monitoring, and future reference in government-funded projects, emphasizing the importance of keeping accurate records of project developments and outcomes.
Jan 31, 2025, 10:04 PM UTC
The document appears to be a fragmented and indecipherable collection of text with unclear content, possibly due to data corruption or formatting issues. Without coherent sentences or structured information, it does not convey any significant topic or central idea related to federal RFPs, grants, or local government initiatives. The scattered words highlight repetitive phrases and unrelated terms, failing to provide actionable insights or details typically expected in a government document. Consequently, this text does not serve as a functional or informative resource for understanding project plans or any governmental procedures. Additionally, without clear themes or points, it cannot be analyzed in the context of government requests for proposals or funding opportunities.
Jan 31, 2025, 10:04 PM UTC
The document serves as the Wage Determination under the Service Contract Act (SCA) from the U.S. Department of Labor, updating wage rates and fringe benefits for service contracts in specific Alaska boroughs. Effective from January 30, 2022, contractors must pay a minimum wage of $17.20 per hour for contracts renewed or extended after this date, or $12.90 for contracts awarded between January 1, 2015, and January 29, 2022. The file details specific wage rates for various occupations, emphasizing compliance with applicable Executive Orders related to minimum wage and paid sick leave. It includes provisions for fringe benefits, outlining health and welfare rates, paid vacation, and holiday requirements. A conforming process is established for unlisted job classifications, ensuring that those not explicitly detailed in the wage determination are compensated fairly based on comparability to listed positions. The document is essential for contractors engaging in federally funded projects, ensuring adherence to labor standards and promoting fair wages and benefits within the service industry in Alaska.
Jan 31, 2025, 10:04 PM UTC
The document pertains to Amendment 0001 of the solicitation regarding the AK PFH 59(3) Snug Harbor Road Gulley Remediation and Erosion Control project. It outlines modifications to the Statement of Work (SOW), detailing specific tasks including installation procedures for fiber rolls and erosion control blankets. Key tasks encompass preparing the site for turf establishment, applying various materials such as biotic soil amendments and fertilizers, and ensuring proper installation methods and maintenance of seeded areas. The amendment emphasizes the importance of adhering to industry standards, specifies material requirements, and establishes a timeline for project completion before 07/18/2025. It also outlines insurance requirements, inspection protocols, and necessary certifications for compliance. The overarching goal is to enhance erosion control effectiveness in the area, with detailed guidelines for execution and accountability to maintain project standards. By ensuring a controlled approach and comprehensive oversight, this amendment aims to facilitate the effective management of the excavation and restoration tasks involved in the erosion control project.
Lifecycle
Title
Type
Solicitation
Similar Opportunities
AK PRA DENA 10(36), Replace Ghiglione Bridge
Buyer not available
The Department of Transportation, through the Federal Highway Administration, is seeking qualified contractors for the replacement of the Ghiglione Bridge along Denali Park Road in Alaska. The primary objective of this project is to enhance safety and improve the visitor experience by constructing a new steel girder bridge while maintaining access for park operations and preserving the road's historical alignment. This initiative is crucial for ensuring safe access to Denali National Park & Preserve, especially given the remote location and short construction season, which typically runs from May to September. Interested parties must submit their qualifications, including company information and past project experience, by April 17, 2025, with an estimated contract value between $10 million and $20 million and a projected solicitation date in summer 2025. For further inquiries, contact the Contracts G. Office at wfl.contracts@dot.gov or call 360-619-7520.
WA ERFO NPS OLYM 2022‐1 (1), OLYMPIC NPS ERFO REPAIRS 2022
Buyer not available
The Department of Transportation, through the Federal Highway Administration's Western Federal Lands Division, is soliciting bids for the WA ERFO NPS OLYM 2022-1 (1) project, which involves critical repairs to North Shore Road in Olympic National Park. The project encompasses road reconstruction, bank stabilization, and the installation of culverts, aimed at addressing damage and enhancing visitor safety while adhering to federal construction standards. This initiative reflects the government's commitment to maintaining national park infrastructure and ensuring compliance with environmental protection measures, with an estimated project cost ranging from $700,000 to $2,000,000. Interested small businesses must submit their bids in writing by the specified deadline and can direct inquiries to the Contracts G. Office at wfl.contracts@dot.gov or by phone at 360-619-7520.
WA ERFO FS MTBKR605 2020-1(1), Mt. Baker Snoqualmie ERFO Repairs 2020 Phase 1 & WA ERFO FS MTBKR605 2022-1(1), Mt. Baker Snoqualmie ERFO Repairs 2022
Buyer not available
The Department of Transportation, through the Federal Highway Administration, is seeking proposals for emergency repair projects in the Mt. Baker-Snoqualmie National Forest, specifically identified as WA ERFO FS MTBKR605 2020-1(1) and WA ERFO FS MTBKR605 2022-1(1). The projects involve critical infrastructure improvements, including earthwork, roadside development, wall construction, and drainage systems across multiple sites in Washington, covering a total length of 0.4 miles. This initiative is vital for enhancing safety and accessibility in the region's roadways, with an estimated budget ranging from $700,000 to $2,000,000 and a fixed completion target set for Winter 2025. Interested contractors should contact the Contracts G. Office at wfl.contracts@dot.gov or call 360-619-7520 for further details and to stay updated on the solicitation documents expected to be released in Winter 2024/2025.
Design-Build Sitka Waterfront Improvements (Sitka, AK)
Buyer not available
The Department of Homeland Security, through the U.S. Coast Guard, is soliciting proposals for the Design-Build Sitka Waterfront Improvements project in Sitka, Alaska. This initiative involves the design and construction of a new fixed Seagoing Buoy Tender (WLB) wharf and approach pier, along with optional enhancements such as a Boat Bay Maintenance Facility and a floating dock for Fast Response Cutters (FRCs). The project is critical for enhancing the operational capabilities of the Coast Guard and improving maritime infrastructure in the region. Proposals are due by April 25, 2025, with a pre-proposal site visit scheduled for March 19, 2025, and the estimated project value is approximately $48 million. Interested contractors can reach out to Tracianne Torklep at Tracianne.Torklep@uscg.mil or Gabriel D. Perez at gabriel.d.perez@uscg.mil for further inquiries.
OR ERFO FS UMPQU 615-2022-2(1), Umpqua ERFO Repairs 2022
Buyer not available
The Department of Transportation, through the Federal Highway Administration, is seeking qualified contractors for the Umpqua ERFO Repairs 2022 project located in the Umpqua National Forest, Oregon. The project involves the repair of a 0.19-mile aggregate roadway, including ditch regrading, slope stabilization, and the construction of a mechanically stabilized earth wall, with a focus on environmental compliance and infrastructure integrity. This initiative is part of federal efforts to maintain and improve infrastructure in natural areas, ensuring safety and environmental protection while promoting public access. The contract is a total small business set-aside, with an estimated price range between $700,000 and $2,000,000, and is anticipated to be solicited in winter 2024/2025. Interested vendors can contact the Contracts G. Office at wfl.contracts@dot.gov or call 360-619-7520 for further details.
OR FS OCHOC607 22(1), Road 22 Repairs MP 0.0 to 8.0
Buyer not available
The Department of Transportation, through the Federal Highway Administration, is seeking contractors for the "Road 22 Repairs MP 0.0 to 8.0" project located within the Ochoco National Forest in Oregon. The project involves extensive road repairs, including asphalt removal, milling, grading, and pavement installation over a total length of 0.64 miles, with an estimated cost between $500,000 and $1,000,000 and a tentative completion date set for Winter 2025. This initiative is crucial for enhancing local infrastructure and ensuring compliance with federal safety standards, thereby addressing community transportation needs. Interested bidders are encouraged to inspect the site during favorable fall conditions and can direct technical inquiries to the Contracts G. Office at wfl.contracts@dot.gov or by phone at 360-619-7520, while monitoring the SAM website for the release of solicitation documents expected in late Fall/Winter 2024/2025.
WA FLAP LINCOL 57860(1), Hawk Creek Road Improvements & WA NPS LARO 208(1), Hawk Creek Road Stabilization
Buyer not available
The Department of Transportation, through the Federal Highway Administration, is seeking contractors for the improvement and stabilization of Hawk Creek Road in Lincoln County, Washington, under the project titles WA FLAP LINCOL 57860(1) and WA NPS LARO 208(1). The project encompasses a range of construction activities, including earthwork, grading, paving, drainage improvements, and the installation of soil nail retaining walls and guardrails, aimed at enhancing access to the Lake Roosevelt National Recreation Area while ensuring environmental sustainability. With an estimated project cost between $5 and $10 million and a targeted completion date in Summer/Fall 2025, interested bidders are encouraged to contact the Contracts G. Office at wfl.contracts@dot.gov or call 360-619-7520 for further details and to monitor the SAM website for solicitation updates.
WA ERFO NPS MORA 2022-1(1), Mount Rainier ERFO Repairs 2022
Buyer not available
The Department of Transportation, specifically the Federal Highway Administration, is seeking qualified contractors for the Mount Rainier ERFO Repairs 2022 project, located approximately 31 miles southeast of Puyallup, Washington. The project involves essential infrastructure repairs including bank stabilization with rip rap revetment, grading, drainage, and paving over a length of 0.18 miles, with an estimated contract value between $700,000 and $2,000,000. This initiative is crucial for maintaining the integrity of roadways within the Mount Rainier National Park and surrounding areas, ensuring compliance with environmental protection standards. Interested vendors should note that this is a total small business set-aside opportunity, with a tentative solicitation date in Winter 2024/2025 and completion expected by Fall 2025; for further inquiries, contact the Contracts G. Office at wfl.contracts@dot.gov or call 360-619-7520.
Z--GAOA - Alaska Peninsula NWR Float Plane Dock Replacement
Buyer not available
The U.S. Fish and Wildlife Service (USFWS) is seeking qualified contractors for the Floatplane Dock Replacement Project at the Alaska Peninsula National Wildlife Refuge in King Salmon, AK. The project entails dismantling the existing floatplane dock and boat ramp, followed by the construction of a new dock that includes essential components such as a bulkhead, gangway, and electrical systems, with an optional boat ramp replacement, addressing structural failures experienced during a storm in 2018. This initiative is crucial for maintaining infrastructure that supports wildlife conservation efforts while enhancing access for water vessels. Interested businesses must submit their Unique Entity Identifier (UEI) and relevant past project details by April 10, 2025, to demonstrate their capability, with the NAICS code for this acquisition being 237990 and a size standard of $45 million. For further inquiries, contact Samantha Lague at samanthalague@fws.gov or call 413-253-8349.
FLOATING BREAKWATER REPLACEMENT, BAR POINT HARBOR, KETCHIKAN, ALASKA
Buyer not available
The Department of Defense, specifically the Department of the Army, is soliciting bids for the replacement of two floating breakwaters at Bar Point Harbor in Ketchikan, Alaska. The project entails the demolition of existing breakwaters that have exceeded their lifespan and the installation of new reinforced concrete float-type breakwaters, which will be anchored by chains and concrete blocks. This procurement is crucial for maintaining the harbor's structural integrity and ensuring safe navigation, as the breakwaters protect the entrance channel and the harbor itself. Interested contractors, particularly small businesses, should reach out to Jennifer Gosh at jennifer.gosh@usace.army.mil or George Nasif at george.g.nasif@usace.army.mil for further details, as the project is set aside for small businesses under SBA guidelines.