Fermilab - Replacement of two Pedestrian Gates with Access Controlled Gates
ID: ISD-365248-RKType: Solicitation
Overview

Buyer

ENERGY, DEPARTMENT OFENERGY, DEPARTMENT OFFERMILAB - DOE CONTRACTORBatavia, IL, 60510, USA

NAICS

Security Systems Services (56162)

PSC

FENCING, FENCES, GATES AND COMPONENTS (5660)
Timeline
    Description

    The Department of Energy, through Fermilab, is seeking proposals for the replacement of two pedestrian gates with access-controlled gates at the Fermi National Accelerator Laboratory in Batavia, Illinois. The project involves the removal of existing gates and the installation of custom electrically lockable gates equipped with card access systems, emphasizing safety and compliance with technical specifications. This initiative is crucial for enhancing security measures at Fermilab while ensuring minimal disruption to ongoing operations. Interested parties must submit their proposals by March 31, 2025, with inquiries directed to Richard Konan at rkonan@fnal.gov or by phone at 630-840-2835.

    Point(s) of Contact
    Files
    Title
    Posted
    The Request for Proposal (RFP) seeks bids for replacing two pedestrian gates with access-controlled gates at Fermilab. Aimed at small businesses, the RFP includes extensive details about the project scope and requirements. Offerors are invited to submit proposals that include a Technical Proposal and a Business/Management Proposal, with a focus on a Lowest Price Technically Acceptable (LPTA) procurement strategy. Key elements include adhering to Davis-Bacon Act wage standards, submission guidelines, and participation in a pre-proposal site visit for clarity on the project’s requirements. The scope covers removal of existing gates, site preparation, installation of new electronic gates, and associated programming. Additionally, the RFP emphasizes insurance and bonding requirements, including a payment bond for contracts exceeding $35,000 and a performance bond for those over $150,000. The proposal deadline is set for March 31, 2025, with strict criteria for submission acceptance. Overall, the RFP reflects governmental procurement practices emphasizing transparency, compliance, and the engagement of small businesses in construction projects.
    The Fermi Forward Discovery Group (FFDG) General Terms and Conditions for Construction outline the obligations and guidelines for subcontractors involved in construction activities under FFDG's Prime Contract with the U.S. Department of Energy. This document emphasizes the independent contractor status of the subcontractor, the necessity for proper licenses, and adherence to applicable laws and safety regulations throughout the project. It delineates payment terms, including progress payments and retainage policies, while establishing requirements for site access and investigation. Key provisions address indemnification responsibilities, warranty obligations, termination rights, and procedures for handling changes to the scope of work. The clauses also incorporate various Federal Acquisition Regulation (FAR) and Department of Energy Acquisition Regulation (DEAR) mandates, reinforcing compliance with labor standards, dispute resolution, and environmental safety. Overall, this document aims to establish a framework for successful contract execution, promoting accountability and fulfilling government contract requirements effectively.
    The document outlines the insurance requirements for subcontractors working at the Fermi National Accelerator Laboratory (Fermilab), as mandated by the Fermi Forward Discovery Group, LLC. Key insurance coverages include Commercial General Liability, Automobile Liability, Excess Liability, Workers' Compensation, and Contractor's Pollution Liability, with specified minimum limits ranging from $1 million to $5 million, depending on the subcontract value. Additionally, supplemental coverages such as Aircraft Liability and Builder’s Risk Insurance may be required based on project circumstances. Subcontractors must ensure that all policies designate FFDG, the University of Chicago, and the United States Government as additional insureds. Important exclusions in the coverage terms that are not acceptable have been highlighted, as well as the requirement for subcontractor compliance and indemnification of FFDG from any insurance-related failures. Finally, subcontractors must provide timely evidence of compliance with these insurance stipulations, including for any sub-subcontractors involved. This detailed insurance framework emphasizes the government's commitment to safeguarding its interests and minimizing liability risks during construction projects.
    The document outlines the payment bond requirements for Fermi Forward Discovery Group, LLC, specifically in the context of federal government contracts. It specifies the obligations of the principal and sureties, ensuring that the principal fulfills its financial responsibilities towards labor and materials provided under the contract. The bond's penal sum is defined, and conditions for nullifying the obligation are stated, emphasizing prompt payments to those involved in the project. The form requires detailed information about the principal's legal name and address, type of organization, and sureties, ensuring that all parties are properly identified. It mandates the inclusion of corporate seals for sureties and specifies requirements for both individual and corporate signatories to confirm authority. The instructions emphasize the importance of using this specific form without deviation, ensuring compliance with government standards. Overall, the document serves as a critical adherence framework for contractors involved in federal projects, reinforcing accountability and financial integrity in subcontracting arrangements.
    The document outlines the requirements for a bid bond related to federal contracting, specifically for projects under Fermi Research Alliance, LLC. It necessitates the identification of the Principal's legal name and address, type of organization (individual, partnership, corporation, etc.), and details about the bond execution. The bond serves as a financial guarantee that, upon acceptance of the bid, the Principal will enter into a contractual agreement and provide necessary bonds within specified timeframes. Key points include obligations of the Principal and sureties, conditions under which the bond becomes void, and rules for executing the bond, such as the requirement for corporate seals and the recording of individual sureties. Additionally, the document emphasizes compliance with the Paperwork Reduction Act, providing a framework for collecting requisite information while minimizing the burden on respondents. Overall, it reflects the structured processes in federal RFPs and grants, ensuring financial accountability and commitment to project execution.
    The document outlines the structure and conditions of a Performance Bond required by the Fermi Research Alliance, LLC, as part of subcontract obligations. It serves to ensure the Principal (contractor) and Surety(ies) are financially bound to the U.S. Government for compliance with subcontract terms. Key components include the legal names and addresses of the Principal and Surety(ies), the penal sum of the bond, and signatures from authorized representatives. The bond becomes void if the Principal fulfills all contractual obligations, including payment of taxes and any modifications to the subcontract. It emphasizes the necessity for Corporations acting as Sureties to be on the Department of the Treasury’s approved list, ensure proper execution with corporate seals, and the inclusion of liability limits. The document also mentions requirements for individual Sureties. This performance bond is crucial in federal and state contract scenarios, ensuring adherence to agreements while providing a financial safety net for the government. The structured format encompasses essential legal requirements, obligations, and signatory provisions necessary for valid execution.
    The document outlines a project to replace two pedestrian gates with access-controlled gates at Fermilab. The scope of work includes removing existing gates and installing custom electrically lockable gates with card access systems. Proposed activities involve excavation, installation of rigid steel conduit, and thorough backfill and pavement repair. Specific tasks include coordinating with subcontractors, submitting a hazard analysis, and ensuring system compatibility with existing access control systems. The installation will incorporate features such as remote exit buttons and self-closing hydraulics for the new gates. The project emphasizes safety, compliance with technical specifications, and rigorous testing and commissioning of the new systems. Overall, this initiative aims to enhance security measures at Fermilab while maintaining operational integrity during the installation process.
    The Fermilab ES&H Manual outlines the protocol for collecting subcontractor injury and illness data, essential for evaluating safety performance. It requires subcontractors to provide comprehensive information including the company's experience modification rate over three years, insurance details, and records of workplace injuries and illnesses as documented in the OSHA 300 log. Specific data points include total recordable cases, case rates, days away, and fatalities. The document emphasizes the calculation of average rates for injuries and emphasizes the importance of involving a safety expert in completing the questionnaire. Submission involves certifying the accuracy of the information shared. This manual serves as a critical tool for assessing the safety and health qualifications of subcontractors, aligning with federal and state requirements for risk management within government contracts, thereby enhancing workplace safety oversight and ensuring compliance with regulatory standards in the execution of projects.
    This document outlines the Statement and Acknowledgment process for subcontracting under a federal prime contract. It includes essential details like the prime contractor's and subcontractor’s information, contract numbers, and specifics regarding the work to be performed. Notably, the form checks for compliance with the "Contract Work Hours and Safety Standards Act," ensuring that labor standards and wage requirements are met. The context involves a subcontract awarded for the installation of custom electric gates at Fermilab in Batavia, Illinois, specifying the tasks involved, including removal of existing gates, excavation, installation requirements, and data collection for site management. This submission highlights regulatory compliance and adherence to federal guidelines for construction and subcontracting practices, reflecting the importance of proper documentation within government contract processes.
    The document, Proposal Certifications (PUR-466), outlines essential requirements for offerors participating in federal solicitations, particularly related to the Fermi Research Alliance. It stipulates that all proposals exceeding $10,000 must include certifications regarding export compliance, Buy American regulations, rights to proposal data, and patent rights. Further sections address specific requirements for higher dollar proposals, mandating certifications regarding price determination, responsibility matters, and anti-kickback provisions for offers above $150,000. For contracts above $500,000, a certification concerning trafficking in persons is also requisite. The document necessitates precise disclosures related to any foreign construction materials, potential patent requests, and conflicts of interest, underlining the importance of transparency and adherence to federal regulations. Each section contains specific conditions and actions that offerors must satisfy to be considered compliant, showcasing the government's emphasis on integrity, accountability, and compliance in procurement processes. This structured proposal certification process ultimately aims to ensure that all participants meet their legal and ethical obligations within the competitive bidding landscape.
    The Form SARC (Subcontractor Annual Representations & Certifications) is issued by Fermi Research Alliance, LLC (FRA) to establish compliance standards for subcontractors involved with U.S. government contracts. This document is crucial in ensuring transparency regarding business structures, owners, and certifications necessary for federal contracting. The form requires details about the business entity, such as ownership type and structure (e.g., corporation or sole proprietorship), along with industry identifiers like DUNS and NAICS codes. Additionally, it mandates certifications related to executive compensation disclosure, accounting system approval status, and compliance with employment eligibility and affirmative action regulations. Subcontractors must declare their business size category (large/small) and select applicable diversity statuses recognized by the Small Business Administration. Furthermore, they are obliged to verify acquaintance with U.S. export/import regulations and provide necessary certifications related to equal opportunity employment. Signatures from authorized company representatives affirm the validity of the information provided, highlighting the importance of accurate reporting in the contract bidding process. Overall, the SARC form emphasizes rigorous compliance and accountability measures for stakeholders in federal procurement, ensuring that subcontractors meet government standards for contracting and financial management.
    The document outlines the General Requirements for the construction of a Daycare Center Crawl Space Supports project at Fermilab, Illinois. It serves as a guideline for subcontractors, detailing their obligations to provide necessary labor, materials, and equipment while adhering to safety, quality, and regulatory standards. Key elements include site access protocols, construction timelines, and responsibilities related to environmental safety and health (ES&H). Subcontractors must coordinate with Fermilab representatives and ensure minimal disruption to the ongoing operations of the daycare facility. The document specifies conditions for the submission of documentation, requests for information, parking arrangements, and use of temporary facilities. It emphasizes the importance of clear communication, timely submission of schedules, and quality control throughout the project. Additionally, it outlines the procedures for inspections, acceptance of completed work, and handling of materials, aligning with the Buy American Act and federal contracting requirements. The structured format includes sections for general instructions, execution details, and attachments for specific requests and quality assurance checks, illustrating a thorough framework for project management and compliance within government contracting processes.
    The FRA (Fermi Research Alliance) outlines stringent Environment, Safety, and Health (ES&H) Requirements applicable to subcontractors and their personnel at Fermilab. The document emphasizes a zero-tolerance policy for accidents and mandates compliance with federal, state, and local regulations concerning worker safety and environmental protection. Key provisions include the requirement for subcontractors to develop comprehensive ES&H programs, conduct hazard analyses, and implement waste disposal procedures in accordance with legislation such as the Resource Conservation and Recovery Act. Each subcontractor must appoint qualified personnel, including a Safety Representative and Field Superintendent, to enforce safety protocols and conduct training for workers. A system for stopping work in the event of unsafe conditions is instituted, alongside specified standards for personal protective equipment (PPE) and emergency response plans. Additionally, the document details procedures for permits related to various work activities, such as excavations and electrical tasks. Training requirements, reporting procedures for incidents, and guidelines for environmental protection measures—including soil erosion control—are thoroughly articulated. The document outlines a holistic approach to managing safety and environmental risks, reiterating the importance that the FRA places on protecting both personnel and the environment during research and construction activities at Fermilab.
    The document outlines the submittal requirements for subcontractors engaged in projects governed by the Federal Railroad Administration (FRA). It establishes the procedures for submitting shop drawings, materials samples, and operation and maintenance manuals, stressing the importance of adherence to specified guidelines in order to ensure compliance with project specifications. Subcontractors must submit shop drawings for review, including a transmittal form detailing each submittal item. The document specifies that FRA will evaluate these submissions and provide responses within a ten-working-day period, which can include acceptance, requests for revisions, or rejections. Additionally, the subcontractor is required to maintain as-built drawings that reflect any modifications or changes during construction. Final project acceptance by the FRA hinges on receiving these accurately marked drawings. The document emphasizes the necessity for clear communication, timely submissions, and compliance with technical specifications, reflecting the structured nature of government RFP processes aimed at ensuring project quality and safety. Overall, it serves as a guideline for subcontractors to navigate the submittal process effectively within FRA projects.
    This document outlines a subcontract for the construction project involving the replacement of two pedestrian gates with access-controlled gates at the Fermi National Accelerator Laboratory in Batavia, Illinois. The subcontract is established between Fermi Forward Discovery Group LLC (FFDG) and an identified subcontractor, with Richard Konan serving as the procurement representative. The scope of work includes providing all necessary materials and labor, ensuring work compliance with professional standards, and completing the project within a specified time frame upon receiving a notice to proceed. Funding limitations are stated, alongside processes for invoicing and payment for services rendered, emphasizing the need for monthly progress reports and adherence to project milestones. Key personnel are designated as crucial to project success, and modifications to the subcontract must be approved by FFDG’s procurement representative. Additionally, several documents related to general terms and insurance requirements are incorporated into the agreement, ensuring alignment with federal regulations. This subcontract exemplifies the structured approach taken in government contracting to promote accountability and successful project execution within set guidelines.
    The document is a Request for Proposal (RFP) issued by Fermi Research Alliance, LLC, concerning the procurement of services for the replacement of two pedestrian gates with access-controlled gates. The RFP, identified as ISD-365248-RK, outlines key submission details including a firm fixed price and payment terms, mandating submission by March 31, 2025, at 3:00 P.M. Central Time. Proposals must be sent to Richard Konan via Oracle Cloud Service or via email. The document emphasizes the need for a bid guarantee and includes fields for the bidder’s information, such as name, address, and employer identification number, ensuring compliance with the Subcontractor Annual Representations & Certifications (SARC). The acceptance period for the proposals is set at a minimum of 90 days unless otherwise specified by the offeror. This RFP represents an essential step in maintaining and upgrading security infrastructure at Fermi National Accelerator Laboratory, reflecting federal and local government priorities on safety and modernization in public facilities.
    The FRA Quality Requirements document outlines the procedures and responsibilities for subcontractors in managing quality control for construction projects. It mandates the implementation of a Quality Control Program, requiring subcontractors to submit a Corporate Quality Assurance Plan with their proposal and a Project Quality Control (PQC) Plan post-award. The PQC Plan must detail personnel roles, quality procedures, testing protocols, and record-keeping relevant to both on-site and off-site operations. A designated Project Quality Control Manager is responsible for ensuring compliance and effective communication regarding quality issues. The document specifies that acceptance of the PQC Plan is required before any work can commence, and it stipulates the FRA's rights to request modifications. Supporting appendices provide guidance for creating the Corporate QA Plan and the PQC Plan, outlining necessary components such as verification processes, document controls, nonconformance handling, and meeting report procedures. This structured approach ensures quality construction that meets regulatory standards and project specifications.
    Lifecycle
    Similar Opportunities
    Main Ring Electrical P-F3 to P-F4 15KV Cable Installation, FESS Project 3-7-103B
    Energy, Department Of
    The Department of Energy, through the Fermi National Accelerator Laboratory (Fermilab), is soliciting proposals for the installation of 15KV electrical cables as part of the Main Ring Electrical P-F3 to P-F4 project (FESS Project 3-7-103B) in Batavia, Illinois. The selected subcontractor will be responsible for providing all necessary labor, materials, equipment, and oversight to complete the installation of approximately 15,000 feet of 15KV medium voltage power cables and associated communication cables, adhering to strict safety and quality standards. This project is critical for enhancing the electrical infrastructure at Fermilab, ensuring reliable power distribution for ongoing scientific research. Proposals are due by December 17, 2025, at 4:00 PM CT, and interested parties should contact Chris Daley at cdaley@fnal.gov for further information.
    Giese Road Substation Feeder 24 Backfeed
    Energy, Department Of
    The Department of Energy, through the Fermi National Accelerator Laboratory (Fermilab), is soliciting proposals for the Giese Road Substation Feeder 24 Backfeed project, which involves electrical medium voltage construction services in Batavia, Illinois. The project requires the installation of overhead feeders, underground duct banks, and the pulling and testing of 15kV power cables, with all work to be completed by February 1, 2026. This opportunity is set aside for small businesses under NAICS code 238210, emphasizing the importance of compliance with safety and quality standards, including the Davis-Bacon Act wage rates and Buy American requirements. Interested contractors must submit their proposals by December 24, 2025, and direct any inquiries to Gina M. Kern at ginakern@fnal.gov.
    Ferrite Fabrications
    Energy, Department Of
    The Department of Energy, through Fermilab, is soliciting proposals for the procurement of 700 Fast Kicker Magnet Assembly Side Pieces and 320 Fast Kicker Magnet Assembly Top Pieces, specifically made from ferrite materials. This Request for Proposal (RFP 375377swk) aims to secure firm-fixed price proposals for a total of 1,020 units, which will be delivered to Fermilab's Receiving Warehouse 2 in Batavia, Illinois. The components are critical for the operation of scientific apparatus at Fermilab, contributing to ongoing research and development in particle physics. Proposals are due by 5 PM Central on January 5, 2026, and must include necessary certifications and documentation, including the SARC and PUR-466 forms. Interested parties should direct any inquiries to Spencer Keske at skeske@fnal.gov.
    HD Coldboxes Fabrication
    Energy, Department Of
    The Department of Energy, through the Fermi National Accelerator Laboratory (Fermilab), is seeking proposals for the fabrication of two high-density (HD) coldbox structures, with an option for a third unit, to support the Long-Baseline Neutrino Facility/Deep Underground Neutrino Experiment (DUNE-US) project. The procurement involves detailed specifications for stainless steel (SS 304) coldboxes designed to house active detectors for cold testing in cryogenic conditions, with strict adherence to quality control measures and compliance with national standards. Proposals must be submitted by 5 PM Central on December 19, 2025, and should include completed SARC and PUR-466 forms for proposals exceeding $10,000. Interested parties can direct inquiries to Spencer Keske at skeske@fnal.gov.
    Electrical Steel Coils
    Energy, Department Of
    The Department of Energy, through the Fermi National Accelerator Laboratory (Fermilab), is soliciting proposals for the procurement of Non-Grain Oriented Electrical Steel (NGOES) Coils, specifically requiring a total of 35,175 pounds of this material. The NGOES is critical for the fabrication of PIP-II ORBUMP magnet cores, necessitating compliance with stringent specifications regarding chemical and magnetic properties, as outlined in the associated technical documents. Proposals must be submitted by December 23, 2025, at 1:00 PM CT, with the contract period extending through December 1, 2026. Interested vendors should direct inquiries to Sharon Duchaj at sduchaj@fnal.gov or call 630-840-8693 for further details.
    RFP - Construction Services for MI-8 Test Stand HVAC
    Energy, Department Of
    The Department of Energy, through the Fermi National Accelerator Laboratory (FNAL), is soliciting proposals for construction services related to the MI-8 Test Stand HVAC project in Batavia, Illinois. The project aims to install a new HVAC system to enhance cooling capabilities for future experiments, requiring comprehensive construction services including installation of a rooftop unit, ductwork, and electrical work, along with necessary management and coordination of subcontractors. This opportunity is set aside for small businesses under NAICS code 238220, with a total project duration of 231 calendar days and adherence to specific safety and quality standards mandated by federal regulations. Interested parties must attend a pre-proposal meeting on December 3, 2025, and submit proposals by December 23, 2025, with all inquiries directed to Gina M. Kern at ginakern@fnal.gov.
    Fermilab-Construction Services for IERC CCD Space Humidificaion-372698
    Energy, Department Of
    The Department of Energy, through Fermilab, is soliciting proposals for construction services related to the Integrated Engineering and Research Center (IERC) CCD Space Humidification project. The selected subcontractor will be responsible for providing all necessary supervision, labor, materials, tools, and associated costs to install two humidification units, which are critical for maintaining precise humidity control in the lab environment. This project is particularly important for the manufacturing of sensitive experimental components, ensuring compliance with safety and quality standards throughout the construction process. Interested small businesses must submit their proposals by January 7, 2026, including a technical and business management section, following a mandatory pre-proposal meeting on December 18, 2025. For further inquiries, contact Dasia Guthrie at dguthrie@fnal.gov or call 630-840-2494.
    LBNF Liquid Argon LAr Circulation Equipment
    Energy, Department Of
    The Department of Energy, through Fermilab, is soliciting proposals for the engineering, manufacturing, and delivery of Liquid Argon (LAr) Circulation Equipment for the Long-Baseline Neutrino Facility (LBNF) project in South Dakota. The procurement involves the design and construction of a vacuum jacketed pump valve box, associated piping, valves, instrumentation, and protective structures for cryogenic equipment, all essential for the efficient transfer of liquid argon within the facility. This project is critical for advancing particle physics research and ensuring the operational integrity of the LAr Circulation System, which plays a vital role in the LBNF/DUNE initiative. Proposals are due by January 5, 2026, with technical questions accepted until December 8, 2025; interested vendors should contact Jeremy Duncan at jeremyd@fnal.gov for further details.
    CFA 608/609 Parking Lot
    Energy, Department Of
    The Department of Energy, through Battelle Energy Alliance, LLC, is seeking Expressions of Interest (EOI) from qualified vendors for the replacement and upgrade of the parking lot and associated infrastructure at CFA-608 and CFA-609 located at the Idaho National Laboratory (INL). The project aims to enhance site safety, accessibility, and operational reliability by replacing the aging asphalt parking lot and sidewalks, installing new canopies, gutters, downspouts, heat trace, exterior light fixtures, engine block heaters, and performing minor landscaping. This initiative is critical for maintaining the operational integrity of a national laboratory dedicated to nuclear energy and clean energy innovation. Interested vendors must submit their EOIs, including company details and relevant experience, by May 1, 2026, to Chase Egbert at Chase.Egbert@inl.gov, as only selected respondents will be invited to participate in the subsequent Request for Quote (RFQ) process.
    OK- DEEP FORK NWR-AUTOMATIC GATE OPENER
    Interior, Department Of The
    The U.S. Fish and Wildlife Service (FWS) is soliciting proposals for the installation of an automatic gate opener at the Deep Fork National Wildlife Refuge (NWR) in Okmulgee, Oklahoma. The project requires the contractor to provide all necessary personnel, equipment, and materials to install the gate opener, which aims to enhance security and improve operational efficiency at the facility. This opportunity is a 100% Total Small Business Set-Aside, with a contract value estimated at less than $25,000, and proposals are due by January 16, 2026, at 5:00 PM EDT. Interested contractors are encouraged to attend a site visit on January 5 or January 7, 2026, and should direct inquiries to John Ferrall at johnferrall@fws.gov.