Y1DA--675-22-701 EHRM Infrastructure Upgrades Construction Lake Baldwin (Orlando)
ID: 36C77624B0028Type: Presolicitation
Overview

Buyer

VETERANS AFFAIRS, DEPARTMENT OFVETERANS AFFAIRS, DEPARTMENT OFPCAC HEALTH INFORMATION (36C776)INDEPENDENCE, OH, 44131, USA

NAICS

Commercial and Institutional Building Construction (236220)

PSC

CONSTRUCTION OF HOSPITALS AND INFIRMARIES (Y1DA)

Set Aside

Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14) (SDVOSBC)
Timeline
    Description

    The Department of Veterans Affairs is seeking qualified contractors for the construction of EHRM Infrastructure Upgrades at Lake Baldwin in Orlando, Florida. This project, identified by solicitation number 36C77624B0028, falls under the NAICS code 236220, which pertains to commercial and institutional building construction, and is set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB). The initiative is crucial for enhancing the VA's infrastructure to support healthcare services, with a total estimated project value of approximately $36 million based on the bids received. Interested contractors can reach out to Contract Specialist Shawn Tavernia at shawn.tavernia@va.gov or Bridget May at bridget.may@va.gov for further details, as the response deadline will be archived 99 days after the unspecified date of the notice.

    Point(s) of Contact
    Shawn TaverniaContract Specialist
    (216) 447-8300
    shawn.tavernia@va.gov
    Files
    Title
    Posted
    The Department of Veterans Affairs (VA) has issued a Request for Proposal (RFP) focusing on the EHRM Infrastructure Upgrades Construction project located at the Lake Baldwin VA Medical Center in Orlando, FL. This project is designated as a competitive Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside, with an estimated construction magnitude ranging from $10 million to $20 million. Contractors are required to provide all necessary tools, materials, and labor to complete the upgrades within a specified timeframe of 600 calendar days post-notice to proceed. The solicitation emphasizes that bids must include required bid guarantees, performance, and payment bonds, and highlights a mandatory site visit for bidders. The document also details submission processes, including electronic submissions only, and stresses the importance of compliance with federal acquisition regulations and VA standards. Key regulatory considerations include maintaining the required demographics for workforce representation and adhering to environmental and safety guidelines throughout the construction process. The VA's commitment to engage SDVOSB firms through this RFP underscores its broader initiative to promote small business participation while modernizing critical infrastructure to enhance service delivery for veterans.
    The Department of Veterans Affairs plans to solicit bids for a Firm-Fixed-Price contract focused on EHRM Infrastructure Upgrades at the Lake Baldwin VA Medical Center in Orlando, FL. The project involves site preparation, demolition, and construction, with a total estimated cost between $10 million and $20 million, and is set aside for Service-Disabled Veteran-Owned Small Businesses. The solicitation is expected to be issued in mid to late September 2024, with an approximate performance period of 600 days.
    The document pertains to an amendment of a solicitation issued by the Department of Veterans Affairs (VA) for Project Number 36C77624B0028. The amendment primarily provides the Site Visit Sign-in Sheet, indicating updates to the procurement process. It outlines the required acknowledgment methods for offers, emphasizing the importance of timely acknowledgment to avoid the rejection of offers. The amendment ensures that all prior terms and conditions of the solicitation remain unchanged unless specified otherwise in this document. The issue date of the amendment is September 3, 2024, and it must be acknowledged by prospective bidders before the specified submission deadline. The document is standardized using GSA FAR guidelines and highlights the administrative changes made to the contract or solicitation process. It serves as an essential tool for maintaining transparency and communication between the government and contractors regarding the bidding procedure.
    This document discusses an amendment to a solicitation issued by the Department of Veterans Affairs (VA) Program Contracting Activity Central, specifically regarding the modification of a contract. The primary purpose of this amendment is to extend the deadline for bid submissions to October 23, 2024, at 1:00 PM EST. It highlights the importance of acknowledging receipt of this amendment by all offerors and specifies methods for acknowledgment, including written confirmation or acknowledgment on submitted offers. Additionally, it mentions that an amendment containing responses to technical questions will be posted later in the week. The document maintains standard government formatting and includes signatures from authorized personnel, reinforcing its official status. Overall, the amendment aims to facilitate the bidding process and ensure all parties are informed of the updated terms.
    This document is an amendment to a solicitation for a contract issued by the Department of Veterans Affairs, specifically the Program Contracting Activity Central. It notes the submission deadline extension for responding to the solicitation, requiring bidders to acknowledge receipt of the amendment by specified methods, including returning copies or noting acknowledgment on submitted offers. The purpose of this amendment is to provide answers to technical questions related to the solicitation, which is crucial for potential bidders to fully understand project requirements. The document establishes continuity by affirming that all previously established terms and conditions remain in effect except for the changes outlined in this amendment. Furthermore, it underscores the importance of adhering to the specified deadline for response to maintain eligibility. The overall goal of the amendment is to facilitate participation in the procurement process for a project associated with the Veterans Affairs, reinforcing transparency and clarity in government contracting processes.
    This document is an amendment to a solicitation issued by the Department of Veterans Affairs, specifically by the Program Contracting Activity Central. The primary purpose of this amendment is to extend the due date for bid submissions to October 30, 2024, at 1:00 PM EST. It emphasizes the requirement for offerors to acknowledge receipt of this amendment to ensure their offers are considered. The amendment states that all terms and conditions outlined in previous documents remain unchanged except for the modification described. The document also includes standard instructions on submitting acknowledgments and potential changes to offers. Overall, this amendment serves to inform bidders of the revised deadline while maintaining the integrity of the solicitation process.
    This document serves as an amendment to a previously issued solicitation by the Department of Veterans Affairs (VA), specifically referencing solicitation number 36C77624B0028. The purpose of the amendment is to provide part two of the responses to technical questions posed by bidders. In addition, it includes supplementary documentation related to plumbing work at Building 502. The amendment outlines the procedures for acknowledging its receipt, emphasizing the importance of doing so by the specified deadline to avoid rejection of the offer. All prior terms and conditions of the contract remain unchanged, maintaining the contract's integrity while facilitating communication regarding technical inquiries. The contracting officer, Bridget E. May, oversees this process, which is essential for ensuring clarity and transparency in federal procurement, specifically within the VA’s contracting activities. Overall, the document highlights the VA’s commitment to transparency and responsive communication in its procurement process.
    This document serves as an amendment to a government solicitation under the Department of Veterans Affairs (VA). It outlines changes to the bidding process, specifically updating the bid due date and time to November 5, 2024, at 1:00 PM EST. Additionally, it provides details for a bid opening conference call, which will occur via Microsoft Teams, emphasizing that no in-person bid opening will take place. Offerors can participate by either calling in or joining online, with specific instructions for accessing the meeting link and dial-in number included. The amendment clarifies that all previously established terms and conditions remain unchanged, reinforcing the importance of acknowledging receipt of this amendment for offer validity. This document highlights the VA's method of soliciting bids while ensuring compliance with procedural requirements for government procurements.
    The document outlines the EHRM Infrastructure Upgrades project at the Orlando VA Medical Center, detailing specifications and requirements for contractors engaged in general, electrical, and mechanical construction work. The project aims to enhance the facility's healthcare capabilities while ensuring continuous operations during construction. Key elements include adherence to safety protocols, thorough site preparation, demolition of existing structures, and integration of modern systems (HVAC, electrical, and fire suppression). The document specifies the obligations of contractors regarding construction security, operations, utility management, and protection of existing assets. Emphasis is placed on the need for coordinated schedules to avoid disrupting medical services, ongoing communication with the Contracting Officer, and compliance with government protocols regarding material disposal and hazardous waste management. Additionally, the necessity for instructional sessions on equipment maintenance and detailed warranty management is emphasized. This comprehensive strategy illustrates the VA's commitment to improving infrastructure while maintaining a high standard of safety, regulatory compliance, and uninterrupted service delivery to veterans.
    The EHRM Infrastructure Upgrades project at the Lake Baldwin VA Medical Center includes an organized site visit scheduled for September 12, 2024, at 09:00 AM (EST). Participants are expected to gather at the Engineering Building, located at 5201 Raymond St, Orlando, FL, entering via Mercy Ave or Raymond St. This site visit is presumably part of the preparatory steps involved in the federal project aimed at enhancing the medical facility’s infrastructure. Attendees are advised to contact the Engineering office at 407-244-2914 for any further instructions. This event underlines the VA's commitment to engaging stakeholders and ensuring comprehensive communication for the infrastructure improvement initiatives.
    The document outlines the **EHRM Infrastructure Upgrades Project** (Project No: 675-22-701) at the Lake Baldwin VA Medical Center in Orlando, Florida. The purpose of this initiative is to address deficiencies in telecommunications and facility operations by upgrading mechanical, plumbing, electrical, and fire safety systems in various buildings within the campus. The project scope includes detailed architectural and engineering assessments, demolition to remove outdated components, and installation of new technologies while adhering to VA construction specifications and safety regulations. Emphasis is placed on implementing stringent infection control measures during construction to safeguard the hospital environment. The contractor is responsible for identifying and managing hazardous materials, particularly asbestos and lead-based paints, and ensuring compliance with environmental regulations. Throughout the upgrade process, coordination with the contracting officer and existing hospital operations is essential to minimize disruptions. The project is designed to enhance operational efficiency, improve system reliability, and maintain high standards of safety and health for users and workers, reflecting the VA's commitment to modernizing healthcare facilities while ensuring regulatory compliance.
    The document outlines the fire protection and design criteria for the renovation of the VA Lake Baldwin facility, ensuring compliance with safety regulations and standards. It details the arrangement and specifications of various rooms, including consultation areas, treatment rooms, and offices, illustrating a clear floor plan layout for the redesign of the first floor of Building 500. Each room's purpose, such as waiting areas, restrooms, and medical offices, is specified, emphasizing functionality and accessibility for patients and staff. The fire protection system is a focal point of this document, with specifications dictating the installation of wet pipe sprinkler systems categorized by hazard classifications. Key design criteria, including discharge densities, maximum coverage areas, and spacing between sprinklers, are provided to ensure comprehensive fire safety coverage throughout the facility. In the context of government RFPs and grants, this document reflects the VA's commitment to modernizing healthcare facilities with enhanced safety protocols, prioritizing effective fire protection, and adhering to local, state, and federal regulations for healthcare construction projects. The collaboration between architects, engineers, and contractors is crucial for executing this large-scale renovation project successfully while maintaining a focus on patient and staff safety.
    The VA Orlando Medical Center's EHRM Project #675-22-701 outlines comprehensive commissioning requirements for the facility's construction phase. The document details processes for verifying that building systems, such as HVAC, electrical, and fuel systems, operate according to design specifications and the Department of Veterans Affairs (VA) operational needs. A dedicated Commissioning Agent will oversee the systematic verification of equipment installation, functional performance testing, operations, and maintenance training for VA staff. Clear communication protocols between the Contractor, Commissioning Team, and VA representatives are established to enhance collaboration and expedite issue resolution. The project aims to ensure all systems are fully functional, properly documented, and energy-efficient, complying with federal guidelines for environmental performance. Additionally, the document includes terms regarding the roles and responsibilities of all parties involved, supporting effective project execution and management throughout the commissioning process.
    The EHRM Project #675-22-701 at the VA Orlando Medical Center aims to enhance infrastructure through comprehensive construction and upgrade works. Responsibilities include site preparations, demolitions, and installations across general, electrical, and mechanical disciplines. A critical focus is on safety and compliance with VA security requirements, ensuring all personnel adhere to protocol during the project lifecycle. Specific provisions include maintaining existing utility services and minimizing disruption to Medical Center operations, as it operates 24/7. Key management practices entail submitting security and construction plans, maintaining as-built documentation, and implementing a Warranty Management Plan to ensure long-term operational reliability. The contractor must also provide clear instructions and training on operating new systems, with an emphasis on integrating existing equipment and managing hazardous materials responsibly, such as PCB disposal. The project's structure encompasses detailed guidelines for contractors, ensuring thorough compliance with environmental controls and existing facility protection. This initiative underscores the VA's commitment to modernizing its medical facilities, ensuring both infrastructure improvements and adherence to stringent operational standards.
    The document outlines the submittal requirements and procedures for the EHRM Project #675-22-701 at the VA Orlando Medical Center, specifically for the construction phase. It details the obligations of contractors for various types of submittals, including preconstruction, shop drawings, product data, samples, test reports, and operation and maintenance data. These submissions must demonstrate compliance with contract specifications and be thoroughly reviewed by the VA. The summary emphasizes the necessity for contractors to coordinate submission timing with project schedules to avoid delays and outlines penalties for incomplete documentation, such as withholding payments. Further, the document instructs contractors on the specific format for submissions, including electronic requirements and sample provisions. It establishes clear protocols for submittal tracking and responses from the VA, ensuring accountability and adherence to construction standards. Compliance with outlined requirements and procedures is crucial for successful project execution and the maintenance of contractual obligations, reflecting the government's commitment to high standards in public health infrastructure projects.
    The VA Orlando Medical Center's EHRM Project #675-22-701 outlines the requirements for an overcurrent protective device coordination study. This study encompasses calculations and analyses related to electrical safety, highlighting the need for a well-coordinated time-current analysis of overcurrent protective devices. The document is structured into sections detailing general descriptions, related work, quality assurance, submittals, applicable publications, study requirements, and necessary analyses. Key aspects of the study include generating a one-line diagram, conducting short-circuit and coordination studies, and performing arc flash calculations, following standards established by IEEE and NFPA. The study is to be prepared by licensed electrical engineers and includes thorough documentation of the device settings and ratings, ensuring compliance with regulatory publications. Ensuring proper coordination and safety in electrical installations is emphasized, with guidelines for arc flash warning labels and necessary personal protective equipment. The project aims to enhance electrical safety and protect equipment efficiently, aligning with federal and local regulations for healthcare facilities.
    The VA Orlando Medical Center's EHRM Project #675-22-701 encompasses the design and installation of advanced lighting control systems. This document specifies the requirements for various components of lighting controls, including electronic time switches, photoelectric switches, and occupancy sensors. It outlines related works such as integration with HVAC systems, electrical installation requirements, and certification processes. Key aspects include ensuring compliance with industry standards from the National Electrical Manufacturers Association (NEMA), Underwriters Laboratories (UL), and the National Fire Protection Association (NFPA). The document details quality assurance measures, submittals required from contractors (shop drawings, manuals, and certifications), and installation procedures according to manufacturer guidelines. The project emphasizes effective installation practices, testing methods for sensors, and ensuring the systems function as intended. Additionally, it mandates training for personnel on system operations and maintenance. The aim is to enhance operational efficiency and safety within the VA medical center by modernizing the lighting infrastructure, in alignment with federal standards and project specifications leading to improved healthcare environments.
    The document outlines the specifications for the installation and connection of panelboards for the VA Orlando Medical Center’s EHRM Project #675-22-701. It begins with the general description of panelboards, related work, and quality assurance requirements, including necessary submittals like shop drawings, maintenance manuals, and certifications from both the manufacturer and contractor. It lists applicable publications that guide compliance, such as the International Building Code and National Electrical Code. Detailed product requirements stipulate that panelboards must conform to safety and performance standards, including specifications for breakers, enclosures, and surge protection devices. Installation guidelines emphasize following the manufacturer’s instructions and ensuring proper locations for conduits. Acceptance checks and tests are mandated both visually and mechanically to verify operational integrity post-installation. The purpose of the document is to provide precise standards and protocols for electrical panelboard installation, ensuring safety, functionality, and compliance with regulatory standards necessary for federal projects. This aligns with the broader goals reflected in government RFPs and grants focused on infrastructure enhancement within public facilities.
    The document outlines specifications for the furnishing, installation, and connection of enclosed switches and circuit breakers as part of the EHRM Project #675-22-701 at the VA Orlando Medical Center. It details requirements for both fused and unfused disconnect switches, applicable publications for compliance, and the necessary submittals for project certification, including shop drawings and maintenance manuals. The document emphasizes adherence to various national codes and standards, ensuring equipment meets specifications for rated capacities and environmental conditions. Installation guidelines, testing, and acceptance checks are also included to ensure proper functionality and safety. The summary of these specifications reflects the government’s commitment to maintaining high safety standards and operational efficiency in electrical systems, crucial for the healthcare environment serving veterans. Overall, the document serves as a comprehensive reference for contractors engaged in this federal project, specifying essential requirements for successful completion.
    The document outlines the specifications for the interior lighting systems to be installed at the VA Orlando Medical Center, Lake Baldwin, under the EHRM Project #675-22-701. It details the furnishing, installation, and connection of various lighting fixtures in accordance with defined electrical standards and guidelines. Related sections cover requirements for demolition, electrical installations, wiring devices, and construction waste management. Key quality assurance measures include submitting shop drawings, manuals, and certifications to ensure compliance with industry standards such as NFPA, UL, and IES. Specific product criteria cover aspects like light fixtures, ballasts, emergency lighting units, and LED specifications, emphasizing energy efficiency and safety. Installation guidelines stress proper alignment and mounting of fixtures while coordinating with electrical trades for optimal functionality. Acceptance checks and follow-up verification are mandated post-installation, ensuring that systems operate correctly per requirements. The overarching purpose of this document is to guide the implementation of a cohesive and regulated interior lighting system to meet the standards set forth for VA facilities.
    The VA Orlando Medical Center's Earthwork specification outlines the requirements for the EHRM Project #675-22-701. This includes site preparation, excavation, backfilling, grading, and site cleanup. Detailed definitions explain terms such as unsuitable materials, subgrade, borrowing, and debris, establishing clear classifications and expectations for soil and materials. Additionally, the document specifies the measurement and payment protocols for excavation, including both typical and rock excavation procedures. Key points include obligations for proper subgrade preparation, shoring, drainage management, and waterproofing necessary for excavation stability. The contractor must ensure groundwater control to maintain a dry working condition, as well as develop a blasting plan for rock excavation that meets regulations. Following the earthwork, the contractor is responsible for disposing of debris and contaminated soils according to government standards. Overall, the specification ensures the project adheres to safety, environmental, and regulatory compliance standards while establishing the methodology and materials required for successful earthwork completion at the VA Orlando Medical Center.
    The VA Orlando Medical Center's EHRM Project #675-22-701 outlines the earthwork requirements for new construction. It details necessary equipment, materials, and procedures for excavation, filling, backfilling, and site restoration, emphasizing the importance of material suitability and effective site preparation. Key definitions include unsuitable materials, excavation classifications, and compaction standards. Related work sections highlight necessary inspections, safety protocols, and subsurface investigations. The document specifies guidelines for clearing, grading, and the appropriate disposal of materials, ensuring minimal environmental impact and adherence to local regulations. It mandates robust oversight during excavation, particularly for drainage and any required blasting operations. The project aligns with compliance requirements for federal, state, and local regulations, demonstrating the VA's commitment to maintaining safe and functional medical facilities while ensuring thorough documentation and testing of materials for structural integrity.
    The document outlines significant updates to the specifications for the VA Lake Baldwin project as of June 21, 2024. Key revisions include amendments to general requirements, laboratory services, contract working hours, and construction security needs. Notably, site visits by bidders will now be conducted per solicitation guidelines and at the Contracting Officer's discretion. Working hours are defined as Monday to Friday, excluding federal holidays, while after-hours work requires prior approval. Additionally, the submittal process for shop drawings and product data has been streamlined, now mandating the use of an FTP file-sharing system and adjusting review timelines for submissions and Requests for Information (RFIs). Several specification sections were refined to eliminate spec writer notices, enhancing clarity. Furthermore, the role of the Commissioning Agent was clarified, indicating the General Contractor's responsibility for engaging this agent under a separate contract. Overall, these updates aim to ensure clarity, efficiency, and compliance in the procurement and execution of the construction contract, reflecting the project’s commitment to maintaining high standards in governmental operations.
    The Department of Veterans Affairs is initiating the EHRM Infrastructure Upgrades Construction project at the Lake Baldwin VA Medical Center in Orlando, FL. This procurement involves a firm-fixed price contract for specific construction materials, critical for standardization across the facility. The project will strictly utilize brand name items, including Johnson Controls for HVAC systems, Lenel for Physical Access Controls, Pelco for surveillance cameras, and CISCO for network switches. The justification for limiting competition is based on the unique qualifications of these brands, which are essential for maintaining existing systems' compatibility and operational integrity. The project budget ranges between $10 million and $20 million, with a competition set-aside for Service-Disabled Veteran-Owned Small Businesses. Despite first using brand name items, the overall procurement will be open to competitive bidding. The justification emphasizes that such standardization is crucial for efficiency and effectiveness while ensuring compliance with federal competition regulations. The contracting officer and healthcare engineer validate that this need aligns with the VA's objectives and provide a clear rationale for this procurement approach.
    The Orlando VA Medical Center (OVAMC) is preparing for significant infrastructure upgrades under the EHRM project, aimed at enhancing various building systems while ensuring compliance with safety and health standards. The project, led by Freddie Candelaria, includes extensive electrical system upgrades, HVAC improvements, and communication infrastructure enhancements across multiple buildings on the Lake Baldwin campus. A Pre-Construction Risk Assessment (PCRA) has been conducted to identify safety precautions necessary during construction to minimize risks to patients, employees, and contractors. Key safety measures outlined in the PCRA include dust and debris management, infection control assessments, and ongoing communication with affected areas. It emphasizes the importance of following strict protocols for potential environmental hazards, including managing the risk of tuberculosis transmission and ensuring the competency of contracted workers through required OSHA training. The document encourages regular inspections and coordination with emergency services to maintain a safe construction environment. Ultimately, these upgrades reflect the VA's commitment to improving healthcare facilities while prioritizing safety, regulatory compliance, and minimizing disruption during the construction phase.
    The document outlines the certification requirements for offerors submitting bids for construction contracts to the VA, specifically regarding limitations on subcontracting. Under 38 U.S.C. 8127(l)(2), contractors must adhere to a rule that limits payments to non-certified Service-Disabled Veteran-Owned Small Businesses (SDVOSBs) to no more than 85% of the total amount received from the government. Cost of materials is excluded from this calculation. The offeror must comprehend that false certifications can lead to severe legal repercussions. During contract performance, the VA may request evidence of compliance, which can include invoices or subcontract records. The document emphasizes the necessity of submitting a signed certification alongside proposals to ensure eligibility for evaluation and awards. Non-compliance or failure to provide requested documentation may lead to government action, affirming the commitment to uphold the integrity of veteran-owned contracting processes.
    The document outlines various requests for proposals (RFPs) and federal grants related to governmental projects and initiatives. It emphasizes the importance of compliance, safety, and transparency in undertaking projects across federal and state levels. Key areas include the evaluation of existing conditions, the need for hazard assessments, and the implementation of safety measures during construction or renovation. The text underscores the obligation for contractors to adhere to regulations while performing assessments, remediating hazardous materials, and ensuring the well-being of the public and stakeholders involved. The overall focus is on promoting responsible management of resources, environmental safety, and the enhancement of public facilities through structured governmental oversight. These RFPs reflect a commitment to improving infrastructure while prioritizing health and safety standards in accordance with federal and local guidelines.
    The document outlines a Special Notice for the construction of the EHRM Infrastructure Upgrades at Lake Baldwin in Orlando, issued by the Department of Veterans Affairs. It provides essential details such as the solicitation number (36C77624B0028), contracting office address, and the point of contact (Contract Specialist Shawn Tavernia). The project falls under the NAICS code 236220, related to commercial and institutional building construction. The notice states that the response deadline is unspecified but will be archived 99 days after that date. A link to the agency's homepage is provided for further information. The attached document further details the bidding process relevant to this construction initiative, highlighting the VA's commitment to improving its infrastructure. Overall, the notice serves to inform potential contractors about an opportunity related to construction projects within the VA framework.
    The document outlines an abstract of offers for construction bids related to the EHRM Infrastructure Upgrades at Lake Baldwin, issued by the Department of Veterans Affairs Program Contracting Activity Central. The solicitation includes details such as the solicitation number, project title, the date issued and opened, and the issuing office. It references six amendments and details the bids from various contractors. Two main offers, from Amcor JV One, LLC and Blue Cord Design & Const., LLC, are presented, each with a bid amount, bid security type, and acknowledgment of amendments. Key figures include a government estimate and multiple offer amounts for the project, which totals around $36 million in combined bids. The document serves as an official record of the bids received and confirms compliance with bidding protocols and regulations. It indicates strong participation from contractors and emphasizes the structured bidding process typical in federal and local construction projects.
    The document outlines the site visit details for the EHRM Infrastructure Upgrades Construction project at Lake Baldwin VAMC, scheduled for September 12, 2024, at 9:00 AM EST. It serves as a sign-in sheet for participants, listing names, companies, email addresses, and phone numbers of attendees. The key individuals involved include Shawn Tavernia, Contract Specialist; Freddie Langevin, the VA Engineer/COR; and Bridget E. May, the contracting officer. The project focuses on upgrading the electronic health record management infrastructure to improve the functionality and compliance of the facility. Main tasks may include evaluations, installations, and adherence to safety and regulation standards throughout the construction process. The document's intent is to facilitate communication and record participation for contractors interested in the project, reflecting the VA's commitment to modernizing its healthcare infrastructure while ensuring thorough oversight in execution.
    The EHRM Infrastructure Upgrades project at Lake Baldwin VAMC involves significant construction improvements focused on fire protection, plumbing, and mechanical systems. The Technical Questions and VA Response Tracking Sheet outlines a series of inquiries from contractors regarding specifications, responsibilities, and existing conditions related to the upgrade. Key clarifications include the contractor's obligation to provide fire extinguishers in temporary buildings, interpretation of duct bank installation requirements, and specifics on handhole dimensions. Additionally, contractors are guided to reference particular drawing sheets for plumbing and electrical details. The document underscores the VA's efforts to ensure safety and compliance throughout the infrastructure upgrade process while streamlining contractor work through clear expectations and existing documentation references. This initiative reflects the VA's commitment to enhancing healthcare facilities while prioritizing safety measures and adherence to design guidelines.
    The EHRM Infrastructure Upgrades project at Lake Baldwin VAMC seeks to modernize various construction and mechanical systems with an estimated budget between $10 million and $20 million. The project will not provide sales tax exemption, and contractors must factor all applicable taxes into their bids. The government emphasizes a firm fixed price model with no consideration for economic price adjustment clauses or price escalation due to tariffs. Payment for stored materials will be evaluated at the discretion of the Contracting Officer and is not guaranteed for materials stored onsite. Contractors must adhere to strict specifications regarding material compliance, including the Buy American Act, and must document any unexpected site conditions, such as the discovery of hazardous materials like asbestos, which will be treated as unforeseen conditions subject to contract modifications. Safety standards require that all contractors obtain VA-issued badges, and a clear management structure for relocations within the construction scope will be mandated. Overall, the extensive technical questions and responses reflect a detailed and rigorous procurement process aimed at ensuring transparency, compliance with federal regulations, and a commitment to meticulous project execution. The information provided in this document serves as both a guideline and a reference for potential bidders as they navigate the complexities of this government project.
    Similar Opportunities
    Y1DA--675-22-706B EHRM Infrastructure Upgrades Construction Lakemont – Orlando, FL
    Active
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is soliciting proposals for the EHRM Infrastructure Upgrades Construction project at the Lakemont VA Medical Center in Orlando, Florida. This initiative, set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSBs), aims to enhance the facility's infrastructure with an estimated construction cost between $2 million and $5 million, requiring contractors to provide all necessary tools, labor, and materials within a timeline of 545 calendar days from the notice to proceed. The project is critical for improving healthcare delivery and operational efficiency at the VA Medical Center, ensuring compliance with federal safety and quality standards. Interested contractors must submit their bids, including a 20% bid guarantee, and are encouraged to attend a pre-bid site visit scheduled for December 18, 2024, with further inquiries directed to Contract Specialist Shawn A Tavernia at shawn.tavernia@va.gov.
    Z2DA--675-22-706A EHRM Infrastructure Upgrades Construction Viera VA Clinic
    Active
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is soliciting proposals for the EHRM Infrastructure Upgrades Construction project at the Viera VA Medical Center in Florida, with an estimated contract value between $2 million and $5 million. This project, set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB), aims to enhance the electronic health record management infrastructure by addressing deficiencies in telecommunication and utility systems, while ensuring compliance with safety and operational standards. Interested bidders must provide all necessary tools, labor, and materials, adhere to strict project timelines, and participate in a mandatory site visit scheduled for January 11, 2025. For further inquiries, potential contractors can contact Contract Specialist Shawn A Tavernia at shawn.tavernia@va.gov.
    EHRM Infrastructure Upgrades Construction - Miami - Project 546-20-120
    Active
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is seeking qualified contractors for the EHRM Infrastructure Upgrades Construction project at the Miami VA Medical Center. This procurement aims to enhance the facility's infrastructure to support improved Electronic Health Record Management systems, with bids ranging from approximately $22 million to $28 million. The project is critical for modernizing health management services for veterans, ensuring that the facilities meet contemporary standards for care delivery. Interested contractors should contact Jason Phillip at jason.phillip@va.gov or 216-447-8300 for further details, as the solicitation number is 36C77624B0027 and the project falls under the NAICS code 236220.
    Y1DA--512-22-710 EHRM Infrastructure Upgrades - Loch Raven MD - Construction (VA-24-00060549)
    Active
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is seeking proposals for the EHRM Infrastructure Upgrades project at the Loch Raven VA Medical Center in Baltimore, Maryland. This initiative aims to modernize the facility's infrastructure, including significant upgrades to mechanical, electrical, plumbing, and fire protection systems, to support the implementation of the Electronic Health Record Management system. The project is critical for enhancing operational efficiency and ensuring compliance with contemporary safety and regulatory standards, reflecting the VA's commitment to improving healthcare delivery for veterans. Interested Service-Disabled Veteran-Owned Small Businesses (SDVOSBs) must submit their proposals by the specified deadline, with an estimated project budget between $10 million and $20 million and a completion timeline of 540 calendar days following the Notice to Proceed. For further inquiries, contact Melissa Waddell at Melissa.Waddell@va.gov or (216) 447-8300.
    Z2DA--689A4-22-700 EHRM Infrastructure, Newington CONSTRUCTION SOLICITATION (VA-24-00028377)
    Active
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is soliciting bids for the construction of the Electronic Health Record Modernization (EHRM) Infrastructure Upgrades at the Newington VA Medical Center in Connecticut. This project aims to address deficiencies in the IT and communication facilities, ensuring compliance with the Physical Security Design and Resiliency Manual while preparing for a national Cerner upgrade. The upgrades will enhance telecommunications infrastructure across multiple buildings, including the installation of new fiber optic cabling, electrical systems, and fire protection measures, all while maintaining operational efficiency and safety for veterans. Interested contractors, particularly those classified as Service-Disabled Veteran-Owned Small Businesses (SDVOSB), should contact Shardae Webb at Shardae.Webb@va.gov or 216-447-8300 for further details, with bids due by the specified deadlines outlined in the solicitation documents.
    Y1DA--589A5-21-700 EHRM INFRASTRUCTURE UPGRADES (VA-24-00076324) Topeka, KS
    Active
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is seeking proposals for the EHRM Infrastructure Upgrades project at the Colmery-O'Neil VA Medical Center in Topeka, Kansas. This initiative aims to modernize the facility's electronic health record management infrastructure through extensive renovations, including upgrades to mechanical, electrical, plumbing, and telecommunications systems across multiple buildings. The project is critical for enhancing healthcare delivery to veterans while ensuring compliance with safety and operational standards. Interested contractors, particularly Service-Disabled Veteran-Owned Small Businesses (SDVOSBs), must submit their bids electronically by January 7, 2025, at 1:00 PM EST, with a projected construction budget between $20 million and $50 million. For further inquiries, contact Richard Webb at Richard.Webb3@va.gov or 216-447-8300 x49623.
    Z2DA--EHRM Construction Amarillo-Project 504-700
    Active
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is soliciting proposals for the Electronic Health Record Modernization (EHRM) Infrastructure Upgrades project at the Amarillo VA Medical Center in Texas. This project aims to enhance the facility's telecommunications infrastructure, including the complete construction and activation of a new Electronic Health Record system, replacement of the main computer room, and upgrades to telecommunications closets and campus fiber and data cabling. The upgrades are crucial for improving healthcare information systems and ensuring compliance with federal standards, thereby enhancing the quality of care provided to veterans. Interested Service-Disabled Veteran-Owned Small Businesses (SDVOSBs) must submit their proposals electronically, with a project budget estimated between $20 million and $50 million, and a performance period of 548 calendar days from the issuance of the Notice to Proceed. For further inquiries, contact Heather Holland at heather.holland3@va.gov or Dean Flanders at dean.flanders@va.gov.
    Y1DA--FY25: NRM (PROJ: 673-21-149) BB Convert 6 West to Private Patient Rooms
    Active
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is soliciting proposals for the renovation of the 6th floor West Wing at the James A. Haley Veterans Hospital in Tampa, Florida, to convert existing spaces into private patient rooms. This project, designated as Project Number 673-21-149, involves extensive demolition and remodeling, including the installation of modern mechanical, electrical, and plumbing systems, while adhering to strict safety and health regulations. The initiative aims to enhance patient privacy and comfort, reflecting the VA's commitment to improving healthcare environments for veterans. Interested Service-Disabled Veteran-Owned Small Businesses (SDVOSBs) must submit their proposals by January 15, 2025, at 3:00 PM EST, to the Contract Specialist, David M. Hernandez, at David.Hernandez1@va.gov, with an anticipated contract value between $5 million and $10 million.
    Y1LZ--573-339 BB Expand Vertical Parking Garage #2 (Independence) Minor Construction - Gainesville VAMC
    Active
    Veterans Affairs, Department Of
    The Department of Veterans Affairs (VA) is seeking bids for a Firm-Fixed-Price contract to expand Vertical Parking Garage 2 at the Gainesville VA Medical Center in Florida. The project entails general construction activities, including the addition of three new garage levels, installation of pedestrian control grilles, elevated driveways, and various structural and utility enhancements. This initiative is part of the VA's commitment to improving infrastructure for veteran services, with a contract value estimated between $10 million and $20 million. The solicitation is designated as a Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside, and bids are expected to be solicited in late October to early November 2024, with a performance period of approximately 365 days following the issuance of a Notice to Proceed. Interested parties should direct all inquiries in writing to Sharese McKinney at Sharese.McKinney@va.gov, as phone calls will not be accepted.
    Z1DA--586-26-102 | Roof Warehouse & Mental Health Modular
    Active
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is soliciting proposals for the "Roof Warehouse & Mental Health Modular" project at the G. V. (Sonny) Montgomery VA Medical Center in Jackson, Mississippi. This project involves replacing two roof systems and is exclusively set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSBs), with an estimated construction cost ranging from $2,000,000 to $5,000,000 and a performance period of 150 calendar days following the notice to proceed. The initiative underscores the importance of maintaining and improving infrastructure for veteran services, ensuring compliance with safety and quality standards throughout the construction process. Interested contractors must submit their proposals by the specified deadline and can contact Contract Specialist Robert D Arabie at robert.arabie@va.gov for further information.