Z1DA--630-CSI-120 NY SPECT CT SITE PREP DESIGN BUILD
ID: 36C24224R0083Type: Combined Synopsis/Solicitation
Overview

Buyer

VETERANS AFFAIRS, DEPARTMENT OFVETERANS AFFAIRS, DEPARTMENT OF242-NETWORK CONTRACT OFFICE 02 (36C242)ALBANY, NY, 12208, USA

NAICS

Commercial and Institutional Building Construction (236220)

PSC

MAINTENANCE OF HOSPITALS AND INFIRMARIES (Z1DA)

Set Aside

Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14) (SDVOSBC)
Timeline
    Description

    The Department of Veterans Affairs is seeking qualified contractors for the design and construction of site preparation for a new Nuclear Medicine GE SPECT CT at the Veterans Affairs Medical Center in Brooklyn, New York. The project requires comprehensive turnkey services, including all labor, materials, and safety measures necessary to prepare the site in accordance with VA and manufacturer specifications, with a focus on maintaining operational continuity in a healthcare environment. This initiative is critical for enhancing medical imaging capabilities for veterans, ensuring compliance with stringent safety and design guidelines. Interested contractors, particularly those who are Service-Disabled Veteran-Owned Small Businesses (SDVOSB), must submit proposals by December 20, 2024, with a contract award anticipated shortly thereafter. For further inquiries, contact Contracting Officer Vladimir Stoyanov at Vladimir.Stoyanov@va.gov or by phone at 718-836-6600 ext 8889.

    Point(s) of Contact
    Contracting OfficerVladimir Stoyanov
    718- 836-6600 ext 8889
    Vladimir.Stoyanov@va.gov
    Files
    Title
    Posted
    The document outlines a Request for Proposal (RFP) for a design-build project titled “NY SPECT CT” at the VA Medical Center in Manhattan. The project entails the design and construction of a Nuclear Medicine GE SPECT CT machine, requiring the contractor to manage all labor, materials, and services. Key responsibilities include preparing construction documents, complying with VA specifications, and adhering to a timeline of 270 days following the Notice to Proceed. The design-build team must include qualified professionals and submit documents for review at specified completion stages (30% and 95%). Quality Assurance (QA) protocols must be established to minimize errors, and professional licensure is mandatory for architects and engineers involved. The proposal also details submission formats, coordination with the VA team, and requirements for construction specifications. The primary focus is ensuring compliance with applicable codes and VA standards while maintaining communication throughout the project lifecycle. This RFP reflects the government's commitment to enhancing healthcare infrastructure through systematic project management.
    The VA NYHHCS is soliciting bids for Project No. 630-CSI-120, focusing on the site preparation for the installation of a Nuclear Medicine GE SPECT CT at the Veterans Affairs Medical Center in New York. Contractors are required to prepare the site through demolition, provide all labor and materials, and ensure compliance with safety and VA design guidelines. Key tasks include architectural engineering design, renovation of a 1,000 square foot radiology space, and installation of a new HVAC system. Strict safety and infection control measures must be adhered to, including training and proof of OSHA compliance. The project emphasizes coordination with ongoing medical operations at the facility, ensuring no disruption to patient services. A timeline must be submitted, targeting completion before June 2025, with regular reporting of progress and potential issues. Successful contractors will adhere to established security and operational protocols, providing their own storage and ensuring proper disposal of debris. This project showcases the VA's commitment to modernizing its facilities to better serve veterans while maintaining a focus on safety and operational continuity.
    The NY SPECT CT Site Prep project, managed by the VA-NYHHCS, emphasizes stringent safety requirements to ensure a secure work environment during construction. The primary goal is to adhere to various regulatory standards including those from OSHA, NFPA, and the American National Standards. The document outlines the development of a comprehensive Accident Prevention Plan (APP) that mandates safety training, hazard assessments, and incident reporting protocols. Key requirements include specifying roles for safety officers and competent persons, conducting daily safety inspections, implementing fall protection measures, and maintaining personal protective equipment (PPE). Infection control measures, especially in healthcare settings, must follow specific guidelines to minimize airborne hazards. Additionally, a robust fire safety and emergency response plan must be in place, detailing fire safety protocols, inspections, and emergency exits. This comprehensive approach ensures all contractors and subcontractors maintain safety, comply with local, state, and federal laws, and implement preventive measures to address potential hazards. The multifaceted safety protocols underscore the commitment to protecting construction workers and the surrounding community during the project.
    The document outlines the requirements for construction contractors and architectural/engineering (A/E) design firms working at VISN 2 VA facilities to use the Autodesk Build Construction management platform, also known as Autodesk Construction Cloud (ACC). The platform is a key resource for managing Non-Recurring Maintenance and Minor Program projects and does not incur any costs for contractors. Upon contract award, contractors must request access to the ACC and complete the necessary training via the ProductivityNOW eLearning Site within specified timelines to ensure compliance. The document specifies the need for only essential staff to be granted platform access and mandates that all project correspondence, including requests for information (RFIs), submittals, schedules, and safety reports, must be conducted exclusively through the ACC. Correspondence outside of this platform will not be recognized, and contractors will not receive time extensions or budget increases for failures to comply. This initiative emphasizes adherence to the ACC platform for effective project management and communication, ensuring a structured collaboration approach among all involved parties.
    The document outlines specifications for radiation protection materials and installation related to lead-lined products, particularly in medical facilities. It includes sections on materials, fabrication, installation procedures, and quality assurance, emphasizing the use of lead-lined concrete masonry units, gypsum wallboard, and wood doors to mitigate radiation exposure. Compliance with applicable standards from organizations like ASTM and NCRP is mandated, along with detailed submittal requirements for product literature and test reports. Key points include conducting preinstallation meetings involving all stakeholders, ensuring that lead material adheres to specified thickness and installation techniques, and providing warranties for lead-lined products. Additional aspects address environmental considerations like recycled content and low-emitting materials. The document stresses the importance of a meticulous approach to ensure safety in high-radiation environments, particularly in healthcare settings. This specification serves as a guideline for contractors and suppliers to ensure adherence to safety standards and effective use of radiation shielding in construction projects.
    This document outlines specifications for HVAC ducts and casings, detailing the requirements for ductwork and accessories critical to HVAC systems in government facilities. It covers aspects such as the types of ducts, construction materials, sealing techniques, and installation processes in accordance with relevant standards, specifically SMACNA guidelines. Key sections include a comprehensive list of related work, applicable publications, and quality assurance measures. It prohibits the use of certain duct materials, such as fibrous glass and underground ductwork. Additionally, stringent requirements are set for duct construction, highlighting the importance of using stainless steel for ducts in specific environments like operating rooms and exhaust systems. Submittal requirements for manufacturers’ literature, as well as operating and maintenance manuals, are emphasized, ensuring compliance with sustainable construction practices. The document mandates rigorous testing and balancing of ductwork systems to ensure performance meets established leakage rates. Furthermore, explicit guidelines for installation procedures, duct sealing, and securing access points for maintenance are provided. Overall, the file serves as a technical guide for procurement within government requests for proposals (RFPs), ensuring adherence to safety, performance, and operational standards while modernizing HVAC systems across various facilities.
    This document outlines specifications for packaged, outdoor, central-station air-handling units (AHUs) intended for military and Veterans Affairs (VA) facilities. It specifies that outdoor AHUs are prohibited in high-humidity areas and hurricane-prone regions, emphasizing mission-critical safety protocols. The document details design requirements, material standards, and performance criteria for roof-top units, focusing on insulation, corrosion prevention, and structural integrity. It requires compliance with various industry standards and mandates thorough submittals for manufacturer specifications, including comprehensive testing procedures. Installation guidelines are provided, including proper handling and startup procedures involving factory representatives, as well as education and training for VA personnel on system maintenance. The document emphasizes quality assurance and encourages the use of environmentally sustainable practices aligning with the USDA’s Bio-Preferred Program. Ultimately, it demonstrates the federal government's commitment to providing safe, effective, and resilient HVAC solutions in its facilities while ensuring compliance with regulatory standards.
    The document outlines specifications for humidity control equipment, specifically desiccant dehumidifiers, as part of a federal project. It details the design, materials, performance requirements, and installation processes of the dehumidifiers. The section begins with general descriptions and references related work, including various HVAC system components. It emphasizes quality assurance, mandating that manufacturers demonstrate at least three years of satisfactory service in producing dehumidifiers. Key focus areas include the construction of the units for outdoor use, their maintenance of humidity control, and the requirement for automatic adjustments based on humidity levels. Specific material standards, testing, and safety procedures are thoroughly detailed, ensuring compliance with relevant standards like those from ASHRAE and NFPA. The document also outlines the submission requirements for maintaining records and documenting operations and maintenance activities. This section serves as a vital part of government RFPs, aiming for effective humidity management in HVAC systems while adhering to rigorous performance and safety standards, ultimately ensuring the integrity and efficiency of facilities managed by government entities.
    The document outlines a request for proposals (RFP) from the Department of Veterans Affairs for a design-build construction project at the VA Brooklyn Medical Center. The main purpose is to solicit bids for turnkey services to prepare the site for a new Nuclear Medicine GE SPECT CT, including all necessary labor, materials, and safety precautions. The project must align with specific VA and manufacturer specifications and includes a performance period of 365 days. Key requirements involve architectural and engineering services, HVAC system upgrades, demolition of existing equipment, and ensuring compliance with safety standards during renovation in an operational healthcare facility. The RFP is set aside for service-disabled veteran-owned small businesses and includes a site visit for interested bidders. Responses are due by December 4, 2024, with a contract award anticipated by December 31, 2024. Offerors must navigate various regulations, including safety, quality control, and waste management, while demonstrating a solid project management approach. This initiative reflects the VA's commitment to enhancing healthcare facilities for veterans through strategic investments and adherence to regulatory requirements in construction projects.
    The Department of Veterans Affairs seeks turnkey services for designing and constructing site preparations to install a new Nuclear Medicine GE SPECT CT at the VA Medical Center in New York City. This includes architectural design, renovation of a 1,000 sq. ft. space, and providing all necessary materials and labor for a new standalone HVAC system, ductwork, and a glycol chiller. The contractor must ensure patient and staff safety and follow infection control protocols in this operational healthcare setting. They will also support the equipment manufacturer during installation and provide project management, risk assessment, and commissioning. With urgency, the VA aims to have the site prepared by August 2025. Contractors must use the VA's construction management platform and complete privacy and security awareness training. The estimated response date is September 11, 2024.
    This document serves as Amendment #1 to the solicitation for a project under the Department of Veterans Affairs, Network Contracting Office 2. The amendment clarifies bid requirements, submission details, and responses to Requests for Information (RFIs) from potential contractors. Critical deadlines include an RFI submission deadline of November 27, 2024, and a proposal response deadline of December 6, 2024, both to be submitted via email. The amendment outlines specific drawing requirements for the project's design phase, with detailed submissions needed for various stages of design documentation, including construction drawings and final as-built documents. Additional requirements focus on documentation from contractors, including SF-330 forms, safety ratings, and compliance with VA specifications. Key RFIs address concerns regarding design compliance, particularly about room sizes and features in line with VA guidelines for medical facilities. The amendment clarifies that certain features may differ from established guidelines and highlights the acceptance of modified designs as long as essential VA standards are met. Overall, this document emphasizes the ongoing collaboration between the VA and contractors to ensure project specifications are adhered to while accommodating practical constraints.
    The document is an amendment to a solicitation by the Department of Veterans Affairs Network Contracting Office 2, specifically for project number 36C24224R0083. The primary purpose of the amendment is to clarify aspects of the solicitation and to extend the due date for offers to December 20, 2024, at 2:00 PM EST, with submissions to be made exclusively via email to Contracting Officer Vladimir Stoyanov. The amendment emphasizes that other requests for information (RFIs) and clarifications will not be accepted at this time, highlighting the importance of adhering to the new timeline for bidders. Additionally, while the amendment alters the submission date, it confirms that all other terms and conditions of the original solicitation remain unchanged. This alteration reflects the federal government's commitment to transparent procurement processes and proper communication with potential contractors.
    The document outlines the construction and modernization project for the Gamma Camera rooms 6503E/F at the Manhattan VA Medical Center. The main purpose is to modify existing HVAC, electrical, plumbing, and sprinkler systems in compliance with the latest federal and local building codes. It details the codes and standards adhered to, including VA directives, NFPA, and OSHA guidelines, emphasizing the requirement for maintaining public health and safety during construction. Key design elements include safety protocols, plans for demolition, modification of plumbing and mechanical designs, and the integration of energy-efficient systems. The contractor is mandated to ensure safety compliance and efficient execution of the project while coordinating with existing services to minimize disruptions. Emphasis is placed on the required documentation, including operation and maintenance manuals, inspection records, and guarantees for work quality. This initiative reflects the VA's commitment to upgrading existing infrastructure, ensuring accessibility and safety for veterans while aligning with best practices for construction and facility management. The detailed sections, including plans and specifications, are intended to guide contractors in achieving a fully functional project, securing a safe environment for both staff and patients.
    The document outlines mandatory privacy training for personnel at the Department of Veterans Affairs (VA) who do not have direct access to VA sensitive information or computer systems. It emphasizes the obligation of all personnel to annually complete basic privacy training to protect personal information, regardless of medium. Those with direct access must undertake additional Privacy and HIPAA training. Key definitions are provided, including VA sensitive information, which encompasses any data requiring protection due to potential harm from breaches, and protected health information, as defined by HIPAA. Additionally, the document presents guidelines for safeguarding sensitive information, detailing proper reporting procedures for unsecured data and prohibiting unauthorized sharing or access of protected health information. Privacy compliance is enforced through various laws, such as the Privacy Act of 1974 and HIPAA, with violations leading to civil and criminal penalties, potentially resulting in job loss among other consequences. The role of Privacy Officers is highlighted for reporting privacy concerns. The training reinforces the importance of protecting veterans' confidential information and establishing a workplace culture that prioritizes privacy security.
    The document outlines the pre-installation requirements for GE Healthcare's NM/CT 850 system at the VA Medical Center in New York. It emphasizes the importance of referencing the GE Healthcare Pre Installation Manual to ensure complete documentation for site preparation. The site readiness checklist includes criteria such as unobstructed access routes, appropriate room dimensions, adequate facilities for GE personnel, and compliance with safety regulations. Essential specifications include structural requirements, HVAC conditions, electrical setup, and radiation protection measures. Customers are responsible for site preparation, ensuring floor and ceiling meets necessary loads, and compliance with local regulations regarding radiation shielding. The document details power supply needs, maximum heat output, and installation instructions for GE equipment, specifying that all electrical conduits and supports must be provided by the contractor. It stresses the necessity of obtaining required permits for using radioactive materials, ensuring environmental standards during installation, and verifying all structural components to accommodate the system's weight and operational needs. Overall, this document serves as a critical guide for local authorities and contractors to meet the necessary compliance and safety standards for a successful installation of GE Healthcare equipment in a medical facility.
    The NY SPECT CT Site Prep project, designated as Project #630-CSI-120, is a federal acquisition by the Department of Veterans Affairs, specifically for Design-Build services. It follows a negotiated best-value approach and requires submitting proposals that detail the management plan, team composition, and pricing separately. The contract will be a firm fixed-price for a single award. Key evaluation factors include the professional qualifications of the team, management plan and quality control, previous experience, project scheduling, and pricing. Specific criteria detail the need for qualified expertise across various engineering and architectural disciplines, prior similar project experience, and the capability to maintain operations at the existing facilities during construction. The proposal must include thorough documentation of past projects, including their outcomes and any safety management practices. The evaluation process uses a set score rating system for both past performance and technical proficiency, emphasizing the importance of realistic pricing and technical capability. This project underlines the government's commitment to enhancing healthcare facilities through compliance with set regulations, ensuring minimal disruption to existing operations, and maintaining high standards in construction management.
    The ProductivityNOW eLearning Access Guide outlines the procedure for granting external contractors access to Autodesk Build training necessary for construction management. It specifies that contractors must submit a written access request within 14 days of contract award, providing staff names and emails to the Contracting Officer Representative (COR). Following this, the COR grants access, assigns appropriate training courses, and establishes an access expiration date of 12 days. The guide details step-by-step instructions for both granting access and assigning training through the ProductivityNOW platform. Specific care must be taken to separate access to ProductivityNOW from Autodesk Build. Given the federal context, this document emphasizes compliance and structured training for contractors, ensuring they meet necessary competency requirements in line with government contracts and grants.
    The document outlines requirements for bidders/offerors regarding their safety and environmental records as part of a federal solicitation. It mandates the submission of certifications confirming no more than three serious OSHA violations or one repeat/willful violation in the past three years. Bidders must also provide their current Experience Modification Rate (EMR), which should be 1.0 or lower, sourced from their insurance company or the National Council on Compensation Insurance (NCCI) for self-insured contractors. Failure to provide accurate information will lead to a determination of "Non-Responsibility," excluding bidders from award eligibility. Additionally, it addresses compliance with the VA Acquisition Regulation (VAAR) concerning service-disabled veteran-owned small businesses. This entails that contracts must comply with subcontracting limitations. The document allows Contracting Officers to use support contractors for compliance assessments, ensuring protection of proprietary information throughout the process. Overall, it emphasizes the importance of demonstrated safety performance, accountability in subcontracting, and adherence to government regulations.
    The document details a federal government Request for Proposal (RFP) for the design and construction of a SPECT CT site preparation at the VA Brooklyn Medical Center, issued by the Department of Veterans Affairs. It outlines a two-phase design-build acquisition process where qualified offerors can submit proposals for Phase I, with selected candidates invited to submit for Phase II after evaluation. The project, with an anticipated contract value between $1 million and $2 million, is set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB). A site visit is scheduled on November 8, 2024. Proposals for Phase I are due by November 22, 2024, with performance required to begin within 365 calendar days of contract award. Offerors must comply with various federal standards including bonding and affirmative action requirements for minority and female participation in construction activities. Potential contractors are advised to register with System for Award Management (SAM) and other relevant registries by the time of submission. The RFP promotes collaboration and effective project management throughout the construction process while emphasizing compliance with all relevant regulations.
    The document outlines participation goals for minorities and females in federally assisted construction projects. It establishes percentage goals for these groups based on local economic areas, emphasizing that these are not quotas but targets meant to enhance equal employment opportunity and reduce barriers. Contractors are required to engage in good faith efforts to meet these goals, which apply to their entire workforce on construction projects, independent of federal funding. The document further clarifies that compliance is assessed through outreach and hiring practices aiming to include qualified minorities and females, without requiring specific positions to be filled by individuals of certain backgrounds. Goals are applicable across various economic areas, providing specific percentages for minority and female participation tailored to different states and localities. Contractors' obligations include maintaining uniform hours of employment for these groups across trades, and any restructuring of workforce to meet goals is prohibited. Overall, the guidelines aim to foster diversity and inclusion within construction contracts supported by federal assistance, reflecting ongoing efforts in workforce equity and inclusion policies.
    The government file outlines a series of Requests for Proposals (RFPs) and grant opportunities available at the federal, state, and local levels. Its primary purpose is to solicit project proposals from qualified organizations that can address specific needs identified by government agencies. Key areas of focus include public health, infrastructure improvement, and community development. The document details the eligibility criteria, application processes, and funding limitations associated with each RFP. It emphasizes the importance of compliance with federal regulations and outlines evaluation criteria that proposals must meet to ensure they align with government objectives. The structure of the document includes sections outlining project goals, funding sources, and deadlines for submissions, providing a comprehensive guide for potential applicants. This resource is essential for organizations looking to secure funding and partnerships with government bodies to implement effective programs and projects that serve public interests.
    The Imaging Services Design Guide provides essential planning recommendations for designing and constructing imaging facilities within the VA healthcare system. It consolidates previous separate guides on Radiology, Nuclear Medicine, and MRI into a unified framework. The guide emphasizes the need for innovative design that accommodates evolving technological advancements and the diverse operational needs of imaging services, including diagnostic and interventional procedures. Key components include a focus on patient acuity, operational workflows, and collaboration with clinical staff to optimize facility layouts. It classifies imaging rooms into three classes based on patient care and intervention levels. The guide underscores the importance of flexible and future-ready designs to adapt to changes in clinical practices and equipment requirements, advocating for efficient use of space and resources. Regulatory compliance with existing codes and standards is crucial, as is stakeholder involvement throughout project development. By aligning design efforts with the VA’s mission of providing high-quality care for veterans, the guide serves as a critical resource for ensuring effective use of facilities while managing long-term operational costs. Ultimately, it aims to enhance the accessibility, efficiency, and effectiveness of Imaging Services across VA facilities, reflecting the dynamic nature of healthcare delivery.
    The HVAC Design Manual, prepared for the Department of Veterans Affairs (VA), outlines comprehensive guidelines for heating, ventilation, and air conditioning systems in VA healthcare facilities. It integrates standards reflecting the latest industry practices and responses to evolving requirements, including considerations for energy efficiency, safety, and environmental comfort for staff and patients. Key components include energy conservation mandates requiring new constructions to meet ASHRAE 90.1-2019 standards and guidelines for cooling and heating load calculations. The document emphasizes the necessity of stakeholder involvement throughout project phases to customize designs for specific operational needs while adhering to VA standards. Notably, the manual details requirements for HVAC systems in critical facilities, commissioning practices, and specifies the VA Hospital Building System (VAHBS) for modular design. The intent is to ensure that all HVAC system designs not only comply with relevant codes but also enhance the sustainability and resilience of healthcare environments for veterans. This document serves as an essential resource for architects, engineers, and project managers involved in VA facility planning, ensuring adherence to quality protocols while maintaining a focus on the unique needs of Veterans' health care services.
    Lifecycle
    Title
    Type
    Similar Opportunities
    Z2DA--657A4-24-105, Site Prep for Fluoro and Xray, PB
    Active
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is soliciting proposals for site preparation related to the installation of fluoroscopy and X-ray services at the John J. Pershing VA Medical Center in Poplar Bluff, Missouri, and the West Plains VA Clinic. The project, designated as 657A4-24-105, involves extensive construction work, including the replacement of existing radiology equipment, modifications to electrical and mechanical systems, and adherence to strict safety and infection control standards. This initiative is crucial for enhancing medical services for veterans, ensuring compliance with health regulations, and maintaining operational integrity during construction. Proposals are due by January 16, 2025, at 3:00 PM CST, with an estimated construction cost between $500,000 and $1,000,000. Interested contractors should direct inquiries to Abby L Monroe at abby.monroe2@va.gov.
    Y1DB--CON 663-CSI-021 Renovation Bldg-100 for IR Lab(Tier 1) VA Pugent Sound Health Care - Seattle Division Seattle, WA
    Active
    Veterans Affairs, Department Of
    The Department of Veterans Affairs (VA) is seeking proposals for a Firm-Fixed-Price Construction Contract to renovate the Interventional Radiology (IR) Lab at the Seattle VA Medical Center. The project entails preparing the site, which includes demolition and removal of existing structures, and renovating approximately 937 square feet within the Radiology Department. This initiative is significant as it aims to enhance medical facilities for veterans, and the solicitation is exclusively set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB), in accordance with FAR regulations. Interested parties must submit any questions in writing to the Contract Specialist, Kenneth Winfield, at Kenneth.Winfield@va.gov by January 31, 2025, at 11:00 AM Pacific Time, with the estimated construction cost ranging from $500,000 to $1 million and a performance period of approximately 250 calendar days post-Notice to Proceed.
    Y1DA--692-CSI-101 MRI Site Prep
    Active
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is seeking contractors for the Y1DA--692-CSI-101 MRI Site Preparation project, which involves comprehensive construction services at the VA Southern Oregon Rehabilitation Center & Clinics in White City, Oregon, and the Portland VA Medical Center in Vancouver, Washington. The contractor will be responsible for site preparation, including the installation of a manufactured double-wide trailer and a modular MRI unit, as well as the removal and transport of an existing MRI unit from Vancouver to White City. This project is crucial for enhancing healthcare infrastructure for veterans, ensuring compliance with safety and environmental regulations throughout the construction process. Proposals are due by January 9, 2025, with site visits scheduled for December 17 and 18, 2024; interested parties should contact Contract Specialist Meredith Valentine at meredith.valentine@va.gov for further details.
    6525--SEP 2024 Consolidation - HTME with Extended Installation Services (Includes Turnkey Services)
    Active
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is seeking proposals for the acquisition of High-Tech Medical Equipment (HTME) with extended installation services, including turnkey work, for various VA facilities as part of the SEP 2024 Consolidation project. The procurement aims to enhance medical imaging capabilities, specifically targeting the replacement of outdated systems to improve patient care for approximately 26,000 annual patients by reducing wait times and enhancing image quality. Interested vendors must hold a current contract with either the VA National Acquisition Center or the Defense Logistics Agency, and proposals are due by March 12, 2025. For further inquiries, vendors can contact Contracting Officer Michael J Kuchyak at michael.kuchyak@va.gov.
    Z1DA--SPS Modification - Construction WNY HEALTHCARE SYSTEMS - BUFFALO VAMC
    Active
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is seeking a qualified Service-Disabled Veteran-Owned Small Business (SDVOSB) to provide commissioning services for the construction project at the Buffalo VA Medical Center, specifically for the Sterile Processing Department (SPS). The project aims to replace outdated equipment and enhance HVAC capacity, ensuring compliance with health regulations while maintaining hospital operations during construction through the use of a mobile trailer unit. The estimated contract value is between $5 million and $10 million, with the solicitation anticipated to be released on or about December 20, 2024, and contract award expected in January 2025. Interested contractors should direct inquiries to Contracting Officer Idalia Algarin at Idalia.Algarin@va.gov.
    Z1DA--632-16-101 UPGRADE EMERGENCY GENERATORS - PHASE I
    Active
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is soliciting proposals for the "Upgrade Emergency Generators - Phase I" project at the Northport VA Medical Center, aimed at enhancing the facility's emergency power capabilities. This project involves the installation of new emergency generators, including extensive civil, structural, and mechanical work, while ensuring minimal disruption to ongoing medical services during construction. The initiative underscores the government's commitment to maintaining and upgrading healthcare facilities for optimal functionality and safety for veterans. Interested contractors, particularly Service-Disabled Veteran-Owned Small Businesses (SDVOSBs), must submit their proposals by January 7, 2025, and can direct inquiries to Contract Specialist Lester S. Griffith at Lester.Griffith@va.gov. The project is valued between $20 million and $50 million, with a completion timeline of 575 calendar days from the Notice to Proceed.
    Y1DZ--SPS Auto flush install
    Active
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is seeking proposals from qualified contractors for the installation of SPS Auto Flush systems at the James J. Peters VA Medical Center in Bronx, New York. This project, set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB), requires the provision of all necessary supervision, labor, equipment, and materials to install auto-flushing units at six sink locations within the facility. The estimated construction cost ranges from $25,000 to $100,000, with a project completion period of 60 calendar days following the award. Interested bidders must submit their proposals electronically by January 9, 2025, and are encouraged to attend a mandatory site visit scheduled for January 2, 2025. For further inquiries, contractors can contact Contract Specialist Akkil Kurian at Akkil.Kurian@va.gov or by phone at 718-584-9000.
    Y1DB--Establish Radiation Oncology Program at SLVHCS Design Build - New Orleans
    Active
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is seeking contractors to establish a Radiation Oncology Program at the Southeast Louisiana Veterans Health Care System (SLVHCS) in New Orleans, Louisiana. This project, identified by solicitation number 36C77624R0107, involves the design and construction of facilities specifically tailored for radiation oncology services, emphasizing the importance of specialized medical infrastructure within the VA healthcare system. A recent amendment to the solicitation has been issued, providing the Phase I Site Visit Sign In Sheet from a visit conducted on December 4, 2024, while confirming that the proposal due date remains unchanged. Interested vendors can reach out to Bailey Donato at bailey.donato@va.gov for further inquiries regarding the procurement process.
    Y1DB--Establish Radiation Oncology Program at SLVHCS Design Build - New Orleans
    Active
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is seeking contractors for the establishment of a Radiation Oncology Program at the Southeast Louisiana Veterans Health Care System (SLVHCS) in New Orleans. This project involves the design and construction of a radiation oncology clinic, including the renovation of existing facilities and the installation of specialized equipment such as linear accelerators and CT simulators, all while ensuring compliance with VA safety and operational standards. The initiative is part of the VA's commitment to enhancing cancer care for Veterans and aligns with the Cancer Moonshot initiative, emphasizing the importance of modernizing healthcare facilities. Interested contractors should note that the Phase I proposal submission deadline has been extended to January 10, 2025, at 2:00 PM EST, and can contact Bailey Donato at bailey.donato@va.gov for further information.
    Y1DA--589A5-21-700 EHRM INFRASTRUCTURE UPGRADES (VA-24-00076324) Topeka, KS
    Active
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is seeking proposals for the EHRM Infrastructure Upgrades project at the Colmery-O'Neil VA Medical Center in Topeka, Kansas. This initiative aims to modernize the facility's electronic health record management infrastructure through extensive renovations, including upgrades to mechanical, electrical, plumbing, and telecommunications systems across multiple buildings. The project is critical for enhancing healthcare delivery to veterans while ensuring compliance with safety and operational standards. Interested contractors, particularly Service-Disabled Veteran-Owned Small Businesses (SDVOSBs), must submit their bids electronically by January 7, 2025, at 1:00 PM EST, with a projected construction budget between $20 million and $50 million. For further inquiries, contact Richard Webb at Richard.Webb3@va.gov or 216-447-8300 x49623.