COLUMBUS AFB, MS FAC# 141 & 145 FUEL TANK INSPECTION
ID: W9128F25Q0006Type: Combined Synopsis/Solicitation
Overview

Buyer

DEPT OF DEFENSEDEPT OF THE ARMYW071 ENDIST OMAHAOMAHA, NE, 68102-4901, USA

NAICS

All Other Professional, Scientific, and Technical Services (541990)

PSC

INSPECTION- FUELS, LUBRICANTS, OILS, AND WAXES (H391)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)
Timeline
    Description

    The Department of Defense, through the U.S. Army Corps of Engineers (USACE), is soliciting proposals for the inspection of fuel tanks at Columbus Air Force Base (AFB) in Mississippi. The project involves conducting both internal and external inspections of two facilities, specifically Facility #141 and Facility #145, in accordance with American Petroleum Institute (API) standards and relevant federal, state, and local regulations. These inspections are crucial for ensuring the safety, compliance, and operational integrity of the fuel storage facilities, which are vital for military operations. Interested small businesses must submit their proposals by October 17, 2025, to Kristal D. Dobry at the provided email address, with the contract expected to last 180 days post-award.

    Point(s) of Contact
    Files
    Title
    Posted
    This government document outlines a Request for Proposal (RFP) for tank inspection and maintenance services at two facilities (Facility 141 and Facility 145). The primary tasks include conducting API (American Petroleum Institute) out-of-service and in-service tank inspections, tank cleaning, and the preparation of draft and final reports following a kickoff meeting. Additionally, there is a provision for the replacement of tank wiper seals at Facility 141. An optional line item is included for the removal and disposal of excess fuel, capped at 2000 gallons per purchase order as per specified conditions. The work is to be performed at specific facilities, with terms specifying "Free on Board" (FOB) delivery to the destination. The structure of the document catalogues job items with corresponding quantities and estimated net amounts while adhering to the federal guidelines for procurement. This RFP serves the purpose of securing qualified contractors for essential maintenance operations to ensure compliance with safety and regulatory standards related to fuel tank management.
    The document outlines a Request for Proposal (RFP) for a non-personnel services contract for the inspection of Department of Defense fuel tanks at Columbus AFB, MS. The contractor is responsible for fuel removal, tank cleaning, and conducting both internal and external inspections according to industry standards (API 653, NFPA, UFC, etc.). Key components include a kickoff meeting, a detailed Inspection Management Plan (PMP), and adherence to environmental regulations. The contractor must provide necessary equipment, a Health and Safety Plan, and ensure rigorous compliance with security and safety regulations throughout the project. Tasks include performing ultrasonic thickness measurements, coating condition surveys, and evaluating containment systems. All findings must be documented in DRAFT and FINAL inspection reports, which will inform decisions about the continued operation of the tanks. Deliverables are scheduled throughout the contract, emphasizing the importance of careful execution, safety, and regulatory compliance in maintaining the integrity of fuel storage facilities. Overall, the RFP demonstrates the government’s structured approach to service procurement and its commitment to environmental safety and operational efficiency within military installations.
    The document outlines a Request for Proposal (RFP) for a non-personnel services contract for the inspection of Department of Defense fuel tanks at Columbus AFB, MS. The contractor is responsible for fuel removal, tank cleaning, and conducting both internal and external inspections according to industry standards (API 653, NFPA, UFC, etc.). Key components include a kickoff meeting, a detailed Inspection Management Plan (PMP), and adherence to environmental regulations. The contractor must provide necessary equipment, a Health and Safety Plan, and ensure rigorous compliance with security and safety regulations throughout the project. Tasks include performing ultrasonic thickness measurements, coating condition surveys, and evaluating containment systems. All findings must be documented in DRAFT and FINAL inspection reports, which will inform decisions about the continued operation of the tanks. Deliverables are scheduled throughout the contract, emphasizing the importance of careful execution, safety, and regulatory compliance in maintaining the integrity of fuel storage facilities. Overall, the RFP demonstrates the government’s structured approach to service procurement and its commitment to environmental safety and operational efficiency within military installations.
    The document outlines the requirements for submitting proposals in response to a solicitation by the U.S. Army Corps of Engineers. Key submission details include providing essential company information such as the name, address, CAGE code, DUNS, TIN, and contact details. Offers must be submitted electronically by a specified deadline, and proposals should consist of a single PDF document not exceeding five pages, excluding certain required attachments. Offerors must affirm their agreement to the terms and submit information related to their technical capabilities, past performance on similar projects, and pricing. The document also emphasizes the requirement for confirmations of compliance with terms, submission of any necessary representations, and a 60-day pricing hold period. Clarifications regarding questions should be directed to designated contacts a week before the proposal due date. Importantly, it notes the tax exemption status of the U.S. Army Corps of Engineers regarding state and local taxes, while highlighting that contractors are not exempt. The document concludes by stressing that no awards will be made until funding is secured. This is part of standard protocol in federal procurements to ensure transparency and compliance in contractor selection processes.
    This document serves as an addendum to the solicitation process under FAR 52.212-1, providing guidelines for proposal submission to the U.S. Army Corps of Engineers (USACE). Proposals must include specific company information, technical capabilities, and relevant past performance examples, not exceeding five pages, plus a price worksheet. Offers should be sent electronically to designated contacts and include an acknowledgment of the solicitation's terms. Offerors are advised to ensure answers to questions are sought ahead of the proposal deadline. The document also details the evaluation criteria, emphasizing the need for technical experience and price competitiveness. The USACE remains exempt from state and local taxes, but contractors must comply with tax obligations. The funding for the contract is currently unavailable, indicating no awards will be made until funds are secured, which is a typical stipulation in government RFP processes. Overall, this addendum establishes a structured framework for submitting competitive proposals that meet federal contracting requirements.
    The document outlines the security requirements for employees accessing Military Installations designated as closed bases. It stipulates identity proofing and vetting processes, which include checks against the National Crime Information Center (NCIC) and California Law Enforcement Telecommunication System (CLETS), unless exempted by a valid security clearance. Contractors are held accountable for ensuring their employees meet identification requirements, presenting various forms of identification. Specific disqualifying factors for access include inability to verify citizenship, past incarceration for serious crimes, and affiliation with terrorism. Each employee must undergo identity verification each time they receive a base pass, which can be revoked if disqualifying information arises during random screenings. Contractors must coordinate with installation offices and ensure compliance with security protocols, including the issuance and retrieval of passes. Lost or expired passes must be reported, and the document highlights increased security measures under various Force Protection Conditions (FPCONs). The primary aim is to maintain a secure environment at military installations by implementing stringent identification and access protocols for contractor employees, reflecting compliance with federal security standards essential for government contracts and operations.
    The document outlines inspection details for fuel storage tanks at Columbus Air Force Base in Mississippi. Two tanks, both designated for JET-A fuel, are specified: Tank 3 with a capacity of 420,000 gallons and Tank 2 with a capacity of 415,000 gallons. Key inspections are categorized as internal and external, with various attributes noted, including dimensions, the need for roundness survey and certified strapping chart, and the potential replacement of IFR seals. The document also mentions the gallons of fuel remaining for storage, transfer, or disposal upon removal. It includes descriptions of manways and their sizes to ensure compliant management of these assets. This information is critical for planning and executing the related Request for Proposal (RFP) processes or grants associated with the maintenance and certification of military fuel infrastructure, ensuring both safety and compliance with federal regulations.
    The Defense Logistics Agency's Energy Division is proposing a project to construct product containment areas and replace secondary containment facilities at Fort Indiantown Gap, PA, under project number P-006858-08. The initiative, managed by Rick Rivera, aims to prevent environmental hazards, including potential fuel releases that could contaminate soil and groundwater or cause fires. The project includes installing secondary spill containment, ground vehicle refueling stations, and repairing safety systems, complying with federal, state, and local standards, and is estimated at $1,150,000. The desired completion date is November 11, 2011. Stakeholders will receive detailed trip reports and necessary review comments and approvals throughout the project lifecycle. A project management approach is established to ensure quality, time adherence, and cost estimates while involving multiple engineering disciplines and administrative units. This initiative is critical for maintaining environmental safety and operational efficiency at military fueling facilities, emphasizing the government's focus on responsibility and compliance in infrastructure projects.
    The document outlines the reporting structure and progress of a government project, detailing the status of task orders managed by Program Manager Adam Ashton. It includes an executive summary highlighting the overall status, key accomplishments, and any concerns, along with a month-to-month outlook for future plans. The status and schedule section breaks down project specifics, including service type, inspection dates, completion percentages, and report timelines. Furthermore, the document emphasizes lessons learned from the project, which are intended to facilitate organizational learning for similar future initiatives. These lessons aim to improve project management practices by reflecting on experiences rather than reiterating specific action points. The concise format suggests targeted reporting on progress, accountability, and a focus on continuous improvement in line with federal guidelines and accountability standards for government contracts and grants. Overall, this report serves as a critical tool for monitoring project execution and providing insights for future endeavors in government contracting and compliance.
    The document outlines the findings from an inspection of Tank [XXX] conducted by [Company Name] under Contract No. [XXXXX], adhering to API STD 653 requirements. The inspection aimed to evaluate the serviceability of the out-of-service fuel tank, identifying issues categorized into three sections: Mandatory, Short Term, and Long Term. The report sets forth recommended future inspection dates for both out-of-service and in-service evaluations, including specifics like ultrasonic roundness and corrosion assessments. It also notes relevant state regulations governing API 653 inspections, with deadlines provided for compliance. This inspection report is significant for maintaining safety and regulatory adherence within fuel system operations, as final documents will contribute to project closeout documentation. The overall goal is to ensure the tank's operational integrity while aligning with industry standards and state requirements.
    The API-653 Out-of-Service Inspection Report outlines the inspection findings for a tank operated by the US Army Corps of Engineers in adherence to the API 653 standards. The document covers a comprehensive evaluation of the tank's structural integrity, including tank construction, foundation, shell, appurtenances, coating conditions, and associated systems like cathodic protection and fire suppression. Key findings include mandatory, short-term, and long-term repairs necessary to ensure the tank's safety and compliance with federal, state, and local regulations. The report emphasizes the importance of future inspection schedules and includes engineering calculations, diagrams, and a detailed checklist to guide ongoing maintenance and safety practices. The organized structure of the report aids in thorough documentation and clarity, ensuring that necessary repairs are completed efficiently and in alignment with established safety standards. Overall, this report is vital for maintaining operational safety and environmental protection at the facility.
    The document is a Return to Service letter regarding the inspection and evaluation of a fuel storage tank, as per API 653 standards. Conducted by [Company Name] on [inspection date], the inspection confirmed that the tank is suitable for reactivation, with no immediate repairs necessary to ensure safety for operators, equipment, or the environment. The tank was officially returned to service on [return date]. Future inspections are recommended, specifying deadlines for both out-of-service and in-service evaluations, as well as detailed inspections for aspects like roundness and corrosion. The state regulations relevant to this inspection process also need consideration, though they were noted as not applicable in this case. The letter concludes with the names and titles of key personnel involved in the inspection, ensuring accountability and compliance with federal and state directives, essential for government RFP and grant criteria.
    The API 653 In-Service Inspection Report details the inspection process for storage tanks under the jurisdiction of the US Army Corps of Engineers. It includes comprehensive findings based on state regulations and historical inspection data, outlining general tank information and specific comments on construction, foundation, shell, and tank systems. Key sections address mandatory repairs essential for safety, short-term repairs that should be timely addressed to avoid risk, and long-term repairs necessary to maintain compliance with current standards. The document follows a structured format, featuring extensive appendices, engineering calculations, and detailed checklists to ensure thorough inspections. The focus on compliance with industry standards reflects the importance of safe and efficient tank operations in federal facilities, supporting accountability and environmental protection initiatives as outlined in government RFPs and grants. Overall, this report serves as a critical tool for maintenance planning and regulatory compliance, emphasizing the necessity for adherence to safety standards in military and civilian installations.
    This document is a combined synopsis and solicitation for a Request for Quote (RFQ) from small businesses under RFQ Number W9128F25Q0006. The request, set aside exclusively for small enterprises using NAICS 541990, seeks commercial products or services related to a performance work statement detailed in an attachment. The place of performance is identified as Columbus AFB, MS, with a contract duration of 180 calendar days post-award. Quotations will be assessed based on technical capability, experience in relevant projects, and pricing that encompasses all associated costs. The evaluation prioritizes quotes that demonstrate expertise and previous success in similar projects, with the government reserving the right to verify past performance. The document also outlines various clauses and provisions applicable to the acquisition, ensuring compliance with federal regulations. Quotes must be submitted to the designated contact, Kristal D. Dobry, by October 17, 2025. This solicitation reflects the government's ongoing commitment to engage small businesses in fulfilling its operational requirements.
    This document is a combined synopsis and solicitation for a Request for Quote (RFQ) from small businesses under RFQ Number W9128F25Q0006. The request, set aside exclusively for small enterprises using NAICS 541990, seeks commercial products or services related to a performance work statement detailed in an attachment. The place of performance is identified as Columbus AFB, MS, with a contract duration of 180 calendar days post-award. Quotations will be assessed based on technical capability, experience in relevant projects, and pricing that encompasses all associated costs. The evaluation prioritizes quotes that demonstrate expertise and previous success in similar projects, with the government reserving the right to verify past performance. The document also outlines various clauses and provisions applicable to the acquisition, ensuring compliance with federal regulations. Quotes must be submitted to the designated contact, Kristal D. Dobry, by October 17, 2025. This solicitation reflects the government's ongoing commitment to engage small businesses in fulfilling its operational requirements.
    The US Army Corps of Engineers engaged Pond to conduct an API 653 in-service inspection of Tank 3 at Columbus Air Force Base on February 24-25, 2020. The inspection report highlights the tank's compliance with relevant standards including API 650/653, UFC, DoD, and NFPA criteria. The tank, a 10,000 BBL welded steel storage unit built in 1958, showed no immediate mandatory repairs but required various maintenance actions to ensure long-term integrity and safety. Key findings included the need for external coating repairs, maintenance on nozzles and piping labeling, and addressing corrosion on the tank structure and associated components. Significant issues included observed leaks from the geodesic dome roof and non-compliance with handrail height regulations. The report provides specific recommendations for necessary repairs and future inspections, emphasizing proactive maintenance to prevent environmental risks and ensure compliance with safety standards. This document underscores the need for ongoing monitoring and adherence to regulatory protocols in managing government infrastructure.
    This report provides an in-service inspection of Tank 2 at Columbus Air Force Base, conducted on February 24-25, 2020, by Pond for the US Army Corps of Engineers (USACE). The tank, which is a welded, steel, vertical aboveground storage facility for Jet-A, was constructed in 1955 and serviced in 2016. The inspection aimed to assess compliance with American Petroleum Institute (API) standards (API 650/653) and applicable codes. Overall findings revealed no immediate mandatory repairs necessary to prevent service suspension. However, several repair recommendations emerged, focusing on the tank's coating, structural integrity, and compliance with safety standards, particularly regarding corrosion and wear of surfaces, sealing integrity of the geodesic dome roof, and the adequacy of safety features such as handrails. The report outlines observations in various inspection areas, including the foundation condition, cathodic protection effectiveness, and secondary containment system integrity. Future inspections are recommended at designated intervals to ensure ongoing safety and compliance. This inspection is critical as it informs maintenance strategies that support environmental safety and operational integrity under federal and local regulations.
    The U.S. Department of Labor issued Wage Determination No. 2015-5157, revision 24, under the Service Contract Act (SCA), which outlines wage rates and fringe benefits for various occupations in multiple counties of Mississippi. Contracts effective on or after January 30, 2022, must adhere to a minimum wage standard of at least $17.20 per hour, while those awarded between January 1, 2015, and January 29, 2022, must meet a $12.90 per hour threshold. The document specifies different wage rates for various job classifications, highlighting roles in administrative support, automotive services, healthcare, and more, each with designated hourly rates. Additionally, it mandates fringe benefits including health and welfare payments, paid sick leave, vacation, and holiday benefits for employees under covered contracts. The regulations also detail the conformance process for unlisted classifications, ensuring fair compensation reflective of skill levels. This wage determination aims to protect workers under federal contracts by establishing consistent wage standards, thereby contributing to transparency and fairness in federal procurement processes. Overall, it supports the equitable treatment of workers in government-sponsored service contracts.
    Lifecycle
    Title
    Type
    Combined Synopsis/Solicitation
    Similar Opportunities
    API Tank Inspection Camp Clark, Missouri
    Active
    Dept Of Defense
    The Department of Defense, specifically the U.S. Army Corps of Engineers, is seeking proposals for the API Tank Inspection services at Camp Clark, Missouri, under a Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside. The procurement involves conducting external inspections of aboveground storage tanks in compliance with various industry standards, including STI SP001 and NFPA regulations, with the objective of ensuring safety and regulatory adherence. These inspections are critical for maintaining the integrity of fuel storage facilities and preventing environmental hazards. Proposals are due by October 16, 2024, and interested parties can direct inquiries to primary contact Euemduan Osmera at euemduan.c.osmera@usace.army.mil or secondary contact Jae Chang at jae.chang@usace.army.mil.
    Fuel Tank Inspection Services
    Active
    Dept Of Defense
    The Department of Defense, through the 48th Contracting Squadron at RAF Lakenheath, United Kingdom, is seeking sources for Fuel Tank Inspection Services. The contractor will be responsible for managing and inspecting approximately 336 fuel storage tanks across RAF Lakenheath, Feltwell, and RAF Mildenhall, ensuring compliance with environmental regulations and military standards. This opportunity is critical for maintaining operational readiness and environmental safety, with the anticipated contract term spanning one base year and four option years, starting in September 2025. Interested companies must submit their capabilities and relevant certifications by October 15, 2024, to the designated contacts, Yolanda Jackson and Brittany Coker, via the provided email addresses.
    Construct Flightline Fueling Facility
    Active
    Dept Of Defense
    The Department of Defense, through the U.S. Army Corps of Engineers, Kansas City District, is seeking contractors for the construction of a Flightline Fueling Facility at Whiteman Air Force Base in Missouri. This Design-Bid-Build (DBB) contract involves the construction of two R-11 refueler truck pantograph fuel stands, a ground vehicle fueling station with double-walled above-ground storage tanks, and associated infrastructure, with an estimated project value between $10 million and $25 million. The solicitation is expected to be released around October 18, 2024, with proposals due approximately 90 days later; interested vendors should register on SAM.gov to receive updates and ensure compliance with registration requirements. For further inquiries, contact Jeri Halterman at jeri.l.halterman@usace.army.mil or Michael France at michael.g.france@usace.army.mil.
    Tank Farm Maintenance
    Active
    Dept Of Defense
    The Department of Defense, specifically the U.S. Air Force, is seeking contractors for a Firm Fixed Price Contract for Tank Farm Maintenance at Tinker Air Force Base in Oklahoma. The procurement involves providing preventative and remedial maintenance for 20 pieces of equipment, ensuring compliance with API and ASME standards, and adhering to stringent safety and operational protocols. This maintenance is critical for the safe management of hazardous materials, particularly in relation to hydrogen storage and handling, reflecting the government's commitment to safety and operational efficiency. Interested contractors must submit their quotes by October 29, 2024, with the contract expected to commence on November 13, 2024. For further inquiries, contact Carol D. Castle at carol.castle@us.af.mil or call 405-761-0317.
    Inspection, Testing, and Repairs of Aboveground and Underground Storage Tanks, NSA, Crane, Indiana
    Active
    Dept Of Defense
    The Department of Defense, through the NAVFACSYSCOM MID-ATLANTIC office, is seeking potential offerors for the inspection, testing, and repair services of aboveground and underground storage tanks at Naval Support Activity (NSA) Crane, Indiana. The upcoming solicitation aims to secure comprehensive services, including annual inspections, leak testing, and maintenance of tanks primarily containing petroleum products, with work to be performed under an Indefinite Delivery-Indefinite Quantity (IDIQ) contract structure. These services are critical for ensuring environmental compliance and safety at the facility, with the government anticipating the solicitation release around October 21, 2024, and proposals due 30 days thereafter. Interested parties, particularly small businesses and those qualifying under specific socio-economic categories, must submit a Statement of Qualifications by 2:00 PM (EDT) on October 10, 2024, to Cynthia VanBibber at cynthia.m.vanbibber.civ@us.navy.mil.
    This solicitation is still suspended until further notice. The purpose of this amendment is administrative and is only to push out the date to fiscal year 2025.
    Active
    Dept Of Defense
    The Department of Defense, specifically the U.S. Army Engineer District Mobile, is seeking contractors for the construction of an Aviation Storage Facility at Soto Cano Air Base. This project involves the design and construction of a fuel storage facility with a capacity of at least 300,000 gallons, including three factory-fabricated storage tanks and a POL Ops building equipped with a fuel laboratory. The procurement is significant for ensuring the operational readiness of U.S. forces by providing essential fuel storage and handling capabilities. Interested contractors can reach out to Jacob Mcgriff at jacob.l.mcgriff@usace.army.mil or Christopher Brunner at christopher.e.brunner@usace.army.mil for further details, noting that the solicitation is currently suspended until fiscal year 2025.
    Boiler Inspections, Post Wide
    Active
    Dept Of Defense
    The Department of Defense, specifically the Department of the Army, is seeking qualified small businesses to provide boiler inspection services at Fort Campbell, Kentucky. The contractor will be responsible for conducting comprehensive inspections of boilers and ensuring proper labeling of the equipment in compliance with safety standards. This procurement is crucial for maintaining operational safety and efficiency within the military installation's facilities. Interested small businesses are encouraged to submit their capabilities to meet this requirement, with a total small business set-aside status under FAR 19.5. The anticipated solicitation will be published on or around October 4, 2024, with responses due approximately 15 days thereafter. For further inquiries, potential bidders can contact Relanda Young at relanda.f.young.civ@army.mil or Thomas Haas at thomas.e.haas13.mil@army.mil.
    CONTRACTOR-OWNED, CONTRACTOR OPERATED (COCO) RETAIL FUEL SERVICES IN ALTUS AFB, OKLAHOMA
    Active
    Dept Of Defense
    The Department of Defense, through the Defense Logistics Agency (DLA) Energy, is soliciting proposals for Contractor Owned Contractor Operated (COCO) retail fuel services at Altus Air Force Base in Oklahoma. The procurement aims to establish a comprehensive fuel operation that includes the receipt, storage, and dispensing of commercial-grade gasoline and diesel fuel, ensuring compliance with safety, environmental, and quality standards. These services are critical for maintaining operational readiness and efficiency in military logistics. Interested contractors must submit their proposals by September 19, 2024, with inquiries directed to Candice Ekwoge at Candice.Ekwoge@dla.mil or Dominique Vest at Dominique.1.Vest@dla.mil.
    Contractor-Owned, Contractor Operated (COCO) Fuel Storage Services in the Arabian Gulf area
    Active
    Dept Of Defense
    The Department of Defense, through the Defense Logistics Agency (DLA) Energy, is soliciting proposals for Contractor-Owned, Contractor Operated (COCO) fuel storage services in the Arabian Gulf area. The primary objective is to secure a contractor capable of providing bulk fuel storage for various petroleum products, with a firm-fixed-price contract spanning a four-year base period from November 1, 2024, to October 31, 2028, and a potential five-year extension. These services are critical for supporting military operations, ensuring the safe and compliant storage and handling of government-owned fuels, including Fuel Naval Distillate Grade F76 and Aviation Turbine Fuel Grade JP5/F44. Interested contractors should contact Chris Kidwell at christopher.kidwell@dla.mil or Careka Squire at careka.squire@dla.mil for further details, with proposals due by October 9, 2024.
    15--TANK,FUEL,AIRCRAFT
    Active
    Dept Of Defense
    The Department of Defense, through the Naval Supply Systems Command (NAVSUP) Weapon Systems Support, is seeking proposals for the procurement of 24 units of aircraft fuel tanks, specifically part number 74A501605-1021. The items must be manufactured, tested, and inspected in accordance with the original equipment manufacturer (OEM) standards, and proposals from non-OEM sources must include traceability documentation to ensure compliance with government requirements. These fuel tanks are critical components for military aircraft operations, and timely delivery is essential to support fleet readiness. Interested vendors should submit their proposals, including a cost breakdown and any necessary source approval documentation, to Jaclyn Dooling at jaclyn.dooling@navy.mil by the specified deadline to be considered for this opportunity.