Y1DZ--626-22-700 EHRM Infrastructure Upgrades Construction Nashville
ID: 36C77624B0029Type: Presolicitation
Overview

Buyer

VETERANS AFFAIRS, DEPARTMENT OFVETERANS AFFAIRS, DEPARTMENT OFPCAC HEALTH INFORMATION (36C776)INDEPENDENCE, OH, 44131, USA

NAICS

Commercial and Institutional Building Construction (236220)

PSC

CONSTRUCTION OF OTHER HOSPITAL BUILDINGS (Y1DZ)

Set Aside

Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14) (SDVOSBC)
Timeline
    Description

    The Department of Veterans Affairs is soliciting bids for the Electronic Health Record Modernization (EHRM) Infrastructure Upgrades project at the Nashville VA Medical Center. This initiative aims to enhance the facility's electrical, communication, HVAC, and physical security systems, ensuring compliance with VA standards while improving healthcare delivery for veterans. The project is critical for modernizing healthcare infrastructure, with an estimated cost between $20 million and $50 million, and is exclusively set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB). Interested contractors must submit their bids by November 19, 2024, and can contact Contract Specialist Samuel I Cornwell at samuel.cornwell@va.gov for further information.

    Point(s) of Contact
    Samuel CornwellContract Specialist
    (216) 447-8300
    Samuel.Cornwell@va.gov
    Files
    Title
    Posted
    The Department of Veterans Affairs (VA) is preparing to solicit bids for a Firm-Fixed-Price contract to upgrade the Electronic Health Record Modernization (EHRM) Infrastructure at the Nashville VA Medical Center. This project will involve a comprehensive renovation that includes electrical systems, HVAC upgrades, communication enhancements, and physical security improvements, affecting multiple buildings and outdoor infrastructure. The solicitation is a total set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) and will be conducted in accordance with federal regulations. It will be advertised as an Invitation for Bid (IFB) with a budget estimated between $20 million and $50 million. The contractor will execute the project over approximately 630 calendar days following the issuance of the Notice to Proceed, with proposals anticipated to be solicited in late September 2024. Potential bidders must direct questions in writing to the assigned contract specialists. This initiative reflects the VA's commitment to modernizing healthcare facilities to better serve veterans.
    The solicitation numbered 36C77624B0029 invites bids for the EHRM Infrastructure Upgrades project at the Nashville VA Medical Center, aimed at improving infrastructure including electrical, HVAC, and communication systems. This procurement is a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB), aligning with federal regulations. Contractors must provide a complete bid, including performance and payment bonds, within a performance timeline of 630 calendar days after notice to proceed. A bid guarantee of at least 20% is required. The project’s estimated cost ranges from $20 million to $50 million, necessitating compliance with government specifications and labor agreements. The bid submission deadline is set for November 19, 2024, with mandatory site visits for interested parties. The inclusion of Project Labor Agreements (PLAs) is required for bids exceeding $35 million. The solicitation emphasizes document accessibility, technical question submission, and detailed preparation protocols. This process reinforces the federal government’s commitment to supporting veteran-owned businesses while ensuring quality and compliance in construction contracts.
    The document outlines the VAAR 852.219-75, which presents the "Notice of Limitations on Subcontracting—Certificate of Compliance for Services and Construction." It emphasizes that offerors, if awarded a contract, must adhere to specific limitations on subcontracting stipulated in the solicitation. For general construction contracts, no more than 85% of the contract value can be subcontracted to non-SDVOSBs or non-VOSBs, with costs for materials excluded. The offeror certifies their understanding of the associated legal implications, recognizing that false certifications could lead to criminal and civil penalties. Furthermore, the document mandates that subcontractors provide supporting documents to confirm compliance during contract performance. The VA may assess compliance through various means, including reviewing invoices and subcontract details. Non-compliance or mishandling of the contract can result in significant repercussions, including referral to the VA Suspension and Debarment Committee and potential fines. Additionally, the offeror is explicitly required to complete a certification form attached to their proposal, which is crucial for eligibility in the bidding process. The emphasis on adherence to these standards reflects the government's commitment to supporting small businesses while ensuring accountability in contract execution.
    The document provides a detailed plumbing symbol list and guidelines for the EHRM Infrastructure Upgrades Design at a Nashville healthcare facility. It outlines various plumbing symbols used in design plans, including fixtures, drainage systems, water supplies, and their specifications. The document emphasizes the responsibility of contractors to ensure adherence to applicable codes and standards, including plumbing slope requirements based on the IPC-2021 codes. Specific notes highlight the installation of drip pans under existing piping, coordination with fire protection measures, and the necessity to maintain service to existing systems during construction. The project entails significant renovations, necessitating careful verification of existing conditions and effective coordination among trades to minimize service disruptions. This infrastructure upgrade symbolizes the U.S. Department of Veterans Affairs' commitment to enhancing healthcare facilities through meticulous planning, safety measures, and regulatory compliance.
    The document outlines detailed architectural and engineering plans for a government building project, categorized across various disciplines, including civil, structural, architectural, fire protection, mechanical, plumbing, electrical, and telecommunications. Each section contains specific sheets covering notes, legends, detailed plans, and sections for different levels of the building, such as basements and parking garages, as well as systems like fire protection and HVAC. The intention is to provide comprehensive blueprints and technical specifications necessary for construction and compliance with safety standards. The plans highlight particular attention to life safety, erosion control, and integration of mechanical and electrical systems, ensuring coherence for future project phases. Given the context of federal RFPs and grants, this documentation reflects systematic planning vital for securing funding and achieving regulatory adherence, demonstrating the government's commitment to infrastructure development while prioritizing safety and functionality in design.
    The document pertains to the structural design plans for the EHRM Infrastructure Upgrades project at the U.S. Department of Veterans Affairs in Nashville, TN. It outlines the requirements for the construction process, focusing on compliance with structural standards and codes. Key details include materials specifications such as concrete mixes, reinforcing steel, and structural steel, emphasizing quality assessments, such as strength tests and mix design approvals. The document stipulates requirements for reinforcements within masonry, details of shop drawing submissions, and mandates field verification of existing conditions. Design loads for various structural elements are specified, including live and dead loads, snow, and wind load capacities, as well as seismic considerations outlined under ASCE standards. The plans underscore the importance of safety measures during construction and adherence to a comprehensive set of specifications to ensure structural integrity and durability. This initiative reflects the commitment to enhancing current facilities while adhering to federal guidelines, showcasing the VA's dedication to ensuring safety, stability, and modernization of infrastructure in high-usage environments.
    The document outlines specifications for a telecommunications infrastructure upgrade project at a VA facility. It emphasizes adherence to the VA's infrastructure standards while detailing requirements for cabling, equipment, and installation processes. Key components include the use of Category 6A cabling, installation of fire-stopping systems for conduits penetrating fire-rated walls, and the necessity for labeling all equipment according to BICSI/TIA standards. Additional requirements involve upgrading existing telecommunications rooms and constructing new ones, while ensuring minimal disruption to ongoing operations and services. The contractor is tasked with providing comprehensive management of cable installation, system testing, and coordination for access control installations, while also accounting for potential additional needs beyond initial assessments. The document includes strict safety and operational protocols, highlighting the need for VA escorts in sensitive areas during construction. Overall, this initiative reflects the VA's commitment to enhancing its telecommunications capacity, ensuring compliance with safety standards, and maintaining seamless operational functionality during upgrades.
    The document presents the General Decision Number TN20240178, detailing wage rates and requirements for construction projects in Davidson County, Tennessee, under the Davis-Bacon Act. It outlines wage determination guidelines based on various Executive Orders, specifically noting the minimum pay standards for covered workers. For contracts initiated on or after January 30, 2022, the minimum wage is set at $17.20 per hour, while contracts awarded between January 1, 2015, and January 29, 2022, without extensions must adhere to a lower rate of $12.90. The document includes prevailing wage rates for various skilled labor classifications such as asbestos workers, electricians, and plumbers, along with required fringe benefits. Furthermore, it highlights contractor responsibilities regarding worker protections, paid sick leave under Executive Order 13706, and the process for wage determination appeals. This information is essential for compliance with federal regulations on labor standards in government contracts, particularly in the context of construction projects funded by federal grants or RFPs at the state and local levels. Overall, the document serves as a critical reference for contractors and workers involved in federally funded construction endeavors.
    A site visit for the Nashville EHRM Construction project is scheduled for Thursday, October 24, 2024, at 8:30 AM CT, taking place at the Nashville VA Medical Center. Participants will converge at 1310 24th Ave S, Nashville, TN, where they should prepare for significant traffic congestion from 7:00 AM to 10:00 AM. Paid parking is available at Vanderbilt across the street, with alternative arrangements necessary if full, as there are no refunds provided. Attendees will access the site through designated entrances: one via the parking garage's second-floor bridge and another through the front lobby. All participants are to report to the multi-purpose room on the first floor, with routes marked in blue on an accompanying map. For any further inquiries, contact information is provided for key personnel.
    The U.S. Department of Veterans Affairs has issued a request for proposal (RFP) for the Electronic Health Record Modernization (EHRM) Infrastructure Upgrade Project at the Tennessee Valley Healthcare System's Nashville campus. This project aims to enhance various infrastructural components including electrical, communication, HVAC, and physical security systems to support improved healthcare delivery for veterans. The contractor is responsible for site preparation, demolition, and infrastructure upgrades while adhering to strict safety and quality control protocols. The work must be carefully coordinated to minimize disruption since most facilities will remain operational during construction. Key requirements include adherence to a detailed logistics plan, ensuring security and access controls for personnel, and managing the temporary relocation of furniture and equipment. Additionally, the RFP mandates compliance with environmental regulations and comprehensive infection control measures. The structured approach involves close communication with the VA to ensure that all upgrades align with healthcare standards and operational requirements, reflecting the organization's commitment to modernizing healthcare services for veterans.
    The Department of Veteran Affairs is initiating an upgrade project for the Electronic Health Record Management (EHRM) Infrastructure at the Tennessee Valley Healthcare System (TVHS) based on the final bid documents dated February 16, 2024. The project encompasses extensive infrastructure enhancements across the Nashville campus, covering mechanical, electrical, plumbing, and telecommunications systems. This upgrade aims to ensure compliance with VA standards while improving functionality and safety. The specifications detail critical work, including site surveys, demolition, construction waste management, and coordination within various trades. Additionally, the project addresses specific requirements for safety, environmental control, and quality assurance as it pertains to health care infrastructure. Maintaining rigorous standards during construction is emphasized, as is the importance of managing hazardous materials and providing a fully functioning communications system. This initiative underscores the VA's commitment to modernizing healthcare facilities, ensuring improved service delivery and compliance with regulatory and safety standards throughout the upgrade process.
    The document outlines the architectural plans and specifications for the EHRM Infrastructure Upgrades project at the U.S. Department of Veterans Affairs facility in Nashville, TN. It details critical life safety elements, including occupancy load factors, required exits, egress path layouts, and the necessary signage and safety equipment. The project emphasizes adherence to safety codes, ensuring full sprinkler systems and compliant exit provisions. Additionally, it includes a comprehensive list of abbreviations and construction notes, guiding contractors in the execution of their responsibilities. The plans aim to create an efficient and safe environment for both staff and visitors, aligning with federal safety standards. Importantly, the document calls for close coordination among engineers, contractors, and various facility personnel during the execution phase to address existing conditions, manage utility shutdowns, and maintain occupant safety throughout the construction process. The inclusion of revisions and detailed specifications reinforces the intent to ensure adherence to design and operational excellence while mitigating risks associated with construction activities.
    The document outlines the specifications and guidelines for the EHRM Infrastructure Upgrades project at the U.S. Department of Veterans Affairs facility located at 1310 24th Avenue South, Nashville, TN. The project involves improving mechanical, water, and gas systems, ensuring compliance with local, state, and federal regulations. Key responsibilities include obtaining necessary permits, conducting utility verification, and handling traffic control plans during construction. The document emphasizes the necessity for contractors to minimize disruptions to existing services, preserve existing trees, and manage erosion control measures. Detailed site plans indicate the dimensions and locations of various utilities, highlighting the need for constant communication with utility companies throughout the project. Critical elements include ensuring proper drainage, maintaining safety protocols per OSHA regulations, and verifying utility connections before demolition or construction. The plans also cover the removal and replacement of pavement and curbing, ensuring that all work aligns with pre-established specifications for materials and structural integrity. This comprehensive approach showcases the VA's commitment to quality upgrades and service excellence within its facilities.
    The document outlines technical specifications and guidelines for electrical installations and demolition as part of the EHRM Infrastructure Upgrades project at the VA facility in Nashville, TN. It includes a comprehensive list of electrical abbreviations, mounting heights, and specific electrical components required for new installations. Key notes emphasize adherence to safety standards, including fire-stopping measures for conduits penetrating fire-rated walls and the necessity for bonding new roof-mounted equipment to existing lightning protection systems. Detailed instructions cover existing electrical equipment, outlining what should remain or be removed. It involves critical assessments of branch circuits, ensuring they meet capacity requirements, particularly for life safety and critical systems, which demand protective measures per NEC standards. The project requires coordination with various trades and maintenance of operational systems, ensuring minimal disruption during construction. This document is crucial for contractors participating in the upgrade project, ensuring compliance with federal and local electrical codes while enhancing healthcare facility safety and functionality.
    The document outlines the Fire Protection Symbol List and accompanying notes for a comprehensive fire protection plan as part of the U.S. Department of Veterans Affairs (VA) infrastructure upgrades at a facility in Nashville, TN. It details various fire protection system components, including symbols and descriptions for devices such as sprinklers, valves, and supervisory devices. The plan emphasizes the integration of fire protection systems with existing mechanical and plumbing components while adhering to industry standards such as NFPA guidelines and International Building Codes. Key aspects include coordination between contractors and trades to ensure compliance with safety standards during installation, as well as guidelines for maintaining service accessibility to all fire protection equipment. The document also specifies requirements for temporary systems during construction, the need for visible tagging of equipment, and fire barriers to prevent smoke spread, thereby underscoring the importance of safety and compliance in VA facilities. Overall, this fire protection plan is fundamental to safeguarding infrastructure and ensuring operational readiness in responding to fire hazards.
    The Nashville VAMC is initiating the Electronic Health Record Modernization (EHRM) Infrastructure Upgrades project, aimed at enhancing safety, functionality, and compliance across the facility at 1310 24th Avenue South, Nashville, TN. This project encompasses the total renovation of mechanical, plumbing, electrical, and fire protection systems to meet current standards, emphasizing fully sprinklered environments for fire safety. A comprehensive approach involves design considerations for demolition, installation, and coordination with multiple trades to ensure seamless execution. Detailed construction documents are prepared, illustrating various phases and requirements including life safety plans, code analysis, and exit signage. The project reflects the VA's commitment to modernizing healthcare infrastructure, ensuring safety and effective service delivery to veterans while adhering to federal, state, and local regulations throughout the process.
    The document outlines mechanical specifications and guidelines for the EHRM Infrastructure Upgrades project at the Nashville VA facility. It details the requirements for mechanical, plumbing, and fire protection systems renovations, emphasizing coordination among different trades and compliance with various building codes and standards, including NFPA and IBC regulations. Key instructions include sizing for ductwork and branch piping, installation of access doors, and ensuring proper sealing of penetrations to maintain system efficiency. Additionally, it specifies that contractors must verify existing conditions, avoid conflicts during renovations, and ensure systems remain operational during construction phases. The document's thoroughness reflects the government’s commitment to enhancing facility safety, functionality, and compliance with modern standards, ultimately improving the infrastructure for healthcare services.
    Similar Opportunities
    Z2DA--506-21-705 EHRM Infrastructure Upgrades - Ann Arbor, MI - Construction (VA-25-00001864)
    Active
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is seeking bids for the EHRM Infrastructure Upgrades project at the Ann Arbor VA Medical Center, focusing on significant enhancements to the facility's mechanical, plumbing, and electrical systems. This construction initiative, set aside exclusively for Service-Disabled Veteran-Owned Small Businesses (SDVOSBs), aims to modernize the healthcare infrastructure in compliance with VA standards and local regulations, ensuring improved operational efficiency and patient safety. The total project cost is estimated between $10 million and $20 million, with bids due electronically by September 23, 2024, and a mandatory pre-bid site visit scheduled for September 4, 2024. Interested contractors can contact David Mark at david.mark2@va.gov or Sheila Vickers at sheila.vickers@va.gov for further information.
    Y1DA--589A5-21-700 EHRM INFRASTRUCTURE UPGRADES (VA-24-00076324) Topeka, KS
    Active
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is soliciting bids for the EHRM Infrastructure Upgrades project at the Colmery-O'Neil VA Medical Center in Topeka, Kansas. This initiative aims to construct a new data center and renovate existing spaces, requiring comprehensive labor, materials, and equipment for general construction, HVAC, electrical work, and installation of permanent equipment across approximately 12,876 square feet. The project is critical for modernizing the facility's infrastructure to enhance healthcare delivery for veterans, with a contract value estimated between $20 million and $50 million. Interested contractors, particularly Service-Disabled Veteran-Owned Small Businesses (SDVOSB), must submit sealed bids electronically by the specified due date, and a site visit is scheduled for October 16, 2024, for potential bidders to assess the work site. For further inquiries, contact Richard Webb at Richard.Webb3@va.gov or call 216-447-8300 x49623.
    Z2DB--626-22-705QA - EHRM Infrastructure Upgrade Albion Clinic
    Active
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is seeking contractors for the EHRM Infrastructure Upgrade project at the Albion Clinic in Nashville, TN, under solicitation number 626-22-705QA. The objective of this procurement is to enhance the clinic's electronic health record management capabilities by upgrading its mechanical, electrical, and architectural infrastructure, ensuring compliance with modern safety standards and building codes. This initiative is critical for improving healthcare services for veterans and reflects the VA's commitment to operational efficiency and quality improvement in healthcare delivery. Interested contractors should direct inquiries to Contract Specialist Brian Bentley at Brian.Bentley@va.gov, and a site visit is scheduled for October 11, 2024, at 1:00 PM to facilitate informed bidding.
    EHRM Infrastructure Upgrades Construction - Miami - Project 546-20-120
    Active
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is soliciting bids for the EHRM Infrastructure Upgrades Construction project at the Bruce W. Carter VA Medical Center in Miami, Florida. This project, set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB), involves comprehensive upgrades to the facility's infrastructure, including mechanical, electrical, and plumbing systems, with an estimated total cost between $20 million and $50 million. The upgrades are critical for enhancing the Electronic Health Record Management (EHRM) system, ensuring compliance with safety standards, and improving overall healthcare services for veterans. Interested contractors must submit their bids electronically by the specified deadlines and can contact Jason Phillip at jason.phillip@va.gov or Bridget May at bridget.may@va.gov for further information.
    Y1DA--675-22-701 EHRM Infrastructure Upgrades Construction Lake Baldwin (Orlando)
    Active
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is seeking qualified contractors for the EHRM Infrastructure Upgrades Construction project at the Lake Baldwin VA Medical Center in Orlando, Florida. This initiative aims to enhance the facility's telecommunications and operational capabilities by upgrading mechanical, plumbing, electrical, and fire safety systems across various buildings, with a construction magnitude estimated between $10 million and $20 million. The project is critical for modernizing healthcare infrastructure to improve service delivery for veterans while ensuring compliance with safety and environmental regulations. Interested Service-Disabled Veteran-Owned Small Businesses (SDVOSBs) must submit their proposals electronically, with a mandatory site visit scheduled for September 12, 2024, and a completion timeframe of 600 calendar days post-notice to proceed. For further inquiries, contractors can contact Shawn A Tavernia at shawn.tavernia@va.gov or Bridget May at bridget.may@va.gov.
    Y1DA--Project Number: 561A4-21-101 Replace RF Unit Site Prep - Rm. 48 Lyons VAMC
    Active
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is soliciting bids for Project Number 561A4-21-101, which involves the replacement of the RF Unit and site preparation in Room 48 at the Lyons VA Medical Center in New Jersey. The project encompasses extensive construction tasks, including demolition, installation of new mechanical systems, plumbing, electrical work, and fire protection, all while ensuring minimal disruption to the facility's 24/7 operations. This initiative is critical for modernizing healthcare technology and improving operational efficiency within the VA system. Interested contractors, particularly Service-Disabled Veteran-Owned Small Businesses, must submit their bids by October 8, 2024, at 10:00 AM EST, via email to the designated contracting officers, with the anticipated contract value ranging between $500,000 and $1,000,000.
    Z2DA--Renovate Halls, Walls, Ceilings
    Active
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is soliciting bids for the renovation of halls, walls, and ceilings in Building 1 at the Durham VA Medical Center, under solicitation number 36C24624B0005. The project aims to upgrade the existing infrastructure while ensuring minimal disruption to hospital operations, involving comprehensive work such as demolition, hazardous material remediation, and installation of new finishes, HVAC, and electrical systems. This initiative is crucial for enhancing the medical facility's standards and operational integrity, with an estimated contract value between $2,000,000 and $5,000,000, exclusively set aside for Service-Disabled Veteran-Owned Small Businesses. Interested contractors must submit sealed bids by January 16, 2025, following a mandatory site visit on December 4, 2024, and should direct inquiries to Contract Specialist Alice Custis at Alice.Custis@va.gov.
    Z1DA--607-22-101 Renovate Inpatient Ward 7B (VA-25-00007172)
    Active
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is soliciting proposals for the renovation of Inpatient Ward 7B at the William S. Middleton Memorial VA Hospital in Madison, Wisconsin, under project number VA-25-00007172. This project, with a budget ranging from $5 million to $10 million, aims to modernize hospital facilities while ensuring compliance with federal regulations and prioritizing participation from service-disabled veteran-owned small businesses (SDVOSB). The renovation will encompass comprehensive upgrades across various construction disciplines, including architectural, mechanical, and electrical systems, to enhance patient care environments. Interested bidders must submit their proposals electronically by 12:00 PM local time on October 11, 2024, and can direct inquiries to Contracting Officer John J Meyers at john.meyers2@va.gov.
    Z1DA--578-17-012 Replace AHU Air Handling Units in Building 45 (VA-25-00004335)
    Active
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is soliciting bids for the replacement of Air Handling Units (AHUs) in Building 45 at the Edward Hines Jr. VA Hospital, identified by Project Number 578-17-012. This project requires contractors to provide labor, materials, and equipment for the HVAC system replacement and associated renovations, with a performance period of 420 calendar days following the Notice to Proceed. The initiative is crucial for enhancing the hospital's infrastructure, ensuring improved air quality and operational efficiency for veteran healthcare services. Interested Service-Disabled Veteran-Owned Small Business (SDVOSB) contractors must attend a mandatory site visit on October 8, 2024, with bids due by October 29, 2024; the estimated contract value ranges from $2 million to $5 million. For further inquiries, contractors can contact Amber Jendrzejek, the Contract Specialist, at Amber.Jendrzejek@va.gov.
    Y1DA--FY25: NRM (PROJ: 673-21-149) BB Convert 6 West to Private Patient Rooms
    Active
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is soliciting proposals for a construction project aimed at converting the 6th-floor West Wing of the James A. Haley VA Hospital in Tampa, Florida, into private patient rooms. The project involves extensive renovations, including the complete demolition of existing structures, upgrades to mechanical, electrical, and plumbing systems, and minor asbestos abatement, all while adhering to strict safety and operational protocols to minimize disruption to hospital services. This initiative is crucial for enhancing the healthcare environment for veterans, ensuring compliance with federal regulations and safety standards throughout the construction process. The anticipated contract value ranges between $5 million and $10 million, with proposals due by 2:00 PM EST on November 4, 2024. Interested contractors, particularly Service-Disabled Veteran-Owned Small Businesses, should contact Contract Specialist David M Hernandez at David.Hernandez1@va.gov for further details.