BB Correct Electrical Deficiencies Lake City, FL PROJECT # 573A4-21-710
ID: 36C24825R0019Type: Solicitation
Overview

Buyer

VETERANS AFFAIRS, DEPARTMENT OFVETERANS AFFAIRS, DEPARTMENT OF248-NETWORK CONTRACT OFFICE 8 (36C248)TAMPA, FL, 33637, USA

NAICS

Commercial and Institutional Building Construction (236220)

PSC

REPAIR OR ALTERATION OF HOSPITALS AND INFIRMARIES (Z2DA)

Set Aside

Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14) (SDVOSBC)
Timeline
    Description

    The Department of Veterans Affairs is soliciting proposals for the "Correct Electrical Deficiencies" project at the Lake City VA Medical Center in Florida, identified as Project # 573A4-21-710. The objective is to address and rectify existing electrical deficiencies by replacing outdated systems, including switchboards, panelboards, and transformers, while ensuring minimal disruption to hospital operations. This project is crucial for enhancing the safety and reliability of electrical systems within the facility, which serves veterans in need of medical care. Proposals from Service-Disabled Veteran-Owned Small Businesses (SDVOSBs) are encouraged, with a total project duration of 730 calendar days from the Notice to Proceed. Interested contractors must submit their final proposals by July 2, 2025, at 1300 EST, and can direct inquiries to Amber C. Milton at amber.milton@va.gov or 727-251-2899.

    Point(s) of Contact
    Files
    Title
    Posted
    This document is an addendum issued for the Correct Electrical Deficiencies project at the Lake City VA Medical Center in Florida. It outlines essential specifications, updates, and instructions for bidders involved in the electrical renovation and corrections outlined in project number 573A4-21-710. Key changes include the replacement and addition of various specifications related to quality control, safety, and environmental controls, ensuring compliance with VA requirements. The main scope of work involves replacing existing electrical systems, including switchboards, panelboards, and transformers that are in inadequate condition according to recent assessments. Specific requirements dictate the use of copper conductors, guidelines for circuit layout, and adherence to safety and health regulations. Comprehensive security and operational protocols are detailed, ensuring minimal disruption to medical services during the construction phase. Emphasis is placed on strict adherence to safety and warranty management throughout the project, including maintaining utility services and obtaining necessary permissions for site work. These measures affirm the VA's commitment to providing updated and operational electrical systems while maintaining safety and functionality during renovations.
    The document outlines the Request for Proposals (RFP) for the construction project "Correct Electrical Deficiencies" at the Lake City VA Medical Center, with solicitation number 36C24825R0019, issued by the Department of Veterans Affairs. The project involves replacing outdated electrical components such as switchboards, panelboards, and transformers, emphasizing compliance with specific VA standards and safety measures. The contractor will ensure the work minimally disrupts hospital operations over a performance period of 730 days. Proposals are encouraged from certified Service-Disabled Veteran-Owned Small Businesses (SDVOSBs), with strict eligibility criteria including project experience in similar environments. Key evaluation factors include technical approach, past performance, and cost, which will follow a best-value trade-off analysis. Additionally, the RFP entails submitting a detailed project schedule, quality control plans, and required performance bonds. The document stresses adherence to federal regulations, safety standards, and environmental considerations, ensuring that any work phases do not actively disturb hospital functions or exceed the project duration. The overall aim is to modernize the electrical systems while maintaining operational safety and regulatory compliance at the VA facility.
    This document serves as an amendment for a solicitation issued by the Department of Veterans Affairs, specifically the Network Contracting Office 8 (NCO 8), regarding the project to address electrical deficiencies at the Lake City VA Medical Center in Florida. The proposal submission deadline has been extended from May 19, 2025, to May 26, 2025, at 1:00 PM EDT. The project, identified under Number 573A4-21-710, is set to last 730 calendar days from the notice to proceed (NTP). Additionally, the document references pertinent wage determination data (DBA FL20250008) applicable to the project. All terms and conditions from the original document remain unchanged unless specified in the amendment, emphasizing the importance of acknowledging this amendment in proposals. The document structure consists of contractual details, including amendment numbers, contractor information, and project specifications, which provide clarity to stakeholders involved in the bidding process.
    The document outlines an amendment to the solicitation for a federal project titled "BB - Correct Electrical Deficiencies" at the Lake City VA Medical Center in Florida. It primarily serves to extend the proposal submission deadline from May 26, 2025, to June 2, 2025, at 1:00 PM EDT, providing new dates for contractors to prepare and submit their offers. The project is associated with the Department of Veterans Affairs, specifically the Network Contracting Office 8, and has a total performance period of 730 calendar days post the Notice to Proceed (NTP). Wage Determination FL20250008, effective January 3, 2025, applies to this project. The document emphasizes the need for offerors to acknowledge receipt of the amendment to avoid rejection of their proposals, underlining its importance in the context of government Request for Proposals (RFPs). Overall, it reflects the procedural adjustments within federal contracting, aimed at ensuring proper compliance from potential bidders.
    The document outlines Amendment 0003 to the solicitation for the “BB - Correct Electrical Deficiencies” project at the Lake City VA Medical Center, specifically Project Number 573A4-21-710. It updates the deadline for final proposals, extending the submission date from June 2, 2025, to June 10, 2025, at 1:00 PM EDT. It includes the updated wage determination applicable to the project and indicates the requirements for site visit sign-in and responses to requests for information (RFIs). The location for the project is specified, and it emphasizes a project completion period of 730 calendar days from the notice to proceed (NTP). Additional references include documents related to RFIs and a site visit sign-in sheet, indicating thorough communication with bidders. This amendment illustrates the federal government's ongoing process of managing contract solicitations to ensure compliance and the timely completion of projects.
    The document outlines an amendment to the Request for Proposal (RFP) related to the project titled "BB - Correct Electrical Deficiencies" at the Lake City VA Medical Center, under project number 573A4-21-710. It indicates that the final proposal submission date has been extended from June 10, 2025, to June 26, 2025, at 1300 EST. The extension allows potential contractors additional time to prepare their bids. An additional site walk is scheduled for June 13, 2025, providing an opportunity for bidders to familiarize themselves with the project site. Furthermore, Requests for Information (RFIs) from contractors are due by June 17, 2025, with specific instructions to use an Excel sheet for submission. The period of performance for the project is set at 730 calendar days from the notice to proceed. Overall, this amendment serves to inform potential contractors about changes in the proposal timeline and clarify processes for addressing inquiries, ensuring a smooth bidding experience for involved parties.
    This document pertains to Amendment 0005 of the federal solicitation for a project titled "Correct Electrical Deficiencies" at the Lake City VA Medical Center in Florida. It outlines the extension of the proposal submission deadline from June 26, 2025, to July 2, 2025, at 1300 EDT. Key details include references to site walk sign-in sheets, responses to requests for information (RFIs), and upcoming additional amendments (Amend 0006). It emphasizes the necessity for contractors to acknowledge the amendment in their submissions to avoid rejection of their offers. The document references applicable Federal Acquisition Regulation clauses regarding domestic sourcing of construction materials, highlighting conditions under which exceptions to the "Buy American" requirements may apply. The structure is organized around critical administrative data such as contract numbers, effective dates, and the responsibilities of bidders, ensuring clarity in communication between the federal contracting office and potential contractors. Overall, it serves as a procedural update and guidance for potential bidders engaging with federal contracting processes.
    This government document is an amendment to the solicitation for the project titled "Correct Electrical Deficiencies" at the Lake City VA Medical Center. The purpose of the amendment (0006) is to inform prospective contractors of key changes, including an extension for the submission of proposals to July 2, 2025, at 1300 EST. The document highlights the updated specifications attached to the amendment and specifies the project number (573A4-21-710) and related administrative details, including the Department of Veterans Affairs’ Network Contracting Office 8 as the issuing authority. The project will span approximately 730 Calendar Days from the Notice to Proceed (NTP) and focuses on correcting identified electrical deficiencies at the facility. The requirements for acknowledging receipt of the amendment and instructions for how to submit proposals are clearly outlined. Overall, this amendment aims to ensure that all contractors are informed of the updated timeline and specifications critical for bidding on the project.
    The document revolves around inquiries and responses related to an electrical upgrade project overseen by the VA, specifically addressing concerns from contractors during the bidding process. Key issues discussed include clarification on price schedules, the requirement for new electrical components like occupancy sensors, and the accuracy of reference drawings and specifications. The VA confirmed that specific components must be replaced in kind, while also addressing quality control applicability and safety requirements, emphasizing non-requirements where deemed appropriate. Additionally, several requests for site visits were denied, highlighting the necessity for contractors to rely on existing documentation and specifications for accurate bidding. Overall, the document underscores the VA's commitment to transparency and clarity in the procurement process while ensuring compliance with established guidelines and standards. The contractor interactions reflect a meticulous review of requirements, aiming to facilitate a successful project execution while adhering to regulatory frameworks.
    The document revolves around inquiries and responses related to an electrical upgrade project overseen by the VA, specifically addressing concerns from contractors during the bidding process. Key issues discussed include clarification on price schedules, the requirement for new electrical components like occupancy sensors, and the accuracy of reference drawings and specifications. The VA confirmed that specific components must be replaced in kind, while also addressing quality control applicability and safety requirements, emphasizing non-requirements where deemed appropriate. Additionally, several requests for site visits were denied, highlighting the necessity for contractors to rely on existing documentation and specifications for accurate bidding. Overall, the document underscores the VA's commitment to transparency and clarity in the procurement process while ensuring compliance with established guidelines and standards. The contractor interactions reflect a meticulous review of requirements, aiming to facilitate a successful project execution while adhering to regulatory frameworks.
    The Department of Veterans Affairs is issuing a presolicitation notice for the Bid-Build project intended to correct electrical deficiencies at the Lake City VA Medical Center in Florida, designated as Project #573A4-21-710. This initiative is exclusively set aside for Service-Disabled Veteran Owned Small Businesses (SDVOSB) in compliance with 38 U.S.C. 8127. The project, under the NAICS code 236220 for Commercial and Institutional Building Construction, has an estimated value between $5 million and $10 million and spans a total of 730 calendar days from the notice to proceed. The contractor will be responsible for site preparation, including demolition, along with the provision of labor and materials necessary for executing the project as outlined in the provided specifications. Certification from the SBA Veteran Small Business Certification program is a prerequisite for contractors seeking to claim SDVOSB status. The solicitation is anticipated to be posted on SAM.gov around March 31, 2025, and firms interested in competing are encouraged to indicate their interest. This presolicitation is intended solely for providing advance notice and no contracts will be awarded until the formal solicitation process is completed.
    The Statement of Work (SOW) addresses the project to correct electrical deficiencies at the VA Medical Center in Lake City, FL. It outlines the contractor's responsibilities for site preparation, demolition, and installation of new electrical systems, including switchboards, panelboards, transformers, and generators. The project is designed to enhance safety and compliance with VA standards, as many existing components are aging and in poor condition. The contractor must provide all necessary labor, materials, and adhere to local regulations, ensuring minimal disruption to hospital operations. Work must be scheduled mostly after hours or on weekends, while maintaining safety protocols, including infection control permits and environmental considerations. The document specifies comprehensive requirements for project management, including the submission of progress schedules, quality control plans, and as-built drawings upon project completion. It emphasizes communication with the VA Project Manager and compliance with federal, state, and local regulations throughout the construction process. The goal is to complete the project within 730 days from the Notice to Proceed, ultimately improving the facility’s electrical infrastructure while ensuring operational continuity and safety.
    The document outlines the construction plans for electrical system upgrades at the Lake City Veterans Affairs Medical Center (VAMC) in Florida. The primary focus is on correcting electrical deficiencies across several buildings, including specifically noted electrical demolition and new work plans for Buildings 18 and 19. Coordinated by the U.S. Department of Veterans Affairs, the project intends to enhance the safety and functionality of electrical systems, integrating new fixtures and panels while reusing existing circuits where feasible. Key components include demolishing outdated equipment and panelboards, installing new panelboards, and ensuring compliance with the National Electrical Code. The plans emphasize the importance of maintaining circuit continuity during upgrades and provide detailed notes on wiring specifications, testing, and installations for safety and reliability. This effort illustrates the VA's commitment to improving infrastructure for better service delivery, adhering to strict regulatory standards, and attending to the electrical safety and efficiency within its facilities.
    The document outlines the "Correct Electrical Deficiencies" project at the Lake City VA Medical Center in Florida, identified as Project No. 573A4-21-710. It includes construction specifications and requirements aimed at addressing existing electrical issues within various buildings on the medical center campus. This project involves careful planning, including demolition, installation of new electrical systems, safety protocols, and compliance with the Department of Veterans Affairs' standards. General contractors are required to prepare the site, manage waste, conduct safety inspections, and ensure minimal disruption to ongoing medical operations. Additionally, the document specifies procedures for security and access, utility management, and construction logistics to maintain the medical center’s 24/7 operations. The comprehensive construction plan emphasizes the need for thorough communication, detailed phasing of work, and warranty management to guarantee quality execution. The aim is to enhance the electrical infrastructure at the VA Medical Center to better serve the veterans seeking care there.
    The document lists various buildings, presumably as part of a broader government initiative related to federal and state/local Requests for Proposals (RFPs) or grants. The identified buildings—Building 18, 19, 37, 38, 42, 44, 62, 64, 64A, 74, 82, 84, and 92—likely represent locations targeted for improvements, upgrades, or specific projects. While the file lacks detailed context, it may serve as a reference for contractors and service providers interested in bidding on projects involving these structures. The focus appears to be on delivery of services related to renovation, renovation oversight, or maintenance under government procurement protocols, highlighting the government’s intent to streamline operations and enhance facilities. Overall, the listing suggests an organizational method to assist in managing project scopes and facilitating collaboration between various stakeholders involved in public works and maintenance projects. This structure underscores the importance of physical assets in government operations.
    The Tailored Comment Matrix is a structured tool created for potential offerors to provide feedback on a Request for Proposal (RFP) issued by the Veterans Health Administration (VHA). The matrix, designed in an Excel format, consists of sections where offerors can input their comments, questions, and responses, categorized by the nature of the feedback (Critical, Substantive, or Administrative). Each row corresponds to an item from the RFP, detailing the item number and title, the section number, and spaces for recording dates and comments from both offerors and VHA representatives. The purpose of this document is to facilitate clear communication regarding the RFP elements, ensuring that any critical issues such as safety violations, discrepancies, or typographical errors are identified and addressed before finalizing contracts. This tool aims to enhance the overall quality of submissions and improve the procurement process by fostering collaboration and clarity among stakeholders. Overall, the Tailored Comment Matrix serves as a vital document for maintaining effective dialogue during the RFP process and ensuring comprehensive evaluation and response to offeror inquiries.
    The document outlines the Compliance Requirement for Contractors, specifically regarding the Limitations of Subcontracting as mandated by 13 C.F.R. 125.6. Contractors must certify whether they will use subcontractors and how the work will be distributed between the prime contractor and similarly situated subcontractors, who must meet certain size standards. The certification includes a detailed breakdown of the work and associated costs to ensure compliance with federal regulations. Serious penalties, including fines and potential debarment, are enforced for violations. The contractor is required to return this certification via email to designated officials to ensure transparency and adherence to federal contracting rules. This document serves as a critical compliance tool within federal RFPs, ensuring that contractors maintain the integrity of their proposals while adhering to legal and regulatory frameworks.
    The document outlines the requirements for bidders and offerors regarding their safety and environmental records as part of a government Request for Proposals (RFP). Bidders must certify that they have no more than three serious OSHA violations or one repeat or willful violation over the past three years. In cases where this certification cannot be made, an explanation must be provided along with details of the violations. Additionally, bidders are required to submit their Experience Modification Rate (EMR) from their insurance carrier, which should be on official letterhead. If the EMR is above 1.0, bidders must explain the reasons and provide an anticipated reduction timeframe. For self-insured contractors, EMR ratings must be obtained from the National Council on Compensation Insurance (NCCI) or state rating bureaus. This information, alongside data from OSHA and EPA databases, will be used to determine the responsibility of the bidders, extending this requirement to subcontractors as well. Included in the document are forms for bidders to report their safety statistics, EMR, and NAICS code, ensuring a comprehensive evaluation of safety practices among contractors engaged in federal grant and RFP projects.
    The document outlines the procedures for creating and submitting a Contract Progress Schedule for government contracts. The purpose is to ensure proper tracking of project milestones from the contract's start date to its completion. Contractors must fill in essential information such as the contract number, project title, and actual starting and completion dates, as well as detail out the work elements involved. Each work element must be assigned a percentage of total project work, summing to 100%. The contractor is required to plan progress by week, providing a clear picture of work distribution over the contract period. Should there be any changes to the project timeline or scope, a revised schedule must be submitted. Regular progress reports are also necessary to reflect the completion percentage of each work element, informing both the contractor and procurement officials about the contract's status. Overall, the document emphasizes the importance of accurate reporting and planning in managing government contracts efficiently and ensuring compliance with established timelines and performance expectations.
    The document is a Performance Relevancy Survey designed for offerors to detail their past project experiences for evaluation in response to federal RFPs. It requires specific information such as offeror name, project/contract title, contract specifics, and a detailed evaluation of the relevance of the work performed—categorized as Very Relevant, Relevant, or Somewhat Relevant based on the scope and complexities of the solicitation. The survey emphasizes the necessity for frank comments on past performances and aims to assess the contractor's capabilities and any modifications to contracts, alongside providing contact information for project points of contact. Additionally, offerors must include information about any liquidated damages encountered in the last three years, problems faced on relevant projects, and any awards or commendations received, thereby ensuring a comprehensive portrayal of the contractor's competency and track record. This structured approach seeks to ensure that past performance evaluations are thorough, objective, and aligned with the government’s procurement objectives.
    The document outlines the "Past and Present Performance Questionnaire" for contractors seeking to bid on a contract with the United States Department of Veterans Affairs. It provides detailed instructions for contractors and their reference contacts. Contractors must complete the contractor information section, which includes project titles, contact details, and performance descriptions, and then send the form to their identified references for feedback on their past performance. The questionnaire rate performance on a scale from 1 (Unsatisfactory) to 6 (Exceptional) across various evaluation criteria, like management quality and adherence to schedules. References must comment on performance issues, if relevant, and indicate whether they'd award another contract to the contractor. This standardized assessment is essential for evaluating the capability of contractors and their reliability, ensuring the Department of Veterans Affairs selects qualified bidders for its projects. Overall, the process aims to provide a systematic way to gather and assess performance data critical for making informed contracting decisions while ensuring compliance with federal guidelines.
    The document presents a "Subcontractor Information and Consent Form" necessary for subcontractors or teaming partners involved in government contracts, specifically for the Department of Veterans Affairs. It emphasizes the requirement for subcontractors to consent to the release of their past performance information to prime contractors, as this information is crucial for source selection and performance assessments. The form mandates submission of contact details and references from prior projects, along with a description of the subcontractor's role in each. At least three references must be provided from different projects where the subcontractor has performed work, excluding any references from the proposing prime contractor. The consent agreement aims to streamline communication between subcontractors and prime contractors regarding performance history, ultimately aiding the government in evaluating proposals for contracts, emphasizing the increasing importance of past performance in achieving best value outcomes during the selection process.
    The document is a Letter of Commitment from Prime Contractor X regarding a federal solicitation for the Department of Veterans Affairs. It outlines the commitment to engage Subcontractor Y for specific services should Prime Contractor X be awarded the contract. The letter specifies the nature of services provided by Subcontractor Y, and notes that Prime Contractor X can utilize Subcontractor Y's experience and expertise in their proposal. It also details the conditions under which another subcontractor may be substituted, requiring prior written approval from the contracting officer. If the contract is not awarded, the letter becomes void. This document is crucial in demonstrating the collaboration between the prime contractor and subcontractor within the framework of government RFPs and grants, emphasizing the importance of maintaining qualified partnerships to fulfill contractual obligations effectively.
    The document contains a comprehensive cost breakdown for various bidding items related to a government construction project, organized into multiple divisions encompassing different trade categories such as general requirements, concrete, masonry, metals, and more. Each division includes fields for labor costs and total costs associated with the project, but all cost figures are currently listed as zero or unfilled. Specific information such as the project title, location, offeror details, and percentages for overhead, profit, and bond are also included. This structure is typical for Requests for Proposals (RFPs) and grant applications, allowing for transparent pricing and budget analysis. The intention is to provide a detailed framework for contractors to submit their bids, ensuring accountability and precision in governmental funding allocation and project execution. The document highlights the necessity for accurate financial estimations in the context of public contracting, aiming to uphold standards of quality and compliance in federal and local government projects.
    The Lake City Veterans Affairs Medical Center (VAMC) conducted an Electrical System Study to enhance the safety and reliability of its power distribution systems. The study, led by Astral Engineers in collaboration with Apogee Consulting Group, identified several deficiencies, including inadequate equipment ratings, non-compliance with electrical codes, and excessive arc flash hazards. Key findings included the presence of both 3-pole and 4-pole automatic transfer switches, insufficient working clearances for equipment, and a total estimated cost of $7.76 million to rectify identified issues. The study outlines critical recommendations for equipment replacements and code compliance improvements across various campus facilities. It emphasizes the need for coordination between overcurrent protective devices and for regular updates of risk assessments in accordance with electrical safety standards. This comprehensive analysis provides a roadmap for significant improvements, ensuring that the VAMC's electrical systems meet current safety and functional standards, crucial for supporting the medical services provided to veterans.
    The document appears to be corrupted or filled with a significant amount of nonsensical characters, making it difficult to extract coherent content regarding federal government RFPs, federal grants, or state and local RFPs. As a result, the main topic and key ideas cannot be identified due to the unstructured and fragmented nature of the text. The file seems to be lacking substantial information or coherent context that relates to any specific government initiative or grant application. Consequently, a structured summary cannot be produced, as the content does not offer clear or meaningful insights into federal or state proposals, grant guidelines, or structural frameworks generally associated with government documentation.
    Similar Opportunities
    Y1DA--589A6-24-410, Replace MDP Panel Bld 89| EKH
    Veterans Affairs, Department Of
    The Department of Veterans Affairs, through the Network Contracting Office 15, is soliciting proposals for the replacement of the main distribution panel in Building 89 at the Dwight D. Eisenhower VA Medical Center in Leavenworth, Kansas. This project, identified as 589A6-24-410, involves extensive general construction work, including the demolition of existing electrical distribution equipment and the installation of new systems, with a performance period of 310 days. The contract is set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSBC) and is valued between $1,000,000 and $5,000,000, emphasizing the importance of compliance with federal regulations and safety standards. Proposals are due by December 19, 2025, with an additional site visit scheduled for December 4, 2025; interested parties should contact Contracting Officer Tim Parison at timothy.parison@va.gov or 913-946-1140 for further details.
    Z2DA--FY26: NRM (PROJ: 673-21-116) BB - Restoration of Building 1 Envelope
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is soliciting proposals for the restoration of the Building 1 envelope at the James A. Haley VA Hospital in Tampa, Florida, under Project Number 673-21-116. This federal contract, valued between $5 million and $10 million, is specifically set aside for VetCert Certified Service-Disabled Veteran-Owned Small Businesses (SDVOSB) and encompasses general construction, alterations, abatement, and new building components, to be completed within 550 calendar days after the Notice to Proceed. Key deadlines include a proposal submission date of February 16, 2026, at 2:00 PM EST, with a site visit scheduled for November 12, 2025, and a requirement for bidders to acknowledge receipt of all amendments and addenda. Interested parties should contact Contract Specialist David M. Hernandez at David.Hernandez1@va.gov for further information.
    C211--589A6-24-410, Replace MDP Panel Bld 89| EKH
    Veterans Affairs, Department Of
    The Department of Veterans Affairs (VA) is seeking qualified Service-Disabled Veteran-Owned Small Business Concerns (SDVOSBC) for a firm-fixed-price contract to replace Main Distribution Panel (MDP) panels in Buildings 88-89 at the Dwight D. Eisenhower VA Medical Center in Leavenworth, Kansas. The project, identified as RFI 36C25526Q0015, has an estimated value between $1,000,000.00 and $5,000,000.00 and requires completion within a 365-day period following the notice to proceed. This procurement is crucial for ensuring the electrical infrastructure's reliability and safety at the facility. Interested contractors must submit a capability statement detailing their qualifications and experience by October 22, 2026, with the solicitation expected to be posted around October 25, 2025. For further inquiries, contact Tim Parison at timothy.parison@va.gov or call 913-946-1140.
    Z2DA--Install Building Lightning Protection Project# 695-22-106
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is soliciting bids for the "Install Lightning Protection" project (Project 695-22-106) at the Clement J. Zablocki VA Medical Center in Milwaukee, WI. This project involves the installation of lightning protection systems across multiple buildings, including Buildings 70, 91, 102, 111, 112, 113, and 123, with an estimated cost between $2 million and $5 million and a completion timeline of 365 calendar days from the Notice to Proceed. The procurement is set aside for CVE verified Service-Disabled Veteran-Owned Small Business Firms (SDVOSB), emphasizing the importance of compliance with subcontracting limitations and safety protocols. Bids are due by December 4, 2025, at 10:00 AM CST, with a virtual bid opening scheduled for the same day at 11:00 AM CST. Interested parties can contact Contracting Officer Stacy G. Hoover at Stacy.Hoover2@va.gov for further information.
    Z1DA--Upgrade Campus Electrical Systems. Project No. 610A4-23-101.
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is soliciting bids for the "Upgrade Campus Electrical Systems" project at the VA Northern Indiana Healthcare System in Fort Wayne, Indiana. This project involves the demolition of Building 16 and the installation of a 6,600 square foot addition to Building 1, which will house new electrical distribution equipment, including three 600 kW standby generators, automatic transfer switches, and substations. The estimated construction budget ranges from $10 million to $20 million, with a bid submission deadline set for February 12, 2025, at 10:00 AM EST. Interested contractors, particularly Service-Disabled Veteran-Owned Small Businesses (SDVOSBs), should direct inquiries to Contract Specialist Brian Rosciszewski at Brian.Rosciszewski@va.gov.
    PN: 636A8-24-003, Correct Lightning Protection and Grounding
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is soliciting proposals from qualified Service-Disabled Veteran-Owned Small Businesses (SDVOSBs) for Project Number 636A8-24-003, titled "Correct Lightning Protection and Grounding," aimed at upgrading the lightning protection systems across various buildings at the Iowa City VA Health Care System. The project involves the removal of outdated lightning protection components and the installation of new systems compliant with Underwriters Laboratory (UL) standards, ensuring enhanced safety and reliability for the facility. With an estimated construction cost between $1,000,000 and $2,000,000, the contract requires adherence to federal regulations, including wage determinations and safety protocols, with proposals due by December 30, 2025, at 10:30 AM CT. Interested parties should direct inquiries to Contracting Officer Angie Frost at Angela.Frost2@va.gov or call 651-293-3070.
    Y1DA--516-21-106 EHRM Infrastructure Upgrades Construction - Bay Pines VAMC
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is seeking qualified contractors for the EHRM Infrastructure Upgrades Construction project at the Bay Pines VA Medical Center in Florida. This procurement, identified by solicitation number 36C77625B0023, involves construction services aimed at enhancing the electronic health record management infrastructure, with a total estimated contract value of approximately $34,888,000. The project is particularly significant as it supports the modernization of healthcare facilities for veterans, ensuring improved service delivery. Interested parties, especially Service-Disabled Veteran-Owned Small Businesses, should direct inquiries to Contract Specialist Thomas Council at Thomas.Council@va.gov, with bids having been opened on November 12, 2025, following the issuance of the solicitation on July 2, 2025.
    Z2NE--660-23-101 | Rehabilitate Domestic Water Lines | Construction
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is soliciting proposals for the rehabilitation of domestic water lines at the Salt Lake City VA Medical Center under Solicitation Number 36C25926R0003. This project, set aside for Service-Disabled Veteran Owned Small Businesses (SDVOSBs), requires contractors to provide all necessary labor, materials, equipment, and supervision, with an estimated contract value between $2 million and $5 million. The rehabilitation of these water lines is crucial for maintaining the operational integrity and safety of the medical facility, which serves veterans. Proposals are due via email by January 8, 2026, at 10:00 A.M. MT, and interested parties should contact Contract Specialist Mark A. Holland at Mark.Holland@va.gov for further information.
    Electrical Distribution System Condition Assessment/ARC Flash
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is seeking proposals for an Electrical Distribution System Condition Assessment and Arc Flash Study at the VA Pacific Islands Health Care System facilities in Honolulu, Hawaii. The project aims to identify and mitigate arc flash hazards in electrical distribution systems across four buildings, totaling over 266,000 square feet, and includes comprehensive analyses and the installation of arc flash labels. This solicitation is set aside for Service-Disabled Veteran-Owned Small Businesses, with a NAICS code of 541330 and a size standard of $25.5 million. Interested parties must submit their responses by December 23, 2025, at 1600 PDT, and direct any inquiries to Victoria Torres at victoria.torres@va.gov by December 9, 2025.
    Z2DA--OKC Replace Exterior Utility Lines Project 623-24-101 Posted 9-17-25 Closes 10-08-25
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is soliciting bids for the "Replace Exterior Utility Lines Project" at the Jack C. Montgomery VA Medical Center in Muskogee, OK, with a contract value estimated between $2,000,000 and $5,000,000. The project involves replacing exterior water and sewer lines, creating separate fire protection and domestic water loops to mitigate Legionella contamination, and requires compliance with ADA, OSHA, and NFPA standards. This opportunity is a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSBs) and emphasizes the importance of safety, quality assurance, and adherence to federal regulations throughout the construction process. Proposals are now due by December 17, 2025, at 2:00 PM CST, and must be submitted via email to Contract Specialist Jesus A. Villegas at jesus.villegas@va.gov.