Z--Industry Day Invitation, Hurricane Ridge Water System, Olympic NP
ID: 140P8324R0018Type: Special Notice
Overview

Buyer

INTERIOR, DEPARTMENT OF THENATIONAL PARK SERVICEPWR OLYM MABO(83000)PORT ANGELES, WA, 98362, USA

NAICS

Water and Sewer Line and Related Structures Construction (237110)

PSC

REPAIR OR ALTERATION OF WATER SUPPLY FACILITIES (Z2NE)
Timeline
    Description

    The National Park Service (NPS) is hosting an Industry Day for the upcoming procurement to rehabilitate the Hurricane Ridge water system in Olympic National Park. This project involves replacing outdated water lines with modern high-density polyethylene piping, rehabilitating a 100,000-gallon concrete reservoir, and installing new telemetry and control systems, all while adhering to archaeological and environmental considerations. The site visit is scheduled for September 12, 2024, at 10:30 AM, and interested parties must RSVP to Kerri Cook by September 10, 2024, to have their park entrance fees waived for this visit. For further inquiries, Michael Beatty can be contacted at michael_beatty@nps.gov or by phone at 360-854-7219.

    Point(s) of Contact
    Beatty, Michael
    (360) 854-7219
    (573) 323-4288
    michael_beatty@nps.gov
    Files
    No associated files provided.
    Lifecycle
    Title
    Type
    Similar Opportunities
    INDE Chilled Water Loop Inspection
    Active
    Interior, Department Of The
    The National Park Service (NPS) is seeking responses for a Sources Sought notice related to conducting chilled water loop inspections at Independence National Historic Park in Philadelphia, PA. The project involves a minimally intrusive inspection of approximately 1,000 feet of chilled water supply and return lines, primarily carbon steel pipes, to assess their current condition and remaining service life. This initiative is crucial for maintaining the operational integrity of the chilled water system, which supports the preservation of historic structures within the park. Interested firms must submit their responses by November 13, 2024, at noon Eastern Time, and should contact Contracting Officer Debbie Coles at DebbieColes@nps.gov or 540-677-0325 for further details.
    Y--YOSE 196416 Rehabilitate El Portal Wastewater Treatment Facility and Admin Camp.
    Active
    Interior, Department Of The
    The National Park Service (NPS) is preparing to solicit proposals for the rehabilitation of the El Portal Wastewater Treatment Facility and Administrative Camp located in Yosemite National Park, California. This project aims to upgrade the 45-year-old wastewater treatment plant, which is critical for managing wastewater for Yosemite Valley and surrounding communities, by replacing outdated infrastructure and systems, demolishing obsolete structures, and creating RV sites for construction workforce housing at the former administrative camp. The estimated cost for this comprehensive project exceeds $150 million, with a performance period of approximately 1460 days, including potential environmental shutdowns. Interested contractors must be registered with the System for Award Management (SAM) to participate, and solicitation documents are expected to be issued around September 30, 2024. For further inquiries, contact Patrick Naulty at patricknaulty@nps.gov or call 303-987-6701.
    Y--YELL 310533 Rehabilitate and Improve Old Faithful
    Active
    Interior, Department Of The
    The Department of the Interior, through the National Park Service, is soliciting proposals for the rehabilitation and improvement of the Old Faithful Water Treatment System at Yellowstone National Park (Solicitation No. 140P2024R0050). The project aims to construct a new water treatment facility, including advanced water treatment technology, while adhering to environmental protection standards and minimizing disruptions to park activities. This initiative is crucial for maintaining essential infrastructure within the park, ensuring compliance with federal regulations, and safeguarding natural resources. Interested contractors must submit their proposals by December 4, 2024, at 2:00 PM MT, with questions accepted until November 18, 2024. For further inquiries, contact Vicki Freese-supler at vickilfreese-supler@nps.gov or call 720-402-8467.
    Z--ORPI 240841 Replace Primary Water System for Maint
    Active
    Interior, Department Of The
    The Department of the Interior, through the National Park Service, is soliciting proposals for the replacement of the primary water system at Organ Pipe Cactus National Monument in Ajo, Arizona. The project aims to improve water distribution systems currently utilizing outdated asbestos-cement pipes, with a focus on installing a new 100,000-gallon potable water tank and upgrading associated infrastructure. This initiative is critical for ensuring reliable water supply and enhancing operational capabilities within the national monument, which is vital for both visitor services and environmental stewardship. Interested small businesses must submit their proposals by November 14, 2024, at 2:00 PM MST, and can direct inquiries to Joy Ewalt at JoyEwalt@nps.gov or by phone at 720-400-3897.
    Z--THRO NU Juniper Campground Water Renovations
    Active
    Interior, Department Of The
    The Department of the Interior, through the National Park Service, is preparing to solicit bids for the renovation of the water system at the Juniper Campground located in Theodore Roosevelt National Park, North Dakota. The project involves the demolition of the existing water storage system, installation of a new above-ground reservoir, and replacement of sections of the water main impacted by river encroachment. This initiative underscores the government's commitment to enhancing infrastructure and resource management within national parks, with a contract value estimated between $250,000 and $500,000. Interested bidders should note that a pre-bid site visit will be conducted prior to the submission deadline, and project documents are expected to be published around November 8, 2024. For further inquiries, contact Joan Brzezinski at joanbrzezinski@nps.gov or call 605-574-0515.
    Site Visit -Mud Mountain Dam Lower Cascade Creek Water Control Facility
    Active
    Dept Of Defense
    The Department of Defense, specifically the U.S. Army Corps of Engineers, is hosting a site visit for the Mud Mountain Dam Lower Cascade Creek Water Control Facility project, scheduled for November 14, 2024, at 10:00 AM Pacific Standard Time. The project involves replacing the existing water control system to enhance water conveyance from Lower Cascade Creek to the White River, including tasks such as demolition, excavation, construction of new structures, and installation of a bypass system. This site visit is crucial for potential contractors to understand the project requirements and expectations, with registration required for attendance. Interested parties should contact Jeannette Patton at jeannette.k.patton@usace.army.mil for registration and further details.
    Y--ROMO 327127 Bridge Preservation
    Active
    Interior, Department Of The
    The Department of the Interior, through the National Park Service, is soliciting proposals for the "Y--ROMO 327127 Bridge Preservation" project, aimed at preserving multiple bridges within Rocky Mountain National Park. The project encompasses various preservation tasks, including concrete repairs, masonry work, and scour countermeasures, with an estimated contract value between $1,000,000 and $5,000,000. This initiative is critical for maintaining infrastructure integrity and ensuring public safety while adhering to environmental regulations within the park. Interested contractors should submit their proposals by November 8, 2024, at 2 PM MT, and can direct inquiries to Shellie Murphy at shelliemurphy@nps.gov or call 720-610-2690.
    Y--YOSE 196416 Rehabilitate El Portal Wastewater Trea
    Active
    Interior, Department Of The
    The Department of the Interior, through the National Park Service, is soliciting proposals for the rehabilitation of the El Portal Wastewater Treatment Facility and Administrative Camp located in Yosemite National Park, California. The project aims to modernize the 45-year-old wastewater treatment facility, which serves Yosemite Valley and surrounding communities, by upgrading treatment processes, electrical systems, and infrastructure to enhance operational efficiency and environmental compliance. This significant investment, with an estimated construction cost between $150 million and $200 million, underscores the government's commitment to maintaining essential services within national parks while ensuring ecological preservation. Interested contractors must submit their proposals by December 2, 2024, and can direct inquiries to Paula Teague at paulateague@nps.gov.
    WA ERFO NPS MORA 2022-1(1), Mount Rainier ERFO Repairs 2022
    Active
    Transportation, Department Of
    The Department of Transportation, specifically the Federal Highway Administration, is seeking qualified contractors for the Mount Rainier ERFO Repairs 2022 project, located approximately 31 miles southeast of Puyallup, Washington. The project involves essential infrastructure repairs including bank stabilization with rip rap revetment, grading, drainage, and paving over a length of 0.18 miles, with an estimated contract value between $700,000 and $2,000,000. This initiative is crucial for maintaining the integrity of roadways within the Mount Rainier National Park and surrounding areas, ensuring compliance with environmental protection standards. Interested vendors should note that this is a total small business set-aside opportunity, with a tentative solicitation date in Winter 2024/2025 and completion expected by Fall 2025; for further inquiries, contact the Contracts G. Office at wfl.contracts@dot.gov or call 360-619-7520.
    Z--DK-AO Heart Butte Safety of Dams Modification Industry Day
    Active
    Interior, Department Of The
    The Department of the Interior, specifically the Bureau of Reclamation, is hosting an Industry Day for the Heart Butte Safety of Dams Modification project, scheduled for October 22-23, 2024. This event aims to engage industry stakeholders in discussions regarding the upcoming dam safety modifications, including project overviews, contracting processes, and site visits, while also providing critical as-built drawings and simplified construction schedules to facilitate understanding of the project requirements. The modifications are essential for enhancing the safety of the aging infrastructure, ensuring compliance with federal and state regulations, and improving water management systems. Interested vendors should direct inquiries to Contracting Officer Mitchell Frost at mfrost@usbr.gov, and are encouraged to submit written questions by November 15, 2024, to be addressed during the event.