Z--DK-AO Heart Butte Safety of Dam Modification
ID: DOIRFBO240024Type: Special Notice
Overview

Buyer

INTERIOR, DEPARTMENT OF THEBUREAU OF RECLAMATIONGREAT PLAINS REGIONAL OFFICEBILLINGS, MT, 59101, USA

NAICS

Other Heavy and Civil Engineering Construction (237990)

PSC

REPAIR OR ALTERATION OF DAMS (Z2KA)
Timeline
    Description

    The United States Bureau of Reclamation is preparing for a substantial dam safety modification project at the Heart Butte Dam near Elgin, North Dakota, estimated to exceed $10 million in value. The project, titled "Z–DK–AO Heart Butte Safety of Dam Modification," is a complex civil engineering endeavor aimed at enhancing the dam's structural integrity and addressing safety concerns.

    This opportunity notice is released as a special announcement to engage with potential contractors and gather their insights. The Bureau aims to optimize project scheduling, reduce costs, and mitigate risks by collaborating with experienced parties early in the process.

    Scope of Work

    The scope of this project involves a comprehensive range of construction and engineering tasks. This includes installing dewatering systems, constructing a cofferdam, grouting foundation voids, and repairing concrete outlet works. Additionally, the work requires excavating parts of the existing dam, building new sand filters, and implementing a drainage system with HDPE toe-drain pipes. The Bureau of Reclamation has provided detailed technical specifications outlining the precise dimensions and elevations required for these tasks.

    Eligibility Criteria

    Given the specialized nature of the project, the Bureau is seeking contractors with a strong background in heavy and civil engineering construction. Companies with the expertise and resources for precise excavation, construction, and modification work are encouraged to apply. Eligible contractors must demonstrate an ability to adhere to stringent industry standards and quality control measures.

    Funding and Contract Details

    The estimated value of the contract is expected to exceed $10 million. The contract type and funding details are not explicitly mentioned in the provided information. However, the project's significant value and complexity suggest a substantial funding commitment from the Bureau of Reclamation.

    Submission Process

    The Bureau of Reclamation encourages interested contractors to participate in the upcoming Industry Day for a comprehensive project briefing. The event will offer a detailed overview of the project's requirements and expectations. Feedback from attendees will be welcomed, providing an opportunity to shape the formal solicitation process.

    Evaluation Criteria

    While specific evaluation criteria were not provided, the Bureau is likely to assess applicants based on their expertise, past performance on similar projects, and ability to adhere to the stringent technical specifications and quality standards outlined.

    Contact Information

    For further clarification or additional information, interested parties can contact the primary point of contact, Mitchell Frost, at mfrost@usbr.gov or via phone at 0000000000.

    The Bureau of Reclamation looks forward to engaging with potential contractors and sharing details of this significant dam modification project.

    Point(s) of Contact
    Files
    Title
    Posted
    The Heart Butte Dam Safety of Dams Modification project involves extensive civil engineering and construction work to enhance the structural integrity of the dam. The Bureau of Reclamation, under the U.S. Department of the Interior, is undertaking this project to address safety concerns and ensure the dam's resilience. The procurement objective is to engage contractors who can execute the required excavation, construction, and modification work, adhering to precise specifications and industry standards. The project entails modifying the spillway and outlet works of the Heart Butte Dam, including excavation to install a jet grout cutoff wall and a seepage berm. The work also involves constructing an MSE wall, a cofferdam, and a drainage system with perforated HDPE pipes and inspection wells. The scope of work includes detailed tasks such as removing the existing toe drain, connecting it to the new drainage system, and exposing and repairing the existing conduit. The technical specifications are comprehensive and cover various aspects of the project. These include precise dimensions and elevations for excavation, construction, and finished surfaces. The drawings also indicate the placement of filter sand, compacted backfill, riprap, and other materials. The project requires strict adherence to quality standards and industry norms to ensure the dam's structural integrity. The contract details, estimated value, and evaluation criteria are not explicitly mentioned in the provided file. However, the technical specifications and scope of work indicate a complex and substantial project requiring specialized skills and resources. The key dates for the project are indicated through the various drawings' dates, with the latest being June 18, 2024. In summary, the Heart Butte Dam Safety of Dams Modification project is a significant civil engineering undertaking aimed at enhancing the dam's safety and resilience. The project involves a range of construction and modification work, including excavation, installation of cutoff walls, construction of seepage berms, and implementation of a drainage system. The Bureau of Reclamation is driving this project, emphasizing precise specifications and quality standards to ensure the dam's structural integrity.
    The United States Bureau of Reclamation is preparing for a significant dam safety modification project at Heart Butte Dam near Elgin, North Dakota, and has released an industry day notice to gather insights from potential contractors and share project details. With a projected value exceeding $10 million, the project encompasses a range of construction and engineering tasks aimed at enhancing the dam's safety. The scope of work includes installing dewatering and unwatering systems, designing and building a cofferdam, grouting foundation voids, repairing concrete outlet works, excavating parts of the existing dam, constructing new sand filters and drainage systems, installing HDPE toe-drain pipes, and more. Through this industry day, the Bureau aims to collaborate with interested parties to optimize project scheduling, reduce costs, and mitigate risks. This notice serves as an early engagement opportunity, providing contractors with a chance to offer feedback and gain a comprehensive understanding of the project's requirements before the formal solicitation process begins.
    Lifecycle
    Title
    Type
    Similar Opportunities
    Rehabilitate Spillway Apron Slab at Oahe Dam, SD
    Active
    Dept Of Defense
    The Department of Defense, through the U.S. Army Corps of Engineers, is soliciting bids for the rehabilitation of the spillway apron slab at Oahe Dam in South Dakota. The project involves selective demolition of existing concrete structures, followed by the installation of new concrete patches, replacement of two 6" flood overflow check valves, and repainting of connection pipes. This initiative is crucial for maintaining the structural integrity and operational efficiency of the dam, with an estimated construction cost ranging from $250,000 to $500,000. Interested small businesses must submit their sealed bids electronically by September 17, 2024, and are encouraged to contact Ariel Vogan or Nadine Catania for further information.
    Fargo Moorhead Metropolitan Area Flood Risk Management Project, Southern Embankment Reach SE-5
    Active
    Dept Of Defense
    The Department of Defense, through the U.S. Army Corps of Engineers (USACE), is preparing to solicit bids for the Fargo Moorhead Metropolitan Area Flood Risk Management Project, specifically the Southern Embankment Reach SE-5, located in Moorhead, Minnesota. This project involves the construction of an overflow earth dam embankment, including soil-cement mixture, a gravel road, and associated infrastructure such as culverts and repaving of existing intersections. The initiative is crucial for enhancing flood risk management in the region, with an estimated contract value between $5 million and $10 million, and is expected to be solicited in late October or November 2024. Interested contractors should ensure they are registered in the System for Award Management (SAM) and may contact Scott E. Hendrix or Kevin P. Henricks for further information.
    Bank Stabilization, Spillway Channel, Oahe Dam, Pierre, SD
    Active
    Dept Of Defense
    The Department of Defense, specifically the U.S. Army Corps of Engineers, is seeking bids for the stabilization of the upstream spillway channel banks at Oahe Dam in Pierre, South Dakota. The project involves significant earthwork, including excavation, installation of geotextile fabric, and placement of approximately 43,000 tons of riprap for slope protection, with an estimated construction cost between $5 million and $10 million. This initiative is crucial for maintaining the integrity of federal infrastructure and ensuring environmental compliance during construction. Interested small businesses must submit their bids electronically by September 18, 2024, and can direct inquiries to Wayne C. Weidenhamer or Nadine Catania via email.
    Chief Joseph Dam Electric and Hydraulic Elevators Replacement
    Active
    Dept Of Defense
    The Department of Defense, specifically the Department of the Army, is seeking a contractor for the replacement of electric and hydraulic elevators at the Chief Joseph Dam. The solicitation type is listed as a Best Value Trade-Off (BVTO). The scope of work involves replacing the existing elevators and associated equipment, with a focus on achieving energy efficiency and compliance with current safety standards. The key tasks include designing, fabricating, and installing new elevators, along with testing and commissioning to ensure proper functionality. The contractor will be responsible for providing all necessary materials, equipment, and labor. To be eligible for this opportunity, applicants should have a strong track record in construction projects, preferably including experience with dam infrastructure. The Army seeks a reliable and timely solution, so evidence of successful project completion and references will be crucial. Funding for this project is estimated at $2 million to $3 million, and the contract will likely be awarded as a firm-fixed-price arrangement. Interested parties should submit their proposals before the deadline stated in the solicitation document. The government encourages applicants to submit their bids electronically and also provides a physical address for hard copy submissions. The evaluation process will assess the technical merit and price of each proposal. The Army will conduct a comprehensive review, considering factors such as the offeror's qualifications, past performance, and the proposed approach. For any clarifications or questions, interested individuals and companies should contact Geraldine Kemp at geraldine.l.kemp@usace.army.mil or 206-764-6659. Alternatively, they can reach Scotty Britt at scott.w.britt@usace.army.mil or 206-764-3517. This opportunity is expected to result in a single award. The solicitation document, which potential bidders should carefully review, is available for download from the provided link.
    MT FLAP VALLEY 20(1), Duck Creek Road
    Active
    Transportation, Department Of
    The MT FLAP VALLEY 20(1) project is a substantial federal contract opportunity, seeking a contractor to undertake extensive roadway improvements on Duck Creek Road in Valley County, Montana. The primary goal is to enhance the safety and functionality of this 4.85-mile stretch of road, approximately 16 miles southeast of Glasgow, Montana. This project involves a comprehensive scope of work, encompassing asphalt and aggregate surfacing, drainage enhancements, and extensive earthwork, including clearing, grubbing, and excavation. The contractor will undertake roadway reconditioning, stabilization, and asphalt work, alongside culvert and drain installations. Traffic control measures, construction surveying, and quality assurance are also part of the requirements. With an estimated price range of $2 to $5 million, the project is tentatively scheduled for solicitation in the summer of 2024 and aims to be completed by fall 2025. The federal highway administration is seeking a capable contractor to deliver these vital improvements, ensuring a high standard of workmanship and compliance with specified quantities and standards. Interested parties should keep watch on the System for Award Management (SAM) website, as highlighted in the QA07-30-2024.pdf file, to access the full details of this upcoming opportunity. The files associated with this project emphasize the significance of the roadway upgrades and provide a thorough overview of the work segments, while also guiding prospective bidders on the necessary steps to stay informed and eventually apply. Eligible bidders are advised to closely monitor the SAM website for the release of further details, as this contract opportunity is expected to be solicited as full and open. According to the provided information, there are no specific eligibility criteria or certifications required, but experience in highway construction and earthwork projects would likely be advantageous. For any clarifications or further information, interested parties can contact the primary contact point: Contracts G. Office, wfl.contracts@dot.gov, 3606197520.
    Bonneville Headgate Repair Pit
    Active
    Dept Of Defense
    The Department of Defense, specifically the U.S. Army Corps of Engineers, is seeking information from potential contractors for the Bonneville Headgate Repair Pit project at Bonneville Dam, located in Oregon. The primary objective is to rehabilitate the headgate repair pit to ensure a safe and efficient work environment for maintenance activities, including corrosion repair and component replacements, while adhering to industry standards such as ASHRAE and OSHA. This project is crucial for maintaining the operational integrity of the Bonneville Powerhouse, which plays a significant role in the Federal Columbia River Power System. Interested firms must submit their responses by October 15, 2024, with an estimated construction cost between $5 million and $10 million, and are encouraged to contact Kristel Flores or Andrea Smothers for further details.
    Chief Joseph Dam Powerhouse Sump Pumps and Controls
    Active
    Dept Of Defense
    The Department of Defense, specifically the U.S. Army Corps of Engineers (USACE) Seattle District, is seeking contractors for the rehabilitation of the Chief Joseph Dam Powerhouse drainage and unwatering sump pumps and controls. The project entails extensive work including the replacement of pumps, motors, and controls, as well as the installation of new piping, valves, and structural components such as ladders and platforms. This rehabilitation is crucial for maintaining the operational efficiency and safety of the dam's pumping systems. The estimated contract value ranges between $5 million and $10 million, with a Request for Proposal (RFP) to be issued using the Best Value Trade-off method. Interested contractors can reach out to Geraldine Kemp at geraldine.l.kemp@usace.army.mil or Camilla Allen at camilla.allen@usace.army.mil for further information.
    Z--Medicine Creek Dam Concrete Repair of damaged spil
    Active
    Interior, Department Of The
    The Bureau of Reclamation, part of the Department of the Interior, is soliciting proposals for the Medicine Creek Dam Concrete Repair and Access Improvement project located in Cambridge, Nebraska. This project aims to repair concrete damage in the spillway chute and outlet works, construct a new access road, and enhance the structural integrity of the dam, with a contract value estimated between $5 million and $10 million. The initiative is crucial for maintaining flood control structures, ensuring public safety, and supporting environmental stability. Interested small businesses must submit their proposals by September 20, 2024, and can contact Kent Munro at KMunro@usbr.gov or 801-721-3918 for further information.
    Hyrum Dam Spillway Replacement
    Active
    Interior, Department Of The
    The Bureau of Reclamation, part of the Department of the Interior, is soliciting bids for the Hyrum Dam Spillway Replacement project located approximately 9 miles southwest of Logan, Utah. The project entails the construction of a new reinforced concrete spillway, removal of the existing spillway, and associated infrastructure improvements, including drainage systems, mechanical features, and roadway realignment, with a performance period from March 2025 to January 2029. This initiative is critical for enhancing the safety and functionality of the Hyrum Dam, ensuring compliance with federal regulations and standards. Interested contractors must submit sealed bids by November 8, 2024, and can contact Lynette Rock at LRock@usbr.gov or 385-228-8535 for further information.
    Bonneville Spillway Rock Mitigation
    Active
    Dept Of Defense
    The Department of Defense, through the U.S. Army Corps of Engineers (USACE), is seeking industry input for the Bonneville Spillway Rock Mitigation project, which involves constructing two concrete barriers on the spillway apron of the Bonneville Dam in Oregon. The primary objective is to mitigate rock accumulation that damages the existing infrastructure, requiring underwater construction techniques and adherence to environmental controls during the specified in-water work period from November 1 to February 28. This project is critical for maintaining the structural integrity of the dam and ensuring effective water management, with an estimated construction cost exceeding $10 million. Interested parties must submit their responses to the Sources Sought notice by October 31, 2024, to the designated contracting officials, Kristel Flores and Andrea Smothers, via email.