The Department of Defense, specifically the Department of the Army through the Omaha District, is soliciting bids for the construction of the B-21 East Alert Apron project. This design-bid-build construction initiative involves the installation of four pre-engineered metal Environmental Protection Shelters (EPS), each approximately 20,000 square feet, designed to accommodate B-2A aircraft and facilitate general maintenance, along with associated airfield paving and support facilities. The project is critical for enhancing operational capabilities at the existing Alert Apron at EAFB and must comply with stringent DoD construction standards, including sustainability and antiterrorism requirements. Interested contractors can reach out to Gloria Garside at gloria.garside@usace.army.mil or Amanda Eaton at amanda.e.eaton@usace.army.mil for further details.