Construction of a KC-46 Two-Bay Hangar at March Air Reserve Base (ARB), CA
ID: W912QR24R0034Type: Solicitation
Overview

Buyer

DEPT OF DEFENSEDEPT OF THE ARMYW072 ENDIST LOUISVILLELOUISVILLE, KY, 40202-2230, USA

NAICS

Commercial and Institutional Building Construction (236220)

PSC

CONSTRUCTION OF OTHER AIRFIELD STRUCTURES (Y1BZ)
Timeline
    Description

    The Department of Defense, specifically the Army Corps of Engineers, is seeking contractors for the construction of a KC-46A Two-Bay Maintenance Hangar at March Air Reserve Base in California. The project involves the demolition of an existing hangar and the construction of a new facility designed to support the maintenance and repair of the KC-46A aircraft, accommodating approximately 300 personnel and including various administrative and maintenance spaces. This initiative is crucial for enhancing military readiness and operational efficiency, with an estimated construction cost ranging from $100 million to $250 million. Interested contractors should note that the solicitation is currently suspended, with a new proposal due date to be announced, and they can contact Lindsay Lawrence at Lindsay.B.Lawrence@usace.army.mil for further information.

    Point(s) of Contact
    Files
    Title
    Posted
    The document outlines the Request for Proposal (RFP) for the addition and alteration of Building 1244 at March Air Reserve Base, California, primarily aimed at establishing a Fuselage Unit Training Facility (FuT) for the KC-46A Program. The project entails the renovation of an existing 20,658 square foot hangar constructed in 1961, which will now support mission-specific training for KC-46A refueling and cargo aircraft. The proposal includes detailed specifications for furniture, fixtures, and equipment (FF&E) to create functional, durable, and ergonomic workspaces tailored to training needs. Compliance with various military and government standards concerning design, sustainability, and indoor air quality is emphasized. The document also includes a structured table of contents, lists of project contacts, and preliminary cost estimates for the various equipment and furnishings necessary for the facility. The overarching goal is to create a modern training environment that promotes collaborative and efficient learning while adhering to federal guidelines and ensuring user comfort and accessibility.
    The document outlines the Certified Final Design Submittal for the Addition and Alteration of Building 1244 at March Air Reserve Base, led by Burns and McDonnell under a US Army Corps of Engineers contract. The project primarily aims to enhance pallet storage capabilities and adheres to specific safety, construction, and environmental regulations. Key elements include a comprehensive sheet index detailing various construction plans (ceiling, door types, plumbing, electrical, mechanical), as well as vital construction approaches to ensure compliance with FAA and Army safety standards. The document delineates access, traffic control, and communication protocols essential for maintaining base security during operations. Additionally, safety requirements and guidelines for handling hazardous waste, dewatering, and stormwater management are emphasized to ensure environmental compliance. Throughout the project, the contractor is mandated to maintain clear communication and coordination with the Corps of Engineers and base security personnel to manage the construction effectively within a secure installation. Overall, the document encapsulates a strategic framework for executing construction while upholding rigorous standards of safety and operational integrity.
    The document outlines the solicitation for renovations and expansions of Building 1244 at March Air Reserve Base, California, designated for FuT-Pallet Storage. This is a Design-Bid-Build project with certified final designs submitted by 04 September 2024. The submitted plans detail various structural and interior design elements, including specific finishes for exteriors, flooring, ceilings, and miscellaneous components. Exterior finishes include solar control insulated glass, metal panels with distinct color specifications, gutters, and roofing. Floor finishes encompass carpet tiles, resilient flooring, and sealed concrete, while wall finishes involve ceramic and porcelain tiles accompanied by specific paint specifications for accents and trim. Other aspects highlight environmental considerations through the choice of materials and finishes to ensure aesthetics align with operational requirements. As part of the federal contracting process, thorough documentation and adherence to construction standards are emphasized, maintaining records for 15 years post-construction. This project demonstrates the government’s commitment to enhancing storage facilities to support military operations.
    The solicitation for the addition and alteration of Building 1244 at March Air Reserve Base, California, outlines a comprehensive project aimed at constructing a KC-46 Two-Bay Maintenance/Fuel Cell Hangar. The project includes significant construction work to enhance facility capabilities for aircraft maintenance, fumigate the environment, and modify existing structures. Estimated costs range between $100 million and $250 million, with a target contract award ceiling of $180 million. The process follows a Best Value/Tradeoff Acquisition method, requiring vendors to submit proposals electronically through the Procurement Integrated Enterprise Environment (PIEE) without paper submissions. Key evaluation factors include past performance, risk management, schedule narratives, and small business participation, followed by price assessments. Offerors are expected to demonstrate substantial experience in similar projects. A mandatory site visit is scheduled, and compliance with several federal regulations and standards, including bonding requirements, is emphasized. The document is structured into clear sections detailing project specifications, proposal submission guidelines, and evaluation criteria to ensure a robust selection process that achieves best value for the government, reinforcing the contract's significance within the context of federal procurement and infrastructure improvement initiatives.
    The document outlines the specifications for the addition and alteration of Building 1244 at March Air Reserve Base, CA, primarily aimed at establishing future pallet storage. Key elements of the project include a comprehensive design-bid-build strategy, detailed specifications across various construction divisions, and protocols for handling hazardous materials. The project emphasizes rigorous procurement and contracting requirements, including compliance with safety and environmental standards relevant to demolition, waste disposal, concrete work, and structural amendments. Each division, from existing conditions to specialized furnishings and fire safety systems, is meticulously documented. Specific focus is given to the integration of furnishings, systems furniture, and installation logistics, adhering to indoor air quality certifications and sustainability criteria. Documentation requires submittals for product data, samples, and warranties, ensuring accountability and quality control throughout the construction process. The structure's updates aim to meet operational requirements while maintaining compliance with federal standards, reflecting the government's commitment to safety and efficacy in infrastructure improvements.
    The document outlines the specifications for the Addition/Alteration of Building 1244 at March Air Reserve Base, CA, focusing on constructing new pallet storage facilities through a Design-Bid-Build approach. It includes certified final designs dated September 4, 2024, emphasizing adherence to safety and engineering standards across multiple disciplines, including civil, structural, and electrical engineering. The project documentation identifies critical areas of work, such as demolition, concrete, masonry, metals, HVAC, plumbing, and landscaping, organized systematically into divisions. Each division specifies detailed procedures, performance standards, and required materials, reinforcing compliance with federal and local regulations. Particular attention is given to environmental safety, including the management of hazardous materials, ensuring thorough remediation protocols for asbestos, lead, and PCBs. The landscaping section emphasizes sustainable practices, requiring organic fertilization and environmental management plans, including iterative inspection and maintenance of plant health. The overall purpose of the document is to ensure safe, efficient, and compliant construction practices while also promoting environmental stewardship at the project site, highlighting the government's commitment to regulatory adherence and community wellness.
    The document outlines the solicitation for the design, construction, and furnishing of a new KC-46A Two-Bay Maintenance Hangar at March Air Reserve Base in California. This project aims to establish a modern facility for the maintenance and repair of the KC-46A weapons system. Key elements include the demolition of an existing hangar, construction of a new two-bay maintenance and fuel cell hangar, and the provision of furniture, fixtures, and equipment (FF&E) compliant with military standards and ergonomic guidelines. The hangar will support approximately 300 personnel and include various administrative and maintenance spaces, promoting functionality, accessibility, and sustainability. Requirements for furniture emphasize durability, ease of maintenance, and eco-friendliness, adhering to federal regulations on indoor air quality. A detailed list of FF&E specifications is provided, including ergonomic task chairs, workstations, conference rooms, and various storage solutions, highlighting the project’s commitment to a healthy work environment. A point of contact list for project oversight is also included, facilitating communication among stakeholders. The overall objectives focus on creating a professional, efficient, and safe working environment that meets the needs of its occupants and enhances military operations.
    The document outlines the certified final design submission for the KC-46A Two-Bay Maintenance Hangar project at March Air Reserve Base. It specifies the compliance requirements for construction activities, emphasizing adherence to the Federal Aviation Administration (FAA) regulations, operational safety during construction, and coordination with base operations. Key components include requirements for notifying air missions, protecting navigational aids, marking hazardous construction areas, and managing debris to prevent foreign object damage. The document also details the need for proper access routes for the fire department, water lines, and hydrant placements to ensure safety protocols are followed. The project demonstrates the Army Corps of Engineers' commitment to maintaining standards while enabling the construction of essential military facilities, reflecting federal mandates for safety and operational efficiency in aviation environments. Overall, this file serves as a comprehensive plan detailing the procedural and structural guidelines essential for the successful execution of the hangar project.
    The document outlines the Certified Final Design Submittal for the KC-46A Two-Bay Maintenance Hangar at March Air Reserve Base, managed by the US Army Corps of Engineers. It serves as a comprehensive blueprint for the project, detailing architectural, mechanical, electrical, and plumbing plans, as well as fire safety standards and life safety code compliance. The report specifies the structural and occupancy classifications, emphasizing adherence to national codes and local jurisdiction standards. Key components include design specifications for fire protection systems, plumbing layouts, mechanical plans, and accessibility features, all critical for operational efficiency and safety. The document also includes plans for critical systems required for the hangar's functionality, detailing machinery placements and infrastructure layouts for maintenance and operational initiatives. The analysis showcases the project's commitment to following exceptional safety protocols and standards necessary for military infrastructure. Overall, it emphasizes high-quality construction aligned with military regulations and operational needs at the facility.
    The document outlines the solicitation for the construction of a Two-Bay Maintenance Hangar for the KC-46A aircraft at March Air Reserve Base in Riverside County, California. It details the Design-Bid-Build approach with a certified final design due by September 4, 2024. The project encompasses various aspects of structural interior design, including specifications for exterior and floor finishes, tile and wall finishes, paint finishes, and ceiling finishes, with precise color and material descriptions provided for each element. Key components discussed include the use of specific materials from recognized manufacturers (where applicable) and the incorporation of aesthetic elements such as flooring tiles and wall paints to enhance functionality and appearance. Importantly, the file mandates that documentation related to the project be retained for a period of 15 years post-construction, reinforcing compliance and accountability. Overall, this solicitation emphasizes the government's focus on systematic planning and execution for military facility upgrades, aiming to ensure high standards in construction and design, aligned with operational requirements for the KC-46A aircraft.
    The solicitation outlines a federal Request for Proposal (RFP) for the construction of a KC-46A Two-Bay Maintenance Hangar and associated facilities at March Air Reserve Base, California. The estimated construction cost is between $100 million and $250 million, and the project falls under NAICS Code 236220. It emphasizes a full and open procurement process and the Best Value trade-off method for evaluation. Proposals must adhere to submission guidelines, including electronic formats through the Procurement Integrated Enterprise Environment (PIEE). Offerors are evaluated on various technical factors, including past performance and risk management, with a strong emphasis on adherence to deadlines and the provision of a solid bonding capability. A significant aspect of the project includes sustainability measures and compliance with federal regulations concerning price evaluations and contractor diversity. A mandatory site visit is scheduled, and critical timelines are set for proposal submission, with an acceptance period of at least 90 days for government review. The document underscores the importance of solid construction standards and contractor reliability as essential elements for this federal undertaking.
    The solicitation outlines the construction of a KC-46A Two Bay Maintenance Hangar and associated infrastructure modifications at March Air Force Base, CA. The project entails the complete demolition of the existing Hangar 1246 and related structures, including extensive site preparation, excavation, and utility installation. Demolition activities must follow a comprehensive plan that emphasizes safety, adherence to environmental regulations, and maximum recycling of materials. Key components include a meticulous demolition plan approved by the Contracting Officer, which details methods for salvaging materials while ensuring occupational safety. The Construction Waste Management Plan mandates daily waste removal and compliance with federal and state regulations regarding hazardous materials. Groundwater contamination and the presence of hazardous substances like PFAS require thorough monitoring and sampling during excavation. Additionally, a Work Plan is required prior to excavation work, which must outline operational schedules, decontamination procedures, and spill contingency plans. The project is part of a broader strategy to modernize Air Force infrastructure and ensure operational readiness. Ultimately, this effort reflects the government's commitment to sustainable practices and compliance within defense contracting.
    The project document outlines the solicitation for constructing a KC-46A Two Bay Maintenance Hangar, mooring points, and re-striping at March Air Base Reserve, California. It details specifications for a design-bid-build format, with a certified final design due by April 2024. The project includes provisions for various divisions, including procurement, general and existing condition requirements, and services for safety and environmental impacts. Key components highlight the structural, mechanical, and electrical systems designed for high safety and operational standards, particularly focused on fall protection during maintenance tasks. Compliance with relevant regulations, and standards set forth by authorities like ANSI and OSHA, is emphasized throughout the procedure. The document intricately details submittal requirements, quality assurance processes, and the need for collaboration among engineers and contractors on site. It underscores the importance of using sustainable materials, adhering to safety measures, and ensuring proper installation of all components involved. By maintaining rigorous documentation and operational standards, the project aims to fulfill federal government guidelines for military infrastructure improvements.
    The document outlines the solicitation for the construction of a KC-46A Two Bay Maintenance Hangar, Mooring Points, and associated re-striping at March Air Base Reserve, California. The project employs a Design-Bid-Build approach and is detailed through comprehensive specifications split into various divisions, ranging from general requirements to specific materials handling and installation procedures. It emphasizes the importance of adhering to regulatory standards, including safety and environmental precautions, and mandates that the quality of materials and workmanship meets rigorous federal guidelines. Key components include telecommunications infrastructure, management of hazardous materials, and detailed documentation requirements for contractors. This solicitation encapsulates the government’s commitment to enhancing military readiness through updated facilities while ensuring compliance with safety and operational standards.
    This document serves as an amendment to solicitation W912QR24R0034 regarding the construction of a KC-46 Two-Bay Maintenance/Fuel Cell Hangar at March ARB, CA. The primary modification indicated is the suspension of the solicitation until further notice, with the intention to announce a new proposal due date at a later time. The current proposal due date listed in the system is merely a placeholder to comply with electronic system requirements. The amendment document emphasizes that the terms and conditions remain unchanged unless specified otherwise. Contractors are required to acknowledge receipt of this amendment to avoid jeopardizing their offers. Overall, this amendment signals a temporary halt to the bidding process, reflecting procedural adjustments typical in government contracting.
    Similar Opportunities
    March Air Reserve Base, CA B600 Flight Simulator
    Active
    Dept Of Defense
    The Department of Defense, specifically the Department of the Army, is conducting a market survey for the construction of an addition and alterations to Building 600 at March Air Reserve Base, California, to accommodate a Boom Operator Trainer and support the new KC-46A mission. The project involves constructing approximately 2,200 square feet of new space and renovating around 7,000 square feet of existing facilities, including specialized training rooms and security enhancements, with an estimated contract duration of 730 calendar days and a budget range of $5 million to $10 million. Interested small businesses, including those certified as HUBZone, 8(a), Woman-Owned, or Service-Disabled Veteran Owned, are encouraged to respond by providing their qualifications and relevant project experience by November 4, 2024, at 2:00 PM EST, to Christopher M. Jackson at christopher.m.jackson@usace.army.mil.
    Three SRM projects at March ARB, CA
    Active
    Dept Of Defense
    The Department of Defense, specifically the Department of the Army, is conducting a market survey for three construction projects at March Air Reserve Base in California, with the aim of determining interest from small business concerns for potential contract opportunities. The projects include minor repairs and renovations to three buildings: Building 2303 for Aero Repair administration, Building 2320 for the KC-46A Hydraulics and Boom Shop, and Building 2327 for battery shop operations, with an estimated contract duration of 540 calendar days and a cost range between $1,000,000 and $5,000,000. Interested small businesses, including those certified as HUBZone, 8A, Woman-Owned, or Service-Disabled Veteran Owned, must respond by November 6, 2024, with required documentation to Seth Dukes at seth.j.dukes@usace.army.mil to be considered for this opportunity.
    AFSOC 103021 SOF Maintenance Hangar and LXEZ 153953 SOF Composite Maintenance Facility
    Active
    Dept Of Defense
    The Department of Defense, through the U.S. Army Corps of Engineers, is soliciting bids for the construction of a one-bay aircraft hangar and a composite maintenance facility at AFSOC. This project encompasses all necessary labor, materials, equipment, and supervision to complete the construction and associated environmental work. The facilities are critical for supporting Special Operations Forces, ensuring they have the necessary infrastructure for maintenance and operational readiness. Interested contractors should note that the bid opening has been extended to December 6, 2024, and can reach out to Jack Letscher at jack.t.letscher.civ@usace.army.mil or Valeria Fisher at valeria.fisher@usace.army.mil for further inquiries.
    W912ER24R0003 SOLICITATION NOTICE FOR F-18 Super Hornet Procurement D, Package 002 Quick Reaction Area (QRA) and Combat Aircraft Loading Area (CALA)
    Active
    Dept Of Defense
    The Department of Defense, through the Transatlantic Middle East District (TAM), is soliciting experienced contractors for the Design-Bid-Build (DBB) construction of a new Quick Reaction Area (QRA) and Combat Aircraft Loading Area (CALA) for the F-18 Super Hornet at Al Jaber Air Base in Kuwait. This project aims to support the fielding of new F/A-18E/F Super Hornet aircraft by constructing essential facilities and related site improvements, all designed in accordance with Unified Facilities Criteria. The estimated contract value ranges between $25 million and $100 million, with a performance period of 613 calendar days from the Notice to Proceed (NTP). Interested contractors can reach out to Sabrina Booker at sabrina.s.booker@usace.army.mil or call 540-667-3182 for further information.
    This solicitation is still suspended until further notice. The purpose of this amendment is administrative and is only to push out the date to fiscal year 2025.
    Active
    Dept Of Defense
    The Department of Defense, specifically the U.S. Army Engineer District Mobile, is seeking contractors for the construction of an Aviation Storage Facility at Soto Cano Air Base. This project involves the design and construction of a fuel storage facility with a capacity of at least 300,000 gallons, including three factory-fabricated storage tanks and a POL Ops building equipped with a fuel laboratory. The procurement is significant for ensuring the operational readiness of U.S. forces by providing essential fuel storage and handling capabilities. Interested contractors can reach out to Jacob Mcgriff at jacob.l.mcgriff@usace.army.mil or Christopher Brunner at christopher.e.brunner@usace.army.mil for further details, noting that the solicitation is currently suspended until fiscal year 2025.
    Construction of P992 Fleet Maintenance Facility (FMF) & Tactical Operations Center (TOC), Isa Air Base, Bahrain
    Active
    Dept Of Defense
    The Department of Defense, through the U.S. Army Corps of Engineers (USACE), is seeking qualified contractors for the construction of the Fleet Maintenance Facility (FMF) and Tactical Operations Center (TOC) at Shaikh Isa Air Base in Bahrain. This project involves the construction of a two-story steel-frame FMF and a single-story TOC, which will support the maintenance and operational needs of P-8A aircraft, including various infrastructure and security enhancements. The estimated construction cost ranges from $10 million to $25 million, with a projected period of performance of 599 calendar days from the Notice to Proceed. Interested firms must possess a Facility Clearance Level (FCL) of SECRET or higher and submit their qualifications, including a signed Non-Disclosure Agreement, to the designated contacts by May 13, 2022.
    $99M California Construction MATOC
    Active
    Dept Of Defense
    The Department of Defense, specifically the Department of the Army through the W075 Endist Sacramento office, is soliciting proposals for a $99 million construction Multiple Award Task Order Contract (MATOC) focused on commercial and institutional building construction in California. This opportunity is set aside for small businesses, in accordance with FAR 19.5, and aims to support various construction projects that may arise within the specified region. The procurement is significant as it facilitates the development and maintenance of essential infrastructure, contributing to the operational capabilities of the Army. Interested contractors should reach out to Gilbert Coyle at gilbert.coyle@usace.army.mil or Barton Kirkpatrick at barton.t.kirkpatrick@usace.army.mil for further details, and note that the response date is pending the release of Amendment 0004, with the current amendment (Amendment 0003) issued on August 20, 2024.
    USACE SPK DBB Construction – MOTCO Ammunition Holding Facilities – Military Ocean Terminal Concord (MOTCO), CA
    Active
    Dept Of Defense
    The Department of Defense, through the United States Army Corps of Engineers (USACE) Sacramento District, is preparing to solicit bids for the construction of eleven Containerized Ammunition Holding Facilities (CAHF) at the Military Ocean Terminal Concord (MOTCO) in California. This Design-Bid-Build (DBB) project will include the construction of storage pads, protective earthen berms, and reinforced concrete retaining walls, all adhering to Department of Defense explosive safety standards, along with necessary utilities and site improvements. The anticipated contract value is between $25 million and $100 million, with a projected period of performance of 540 days following the Notice to Proceed. Interested contractors must register in the Procurement Integrated Enterprise Environment (PIEE) and the System for Award Management (SAM) prior to submitting bids, with the solicitation expected to be posted around November 1, 2024, and bids due by December 13, 2024. For further inquiries, contact Constantinos Laliotitis at constantinos.laliotitis@usace.army.mil or call 916-557-7621.
    Design-Build Construction of a Network Enterprise Center in Fort Hunter Liggett, CA
    Active
    Dept Of Defense
    The Department of Defense, through the U.S. Army Corps of Engineers, is soliciting proposals for the design-build construction of a 21,500 square foot Network Enterprise Center at Fort Hunter Liggett, California. The project aims to create a state-of-the-art facility that includes various operational spaces such as a command center, administrative offices, and technical support areas, while also ensuring compliance with Department of Defense standards for safety and environmental considerations. This initiative is critical for enhancing military communication and operational capabilities, with an estimated construction cost between $25 million and $100 million. Interested contractors must submit their proposals electronically by November 8, 2024, and can direct inquiries to Bonny Dylewski at bonny.c.dylewski@usace.army.mil.
    JBLM MDTF Bldgs 3218,19; & 3221-24 Construction Consolidation, Joint Base Lewis McChord, Washington
    Active
    Dept Of Defense
    The Department of Defense, through the U.S. Army Corps of Engineers (USACE) Seattle District, is seeking qualified contractors for the renovation of Barracks 3218 and 3219 at Joint Base Lewis-McChord (JBLM), Washington, as part of the FY25 Multi-Domain Task Force (MDTF) Phase 2 initiative. The project involves approximately 76,781 square feet of renovation work, including hazardous material abatement, selective demolition, and the reconstruction of mechanical and electrical systems, with an estimated contract value ranging from $100 million to $250 million. This renovation is crucial for enhancing operational capabilities and ensuring compliance with modern safety and structural standards. Interested firms must submit a capabilities package by November 12, 2024, and should contact Andrea Jackson at Andrea.G.Jackson@usace.army.mil or Cassandra Gonzalez at cassandra.p.gonzalez@usace.army.mil for further details.