Fermilab - Removal and replacement of roofing systems
ID: ISD-356855-RKType: Solicitation
Overview

Buyer

ENERGY, DEPARTMENT OFENERGY, DEPARTMENT OFFERMILAB - DOE CONTRACTORBatavia, IL, 60510, USA

NAICS

Roofing Contractors (238160)

PSC

ROOFING AND SIDING MATERIALS (5650)
Timeline
    Description

    The Department of Energy, through the Fermi National Accelerator Laboratory (Fermilab), is soliciting proposals for the removal and replacement of roofing systems at the Site 40 Low Level Waste Handling Building in Batavia, Illinois. The project involves comprehensive work, including the complete tear-off of existing roofing down to the decking, installation of new SBS Asphalt roofing systems, and relocation of existing roof equipment, all while adhering to strict safety and environmental standards. This procurement is critical for maintaining the facility's operational integrity and compliance with federal regulations, including the Davis-Bacon Act for labor wages. Proposals are due by November 15, 2024, and interested contractors should contact Richard Konan at rkonan@fnal.gov or 630-840-2835 for further details.

    Point(s) of Contact
    Files
    Title
    Posted
    The document is an amendment to a solicitation for the Fermi National Accelerator Laboratory, concerning the removal and replacement of roofing systems. Issued on November 5, 2024, this amendment modifies the original solicitation dated September 24, 2024, with a proposal due date of November 15, 2024. The key changes include the replacement of a specific exhibit detailing the roofing project drawing set and the omission of a specified section from the project specifications. Instead, it is recommended that contractors utilize JM-RS-4986 CR Roofing Granules for embedding into the wet compound. Bidders must acknowledge receipt of this amendment through email or by returning a signed copy to the Procurement Specialist, Richard Konan, prior to the proposal submission deadline. This document reflects standard procedures in federal RFPs, ensuring clarity and compliance for contractors involved in federal projects. The amendment underscores the importance of adhering to updated specifications in government contracting processes.
    The Fermi Research Alliance, LLC is soliciting proposals for a construction subcontract (RFP ISD-356855-RK), specifically the roof replacement at the Site 40 Low Level Waste Handling Building. Issued on September 24, 2024, proposals are due by November 15, 2024. This small business set-aside involves a competitive procurement focusing on the lowest-cost technically acceptable criteria, requiring bidders to submit separate technical and price proposals. The project necessitates the removal and replacement of existing roofs and includes asbestos and mold remediation compliant with the Davis-Bacon Act, which governs wages for laborers. Proposals must detail contractor experience, project relevancy, and a clear safety plan, with considerations for minority and women participation. Pre-proposal meetings and site visits are scheduled to clarify requirements. Key documents include insurance requirements and bid guarantees, with stringent evaluation criteria ensuring high standards of safety and competency in project execution. The RFP allows for amendments and stipulates that failure to meet conditions may result in disqualification. Overall, this RFP reflects the commitment to maintaining safety and compliance while engaging in vital infrastructure updates within a federal framework.
    The "Fermi Research Alliance, LLC General Terms and Conditions for Construction" outlines the legal and operational framework for subcontractors involved in construction projects at the Fermi National Accelerator Laboratory. The document specifies various essential clauses, including general provisions such as definitions and the scope of work, payment terms, the requirement for licenses and permits, indemnification, and liabilities, as well as safety protocols. Key points include the contractor's obligation to act as an independent entity, the importance of timely project completion, and the specifics of payment processes, including progress payments and retainage policies. Additionally, it addresses the potential for changes and modifications to work orders, emphasizing that any alterations must be formally accepted in writing. The document mandates adherence to environmental, safety, and health regulations and includes provisions for insurance bonds, compliance with the Davis-Bacon Act, and special government requirements. The overarching aim is to ensure all construction activities comply with federal regulations, ensuring safety and accountability throughout the project lifecycle, thus reflecting the government's commitment to quality and risk management in public contracts.
    The document outlines the insurance requirements for construction subcontracts at the Fermi National Accelerator Laboratory (Fermilab). It specifies that subcontractors must obtain various types of insurance, including Commercial General Liability, Automobile Liability, Excess Liability, Worker's Compensation, Contractor's Pollution Liability, and Contractor's Professional Liability, with detailed minimum coverage limits based on contract amounts. Supplemental coverages, like Aircraft Liability and Builder’s Risk, may also be required. All policies must include Fermi Research Alliance, LLC, the University of Chicago, and the U.S. Government as additional insureds, with specific coverage obligations and conditions, such as evidencing compliance and providing notifications for any changes to coverage. The subcontractor is also responsible for ensuring that all sub-subcontractors maintain appropriate insurance, reflecting the unique risks of their work. Lastly, the document emphasizes that the subcontractor will indemnify FRA for any losses incurred from non-compliance with these insurance requirements. This comprehensive insurance framework is crucial for mitigating risks associated with construction projects in a federal context, ensuring compliance and protecting all parties involved.
    The Fermi National Accelerator Laboratory (FNAL) has issued a Request for Proposal (RFP) for the removal and replacement of roofing systems at its Site 40 Low-Level Waste Handling Building in Batavia, Illinois. The project encompasses both a low roof and a high bay roof, requiring the subcontractor to provide all necessary supervision, labor, materials, and equipment to complete the work as outlined in the accompanying drawings and specifications. Key tasks include stripping existing roofing down to the decking, installing new SBS Asphalt roofing systems, and relocating existing roof equipment. Quality assurance measures will be implemented under the oversight of a Fermilab Construction Coordinator, with the subcontractor responsible for ensuring compliance with project specifications and quality controls. Additionally, no government-furnished materials are expected for this project, and strict security requirements, including obtaining badging and adhering to COVID-19 protocols, must be followed by personnel on-site. The project timeline includes specific milestones such as a Notice to Proceed (NTP), material submittals in 20 days, and project completion within 75 calendar days, encapsulating the structured approach to managing the roofing replacement process while adhering to safety and regulatory standards.
    The provided document is a bid bond form necessary for contractors bidding on projects, specifically for the Fermi Research Alliance, LLC. It requires bidders to designate their business structure, such as corporation or partnership, and to provide details about the bid, including the bid date and solicitation number. The bid bond secures the contractor's commitment by stipulating that they will honor their bid and execute contract documents if selected. It also outlines the surety company's responsibilities and liability limits in case of defaults. Additionally, it emphasizes the need for sureties to be on the Department of the Treasury's approved list, and any individual sureties must accompany their affidavits. The inclusion of signatures and seals from both the principal and surety is mandatory for the bond to be valid. Compliance with the Paperwork Reduction Act is acknowledged, noting the estimated time for form completion. Overall, the document serves to ensure a financial commitment from bidders within federal and local government contracting frameworks, reinforcing both accountability and compliance standards in bidding processes.
    The document outlines the Payment Bond Form utilized when a payment bond is required under federal law, specifically 40 USC Chapter 31, Subchapter III. It is primarily aimed at protecting individuals and entities supplying labor and materials in relation to subcontract work. The bond includes crucial elements such as the identification of the Principal and Surety (or Sureties), as well as the penal sum, which signifies the financial obligation secured by the bond. Key components include the obligation of the Principal and Surety, ensuring payment to all workers and material suppliers. It stipulates requirements for corporate sureties, including their approval status from the Department of the Treasury. The form also outlines necessary signatures, corporate seals, and the framework for joint and several liability among sureties. Additionally, it details the steps for completing the bond, ensuring compliance with regulations and safeguarding all parties involved. In summary, this Payment Bond Form is integral to federal contracting processes, protecting stakeholders and ensuring financial responsibility in projects funded by federal government contracts.
    This document outlines the requirements and obligations concerning a Performance Bond in relation to subcontracts with the Fermi Research Alliance, LLC, as mandated by the federal government. The Performance Bond serves as a guarantee that the Principal (contractor) and Surety(ies) will fulfill all terms and obligations of the subcontract, including any extensions and modifications, and pay applicable taxes. Key elements include the identification of the Principal's legal name and business address, type of organization, and personal and corporate Sureties responsible for the bond. The document states the bond's penal sum, establishes conditions under which the obligation becomes void, and outlines instructions for completion, including necessary signatures and corporate seals. Further, it highlights that Sureties must be on the Treasury's approved list and provides guidelines for co-surety arrangements. Overall, this document formalizes accountability and provides assurances of performance in federal and state contracting processes, integral for ensuring compliance and protecting government interests.
    The Fermilab ES&H Manual outlines the requirements for subcontractors to report their injury and illness data through a structured questionnaire. The focus is on the collection of detailed information over three years, including experience modification rates, Workers' Compensation carrier details, and records of injuries and illnesses as per OSHA guidelines. The manual instructs subcontractors to provide a summary of total recordable cases and convert them into specific case rates, ensuring that safety measures and incident reporting are standardized. Additionally, it emphasizes the importance of providing accurate information through a designated safety officer's signature, confirming familiarity with the data submitted. This procedural requirement appears to support compliance with federal standards, which is critical in the context of government RFPs and grants aimed at ensuring workplace safety and health accountability within contracted entities.
    The document outlines the Statement and Acknowledgment related to a prime contract and its subcontract awarded by Fermi Research Alliance LLC for a project located at the Fermilab site in Batavia, Illinois. It includes details such as the prime contractor and subcontractor information, contract number, award dates, and the specific purpose of the subcontract. The subcontractor is required to provide all necessary supervision, labor, materials, and tools to fulfill the stipulated construction work, adhering to technical specifications and drawings. Notably, it references compliance with the Contract Work Hours and Safety Standards Act and several labor standards clauses. The document facilitates accountability and provides assurance that workers' rights and safety protocols will be upheld, emphasizing the government’s commitment to regulatory compliance within federal solicitation processes. The statement also includes acknowledgments from both the prime contractor and subcontractor, affirming their understanding and adherence to contract terms.
    The document outlines the Proposal Certifications related to federal grants and RFPs for the Fermi Research Alliance, LLC. It specifies mandatory certifications for proposals based on their dollar value, detailing compliance with export/import regulations, the Buy American Act for construction materials, and rights related to proposal data and patent rights. Notably, all proposals exceeding $10,000 require a certification on export compliance and acknowledgment of domestic preference for construction materials. Proposals over $150,000 must include certifications regarding price determination, lobbying activities, and responsibility matters of the offeror. For proposals exceeding $500,000, there's a requirement for a compliance plan against trafficking in persons. The document emphasizes integrity in the bidding process, encouraging transparency and adherence to federal regulations. Additionally, it includes instructions for completing certifications, ensuring that all parties involved are informed of their obligations regarding compliance, integrity, and reporting. The structured approach aims to facilitate fair contracting practices while safeguarding federal interests.
    The Fermi Research Alliance, LLC's Subcontractor Annual Representations & Certifications (SARC) form is designed for subcontractors engaging with U.S. government contracts to ensure compliance with various federal regulations and procurement standards. It requires detailed information about the offeror's business structure, ownership, and industry classifications, including requirements for reporting executive compensation in certain cases. The form is organized into five sections, reflecting essential certifications that subcontractors must acknowledge. Section I gathers business information and classifications; Section II assesses offeror responsibility, including accounting system reviews and adherence to labor trafficking laws; Section III encompasses export/import control compliance; and Section IV ensures adherence to Equal Opportunity and affirmative action standards. The certifications are valid for twelve months, and any changes in status or information must be reported to FRA within 15 days. The document emphasizes the need for confidentiality concerning FRA’s information and outlines the consequences of failure to comply. Overall, the SARC form is a crucial instrument for maintaining transparency, accountability, and integrity in government contracting processes.
    The document outlines the Small Business Subcontracting Plan clause (FAR 52.219-9) applicable to federal contracts, emphasizing the importance of subcontracting with small businesses and various socioeconomic categories such as veteran-owned and women-owned small businesses. The clause details obligations for offerors to submit subcontracting plans that specify goals for engaging such businesses and must be incorporated into contracts. Definitions provided include terms like 'Alaska Native Corporation,' 'commercial plan,' and 'Electronic Subcontracting Reporting System (eSRS),' which facilitate compliance and reporting. The subcontracting plans must define specific dollar goals and percentages related to various business categories, describe the solicitation methods for potential subcontractors, and outline the administrative process for these plans. Additionally, there are stipulations for the proper reporting of subcontracting achievements and assistance to ensure equitable opportunities for small businesses. Failure to comply with the requirements renders contractors ineligible for awards, highlighting the federal commitment to fostering small business participation in government contracts. This clause underscores the role of small businesses in federal contracting and the structured steps required for accountability and inclusion.
    The Fermi Research Alliance (FRA) has outlined the general requirements for the Site 40 Low Level Waste Handling Building Roof Replacement project (Project No. 10-4-101). The subcontractor is responsible for all aspects of the project, including labor, materials, equipment, and safety oversight, ensuring compliance with FRA and industry standards. Key provisions include adherence to the Buy American Act, submission of a comprehensive construction schedule, and maintaining a safe work environment. Specific tasks involve removing the existing roofing and replacing it with new SBS Asphalt roofing, including installation of a ballasted roof edge railing system. Additionally, the project emphasizes environmental safety and health (ES&H) compliance, requiring various training for subcontractor personnel. The FRA will furnish limited services, such as electrical power and utility locates, while the subcontractor must supply necessary temporary facilities and adhere to strict site access and transportation protocols. A detailed documentation process is established, including the tracking of quality control and compliance with specified drawings and materials. The project's success hinges on effective coordination with the FRA Construction Coordinator and thorough management of all subcontractor activities, ensuring timely project completion and quality assurance throughout the construction phase.
    The FRA ES&H Requirements document outlines the environment, safety, and health standards necessary for subcontractors working at the Fermi National Accelerator Laboratory (Fermilab). It emphasizes the importance of protecting the well-being of all personnel and the environment during project execution. The document details responsibilities for subcontractors, including the need for a comprehensive Environmental, Safety, and Health (ES&H) Program that adheres to federal, state, and local regulations. Key elements include the mandate for safety protocols, submission of hazard analyses, training requirements, and the establishment of a Stop Work Authority for unsafe conditions. The document also specifies requirements regarding waste disposal, environmental protection measures, job site orientation, and the importance of properly managing existing utilities. Subcontractors are required to obtain permits for specific activities, including excavation and hot work, and to maintain stringent safety measures, including personal protective equipment and regular site inspections. Overall, the document serves as a comprehensive guideline to ensure a safe and compliant operational environment at Fermilab, reflecting the federal government’s commitment to safety in construction practices.
    The document outlines the submittal requirements for construction projects under the Federal Railroad Administration (FRA). It establishes the procedures for subcontractors to submit shop drawings, material samples, and operation and maintenance manuals, emphasizing the importance of electronic formats. Subcontractors are required to maintain As-Built drawings on site, documenting daily work and modifications, which must be available for FRA inspection. The FRA's role is highlighted as the authority for reviewing and accepting all submissions, with a structured response process that includes graded actions like “No exception Taken” or “Revise & Resubmit.” Additionally, the document details provisions for material substitutions, ensuring equal or equivalent products meet specification requirements without incurring additional costs to the FRA. The comprehensive nature of this structure is essential for streamlining workflow, ensuring compliance, and facilitating effective project management, integral to the success of federal RFPs and grant obligations.
    This document outlines a firm fixed-price subcontract between Fermi Research Alliance, LLC (FRA) and a subcontractor for construction work on the SITE 40 Low Level Waste Handling Building, specifically for rigging and related services. The subcontract is under the Prime Contract with the U.S. Department of Energy for managing the Fermi National Accelerator Laboratory (FNAL) in Batavia, Illinois. Key components include the subcontractor's obligations, which encompass providing necessary resources for completion per specified drawings and specifications, performance acceptance criteria, and defined reporting periods. The document details pricing, invoicing procedures, and payment timelines, emphasizing monthly progress payments subject to project milestones, with a retention policy to safeguard government interests. Moreover, it specifies administration and reporting requirements, mandating the submission of monthly progress reports and delineation of project milestones. Key personnel roles are highlighted, stressing the importance of continuity in project management. Incorporated documents reiterate standard compliance measures, including safety and insurance requirements. Overall, this subcontract reinforces compliance, project management standards, and financial stipulations within federal contracting frameworks, ensuring clarity and accountability in the execution of federally funded construction projects.
    The document outlines the wage determination for construction projects in Illinois, specifically focused on building and residential contracts subject to the Davis-Bacon Act. It covers counties including Du Page, Grundy, Kane, Kendall, Lake, McHenry, and Will, indicating that contractors must adhere to minimum wage rates established by Executive Orders 14026 and 13658, depending on the project's commencement or renewal date. The specified minimum wage for covered workers is $17.20 per hour for contracts initiated or extended after January 30, 2022, and $12.90 per hour for those awarded between January 1, 2015, and January 29, 2022. Various trades and classifications are listed alongside their corresponding wage rates and fringe benefits, including specific job titles like electricians, carpenters, and laborers, reflecting the prevailing wage in the respective counties. Additionally, it details the process for requesting conformance for any unlisted classifications needed for the project. A clear guideline for appeal regarding wage rates and classifications is also provided, emphasizing compliance with federal regulations. This determination serves as a vital resource for contractors and workers involved in federally-funded projects ensuring fair compensation and adherence to labor standards within the specified regions.
    The Low Level Waste Handling Building project at Fermilab aims to replace the roofing system in compliance with industry standards and established regulations. The project involves a complete tear-off of the existing roof down to the metal deck and the installation of a new SBS-modified bituminous membrane roofing system, ensuring a watertight and durable application. Key requirements include compliance with structural design codes, precise load specifications, and wind pressure calculations as outlined by ASCE 7-16 and IBC 2021 standards. The construction scope includes relocating existing roofing equipment, removing and replacing all associated roof trim and facia, and ensuring debris removal and daily clean-up. Subcontractors must follow OSHA regulations and provide safety barriers during the work. Warranty obligations demand that the roofing system installation be carried out by an approved applicator and include a 20-year total system warranty that covers material and workmanship defects. This project exemplifies federal obligations for environmental safety, adherence to construction standards, and the maintenance of existing structures while facilitating operational improvements at Fermilab.
    The Fermi Research Alliance, LLC is issuing a Request for Proposal (RFP) identified as ISD-356855-RK, dated September 24, 2024, for services related to the Site 40 Low Level Waste Handling Building. The submission deadline for proposals is also set for September 24, 2024, at 3:00 P.M. Central Time. Interested offerors must submit their total firm fixed price along with their completed proposal, including necessary bid guarantees. The offer remains valid for 90 calendar days after the opening date unless an extended acceptance period is stated. The document includes instructions for submitting bids via FRA’s Oracle Cloud Service or directly to Richard Konan's email. The requirements also incorporate the Subcontractor Annual Representations & Certifications, which must be acknowledged as part of the proposal. Overall, the RFP outlines the procedural aspects of the bidding process, expectations for submission, and critical deadlines, maintaining a formal and structured approach typical of federal RFPs.
    The Request for Clarification (RFC) Log for the Site 40 Low Radiation Roof Replacement project outlines inquiries from contractors regarding project specifications and requirements as of November 5, 2024. Key topics include clarification on coping removal and replacement, protection protocols for building entrances, interior protection measures, insulation specifications, and training requirements related to safety. Specific responses indicate that existing coping should be reused or replaced, temporary enclosures are necessary to mitigate dust and debris, insulation must meet R-value codes, and various safety trainings are mandated, including Subcontractor Orientation and Hazard Awareness. Moreover, the radiological survey of the roof is confirmed as unnecessary due to prior testing indicating no restrictions, and a hot work permit is required when cutting. The document serves as a crucial guide to ensure contractors understand expectations and comply with both safety standards and project specifications, ultimately ensuring a smooth execution of the roofing project in a low-level radiation environment.
    This document outlines the specifications for a roofing system incorporating SBS-modified bituminous membrane roofing, cover board, roof insulation, and related components. It details design criteria, including watertight performance, wind uplift resistance, and fire safety characteristics, ensuring compatibility among materials. It specifies submittal requirements such as product data sheets, installer certifications, and maintenance data. The quality assurance section mandates qualifications for installers and manufacturers, alongside testing by a qualified agency. The product specifications include roofing and flashing materials, insulation types, and auxiliary components aligned with ASTM standards. It emphasizes the necessity of using a single-source roofing manufacturer for guaranteed compatibility. The execution section outlines examination and preparation procedures to ensure substrate readiness for installation. Overall, the document serves as a comprehensive guide for contractors and subcontractors responding to the RFP, ensuring compliance with specified standards and providing a structured approach for installation while emphasizing safety and performance in roofing projects, consistent with federal and local funding oversight requirements.
    Lifecycle
    Title
    Type
    Similar Opportunities
    Fermilab LBNF NSCF Construction - Near Detector Complex RFP
    Active
    Energy, Department Of
    The Department of Energy, through the Fermi Research Alliance (FRA), is seeking a qualified subcontractor for the construction of the Near Detector Complex as part of the Long-Baseline Neutrino Facility (LBNF) project located in Batavia, Illinois. The procurement involves comprehensive construction services, including the development of a service building, shafts, and utilities necessary to support the LBNF Near Detector, with a focus on adhering to strict safety and environmental regulations. This project is critical for advancing neutrino research and requires contractors to demonstrate relevant experience and compliance with federal guidelines, including the Buy American Act. Proposals are due by February 7, 2025, and interested parties should direct inquiries to Brian Quinn at bquinn@fnal.gov or Craig Schmitz at schmitzc@fnal.gov.
    Fire House Generator and ATS Replacement
    Active
    Energy, Department Of
    The Department of Energy, through the Fermi National Accelerator Laboratory (Fermilab), is soliciting proposals for the replacement of a generator and an automatic transfer switch (ATS) at the Fire House located in Batavia, Illinois. The project requires the selected contractor to provide all necessary supervision, labor, materials, and equipment to complete the work as outlined in the technical specifications and drawings, ensuring compliance with safety and regulatory standards. This procurement is critical for maintaining operational safety and infrastructure at Fermilab, reflecting the federal government's commitment to modernizing essential facilities. Proposals are due by January 13, 2025, at 5 PM CT, and interested parties can contact Danielle Amico at damico@fnal.gov or 630-840-3207 for further information.
    Installation of Bedrock Wells at Booster Neutrino Beam (BNB)
    Active
    Energy, Department Of
    The Department of Energy, through the Fermi National Accelerator Laboratory (Fermilab), is soliciting proposals for the installation of three bedrock monitoring wells at the Booster Neutrino Beam (BNB) facility located in Batavia, Illinois. The project requires the selected subcontractor to provide all necessary supervision, labor, materials, tools, and equipment to install the wells to a depth of approximately 67 feet below ground surface, ensuring compliance with detailed technical specifications and safety protocols. This initiative is crucial for monitoring potential contamination from tritiated water produced by high-energy physics experiments, reflecting the government's commitment to environmental safety and regulatory compliance. Proposals are due by February 5, 2025, at 5 PM CT, and interested parties can contact Danielle Amico at damico@fnal.gov or by phone at 630-840-3207 for further information.
    Rapid Response Department Site Wide General Construction Blanket Purchase Agreement (BPA)
    Active
    Energy, Department Of
    The U.S. Department of Energy, through UChicago Argonne, LLC, is seeking qualified contractors to provide general construction services under a Rapid Response Department Site Wide General Construction Blanket Purchase Agreement (BPA) at Argonne National Laboratory in Illinois. The procurement aims to secure contractors capable of performing modifications, repairs, and installations, with individual firm fixed-price Task Orders not exceeding $250,000 and a total projected value of up to $4 million per BPA over a one-year term, with an option for a one-year extension. Proposals will be evaluated based on technical merit, cost, safety, and compliance with federal regulations, with a virtual pre-proposal meeting scheduled for January 6, 2025, and a submission deadline of January 13, 2025. Interested parties can contact Nick Hitzler at nhitzler@anl.gov for further information and access to the RFP documents.
    Leak Detectors
    Active
    Energy, Department Of
    The Department of Energy, through Fermilab, is soliciting proposals for the procurement of leak detectors, with a focus on enhancing leak detection capabilities. The request includes specific equipment such as remote control units, pumps, and sniffer probes, which are critical for ensuring precision and reliability in leak detection operations. This procurement is vital for Fermilab's scientific and operational missions, emphasizing compliance with federal regulations and quality assurance. Interested vendors must submit their proposals by December 30, 2024, at 4 PM CT, and can direct inquiries to Sharon Duchaj at sduchaj@fnal.gov or by phone at 630-840-8693.
    VERTICAL BALER
    Active
    Energy, Department Of
    The Department of Energy, through the Fermi National Accelerator Laboratory (Fermilab), is seeking proposals for the procurement of two vertical balers to process waste materials, including cardboard, plastics, and non-ferrous metals, at the Sanford Underground Research Facility in South Dakota. The vertical balers must meet specific technical requirements, including dimensions under 12’L x 4.4’W x 10.2’H, a weight limit of less than 6,000 lbs., and operational specifications such as a motor horsepower of 10 and a press force of at least 80,000 lbs. This procurement is critical for effective waste management within the context of the Long-Baseline Neutrino Facility project. Interested vendors must submit their proposals by December 27, 2024, and can direct inquiries to Grace Gomez at ggomez@fnal.gov. The procurement will follow a Low Price Technically Acceptable (LPTA) evaluation method.
    LBNF Argon Distribution Equipment IDIQ
    Active
    Energy, Department Of
    The Department of Energy, through Fermilab, is seeking proposals for the procurement and installation of Argon Distribution Equipment as part of the Long-Baseline Neutrino Facility (LBNF) project in Lead, South Dakota. The primary objective is to establish a comprehensive system for transferring gaseous and liquid argon and nitrogen throughout the underground facility, which is critical for the Deep Underground Neutrino Experiment (DUNE) aimed at advancing neutrino science. This project is essential for supporting the infrastructure necessary for massive neutrino detectors located 4850 feet below the surface, facilitating groundbreaking research in particle physics. Interested contractors must submit their proposals by December 20, 2024, and direct inquiries to Jeremy R. Duncan at jeremyd@fnal.gov or by phone at 865-300-0443.
    APS-U Repurposing of Shielded Transport for Beamline 34-ID
    Active
    Energy, Department Of
    The Department of Energy, through UChicago Argonne, LLC, is soliciting proposals for the fabrication and installation of shielded transports for X-ray delivery at the Advanced Photon Source's Beamline 34-ID in Lemont, Illinois. The project involves modifying an existing transport section, constructing support pedestals, and making necessary enclosure modifications, all in accordance with specified requirements. This work is crucial for the effective transport of hard X-ray beams between shielded experimental enclosures, enhancing the capabilities of the synchrotron beamlines. Proposals are due electronically by January 10, 2025, following a pre-proposal meeting on December 18, 2024, with contract awards expected around January 31, 2025, and project completion by April 30, 2025. Interested bidders should contact Robert K Kman at kman@anl.gov or 630-252-6488 for further details and access to the proposal documents.
    LBNF Argon Receiving System
    Active
    Energy, Department Of
    The Department of Energy, through Fermi Research Alliance LLC, is soliciting proposals for the engineering, manufacturing, installation, and testing of an Argon Receiving System for the Long-Baseline Neutrino Facility (LBNF) located at the Sanford Underground Research Facility (SURF) in Lead, South Dakota. This system is critical for the delivery and processing of liquid argon (LAr), which will support the Deep Underground Neutrino Experiment (DUNE) by facilitating the storage, vaporization, and transfer of argon to underground detectors. The project aims to enhance scientific research capabilities in neutrino physics, with a focus on safety, quality, and compliance with federal regulations. Proposals are due by January 8, 2025, and interested parties should direct inquiries to Jeremy R. Duncan at jeremyd@fnal.gov or call 865-300-0443.
    Semiconductor Parameter Analyzer
    Active
    Energy, Department Of
    The Department of Energy, through the Fermi Research Alliance, LLC, is seeking proposals for a Semiconductor Parameter Analyzer to support research at the Fermi National Accelerator Laboratory in Batavia, Illinois. The procurement aims to acquire a commercial product that includes an analyzer mainframe, medium-power source measurement units, a pulse measurement unit, and a capacitance-voltage unit, all essential for advanced semiconductor testing and analysis. This equipment is critical for enhancing research capabilities in energy-related projects, ensuring compliance with federal regulations and standards. Interested vendors must submit their quotes, including completed certifications (SARC and PUR-466), by January 27, 2025, and can direct inquiries to Cathleen Stadler at cstadler@fnal.gov or by phone at 630-840-2763.