J--Chandler Dam Turbine and Pump Overhaul
ID: 140R1724Q0075Type: Presolicitation
Overview

Buyer

INTERIOR, DEPARTMENT OF THEBUREAU OF RECLAMATIONGRAND COULEE POWER OFFICEGRAND COULEE, WA, 99133, USA

NAICS

Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance (811310)

PSC

MAINT/REPAIR/REBUILD OF EQUIPMENT- PUMPS AND COMPRESSORS (J043)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)
Timeline
    Description

    The Bureau of Reclamation, under the Department of the Interior, is seeking qualified small businesses to undertake a turbine and pump overhaul for the Chandler Dam in Washington State. The project involves a firm-fixed price contract where the contractor will provide all necessary labor, equipment, and materials to overhaul a James Leffel & Co. turbine and a Worthington Hydrocone pump, including repairs, modifications, and refurbishments as specified. This procurement is crucial for maintaining the operational efficiency of the dam's equipment and falls under NAICS Code 811310, with a small business size standard of $12.5 million. Interested vendors must be registered in the System for Award Management (SAM) prior to the anticipated Request for Quote issuance in early October 2024, with the closing date expected in the third week of October. For further inquiries, contact Malena Sanderlin at 509-633-9515 or via email at msanderlin@usbr.gov.

    Point(s) of Contact
    Sanderlin, Malena
    (509) 633-9515
    (509) 633-9175
    msanderlin@usbr.gov
    Files
    No associated files provided.
    Lifecycle
    Title
    Type
    Presolicitation
    Similar Opportunities
    Chief Joseph Dam Powerhouse Sump Pumps and Controls
    Active
    Dept Of Defense
    The Department of Defense, specifically the U.S. Army Corps of Engineers (USACE) Seattle District, is seeking contractors for the rehabilitation of the Chief Joseph Dam Powerhouse drainage and unwatering sump pumps and controls. The project entails extensive work including the replacement of pumps, motors, and controls, as well as the installation of new piping, valves, and structural components such as ladders and platforms. This rehabilitation is crucial for maintaining the operational efficiency and safety of the dam's pumping systems. The estimated contract value ranges between $5 million and $10 million, with a Request for Proposal (RFP) to be issued using the Best Value Trade-off method. Interested contractors can reach out to Geraldine Kemp at geraldine.l.kemp@usace.army.mil or Camilla Allen at camilla.allen@usace.army.mil for further information.
    62--Nathaniel Washington Powerplant - Luminaire Replacement
    Active
    Interior, Department Of The
    The Department of the Interior's Bureau of Reclamation seeks offers for a construction contract valued between $1 million and $5 million to overhaul lighting, T-beam joints, and general cleaning at the Nathaniel Washington Powerplant, Grand Coulee Dam. The procurement aims to enhance lighting efficiency and maintain structural integrity for specialized construction projects, with a mandatory requirement for bidders to be registered in the System for Acquisition Management (SAM). The solicitation is expected by the end of August 2024.
    Mud Mountain Dam Lower Cascade Creek Water Control Facility
    Active
    Dept Of Defense
    The Department of Defense, through the U.S. Army Corps of Engineers, is seeking qualified small businesses to undertake the Mud Mountain Dam Lower Cascade Creek Water Control Facility project in Enumclaw, Washington. The objective of this procurement is to replace an outdated water control structure that failed during a flood event in 2009, necessitating the full demolition of the existing system and the construction of a modern facility designed to improve flood management capabilities and operational reliability. This project is critical for enhancing the hydrological management of Lower Cascade Creek, ensuring compliance with environmental standards, and minimizing disruption to existing operations, with an estimated construction cost between $10 million and $25 million. Interested parties should note that the solicitation is expected to be issued on or about October 17, 2024, with a closing date around December 3, 2024, and can contact Jeannette Patton at jeanette.k.patton@usace.army.mil for further inquiries.
    Y--Clear Creek Dam Fish Passage Facility, Yakima Rive
    Active
    Interior, Department Of The
    The U.S. Department of the Interior, through the Bureau of Reclamation, is soliciting bids for the construction of the Clear Creek Dam Fish Passage Facility as part of the Yakima River Basin Water Enhancement Project in Washington. The project aims to enhance fish migration by constructing a new fish ladder and associated infrastructure, including an intake structure, pump systems, and necessary electrical upgrades, with an estimated construction cost between $15 million and $20 million. This initiative is crucial for improving the long-term viability of the bull trout population and restoring aquatic ecosystems affected by existing dam operations. Interested contractors must submit their proposals by September 10, 2024, and are encouraged to attend a pre-bid site visit on August 28, 2024; for further inquiries, they can contact Contract Specialist Drew McGuire at dmcguire@usbr.gov or Contracting Officer Lance Fleming at lfleming@usbr.gov.
    7B--Facility Management System Motion Control Engineer
    Active
    Interior, Department Of The
    The Bureau of Reclamation, part of the Department of the Interior, is seeking proposals for the Facility Management System Motion Control Engineer project, specifically aimed at upgrading the elevator monitoring system at the Hoover Dam. The procurement involves supplying and installing IController software, Dell PCs, and associated warranties to enhance operational support and monitoring capabilities for elevator maintenance personnel. This upgrade is crucial for maintaining safety and efficiency at the facility, ensuring compliance with IT security protocols. Interested vendors, particularly Service-Disabled Veteran-Owned Small Businesses (SDVOSB), must submit their quotes by September 19, 2024, at 10:00 AM PDT, and can direct inquiries to Noah Maye at nmaye@usbr.gov.
    John Day Dam Generator Water Cooling System Rehab
    Active
    Dept Of Defense
    The Department of Defense, through the U.S. Army Corps of Engineers (USACE) Portland District, is soliciting proposals for the rehabilitation of the Generator Water Cooling System at the John Day Dam located in Rufus, Oregon. The project entails replacing generator air coolers, header and drain piping, and installing modulating valves and associated controls across 16 generator units to mitigate water infiltration issues that have led to generator failures. This initiative is critical for maintaining the operational efficiency of one of the largest hydroelectric facilities in the United States, with an estimated project cost between $5 million and $10 million. Interested small businesses must submit their proposals by October 11, 2024, and are encouraged to attend a site visit scheduled for September 25, 2024. For further inquiries, contact Andrew Sprys at andrew.j.sprys@usace.army.mil or Andrea Smothers at andrea.k.smothers@usace.army.mil.
    Y--Archimedes pump construction for Topock
    Active
    Interior, Department Of The
    The U.S. Department of the Interior, through the Bureau of Reclamation, is soliciting proposals for the construction of a 60 cubic feet per second (cfs) pumping station at Topock Marsh within the Havasu National Wildlife Refuge in Mohave County, Arizona. The project involves the installation of an Archimedes Screw Pump, concrete structures, a dewatering system, and solar power modifications, with an estimated contract value between $10 million and $15 million. This initiative is crucial for enhancing local water management capabilities and supporting ecological preservation efforts in the region. Interested contractors must submit their proposals by October 11, 2024, and can direct inquiries to Diane Rodriguez at DLRodriguez@usbr.gov or by phone at 702-293-8368.
    Chief Joseph Dam Electric and Hydraulic Elevators Replacement
    Active
    Dept Of Defense
    The Department of Defense, specifically the Department of the Army, is seeking a contractor for the replacement of electric and hydraulic elevators at the Chief Joseph Dam. The solicitation type is listed as a Best Value Trade-Off (BVTO). The scope of work involves replacing the existing elevators and associated equipment, with a focus on achieving energy efficiency and compliance with current safety standards. The key tasks include designing, fabricating, and installing new elevators, along with testing and commissioning to ensure proper functionality. The contractor will be responsible for providing all necessary materials, equipment, and labor. To be eligible for this opportunity, applicants should have a strong track record in construction projects, preferably including experience with dam infrastructure. The Army seeks a reliable and timely solution, so evidence of successful project completion and references will be crucial. Funding for this project is estimated at $2 million to $3 million, and the contract will likely be awarded as a firm-fixed-price arrangement. Interested parties should submit their proposals before the deadline stated in the solicitation document. The government encourages applicants to submit their bids electronically and also provides a physical address for hard copy submissions. The evaluation process will assess the technical merit and price of each proposal. The Army will conduct a comprehensive review, considering factors such as the offeror's qualifications, past performance, and the proposed approach. For any clarifications or questions, interested individuals and companies should contact Geraldine Kemp at geraldine.l.kemp@usace.army.mil or 206-764-6659. Alternatively, they can reach Scotty Britt at scott.w.britt@usace.army.mil or 206-764-3517. This opportunity is expected to result in a single award. The solicitation document, which potential bidders should carefully review, is available for download from the provided link.
    UCM HOOVER HARDWARE - SCHNEIDER ELECTRIC BRAND
    Active
    Interior, Department Of The
    The Department of the Interior's Bureau of Reclamation is seeking qualified small businesses to provide Schneider Electric hardware components for the Hoover Dam's control system upgrade. This procurement involves replacing five programmable logic controllers (PLCs) as part of a transition from the Quantum system to the M580 system, which is essential for maintaining operational efficiency and compatibility with the existing Supervisory Control and Data Acquisition (SCADA) system. The selected contractor must deliver the required hardware within 60 calendar days post-award, ensuring minimal disruption to operations and reducing costs associated with reprogramming and integration. Interested vendors must submit their price quotes, technical capabilities, and delivery dates by September 20, 2024, and can direct inquiries to Jessie Conden at jconden@usbr.gov or by phone at 702-293-8128.
    Chief Joseph Dam Emergency Generator
    Active
    Dept Of Defense
    The U.S. Army Corps of Engineers is soliciting quotes for the procurement of a Standby Emergency Diesel Generator to be delivered to the Chief Joseph Dam in Bridgeport, Washington. The generator must be fully enclosed for sound and weather protection, equipped with an integral fuel tank base, integrated load bank, and mounted on a step deck trailer, while also complying with Tier 2, Tier 3, or Tier 4 EPA emission standards. This procurement is critical for ensuring operational readiness and environmental compliance at the dam. Quotes are due by September 30, 2024, at 10:00 AM Pacific Time, and interested contractors must be registered in the System for Award Management (SAM) to be eligible for award. For further inquiries, contact McKenna Rain at mckenna.t.rain@usace.army.mil or Robert L. Gonzalez at robert.l.gonzalez@usace.army.mil.