Y--Clear Creek Dam Fish Passage Facility, Yakima Rive
ID: 140R1024R0015Type: Solicitation
Overview

Buyer

INTERIOR, DEPARTMENT OF THEBUREAU OF RECLAMATIONPACIFIC NW REGION PN 6615BOISE, ID, 83706, USA

NAICS

Other Heavy and Civil Engineering Construction (237990)

PSC

CONSTRUCTION OF OTHER NON-BUILDING FACILITIES (Y1PZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)
Timeline
    Description

    The U.S. Department of the Interior, through the Bureau of Reclamation, is soliciting bids for the construction of the Clear Creek Dam Fish Passage Facility as part of the Yakima River Basin Water Enhancement Project in Washington. The project aims to enhance fish migration by constructing a new fish ladder and associated structures, including an intake system, pump installations, and necessary electrical upgrades, with an estimated construction cost between $15 million and $20 million. This initiative is crucial for improving the ecological integrity of local aquatic habitats, particularly for the threatened bull trout population, and aligns with federal commitments to environmental restoration. Interested contractors must submit their proposals by October 17, 2024, with work expected to commence on December 23, 2024, and conclude by October 31, 2027. For inquiries, contact Contract Specialist Drew McGuire at dmcguire@usbr.gov or Contracting Officer Lance Fleming at lfleming@usbr.gov.

    Point(s) of Contact
    Files
    Title
    Posted
    The Clear Creek Dam Fish Passage Facility project addresses inquiries from prospective contractors regarding specifications and bidding processes. Amendments to the original documents have clarified missing sections in the Table of Contents and provided guidance on bid guarantees, CAD files, and the required finishes for concrete surfaces. The government confirmed no bidders list would be published and highlighted the methods for measuring and paying for Controlled Low Strength Materials (CLSM). Contractors were informed about the specifications for security equipment, site communications, and electrical requirements, including grounding and hazardous area classifications. Site visits are not being scheduled due to access restrictions, but visual aids have been provided. Additional clarifications include guidance on specific technical requirements related to fabrication processes, grounding for structures, and engineering specifications for the fish ladder. Notably, there were requests to extend the proposal submission date due to unanswered questions and the complexity involved. This document serves to ensure potential offerors have clear guidance on technical requirements and expectations to facilitate informed bidding for the government project, reflecting the standard practices in federal and local RFPs involving environmental and structural construction phases.
    The file discusses the authorization of the Clear Lake Dam Fish Passage Project under U.S. Army Corps Nationwide Permits 27 and 33, as communicated on July 15, 2024. The Washington Department of Ecology has confirmed that the project complies with its Section 401 Water Quality Certification (WQC) requirements, thus negating the need for an individual WQC. The email from Maya Maldonado at the Department of Ecology reassures that no further coordination is necessary since the project is covered by a programmatic WQC for the Nationwide Program. The communication also includes a note from David Moore of the U.S. Army Corps of Engineers, indicating that permit conditions for the project are outlined in the attached letter. This correspondence illustrates the procedural aspects of federal and state regulatory compliance for environmental projects, emphasizing efficient coordination among agencies to facilitate water quality management and ecological protection. Overall, the documentation signifies a collaborative effort in permitting environmental initiatives within the framework of government regulation.
    The Inadvertent Discovery Plan (IDP) for the Clear Creek Dam Fish Passage project in Yakima County, Washington, outlines procedures for handling the unexpected discovery of cultural resources or human remains. Key protocols include immediate cessation of work, securing the discovery site, and notifying the Bureau of Reclamation's archaeologist and project manager. Recognizing cultural resources encompasses various signs, such as bone fragments, artifacts, and historical debris. If human remains are found, they must be treated with respect, and law enforcement must be alerted without calling 911. The IDP emphasizes confidentiality concerning discoveries and ensures compliance with the Native American Graves Protection and Repatriation Act. Project managers and staff are responsible for contacting relevant state and tribal authorities, including the Washington Department of Archaeology and Historic Preservation and the Confederated Tribes and Bands of the Yakama Nation. Work may continue safely outside of discovery locations while adhering to legal requirements before proceeding with any activities in the affected areas. This document is essential for safeguarding cultural heritage within federal and state regulatory frameworks during construction efforts.
    The U.S. Army Corps of Engineers has authorized the Bureau of Reclamation to construct a new fish ladder at Clear Creek Dam to improve fish passage for bull trout and other species. This project includes excavation of sediment, placement of temporary fill material, and a new water intake structure near Naches, Washington. The authorization relies on compliance with the Endangered Species Act and National Historic Preservation Act. Special conditions have been put in place to protect threatened and endangered species during construction activities. The planned fish ladder will address obstacles in the existing fishway, which currently impedes fish movement due to sedimentation and temperature issues. Construction is slated to begin in April 2025 and conclude by October 2027, with specific protocols to minimize environmental impacts, particularly regarding water quality. The project has received federal funding and aims to enhance the long-term viability of bull trout populations in the North Fork Tieton River. Compliance with water quality standards and other environmental provisions is mandated throughout the construction process, demonstrating a commitment to ecological preservation while advancing infrastructure needs.
    The document comprises detailed engineering plans for the Clear Creek Dam Fish Passage Facility, part of the Yakima River Basin Water Enhancement Project by the U.S. Bureau of Reclamation. It outlines various aspects of the fish ladder and related structures, specifying design details, including civil, structural, mechanical, electrical, and miscellaneous metalwork drawings. The drawings provide extensive information on the construction elements, including site plans, profiles, and sections, as well as installation notes for equipment like bulkhead gates and chain link fences. Central to the project is enhancing fish passage in a dam environment, aiming to support local aquatic ecosystems while ensuring structural integrity. Each section includes references to relevant specifications and standards to ensure quality and safety compliance. The document also highlights operational considerations, such as maintenance access and environmental restoration processes. This collection aids in the execution and oversight of the construction process while emphasizing safety and adherence to governmental regulations. It serves as a critical resource for contractors and engineers involved in the project, illustrating the Bureau's commitment to integrative planning for water management and environmental conservation.
    The document outlines the design and construction plans for the Clear Creek Dam Fish Passage Facility as part of the Yakima River Basin Water Enhancement Project. Key components include detailed drawings related to the construction of a fish ladder, reservoir structures, and their associated mechanical and electrical systems. It specifies the required materials, structural reinforcements, and installation details to facilitate fish passage while ensuring structural integrity. The drawings are organized by civil, structural, mechanical, electrical, and standard design categories, providing a comprehensive overview of the project requirements. Safety protocols and quality assurance measures are embedded within the design notes and drawings. The document serves as a technical guide for contractors and engineers to comply with federal regulations and standards while executing the project effectively, highlighting the government’s commitment to environmental enhancement through infrastructure development.
    The Clear Creek Dam Fish Passage Facility project in Yakima, Washington, focuses on ensuring efficient fish passage while adhering to strict operational guidelines. Key stakeholders, including the Contracting Officer Representative, oversee the project's compliance, particularly regarding material handling, construction methodologies, and environmental safety. The document outlines specific work restrictions, including limited times for material deliveries and on-site inspections by government officials. Various areas, such as land disturbance and reservoir construction, are strictly regulated to avoid potential ecological impacts. The contractor must also coordinate with other ongoing projects in the vicinity, ensuring no interference with concurrent operations. Mandatory submittals are detailed, stipulating timelines for approvals of plans covering safety protocols, quality control, and environmental measures. The document includes comprehensive instructions on temporary utilities required during construction, including water for operations and electrical power management. Overall, this contract amendment emphasizes the federal government's commitment to sustainable project execution, integrating meticulous planning, environmental stewardship, and collaboration among contractors, thus setting a precedent for future infrastructure projects in sensitive ecological zones.
    The document details various elements related to the construction and functionality of electrical and safety systems within a building. It mentions essential features such as flammable liquid storage cabinets, electrical and control panels, generator transfer switches, and the general layout of workspaces including SCADA systems. The infrastructure includes critical aspects like ventilation, doorways, a first aid station, and safety measures like lockout tagout protocols. Specific construction details emphasize CMU (Concrete Masonry Unit) construction methods, and the safe incorporation of a generator and its exhaust system is outlined, focusing on electrical connections and voltage specifications. This document aligns with federal and local RFPs, indicating government standards and requirements for safety and operational efficiency in facility management.
    The U.S. Department of the Interior's Bureau of Reclamation has prepared a Final Environmental Assessment (EA) for the Clear Creek Dam Fish Passage project in Yakima County, Washington. This project aims to construct a new fish ladder and supporting structures to facilitate upstream passage for bull trout and other resident fish around Clear Creek Dam. The current fishway has proven ineffective, obstructing the migration of bull trout, a species listed as threatened under the Endangered Species Act. By improving fish passage, the project intends to enhance the long-term viability of bull trout populations and provide access for anadromous fish once reintroduced into upstream habitats. The proposed action includes detailed construction plans, potential environmental impacts, and legal frameworks guiding the project. Additionally, the EA explores two alternatives: the "No Action" alternative, maintaining current dam operations without significant changes, and the Proposed Action which focuses on building the fish ladder. Public involvement included a comment period where feedback was generally non-substantive. The assessment is part of a broader effort within the Yakima River Basin Water Enhancement Project aimed at environmental restoration and species recovery, fulfilling commitments made to various stakeholders, including the Yakama Nation.
    The U.S. Department of the Interior's Bureau of Reclamation has issued a Finding of No Significant Impact (FONSI) regarding the Clear Creek Dam Fish Passage project in the Yakima River Basin, Washington. This decision follows the National Environmental Policy Act (NEPA) regulations and assesses potential environmental impacts of constructing a fish ladder to facilitate bull trout migration. The proposed action aims to enhance the long-term viability of the North Fork Tieton bull trout population by reconnecting critical spawning and rearing habitats. Key alternatives analyzed include a No Action approach, which would maintain the status quo, and the Proposed Action, which involves building a pool and weir fish ladder. While the project may temporarily disrupt wildlife and local recreation during construction, it is expected to result in significant long-term benefits for fish populations, including an increase in various salmonid species. The project’s design incorporates measures to mitigate environmental impacts, and consultation with relevant government and tribal agencies has been conducted. Overall, the Fish Passage project is a crucial step in restoring ecological balance in the Yakima Basin and aiding bull trout recovery efforts.
    The U.S. Department of the Interior, specifically the Bureau of Reclamation, has issued a solicitation (No. 140R1024R0015) for the construction of a fish passage facility at Clear Creek Dam, part of the Yakima Project in Washington. This project is focused on enhancing the fish migration path by constructing various structures, including an intake structure, pump, concrete fish ladder, and automation for dam gates, alongside necessary electrical upgrades and an access road. The estimated construction cost ranges from $15 million to $20 million, with a completion timeline extending from December 23, 2024, to October 31, 2027. The solicitation targets small businesses and emphasizes the requirement for personal protective equipment during site visits. Contractors must adhere to strict safety and quality standards throughout the project, as outlined in numerous specifications and guidelines provided within the solicitation. The document includes comprehensive sections covering project management, quality procedures, and environmental controls, ensuring all work aligns with federal regulations and best practices for construction.
    The U.S. Department of the Interior's Bureau of Reclamation has issued a solicitation (No. 140R1024R0015) for the construction of a fish passage facility at Clear Creek Dam, part of the Yakima Project in Washington. This project, aimed at facilitating fish movement, includes the construction of an intake structure, a concrete fish ladder, pump installation, dam gate automation, site lighting, and access road enhancements. The estimated construction cost ranges from $15 million to $20 million, emphasizing the project's significance and scale. Key requirements also stipulate adherence to safety protocols, environmental protections, and compliance with various federal standards. The contractor must begin work on December 23, 2024, and complete it by October 31, 2027, under strict guidelines for site access and work hours. A pre-bid site visit is scheduled, with participants required to follow safety measures and bring personal protective equipment. The solicitation specifically encourages participation from small businesses, highlighting the government's commitment to inclusive contracting practices. This document serves as a detailed guide for potential contractors, outlining project specifications, work parameters, and submission procedures while ensuring compliance with health, safety, and environmental regulations throughout the construction phase.
    The Washington State Department of Ecology has issued a Determination of Nonsignificance (DNS) for the Clear Creek Dam Fish Passage Project proposed by the Bureau of Reclamation. This initiative aims to construct a new fish passage system to replace an ineffective ladder built in 1993, in alignment with the Yakima Basin Integrated Plan. The project includes a pool and weir fish ladder, along with the installation of mechanical and electrical features, and site development on federal lands in Yakima County. The Department adopted the U.S. Bureau of Reclamation's Final Environmental Assessment (EA) and Finding of No Significant Impact (FONSI), concluding that the project will not significantly affect the environment. This endeavor aims to improve the viability of the North Fork Tieton bull trout population, a threatened species under the Endangered Species Act. The comment period for the DNS begins June 7, 2024, and ends June 20, 2024. Stakeholders are invited to submit comments online, via email, or by mail.
    The Bureau of Reclamation is set to implement the Clear Creek Dam Fish Passage Project aimed at enhancing upstream fish passage, specifically for bull trout, under the 2019 Updated Proposed Action for the Yakima Irrigation Project. The project entails constructing a fish ladder compliant with the 2022 National Marine Fisheries Service (NMFS) design criteria, with provisions to favor cold-water attraction flows. Key provisions include strict timing limitations for construction to minimize impact on fish spawning, compliance with approved plans, and mandatory notifications to the Washington Department of Fish and Wildlife (WDFW) before and after construction activities. Environmental monitoring is mandatory, with a qualified Environmental Compliance Inspector required to ensure adherence to regulations. Specific prescriptions involve utilizing clean inert materials for cofferdams, maintaining necessary water levels for fish passage, and detailed guidelines for pollution containment during construction. Post-project, site restoration mandates the planting of native vegetation and monitoring to support ecological recovery. The project, carrying a permit valid until July 18, 2029, underscores a commitment to fish conservation while facilitating infrastructure improvements, thus aligning with state and federal environmental regulations. Compliance with extensive operational protocols is essential to mitigate the impacts on local fish habitats and water quality throughout the construction process.
    The Bureau of Reclamation's project proposal focuses on developing the Clear Creek Dam Fish Passage Facility as part of the Yakima River Basin Water Enhancement Project in Washington. This initiative aims to create an effective fish ladder to support aquatic life while enhancing water management strategies. The document includes comprehensive engineering plans featuring detailed drawings, construction specifications, and environmental compliance requirements. Key components discussed include the design and layout of the fish ladder, earthwork plans, structural reinforcements, piping, electrical systems, and contractor use areas for construction activities. Notably, specific guidelines for existing vegetation removal, site restoration, and the preservation of natural features emphasize ecological considerations throughout the construction process. Each drawing within the proposal includes vital technical data, such as elevations, dimensions, and material specifications, vital for facilitating the construction and ensuring safety standards. The plans illustrate rigorous coordination among engineers and project managers, stressing collaboration to optimize project execution efficiently. This integrated plan signifies a commitment to balancing infrastructure improvements with environmental stewardship, ensuring sustainable management of water resources and fish habitats.
    The document outlines the Clear Creek Dam Fish Passage Facility project, part of the Yakima River Basin Water Enhancement Project. This initiative includes the design and construction of a fish ladder to enhance fish migration, along with extensive earthwork, structural, and electrical work. Key components include various drawings detailing the civil, structural, mechanical, electrical, and piping elements of the project. Specific instructions cover the use of contractor areas, tree removal limits, existing infrastructure preservation, and environmental compliance. The plans emphasize safety measures, general contractor responsibilities, and the integration of the facility into the natural setting. The comprehensive design incorporates updated surveying data and construction standards, ensuring compliance with government regulations while facilitating ecological restoration through the enhancement of aquatic habitats. The document serves as a crucial resource for contractors bidding on the project, guiding implementation for successful completion in alignment with federal and local guidelines.
    The Clear Creek Dam Fish Passage Facility project aims to enhance fish migration in the Yakima River Basin by constructing a fish ladder. Managed by the Bureau of Reclamation under the U.S. Department of the Interior, the integrated plan includes detailed civil, structural, mechanical, and electrical designs, with an emphasis on environmental compliance and safety. Key features include a series of drawings outlining site plans, fish ladder profiles, and access road designs, as well as specifications for earthwork, paving, and utility management. The design incorporates a mix of steel piping, concrete structures, and the integration of existing natural features. The project entails careful excavation and restoration, with specific considerations for tree removal and preserving nearby habitats. Various contractor use areas are established for staging and managing construction activities. The project documents outline requirements for reinforcement and installation of electrical systems to facilitate efficient operation of the fish passage structures. Overall, this initiative is part of a broader commitment to ecological improvements and infrastructure upgrades within the Yakima River system, focusing on sustainability and the regulatory framework of federal grants and state/local RFPs.
    The Clear Creek Dam Fish Passage Facility project, part of the Yakima River Basin Water Enhancement Project, aims to enhance fish passage through the construction of a fish ladder and related structures. The documentation details various plans, elevations, sections, and specifications associated with the project, emphasizing civil, structural, and mechanical designs. Key components include fish ladder profiles, earthwork details, electrical layouts, and hydrological considerations, ensuring that the facility supports fish migration effectively while minimizing environmental impact. The project also outlines contractor use areas, tree removal protocols, and existing utilities that must be managed during construction. The emphasis placed on safety, proper installation techniques, and adherence to the specifications indicates a commitment to environmental stewardship and compliance with federal guidelines. The project's structure is organized into detailed drawings and notes, facilitating contractor understanding and execution.
    The email correspondence confirms the authorization of the Clear Lake Dam Fish Passage Project under U.S. Army Corps of Engineers' Nationwide Permit 27 and 33. The Washington State Department of Ecology (Ecology) acknowledges receipt of the Corps' authorization letter and states that no additional coordination is necessary since the project complies with Ecology's Section 401 Water Quality Certification requirements. An individual Water Quality Certification is not required for the project, which falls under the programmatic WQC for the Nationwide Program. The communication involves key officials from both the Department of Ecology and the U.S. Army Corps of Engineers, emphasizing the regulatory compliance and streamlined approval process for this environmentally significant infrastructure project. This document reflects the cooperation between federal and state agencies in facilitating project approvals while ensuring environmental standards are met.
    The U.S. Army Corps of Engineers has authorized the Bureau of Reclamation to construct a new fish ladder at Clear Creek Dam, aimed at improving fish passage and enhancing the ecosystem for bull trout and other species. The project involves excavation, placement of temporary fill, and installation of a water intake structure. Compliance with the Endangered Species Act and additional special conditions is mandatory, particularly concerning the protection of vulnerable species like the bull trout. The structure will include adjustments to existing access roads and necessitate a temporary reservoir drawdown from September 29, 2025, to March 31, 2026. Various construction methods will be employed, utilizing standard excavation equipment while implementing water quality monitoring to mitigate impacts on the aquatic environment. The comprehensive approach follows federal regulations, including the National Historic Preservation Act, ensuring no significant disruptions occur to local ecosystems, particularly wetlands. The project's timeline is extended to October 2027, with specific environmental commitments and management practices in place to monitor and mitigate potential adverse effects on water quality and habitat during the construction process.
    The Hydraulic Project Approval (HPA) pertains to the Clear Creek Dam Fish Passage Project aimed at improving fish passage specifically for bull trout, enhancing the ecological integrity of the Yakima Irrigation Project. The Bureau of Reclamation proposes constructing a new fish ladder following NMFS design standards, utilizing cooler water to attract fish. The approval outlines numerous provisions regarding project timings, construction practices, and environmental protections. Key stipulations include performing certain construction activities during low flow periods, post-construction notifications to the Washington Department of Fish and Wildlife (WDFW), and taking measures to prevent pollution and habitat disruption. Specific requirements mandate photographic documentation of the job site, limiting in-water construction activities to minimize impacts on fish spawning periods, and ensuring that proper materials and cleaning protocols are observed to prevent the introduction of invasive species. Environmental Compliance Inspectors must monitor project activities to ensure adherence to ecological standards. Additionally, the HPA stipulates restoration obligations at the project's conclusion, including grading and replanting disturbed areas with native species. This approval, applicable until July 18, 2029, emphasizes adherence to state regulations regarding fish habitat conservation and outlines a structured process for potential appeals related to project actions. It underscores the government’s commitment to balancing infrastructure development with the protection of aquatic ecosystems.
    The Inadvertent Discovery Plan (IDP) for the Clear Creek Dam Fish Passage in Yakima County, Washington outlines the essential procedures for managing the unexpected discovery of cultural resources and human remains during ground-disturbing activities. The document emphasizes the need to recognize signs of archaeological materials, such as bones, artifacts, and evidence of historic human activity. In the event of such a discovery, all work must cease immediately, and appropriate parties, including the Bureau of Reclamation and the Project Manager, must be notified. The document details the roles of various personnel, including the CCAO Archaeologist, project staff, and the responsibilities of local law enforcement in cases of human remains. It also emphasizes confidentiality in handling such discoveries to protect sensitive cultural sites as mandated by federal law. Work may continue in other areas while the assessment and documentation of discoveries take place. This IDP ensures respectful treatment of cultural resources while complying with legal frameworks, underscoring federal priorities in preserving heritage during construction projects.
    The U.S. Department of the Interior's Bureau of Reclamation is conducting a Final Environmental Assessment (EA) for the Clear Creek Dam Fish Passage (CCDFP) Project in Yakima County, Washington. The primary objective is to construct a new fish ladder to facilitate upstream passage for bull trout and other resident fish species, addressing barriers created by the existing dam infrastructure. The EA evaluates potential environmental impacts and outlines necessary actions to comply with the National Environmental Policy Act (NEPA), including public involvement and coordination with multiple cooperating agencies. The assessment includes two key alternatives: the No Action alternative, which would maintain current dam operations without changes, and the Proposed Action, aiming to enhance fish passage. The Proposed Action involves constructing a pool-and-weir-style fish ladder designed to meet updated fish passage criteria, addressing past failures of the existing structures. The project is essential for the recovery of the North Fork Tieton bull trout population, previously isolated from spawning habitats. The EA details construction methodologies, environmental impacts, and the necessary permits that must be acquired. This assessment supports key government initiatives for water resource management and ecosystem restoration in the Yakima River basin, reflecting continued federal commitments to environmental stewardship and fish population recovery.
    The Bureau of Reclamation has issued a Finding of No Significant Impact (FONSI) for the Clear Creek Dam Fish Passage project in Yakima County, Washington, under the National Environmental Policy Act (NEPA). The project aims to enhance fish passage for bull trout and other native species by constructing a new fish ladder at Clear Creek Dam, which currently impedes upstream migration. The dam is part of the Yakima Basin Water Enhancement Project, which seeks to improve fish and wildlife habitats affected by irrigation development. The proposed action includes constructing a pool and weir fish ladder and associated facilities and is deemed necessary to improve the long-term viability of the bull trout population in the North Fork Tieton River. The project will have long-term benefits for fishing and habitat connectivity, while temporary, localized impacts are expected during construction. There will also be measures in place to minimize adverse effects on vegetation, wildlife, and water quality. The project's completion aligns with previous agreements with the Washington Department of Fish and Wildlife and the Yakama Nation aimed at enhancing aquatic ecosystems. Overall, the fish passage initiative embodies a commitment to ecosystem restoration while maintaining existing water resource operations.
    The Clear Creek Dam Fish Passage Project, proposed by the Bureau of Reclamation, aims to construct a fish passage system at Clear Creek Dam in Yakima County, WA, to facilitate upstream fish migration. This project is a key component of the Yakima Basin Integrated Plan, involving collaborations with various federal and state agencies, including the U.S. Forest Service and Washington State Departments of Ecology and Fish and Wildlife, among others. The proposed system will replace an outdated fish ladder and includes the construction of a concrete pool and weir fish ladder, mechanical installations, and improvements to site infrastructure. The project is located in federally managed lands within the Okanogan-Wenatchee National Forest, with its completion intended to boost the endangered North Fork Tieton bull trout population. An environmental assessment conducted by the Bureau of Reclamation concluded that the project will not have significant adverse environmental impacts, allowing the Washington State Department of Ecology to issue a Determination of Nonsignificance. A public comment period will commence from June 7 to June 20, 2024, inviting feedback from stakeholders. Overall, this proposal seeks to significantly enhance local aquatic ecosystems while ensuring adherence to regulatory standards.
    The Bureau of Reclamation, under the U.S. Department of the Interior, has conducted geological evaluations linked to the Clear Creek Dam fish passage project in the Yakima Project's Kittitas Division, Boise, ID. The project involves multiple geological drillholes and test pits aimed at determining the subsurface conditions and materials to facilitate the construction of a proposed fish ladder. The data reveal the rock foundation as predominantly pre-tertiary Russel Ranch metavolcanic rock, characterized by various alterations including the presence of serpentine, epidote, and quartz veining. Detailed logs from drillholes DH-20-1, DH-20-2, and DH-20-3 outline the rock properties, fracture densities, and weathering states, demonstrating variability in composition and structural integrity, which are critical for ensuring the safety and effectiveness of the dam infrastructure. The document emphasizes the importance of adhering to safety guidelines and environmental regulations during the project’s execution. This geological assessment is foundational in securing necessary federal and state grants, as well as complying with local RFPs to support the ongoing efforts of enhancing fish passage and managing water resources effectively.
    The Bureau of Reclamation's Clear Creek Dam project in Boise, Idaho, focuses on improving fish passage and assessing geological conditions significant to infrastructural integrity. The documentation includes a series of AutoCAD files detailing various geological exploration data through drill holes and test pits. Key geological units encountered include Quaternary Colluvium, Metavolcanic Rock, and various fill materials from the Tieton River. The report details characteristics such as material classification, weathering, fracturing, and density, assessed through exploratory drilling and excavation. A series of tests were performed, compiling laboratory indices for evaluating soil and rock properties, necessary for ensuring the dam's functionality and compliance with safety standards. The findings will guide further actions regarding the construction and rehabilitation of the fish ladder while ensuring environmentally conscious practices are upheld. This project aligns with federal initiatives aimed at ecological restoration and infrastructure modernization to facilitate local biodiversity.
    The Bureau of Reclamation's Clear Creek Dam project, part of the Yakima Project in Boise, ID, focuses on geological exploration and the design of fish passage facilities. The file includes detailed geological maps, exploration logs, CAD drawings, and summaries of drilling and test pit results aimed at ensuring structural integrity and environmental compliance. Geological descriptions cover materials such as pre-tertiary Russel Ranch metavolcanic rock, colluvium deposits, and gravel compositions analyzed for their physical properties. Test pits (TP-20-1, TP-20-2, TP-20-3, etc.) reveal findings on soil and rock characteristics vital for construction activities. The project aims to facilitate fish passage while concurrently addressing safety and ecological factors. This comprehensively documented exploration serves as a critical foundation for potential federal and state grant proposals, showcasing responsible project planning and adherence to regulations in water resource management.
    The Bureau of Reclamation conducted geologic explorations for the Clear Creek Dam Fish Passage project as part of the Yakima Project in Boise, Idaho. The documentation includes location maps, geologic legends, and detailed explanations of the site’s geology, particularly focusing on the Russel Ranch metavolcanic rock from the pre-tertiary era. Various drill holes (DH-20-1, DH-20-2, and DH-20-3) and test pits (TP-20-1 through TP-20-6) were logged, highlighting materials such as silty sand, gravel, and metavolcanic rock, accompanied by stratigraphy and sample testing results. The logs provide quantitative data on rock quality, including recovery percentages, fracture density, and rock hardness, alongside laboratory indices for soil and rock samples. This information is vital for assessing the foundation conditions necessary for both safety and construction quality during the project’s implementation, particularly emphasizing the importance of safety measures throughout the exploration process. The document serves as a comprehensive record to support future construction efforts, ensuring compliance with engineering geological standards while facilitating the development of effective fish passage solutions in line with environmental regulations.
    The Bureau of Reclamation seeks construction services for the Clear Creek Dam Fish Passage Facility project, approximately 45 miles east of Yakima, Washington. The main objectives are to construct a fish ladder, design and build a cofferdam, and install unwatering systems for excavations during construction. Contractors will also be responsible for maintaining minimum reservoir releases, installing pumps and piping, and undertaking earthwork and erosion control measures. The work involves significant civil engineering tasks, including upgrading electrical systems and constructing a new access road. With a rough order of magnitude estimated between $15 million and $20 million, this small business set-aside project requires entities to register in SAM.gov for consideration. The solicitation period is expected to begin approximately 15 days after the notice period, with proposals accepted around 30 days later.
    The document outlines the solicitation for the Clear Creek Dam Fish Passage Facility, designated as Solicitation No. 140R1024R0015. It includes specific guidelines on attendance at site visits, stipulations for amendments, and authorized deviations in federal acquisition regulations. The primary purpose is to solicit technical proposals from responsible offerors, emphasizing that non-cost evaluation factors (technical quality, management control, and past performance) are significantly more important than price. Key evaluation factors include the General Technical Plan, which assesses risk mitigation and compliance with construction specifications; the Management Control Plan, focusing on the ability to manage subcontractors effectively; and Past Performance, evaluating previous similar project completions and any performance issues. Price is the final factor but will only be considered after technical evaluations. By clearly specifying these criteria, the document aims to ensure that only the most qualified bidders are considered, allowing the government to select proposals that offer the best value while ensuring timely and safe project completion.
    The document outlines details from a site visit regarding the Clear Creek Dam Fish Passage Facility project, associated with Solicitation No. 140R1024R0015, occurring on August 28, 2024, at 1:00 PM Pacific Time. It lists the participants from various construction organizations, including Ballard Marine, Max J. Kuney Company, Northbank Civil & Marine, Pipkin Construction, Advanced American Construction, Goodfellow Bros, LLC, and Guardian Construction, Inc. Each participant's name, organization, contact details, and attendance status are documented, indicating their engagement and interest in the project. The purpose of the site visit is likely to familiarize potential bidders with project specifications and facilitate their bids for federal or state RFPs related to infrastructure improvement and fish passage. By assembling stakeholders from various firms, the site visit promotes collaboration and ensures that contractors are well-informed about project requirements and expectations. This gathering suggests a proactive approach to ensuring compliance with environmental and construction regulations in the context of this critical infrastructure project.
    The document is an amendment to the solicitation for the Clear Creek Dam Fish Passage Facility project under the Yakima River Basin Water Enhancement Project in Washington. It outlines the updated communication details for offerors, specifically correcting the email address for the Contract Specialist, Drew McGuire, and providing an alternative for submitting proposals. The amendment states that all terms and conditions from the original solicitation remain unchanged, with the exception of the stated modifications. It emphasizes the importance of acknowledging receipt of this amendment prior to the specified deadline to avoid rejection of offers. Additionally, it specifies the project's period of performance, which is set from December 23, 2024, to October 31, 2027. The document highlights crucial procedural elements necessary for the submission and potential modification of proposals, ensuring participants are informed and compliant with the solicitation requirements.
    This document serves as an amendment to the solicitation 140R1024R0015 for the Clear Creek Dam Fish Passage Facility project in Washington. It specifies the procedures for acknowledging receipt of this amendment, detailing three acceptable acknowledgment methods. The amendment does not alter the proposal submission deadline but corrects specification sections in the Table of Contents. It allows for modifications or withdrawals of offers before the submission deadline, requiring that any changes reference the original solicitation and amendment. The period of performance for the project is noted as December 23, 2024, to October 31, 2027. The amendment ensures that all other terms and conditions of the solicitation remain unchanged and in full effect, underscoring the importance of compliance with federal guidelines and maintaining clear communication with the contractors involved.
    The document is an amendment to solicitation 140R1024R0015 concerning the Clear Creek Dam Fish Passage Facility project in the Yakima River Basin, Washington. It primarily addresses the modification of the original solicitation, confirming that the date, time, and location for proposal submission remain unchanged. The amendment includes the site visit attendee roster from an earlier visit on August 28, 2024, and notes that no additional site visits will be scheduled. Furthermore, it reminds offerors that the deadline for submitting questions is set for September 6, 2024, at 1400 Mountain Time. Offerors are instructed on how to acknowledge receipt of the amendment, emphasizing the importance of acknowledgment for their proposals to be considered. Both modifications to existing offers and details about contractual agreements are covered, specifying that the period of performance for the project runs from December 23, 2024, to October 31, 2027. Overall, this amendment serves to clarify procedural details and reinforce timelines for potential contractors, ensuring a structured approach to the proposal and contracting process.
    The document is an amendment to solicitation number 140R1024R0015 concerning the Clear Creek Dam Fish Passage Facility project in the Yakima River Basin, Washington. It outlines procedures for acknowledging the amendment's receipt, specifically requiring that offers must confirm acknowledgment in one of several specified formats, or risk rejection if not received on time. The amendment clarifies details regarding the Question and Answer period, which is set to conclude on 09/06/2024 at 1400 Mountain Time, and notes that no additional site visits will be conducted, although it provides informational pictures to aid offerors. Additionally, it addresses modifications to previously submitted offers and includes instructions for forwarding the amendment to third parties if necessary. The period of performance for the project is set from December 23, 2024, to October 31, 2027. The overall aim of this amendment is to ensure clear communication and compliance among all parties involved, maintaining the integrity of the solicitation process while providing necessary clarifications to offerors.
    The government document outlines an amendment to solicitation number 140R1024R0015 related to the Clear Creek Dam Fish Passage Facility within the Yakima River Basin Water Enhancement Project in Washington. It specifies that the deadline for proposals remains unchanged while introducing an additional Question and Answer (QA) period, now concluding at 10:00 AM MT on September 17, 2024. Questions should be directed to designated contacts via email. The document emphasizes the importance of acknowledging receipt of the amendment prior to the proposal deadline, and it provides instructions on how to do so, ensuring compliance for offers that may need to be modified or withdrawn. The amendment retains all existing terms and conditions, with a performance period from December 23, 2024, to October 31, 2027. The overall intention is to facilitate clarity and communication regarding the solicitation process while ensuring all stakeholders are informed of necessary updates.
    The document is an amendment to the solicitation for the Clear Creek Dam Fish Passage Facility project under the Yakima River Basin Water Enhancement Project in Washington. Its main purpose is to extend the deadline for receiving proposals from September 30, 2024, to October 17, 2024, at 10:00 am MDT. Offerors are required to acknowledge receipt of this amendment through specified methods. The document outlines that all other terms and conditions of the initial solicitation remain unchanged, and provides guidance for participants wishing to modify or withdraw their proposals. It should be noted that the period of performance for the awarded contract runs from December 23, 2024, to October 31, 2027. This amendment underscores the importance of proper communication and adherence to deadlines in the proposal submission process for federal grants and contracts.
    This document is an amendment to a solicitation pertaining to the Clear Creek Dam Fish Passage Facility project within the Yakima River Basin Water Enhancement Project in Washington. Issued by the Bureau of Reclamation's Acquisition Management Division, the amendment does not alter the due date or location for proposal submission. It primarily addresses inquiries from potential offerors, providing a Q&A log along with associated specification and drawing revisions. Offerors must formally acknowledge receipt of this amendment to ensure their proposals are accepted; this can be done through various specified methods prior to the submission deadline. Additionally, if an already submitted offer needs modification, it can be amended via letter or electronic communication, provided it references the solicitation and the amendment. The period of performance for the project is set from December 23, 2024, to October 31, 2027. All other terms and conditions of the original solicitation remain unchanged, emphasizing the document's role in maintaining compliance and clarity throughout the contracting process.
    This government file pertains to an amendment for the solicitation identified as 140R1024R0015, related to the Clear Creek Dam Fish Passage Facility project within the Yakima River Basin Water Enhancement Project, Washington. The amendment outlines procedures for acknowledging receipt of the amendment, detailing that offers must be recognized in a specific manner to avoid rejection. Key changes include the revision of section M.1 regarding evaluation factors for award, now including paragraph (e) to accommodate updates, which all offerors must review. Proposals are to be submitted unchanged in terms of date and time for receipt. The document specifies the period of performance for the project as from December 23, 2024, to October 31, 2027. The amendment also guides contractors on modifying submitted offers and emphasizes communication requirements for acknowledgment and modifications, stressing that all other terms remain unaffected. It indicates administrative changes, ensuring compliance with existing regulations. This file serves as a crucial update in the procurement process, ensuring all parties involved are informed and their submissions properly recognized and modified as necessary.
    The U.S. Department of the Interior, Bureau of Reclamation, is soliciting bids for the construction of the Clear Creek Dam Fish Passage Facility as part of the Yakima Project in Washington. This construction opportunity is a total small business set-aside, with anticipated costs ranging between $15 million and $20 million. The contractor must begin work by December 23, 2024, and complete the project by October 31, 2027. A site visit is scheduled for August 28, 2024, requiring prior registration and adherence to safety protocols. Contractors are to submit their offers by 2:00 PM MST on September 10, 2024, with no questions accepted after this deadline. The project emphasizes strict compliance with specified construction requirements, and a performance bond may be required. The purpose of this solicitation is to enhance fish passage at the facility, thereby contributing to environmental conservation efforts. The document outlines the schedule, requirements, and eligibility criteria for bidders, ensuring alignment with federal contracting guidelines to promote a fair and competitive bidding process.
    The U.S. Department of the Interior's Bureau of Reclamation issued a solicitation for the construction of a Fish Passage Facility at Clear Creek Dam, Yakima Project, Washington, under Solicitation No. 140R1024R0015. This project aims to facilitate fish passage through a series of components, including an intake structure, pump systems, a concrete fish ladder, and necessary electrical upgrades. The construction cost is estimated between $15 million to $20 million, with an anticipated completion date set for October 31, 2027. The solicitation emphasizes compliance with safety standards and environmental protections, mandating personal protective equipment during site visits and adherence to specific construction protocols. Key requirements include project coordination with existing operations, managing ecological impacts, and quality control throughout various construction phases. Interested bidders are encouraged to attend a pre-bid site visit scheduled for August 28, 2024, and submit all inquiries by September 6, 2024. This initiative reflects federal efforts to enhance aquatic ecosystems and improve infrastructure supporting the Yakima Project's water management goals, as part of ongoing sustainability efforts in public resource management.
    Similar Opportunities
    Trinity River Fish Hatchery Modernization
    Active
    Interior, Department Of The
    The Department of the Interior's Bureau of Reclamation is seeking qualified contractors for the modernization of the Trinity River Fish Hatchery located in Lewiston, California. This project, estimated to cost between $40 million and $80 million, aims to enhance the aging infrastructure of the hatchery, originally built between 1960 and 1963, to meet contemporary aquaculture needs and regulatory requirements for the next 50 years. The procurement will utilize a design-build approach, encompassing phases such as pre-design data collection, design preparation, construction execution, and post-construction support. Interested businesses must submit their capabilities and qualifications by January 10, 2025, to the designated contract specialist, Abelardo Lopez, at aclopez@usbr.gov or by phone at 916-978-5398.
    Z--Battle Creek - South Diversion Dam and Canal Removal
    Active
    Interior, Department Of The
    The Bureau of Reclamation, part of the Department of the Interior, is preparing to issue a Request for Proposal (RFP) for a firm fixed-price construction contract focused on the removal of the Battle Creek South Diversion Dam and associated canal. The project involves significant demolition work, including the dismantling of multiple diversion dams and the excavation and filling of the South Canal, with an estimated project cost ranging from $10 million to $15 million. This procurement is crucial for environmental restoration efforts in the region and is open to all responsible sources, with a requirement for 100% performance and payment bonds. Interested contractors must be registered in the System for Award Management (SAM) and can expect the solicitation to be posted on or around January 3, 2025, with proposals due approximately by February 3, 2025. For inquiries, contact Rosana Yousef Goarji at RYousefgoarji@usbr.gov or call 916-978-5004.
    Y--Lookingglass FH - Egg Incubation Room
    Active
    Interior, Department Of The
    The U.S. Fish and Wildlife Service (USFWS) is soliciting bids for a design-build contract to expand the Lookingglass National Fish Hatchery in Oregon by constructing a new egg incubation room. This project aims to increase the hatchery's egg incubation capacity by 10-15%, thereby enhancing operational efficiency and safety through the installation of new infrastructure and utility connections. The selected contractor will be responsible for comprehensive design and construction services, adhering to federal regulations, including environmental and historical preservation laws, while ensuring minimal disruption to existing hatchery operations. Interested contractors should contact Cindy Salazar at CindySalazar@fws.gov or 503-872-2832, with a project budget estimated between $500,000 and $2,000,000, and key deadlines including a Request for Information by January 3, 2025, and proposal submissions due by January 10, 2025.
    Y--GVIC FISH SCREEN REHABILITATION
    Active
    Interior, Department Of The
    The Department of the Interior, through the Bureau of Reclamation, is soliciting bids for the rehabilitation of fish screens at the Grand Valley Irrigation Company (GVIC) located in Mesa County, Colorado. This project, estimated to cost between $1,000,000 and $5,000,000, aims to enhance water infrastructure as part of the Upper Colorado River Endangered Fish Recovery Program, focusing on the installation of new concrete structures and fish screens, along with a control and cleaning system. The rehabilitation is crucial for preserving aquatic ecosystems and ensuring compliance with environmental regulations. Interested small businesses must submit their sealed bids by January 29, 2025, with inquiries due by January 10, 2025, and the expected performance period running from April 1, 2025, to May 1, 2026. For further details, potential bidders can contact Ana Fife at afife@usbr.gov or by phone at 801-524-3671.
    Z--Reclamation - Interior Region 10 California - Grea
    Active
    Interior, Department Of The
    The Bureau of Reclamation, part of the Department of the Interior, is soliciting proposals for the B.F. Sisk Dam Safety of Dams (SOD) Modifications, Phase II project, located in California. This project aims to enhance dam safety through significant structural modifications, including the construction of shear keys, drainage systems, and monitoring systems for slope stability, with an estimated cost between $250 million and $500 million. The procurement is unrestricted, and contractors are required to adhere to strict environmental and labor standards, including compliance with the Davis-Bacon Act. Proposals must be submitted electronically by January 27, 2025, with a performance period extending from June 2, 2025, to June 2, 2028. Interested parties can contact Roxana Ahola at rahola@usbr.gov or by phone at 916-978-5549 for further information.
    Z--Folsom Right Wing Dam - North Fork Ditch Bypass
    Active
    Interior, Department Of The
    The Department of the Interior, specifically the Bureau of Reclamation, is preparing to solicit proposals for a firm fixed-price construction contract for modifications to the Folsom Right Wing Dam’s North Fork Ditch Bypass, with a focus on small business participation. The project involves critical tasks such as site preparation, removal of existing infrastructure, installation of drainage systems, and utility installations, with estimated costs ranging from $5 million to $10 million. This initiative underscores the government's commitment to enhancing infrastructure while supporting small businesses in significant construction projects. The solicitation, identified as 140R2025R0004, is expected to be posted on the Government Point of Entry around January 3, 2025, with proposals due by February 3, 2025; interested contractors must be registered in the System for Award Management (SAM) to qualify for bidding. For inquiries, contractors can contact Ronald Gamo at rgamo@usbr.gov or by phone at 916-978-4304.
    P--Conconully Lake Resort Asbestos and Lead Abatement and Demolition Columbia Basi
    Active
    Interior, Department Of The
    The Department of the Interior's Bureau of Reclamation is seeking qualified contractors for the Conconully Lake Resort Asbestos and Lead Abatement and Demolition project located in Conconully, Washington. The project involves the abatement of hazardous materials and the demolition of eight structures, along with the decommissioning of a septic tank, all within a performance period of 60 days. This initiative is crucial for ensuring safety and compliance with environmental regulations while responsibly managing hazardous materials during demolition. Interested contractors must demonstrate their qualifications and past experiences, with responses due by January 21, 2025; the estimated project cost ranges between $250,000 and $500,000. For further inquiries, potential bidders can contact Brock Palen at bpalen@usbr.gov.
    WA USFS OKWEN 617 76(1) Icicle Creek Rockfall Mitigation Project
    Active
    Transportation, Department Of
    The Department of Transportation, through the Federal Highway Administration, is seeking qualified contractors for the Icicle Creek Rockfall Mitigation Project located in Chelan County, Washington. The project involves implementing rockfall mitigation measures on up to three slopes, including the installation of draped wire mesh, slope scaling, and gabion basket barriers over a length of 0.55 miles. This initiative underscores the government's commitment to infrastructure safety and environmental protection in sensitive natural areas. The estimated contract value ranges from $700,000 to $2,000,000, with a tentative completion date set for summer 2025. Interested vendors can contact the Contracts G. Office at wfl.contracts@dot.gov or call 360-619-7520 for further information.
    Y--NV ASH MEADOWS NWR CRY SPRNGS RESTORE
    Active
    Interior, Department Of The
    The U.S. Fish and Wildlife Service, under the Department of the Interior, is soliciting proposals for design/build services aimed at restoring the Crystal Springs outflow and associated infrastructure at the Ash Meadows National Wildlife Refuge in Nevada. The project involves the decommissioning and removal of existing dams, construction of new outflow channels, and enhancements to visitor access, with a focus on ecological restoration and habitat improvement for endangered species. This initiative is critical for restoring natural hydrology and biodiversity in the region, addressing past agricultural impacts, and ensuring compliance with federal environmental regulations. Interested contractors must submit their sealed proposals by January 30, 2025, with the contract performance period running from April 1, 2025, to September 12, 2028. For further inquiries, contact Ian Young at ianayoung@fws.gov or call 612-713-5214.
    INDUSTRY DAYS - Duckabush Estuary Restoration, Jefferson County, WA
    Active
    Dept Of Defense
    The U.S. Army Corps of Engineers (USACE) is hosting an Industry Day for the Duckabush Estuary Restoration project in Jefferson County, Washington, aimed at soliciting feedback and providing information to potential contractors. The project involves restoring the Duckabush Estuary Ecosystem, which includes constructing an elevated bridge, replacing culverts, and removing existing infrastructure to enhance natural tidal and riverine processes, ultimately supporting salmon spawning and native wildlife. This significant construction initiative is expected to have a budget between $100 million and $250 million, with work anticipated to begin in 2026. Interested parties should contact Londres Medranda at londres.medranda@usace.army.mil for further details and must register for the virtual Industry Day on October 9, 2024, and the onsite event on October 10, 2024, with a deadline for onsite registration by October 8, 2024.