This document clarifies logistics for a government project, likely an RFP or contract, focusing on site access and material storage. It details the designation of three lots: Lot 1 (triangle lot next to the building), Lot 2 (across and diagonal to the building), and Lot 3 (corner of E and Fargo Streets). Snow is to be removed and not stored on Lot 2. The contractor will receive keys for access to all three lots. For material and equipment storage, a small storage container can be placed in the back of Lot 3 near an open dumpster for salt and small equipment, with other small rolling equipment also allowed to be parked in the back of Lot 3. The document addresses key operational questions regarding site utilization and contractor provisions.
This document clarifies various aspects of a snow removal and stockpiling contract, likely an amendment or Q&A for an RFP. It details the location and access of three lots (Lot 1: triangle lot next to the building, Lot 2: across and diagonal to the building, Lot 3: corner of E and Fargo Streets), specifying that Lot 2 is for snow removal, not storage, and keys for all lots will be provided. A small storage container for salt and equipment is permitted in Lot 3. The document explains CLINs related to stockpiling (up to 3000 cu yds in Lot 3) and snow removal quantities (e.g., "10" for 1"-3" storms). It clarifies that sidewalk clearing is a separate CLIN, initiated by the COR, and should commence at 1 inch of snowfall, correcting a typo. HVAC units are not on the roof and do not apply to this building. Snow relocation due to excessive accumulation is the contractor's responsibility and there is no separate CLIN for off-site hauling.