Pump and Motor Replace
ID: 12505B24Q0365Type: Solicitation
Overview

Buyer

AGRICULTURE, DEPARTMENT OFAGRICULTURAL RESEARCH SERVICEUSDA ARS MWA AAO ACQ/PER PROPPEORIA, IL, 61604, USA

NAICS

Other Building Equipment Contractors (238290)

PSC

INSTALLATION OF EQUIPMENT- PUMPS AND COMPRESSORS (N043)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)
Timeline
    Description

    The United States Department of Agriculture (USDA), through its Agricultural Research Service (ARS), is soliciting proposals for the replacement of cooling tower pumps and motors at the National Center for Agricultural Utilization Research in Peoria, Illinois. The project aims to enhance operational efficiency by addressing issues with existing cooling towers, requiring the procurement and installation of new pump/motor combinations, decommissioning of old units, and training on the new installations. This initiative is critical for maintaining the facility's cooling capacities and aligns with government procurement practices to ensure compliance with safety and environmental regulations. Proposals are due by November 1, 2024, with a construction budget estimated between $100,000 and $250,000, and interested contractors should contact Joel Maas at joel.maas@usda.gov for further details.

    Point(s) of Contact
    Files
    Title
    Posted
    The solicitation document (12505B24Q0365) issued by the USDA Agricultural Research Service outlines a request for proposals for the replacement of cooling tower pumps and motors at the National Center for Agricultural Utilization Research in Peoria, IL. This project is classified under the NAICS Code 238290, with an estimated construction budget between $100,000 and $250,000. It is designated as a total small business set aside. Proposals are expected to comply with detailed work specifications, including performance and payment bond requirements. The project is expected to commence within 30 days of the notice to proceed and must be completed within 60 days. The contractor must ensure proper conduct of employees and submit necessary shop drawings and materials for approval. Special requirements include compliance with federal regulations regarding lead-based paint and environmental control measures. The document emphasizes the need for thorough inspections, timely communication of any service interruptions, and adherence to strict insurance and liability policies. Proper handling of invoices and payments must be managed electronically, with emphasis on accurate documentation. This solicitation reflects the government’s operational standards for construction projects, ensuring safety, quality, and regulatory compliance throughout the project lifecycle.
    The document outlines the completion and payment schedule required by the U.S. Department of Agriculture's Agricultural Research Service (ARS) for construction projects. It serves as a formal tool to ensure contractors report progress on various branches of work, including their respective values and completion percentages during a project period. Key sections of the form require details such as contract number, project location, and specific work phases, with associated dollar values and completion dates. Contractors must submit the schedule within 14 days of receiving the Notice to Proceed, even if no partial payments are initially requested. This form is essential for tracking construction progress, enforcing accountability, and facilitating financial transactions tied to completed work. It underscores the commitment to project management and financial transparency in alignment with government standards for federal and state projects.
    The document serves as a Contractor's Request for Payment Transmittal, structured to detail the financial transactions related to a specific federal contract. It outlines the necessary components for processing payments, including the original contract amount, any change orders, and the total adjusted contract prices. The form captures the value of work completed up to the specified period, alongside any materials stored at the site. Key calculations include the total value of work and materials, the total due to the contractor, and any previous requests. A series of certifications and signatures from authorized representatives validate that payments have been made to subcontractors according to contract terms, emphasizing compliance with federal payment regulations. This document is essential for ensuring financial accuracy and accountability in government contracts.
    The Past Performance Evaluation Sheet is a crucial document that contractors must complete when submitting proposals for federal government contracts. Each contractor is required to submit a minimum of three sheets for previous contracts undertaken. The sheet includes essential information such as the contractor's name, the government agency or company that awarded the contract, details of the contract including the number, description of services, total contract value, performance period, place and type of performance, along with the current point of contact details. If applicable, contractors must also explain any received Cure Notices or Show Cause orders, along with actions taken to address such issues. It is the contractor's responsibility to send this document to the current Contracting Officer Representative (COR) to gather comments about the contract. This evaluation process aims to assess the contractor's past performance and reliability, which are critical factors in the award of future government contracts.
    The document presents a straightforward inquiry regarding the acquisition of model and serial numbers for a specific unit, which is necessary for requesting parts pricing. This brief exchange indicates an essential step in the maintenance or repair process within a governmental context, aligning with protocols often followed in federal and state RFPs when addressing equipment needs. The inquiry underscores the significance of precise identification of units to facilitate efficient procurement and cost assessment. Maintaining clear communication about technical specifications is vital in ensuring adherence to contractual obligations in government-funded projects. Overall, this brief document reflects procedural diligence in managing equipment resources relevant to government operations.
    The document outlines key considerations for a government RFP regarding the replacement and maintenance of specific mechanical components. It addresses inquiries about the inclusion of alternative pricing for heat trace systems and valves, with a focus on reusing existing hardware unless significantly damaged during installation. Bidders are encouraged to suggest voluntary alternatives for improved installation outcomes, especially regarding vibration isolators and mounting methods. The document also seeks to clarify the acceptable use of existing insulation and metal cladding, permitting reuse contingent on their integrity. It highlights the importance of pricing in relation to the bidder's risk tolerance due to uncertainties in the condition of existing materials. Overall, the document focuses on ensuring compliance and efficiency in mechanical system upgrades, while allowing flexibility for contractors to propose enhancements subject to approval.
    This solicitation document outlines the requirements for a construction project issued by the USDA ARS in Peoria, Illinois. It is identified as Solicitation No. ARS-12505B24Q0365, with a projected construction budget of $100,000 to $250,000. The project falls under the North American Industry Classification System (NAICS) Code 238290, with a small business size standard of $22 million. The contract specifies full and open competition, requiring offers to be submitted no later than 11/01/2024. The contractor is obligated to begin work within 30 calendar days post-award, with a performance period stretching from 11/04/2024 to 01/06/2025. Notably, a performance and payment bond is mandatory for the contractor. The solicitation provides details on the bid submission process, including that sealed offers are due in specified copies, and highlights the importance of adherence to submission timelines for government consideration. Moreover, the document emphasizes the collaborative process of the contract, ensuring the offeror complies with all requirements and acknowledges any amendments made during the bidding process. This solicitation serves as a formal request for proposals and provides potential contractors the necessary parameters to formulate their bids.
    The United States Department of Agriculture's Agricultural Research Service has issued a Statement of Work for the replacement of cooling tower pumps and motors at the National Center for Agricultural Utilization Research in Peoria, IL. The project, critical for maintaining operational efficiency and redundancy in cooling capacities, addresses existing issues with three cooling towers, with specific components requiring replacement due to disrepair and inefficiency. The scope includes the procurement and installation of new pump/motor combinations, decommissioning of old units, and training on new installations. Contractors must ensure compliance with safety, environmental regulations, and efficient project execution to minimize disruption to facility operations. Additionally, the document outlines expectations for documentation, project schedules, quality assurance, and adherence to applicable codes and standards. This initiative aligns with government procurement practices aimed at enhancing operational functionality within federal agricultural research facilities.
    The document outlines the prevailing wage determination for landscaping work on construction projects in Illinois, specifically for contracts that fall under the Davis-Bacon Act. It summarizes applicable wage rates for various classifications of laborers, including Landscape Equipment Operators and Truck Drivers across multiple counties such as Cook, Du Page, and Winnebago. Key minimum wage rates are governed by Executive Orders 14026 and 13658, which mandate specific hourly wages based on contract award dates and conditions, such as a minimum wage of $17.20 an hour for contracts after January 30, 2022. The wage determination provides detailed rates for operators and laborers, including health and welfare contributions and paid holidays. It also specifies the classifications of trucks based on axle numbers, with corresponding wage rates and fringe benefits. The determination emphasizes compliance with wage and labor standards, including required paid sick leave and appeals related to wage decisions. Overall, it serves as a regulatory framework for contractors and federal agencies regarding labor standards in federally funded construction projects in Illinois.
    Lifecycle
    Title
    Type
    Pump and Motor Replace
    Currently viewing
    Solicitation
    Similar Opportunities
    Replace Building 9 Drain Line
    Active
    Agriculture, Department Of
    The United States Department of Agriculture (USDA), through its Agricultural Research Service (ARS), is soliciting bids for the replacement of the drain line in Building 9 at the Corn Host Plant Resistance Research facility in Mississippi State, Mississippi. The project involves the complete removal of the existing collapsed 4” cast iron sanitary sewer line and its replacement with new 4” PVC piping, adhering to local, state, and national building codes. This work is crucial for maintaining the functionality and compliance of agricultural research facilities, ensuring effective drainage systems are in place. Interested contractors must submit their quotations by 3:00 PM CST on January 13, 2025, and are encouraged to schedule a site visit with the USDA representative prior to bidding. The estimated contract value is between $25,000 and $100,000, and all inquiries should be directed to Monte Jordan at monte.jordan@usda.gov.
    Install New Boilers - Bldg.#5 and Bldg. #6-Stoneville, MS.
    Active
    Agriculture, Department Of
    The Department of Agriculture, specifically the Agricultural Research Service (ARS), is seeking contractors for the installation of new natural gas boilers at the Jamie Whitten Delta States Research Center in Stoneville, Mississippi. The project involves demolishing four existing Lochinvar boilers and four Bell and Gossett pumps, followed by the supply and installation of new equipment as outlined in the Statement of Work. This procurement is crucial for maintaining the operational efficiency of the research facilities, and the contract will be a Total Small Business Set-Aside under NAICS code 238220, with a size standard of $19 million. Interested contractors should prepare to submit a detailed technical proposal and cost breakdown, with the Request for Proposals anticipated to be issued around January 9, 2025; inquiries can be directed to Huron W. Virden at huron.virden@usda.gov.
    Electric Motor Drive
    Active
    Agriculture, Department Of
    The Department of Agriculture, specifically the Agricultural Research Service, is seeking quotes for the procurement of electric motor drives and motor controllers as part of a project aimed at enhancing robotic mobility in agricultural practices. The requirement includes four electric motor drives and five motor controllers, which must meet specific technical parameters such as an operating temperature range of 0 to 75°F, IP66 housing classification, and a minimum torque output of 800 Nm. This initiative is crucial for advancing autonomous farming technologies, ensuring efficiency and precision in agricultural operations. Interested contractors must submit their quotes electronically to Joel Maas at joel.maas@usda.gov by 5:00 PM Eastern on January 3, 2024, with questions due by 1:00 PM Eastern on December 20, 2024. All contractors must be registered in the System for Award Management (SAM) to be eligible for award.
    Replacement of an Air Compressor Skid - RFQ
    Active
    Agriculture, Department Of
    The Department of Agriculture, specifically the Agricultural Research Service (USDA-ARS), is seeking quotes for the replacement of an air compressor skid at the Cereal Crop Research Unit in Madison, Wisconsin. The procurement involves disconnecting and disposing of the existing compressor system, installing a new compressor with specified capacity and features, and providing operator training, all while ensuring minimal downtime to support ongoing research activities. This project is critical as the current compressor system has failed, and compliance with Federal, State, and Local regulations regarding waste disposal and workplace safety is mandatory. Interested vendors must submit their quotes electronically by January 7, 2024, and can direct inquiries to Aaron Dimeo at aaron.dimeo@usda.gov or Chris Turner at Christopher.C.Turner@usda.gov.
    Deferred Maintenance Projects - Stillwater, OK
    Active
    Agriculture, Department Of
    The United States Department of Agriculture (USDA), through its Agricultural Research Service (ARS), is seeking contractors for deferred maintenance projects in Stillwater, Oklahoma, specifically focusing on repairs and improvements to various facilities, including greenhouses and roofs. The project entails comprehensive renovations across multiple buildings, including demolition and replacement of mechanical, electrical, and structural systems, with an emphasis on compliance with safety regulations and sustainable practices. This initiative is crucial for modernizing USDA facilities to enhance operational efficiency and safety standards. The anticipated Request for Proposal (RFP), 12805B25R0005, is expected to be issued around January 2, 2025, with a contract value estimated between $1 million and $5 million. Interested contractors should monitor sam.gov for updates and are encouraged to contact David Hildebrand at david.hildebrand@usda.gov for further information.
    Replacement Pumps and Motors for the Dredge Goetz
    Active
    Dept Of Defense
    The Department of Defense, specifically the U.S. Army Corps of Engineers, is soliciting bids for the replacement of two Durco Flowserve pumps and motors for the Dredge Goetz, located in Wisconsin. The procurement requires contractors to provide two new pump-motor assemblies, with the installation not being part of the contractor's responsibilities. This equipment is crucial for maintaining operational efficiency in dredging activities, ensuring the reliability of water movement in various projects. Interested contractors must submit their proposals by December 30, 2024, and can direct inquiries to Ben Knutson at benjamin.t.knutson@usace.army.mil or Sharon Frank-Scheierl at Sharon.m.frank-scheierl@usace.army.com for further clarification.
    Sealing Bldg. 89, Miami, FL
    Active
    Agriculture, Department Of
    The Department of Agriculture, specifically the Agricultural Research Service, is seeking qualified contractors for a project titled "Sealing Bldg. 89" at the Subtropical Horticultural Research Station in Miami, Florida. The primary objectives of this procurement include upgrading the air conditioning system, sealing gaps to prevent moisture intrusion, and enhancing energy efficiency to create a controlled laboratory environment for research purposes. This initiative underscores the government's commitment to maintaining effective research facilities while ensuring compliance with safety and environmental standards. The project budget is estimated between $100,000 and $250,000, with a timeline for completion set from January 21, 2025, to May 2, 2025. Interested parties should contact Amanda Somerville at amanda.somerville@usda.gov for further details and to ensure compliance with the total small business set-aside requirements.
    Hatchery Complex Electrical Distribution-Stoneville, MS
    Active
    Agriculture, Department Of
    The Department of Agriculture, specifically the Agricultural Research Service (ARS), is preparing to solicit proposals for refurbishing and upgrading the electrical distribution system in the Hatchery area at the Jamie Whitten Delta States Research Center in Stoneville, Mississippi. The project requires contractors to provide all necessary labor, equipment, and materials, adhering strictly to the specifications outlined for the electrical upgrades. This initiative is crucial for maintaining the operational efficiency of the research center's facilities. The USDA ARS intends to issue a Request for Proposals (RFP) around January 14, 2025, with the contract set aside for small businesses under NAICS code 238210, which has a size standard of $19 million. Interested contractors should refrain from contacting the facility directly and can expect a site visit opportunity during the solicitation phase; for further inquiries, they may reach out to Huron W. Virden at huron.virden@usda.gov.
    Mechanical, Electrical, Plumbing (MEP) IDIQ - Pacific West Area
    Active
    Agriculture, Department Of
    The U.S. Department of Agriculture's Agricultural Research Service (ARS) is seeking qualified contractors for a Mechanical, Electrical, Plumbing (MEP) Indefinite Delivery-Indefinite Quantity (IDIQ) contract within the Pacific West Area (PWA). This procurement aims to provide essential MEP services, including but not limited to HVAC installation, refrigeration system setup, and hazardous waste disposal across various research laboratory facilities located in eight states, including California and Hawaii. The anticipated ceiling for this IDIQ contract is $5 million, covering five one-year ordering periods, and interested parties must submit their capability statements to Robert Skipper at robert.skipper@usda.gov by the specified deadline, as this notice serves as a Sources Sought for market research purposes only.
    AIR-COOLED PRECISION COOLING SYSTEMS
    Active
    Dept Of Defense
    The U.S. Army Contracting Command – Rock Island is seeking proposals for the procurement of three Air-Cooled Precision Cooling Systems to replace non-operational units at Pine Bluff Arsenal (PBA) in Arkansas. The contract will be a Firm-Fixed-Price agreement requiring the delivery of two 10-ton units and one 6.5-ton unit, with specific technical and warranty requirements outlined in the solicitation. This procurement is critical for maintaining operational capabilities at PBA through updated infrastructure, ensuring compliance with applicable standards and regulations. Interested contractors must submit their quotes electronically by January 6, 2025, and can direct inquiries to Greg Brown at greg.j.brown.civ@army.mil or John Fotos at john.g.fotos.civ@army.mil.