C219--VISN 1 Critical Utility Management Plans
ID: 36C24125Q0342Type: Solicitation
Overview

Buyer

VETERANS AFFAIRS, DEPARTMENT OFVETERANS AFFAIRS, DEPARTMENT OF241-NETWORK CONTRACT OFFICE 01 (36C241)TOGUS, ME, 04330, USA

NAICS

Engineering Services (541330)

PSC

ARCHITECT AND ENGINEERING- GENERAL: OTHER (C219)
Timeline
    Description

    The Department of Veterans Affairs is seeking qualified contractors to develop Critical Utility Management Plans for eleven facilities within the VISN 1 network. The primary objectives include creating an inventory of utilities, assessing their criticality for patient care, evaluating potential failure risks, and establishing maintenance schedules. This initiative is crucial for ensuring operational resilience and patient safety across VA healthcare facilities, reflecting the government's commitment to effective infrastructure management. The total award amount for this contract is $25.5 million, with a project duration of two years starting from the contract award date. Interested parties can direct inquiries to Contract Specialist Rosangela Pereira at rosangela.pereira@va.gov, with bids due by April 29, 2025.

    Point(s) of Contact
    Rosangela PereiraContract Specialist
    rosangela.pereira@va.gov
    Files
    Title
    Posted
    The VHA Directive 1811 establishes essential policies for the Veterans Health Administration's (VHA) Healthcare Engineering Programs. It mandates that Department of Veterans Affairs (VA) medical facilities implement a program focused on maintaining a safe and efficient healthcare environment through effective infrastructure management. Key responsibilities include ensuring compliance with relevant regulations, conducting assessments, and managing budgets for engineering operations. The directive outlines specific roles for officials ranging from the Under Secretary for Health to medical facility directors, emphasizing their duty to uphold safety standards, oversee functionality, and report on performance metrics. The directive also highlights training requirements for healthcare engineering staff and mandates adherence to Federal, State, and local codes. Regular assessments of utility systems, capital planning, and documentation of operational practices are stressed, alongside an emphasis on continuous monitoring and corrective actions to address any non-compliance. The directive is fundamental in guiding the engineering infrastructure necessary to support high-quality healthcare within VA medical facilities, ensuring resilience and safety for patient care environments. Effective as of April 10, 2023, the directive is subject to recertification by April 2028 and rescinds previous directives on facility management qualifications.
    The document outlines a contract solicitation from the Department of Veterans Affairs aimed at awarding services for developing Critical Utility Management Plans for eleven facilities across the VISN 1 network. The primary objectives are to create an inventory of utilities, assess their criticality for patient care, evaluate potential failure risks, and establish maintenance schedules. The plan requires site visits, documentation sharing via a digital repository, and provides for the comprehensive delivery of the management plans in both physical and electronic formats. The contract is classified under NAICS code 541330 for Engineering Services with a total award amount of $25.5 million. Compliance with various federal regulations and labor standards, including provisions for small business participation and veteran-owned business considerations, is emphasized. The expected duration for project completion is two years, starting from the contract award date. Overall, the solicitation reflects the VA's commitment to ensuring operational resilience and patient safety through improved infrastructure management across its healthcare facilities.
    The Department of Veterans Affairs is preparing to solicit bids for the VISN 1 Critical Utility Management Plan, aiming to award a Firm-Fixed contract to the most advantageous offeror. This procurement is specifically set aside for Veteran-Owned Small Businesses (VOSBs) capable of fulfilling the requirements. The solicitation, identified as number 36C24125Q0342, will be available for download on April 2, 2025, with a response deadline of April 22, 2025, at 5 PM EST. Interested parties must register in the System for Award Management (SAM) before the award can be granted, with more information available at www.sam.gov. Questions must be directed to Contract Specialist Rosangela Pereira via email by April 18, 2025. The applicable NAICS code for this procurement is 541330, relevant to professional and technical services. This initiative reflects the government's commitment to engaging VOSBs while addressing critical utility management needs.
    The document is an amendment to a federal solicitation issued by the Department of Veterans Affairs for a project related to the management of building utilities at VAMC Providence. It extends the submission deadline for bids to April 29, 2025, and incorporates the FAR clause 852.215-70 addressing service-disabled veteran-owned and veteran-owned small business evaluation factors. Key details include answers to questions submitted by prospective bidders, which clarify requirements regarding historical inventory, square footage, equipment definitions, and site plans, among other specifications. The document emphasizes the need for detailed site information as part of the proposal and confirms that certain inventory and site drawing specifications are essential. The amendment facilitates understanding of the solicitation process by providing critical clarifications necessary for bidders, particularly regarding the qualifications needed for technical staff. This streamlined communication aims to ensure that bidding entities can prepare comprehensive proposals in alignment with federal guidelines, ultimately underlining the government's commitment to transparency and fair competition in procurement processes.
    The document provides a detailed overview of the Edith Nourse Rogers Veterans Affairs Medical Center (VAMC) located in Bedford, MA. It outlines key statistics, including an acreage of 180.7, with 518 buildings comprising a total gross square footage of 1,171,034. The report highlights several major initiatives funded by the center, including a $2 million canteen and theatre project and a $4 million outpatient expansion, all of which have been completely funded. As of fiscal year 2013, the center served 23,728 patients and operates in collaboration with Boston University for specific housing agreements. In addition, the document mentions that the facility has three community-based clinics and a vet center in its network, while it has completed a master plan in 2012. Importantly, the estimate for future technical corrections stands at $204.8 million, emphasizing the center's commitment to maintaining and improving its infrastructure. Overall, the file illustrates the operational scope of the VAMC and its role in providing essential healthcare services to veterans while adhering to federal funding and project guidelines.
    The file presents details about the Boston Healthcare System under the Veterans Health Administration (VHA), specifically its Jamaica Plain facility. It outlines the site’s characteristics, including its acreage of 15.8 acres, existing buildings amounting to 1,083,221 square feet, and an average building age of 57 years. The mission focuses on tertiary care and poly-trauma treatment, serving a patient population of 62,388 in fiscal year 2013. The document lists completed major initiatives such as electrical upgrades and safety fixes, with a total capital cost of $167.9 million for technical corrections. Affiliations with Boston University and Harvard are noted, indicating collaboration in healthcare education and research. Furthermore, the file mentions community-based clinics and a vet center to support veterans. The overarching purpose emphasizes updates to healthcare facilities to enhance services for veterans, aligning with the government’s ongoing efforts in facility management, construction, and potential grants for future improvements. This information is vital for understanding the VHA’s strategic planning and resource allocation for veteran healthcare in the Boston area.
    The Boston Healthcare System (Brockton, MA) details a profile of its facilities and initiatives, highlighting an overall acreage of 145.7 and significant existing infrastructure totaling over 1 million square feet. Notable completed initiatives include retrofitting buildings for Spinal Cord Injury services and life safety upgrades, cumulatively costing approximately $226.3 million. Affiliated with Harvard, the facility served 17,846 patients in FY 2013, indicating a significant role in community health. A master plan developed in 2014 aims to improve facility services and efficiency, with a projected completion date of 2016. The report mentions Catholic Charities as an additional program associated with the site, emphasizing its community outreach. Overall, the document serves to provide a comprehensive overview of the Boston HCS’s facilities, associated costs for improvements, and patient services, which can inform state and local RFPs and grant applications for future projects aimed at enhancing veteran care and facility modernization. The systematic detailing of building conditions and financial aspects reflects a strategic approach to facility management within the Veterans Affairs framework.
    The Buildings Full Detailed Report outlines the status and mission needs of various facilities within the Veterans Health Administration (VHA), specifically the North Atlantic region. The report categorizes assets into three primary groups: those marked for current mission need, which include essential utilities and clinical spaces, and those designated for disposal, such as various single housekeeping quarters. Each facility is assigned a unique identification code and detailed information regarding its geographic location, asset type, and condition. Key points include the identification of assets needing immediate attention for ongoing requirements, as well as the classification of several buildings as surplus or no longer needed for VHA operations. Through this detailed categorization, the report aims to support decision-making regarding property management and resource allocation within federal facilities. Overall, this document serves as an essential tool for the federal government to evaluate the viability of its real estate assets, align them with the strategic needs of the VHA, and ensure compliance with operational demands.
    The document outlines the compliance requirements for contractors regarding the limitations on subcontracting as mandated by 13 C.F.R. 125.6 in federal solicitations. Contractors must indicate whether they intend to utilize subcontractors and, if so, prove that either no subcontractors will be involved or that at least 50% of the contract value will be executed by the contractor and certified similarly situated subcontractors. The required information includes details about the subcontractors, such as their business names, DUNS numbers, a description of work, and the percentage of contract value assigned to them. The document also emphasizes the severe penalties for violations, which can result in fines or potential debarment under government contracting regulations. Compliance verification may occur throughout the contract performance, requiring contractors to submit invoices and contracts for review. The certification at the end affirms that the provided information is accurate to the best of the contractor's knowledge and must be submitted via email to the designated contracting officer. This guidance ensures adherence to federal regulations, promoting fair and responsible subcontracting practices in government procurement.
    The VHA Manchester Medical Center in New Hampshire encompasses 30.23 acres and includes 14 buildings with a gross area of 294,597 square feet. In fiscal year 2013, it served 30,493 patients, emphasizing its role in secondary medical and surgical care. The facility has completed significant projects, including a new 120-bed nursing home care unit and an Ambulatory Care addition, both funded and fulfilling their financial scopes. Maintained affiliations with institutions like Harvard Medical School enhance its operational capabilities. While no emergency or unique projects were reported, plans for a master development continue, post-contracted in 2014. The Total Technical Corrections Cost of $91.1 million indicates substantial investments in infrastructure and maintenance. The document outlines the center's ongoing commitment to enhancing healthcare services for veterans and ensuring compliance with federal requirements, positioning it as a critical component of the VA's regional healthcare system within the New England area.
    The document outlines key details regarding the Connecticut Healthcare System (HCS) located in Newington, CT, under the Veterans Health Administration (VHA). The facility encompasses 48.8 acres with a total of 466,939 gross square feet, housing 26 buildings, of which 2 are currently vacant. Major initiatives include an outpatient expansion costing $1.2 million and a 1999 modernization project funded at $49.9 million. The VHA's mission focuses on providing ambulatory care and a Program of Comprehensive Rehabilitation and Recovery Treatment Programs (PRRTP) for 28,044 patients recorded in FY 2013. There’s an ongoing master plan, contracted in 2014, set for completion in 2016, and a permanent housing agreement established in December 2011 for 74 units aimed at homeless veterans. There are no current community-based clinics or vet centers associated with this service area. The document serves as a part of federal resources to support government contracts and grants aimed at enhancing veteran healthcare infrastructure while addressing the needs of the homeless veteran population in Connecticut. Overall, the information emphasizes the VHA's commitment to improving facilities and services for veterans in New England.
    The document outlines the facilities profile for the Veterans Health Administration (VHA) at the CentWest Massachusetts Healthcare System - Boland VAMC in Northampton, MA. It details the acreage (105.1 acres total), building statistics (55 existing buildings with an average age of 85.9 years), and the square footage (607,571 sq ft gross). The VHA mission focuses on providing secondary medical, psychiatric, and nursing care, having served 42,899 patients in FY 2013. Key initiatives include a $2.9 million outpatient expansion completed in 1979, emphasizing the hospital’s ongoing development efforts. The report also notes community-based clinics and veteran centers, highlighting partnerships and existing collaborations. Additionally, a permanent housing agreement for supportive and transitional housing units was signed in 2011 and amended in 2014. Overall, the document serves as a comprehensive snapshot of the current state and future potential of VHA facilities, reflecting the strategic objectives laid out in federal grants and RFPs, aiming to ensure that veterans receive improved service delivery and access to health resources.
    The document outlines a government contract for Preventative Maintenance awarded by the Department of Veterans Affairs (VA). Key details such as the contracting activity's specifics—including address, contract number, and contact information—are referenced but not disclosed in the provided text. The contract covers preventative maintenance services, likely aimed at ensuring the operational efficiency of VA facilities. The summary lacks specific values and dates related to the contract, such as the award date, term duration, and financial details. Notably, it mentions that a continuation sheet may be required for further descriptions of work involved, prominent subcontractors, and any awards received. The structure shows a systematic approach to documenting contracts, consistently emphasizing the need for points of contact and performance locales, significant for transparency and coordination in government contracts. This document ultimately illustrates the VA's commitment to maintaining its facilities and ensuring quality services for veterans, aligning with the broader objectives of federal RFPs and grants aimed at service optimization.
    The document outlines the facilities and initiatives of the Veterans Health Administration (VHA) at the Veterans Affairs Medical Center (VAMC) in Providence, Rhode Island. It details the site, including its address, acreage of 45.9 acres, and total gross square footage of approximately 536,715 square feet. The VAMC serves a mission focused on secondary medical and surgical care, with 43,157 patients reported in fiscal year 2013. There are significant initiatives funded for facility improvements, including outpatient consolidations and expansions totaling over $10 million since 1979, with a notable upcoming special care addition projected at $74 million. Additional context includes information about community-based clinics, vet centers, and affiliations with Brown University and Harvard University, emphasizing the center's collaborative approach to veteran care. The document notes the completion of a master plan contracted in 2014, intended to enhance operational efficiency and facility planning. The total technical corrections cost for facility assessments stands at $118.4 million. Overall, the document serves as a strategic overview of the VAMC's facilities, ongoing projects, and its commitment to providing comprehensive care to veterans, highlighting the alignment with federal RFPs and grant processes for infrastructure developments.
    The document outlines details regarding the Veterans Health Administration (VHA) facility located at Togus, Maine, under the Department of Veterans Affairs. It highlights the facility's mission of providing secondary, rehabilitation, and nursing care to veterans with significant data on buildings, acreage, affiliated programs, and funding for various initiatives. Key points include the facility's patient count of 64,489 in FY 2013, the existence of 31 buildings with a total gross square footage of 815,365, and significant renovation projects completed or underway, such as the BVA Building. Funding specifics for major projects amount to $39 million. The document mentions the completion of a master plan in 2012 and the presence of community-based clinics and vet centers on-site. It serves to provide a comprehensive overview of the assets, initiatives, funding status, and operational context of the Togus facility, aligning with broader federal objectives in facility management and veteran services. The purpose of the report is to inform stakeholders about current conditions, funding allocations, and future plans for the facility within the framework of federal grants and RFPs.
    The document is a wage determination from the U.S. Department of Labor regarding the Service Contract Act. It outlines minimum wage requirements for contracts involving federal work, specifically noting that contracts made or extended after January 30, 2022, must meet a minimum wage of at least $17.75 per hour, while those awarded between January 1, 2015, and January 29, 2022, must meet a minimum of $13.30 per hour. Additionally, it provides a comprehensive list of occupations and their respective wage rates in various fields, including administrative support, automotive services, health occupations, and technical occupations, along with mandated fringe benefits like health and welfare, vacation, and paid sick leave. The document highlights specific geographic applicability in Massachusetts and Rhode Island, and reiterates that adjustments to wage rates occur annually. It also covers provisions for uniform allowances and the conformance process for unlisted job classifications. It emphasizes compliance with Executive Orders related to minimum wages and seeks to ensure proper worker protections under federal contracting guidelines, thereby facilitating fair compensation in government contracts. This wage determination is vital for contractors and federal entities to ensure adherence to legal requirements in employee compensation for government projects.
    The document outlines the status and plans for the Veterans Affairs (VA) facility located in West Haven, Connecticut. It provides details on the site's acreage, building conditions, upcoming initiatives, and financial allocations. The facility spans 43.87 acres, with a gross square footage of 1,196,970, primarily supporting a tertiary medical-surgical and psychiatric mission. The patient population served was approximately 66,347 in FY 2013. Key initiatives include major construction projects, such as a $103.8 million Clinical/Ward Tower, and past enhancements like a $9.3 million Life Safety Improvement from 1991. The document indicates partnerships with Yale University and highlights the absence of a National Cemetery Administration presence in the region. Additional context includes contracted master planning for facility development, with a summary of associated costs reaching $194.4 million in technical corrections. This file serves as a reference for federal grants and RFPs pertinent to the VA's facility management and improvement strategies, emphasizing infrastructure upgrades and community services for veterans.
    The document outlines various details concerning the Boston Healthcare System's Veterans Affairs (VHA) location in West Roxbury, MA, specifically addressing facility management and future planning initiatives. The site, covering 30 acres, includes 16 existing buildings with a total gross square footage of 545,306. Historical and seismic risks are noted, although no buildings are reported as vacant or out-leased. Significant projects include renovations of the Spinal Cord Injury Center and an Ambulatory Care Clinical Addition, totaling $75.3 million in completed funding. Future initiatives include a proposed Clinical Addition estimated at $279.7 million. The VHA serves a significant patient population, with 41,025 patients recorded in FY 2013, and holds affiliations with Harvard University. Additionally, a completed master plan from 2012 and various community-based clinics and Vet Centers highlight the VHA's integrated approach to patient care and community outreach. The document serves as a summary of the assets, ongoing projects, and future needs within the context of facility management and planning for the Department of Veterans Affairs to ensure that veterans receive quality healthcare.
    The document pertains to the Veterans Health Administration (VHA) facility located in White River Junction, VT, detailing its resources and initiatives. Spanning 63.9 acres, the facility comprises 37 buildings, contributing to a total gross square footage of 501,982, with no current vacancies. The mission focuses on providing secondary care and psychological services, with notable patient interactions reported at 35,205 for FY 2013. Major renovation initiatives include upgrades to beds and engineering improvements since 1977, with funding amounts totaling $57.6 million for various projects, culminating in a master plan finalized in 2012. The facility partners with Dartmouth University and operates several community-based clinics and Veteran Centers, emphasizing its role in a broader healthcare network. Overall, this document outlines the operational layout and strategic improvements aimed at enhancing care and services within the VHA framework, reflecting the federal government’s commitment to veterans' health and wellbeing.
    Lifecycle
    Similar Opportunities
    Y1DA--NRM-CONST 630A4-22-413 Upgrade Station Chilled Water for P&ID
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is seeking qualified contractors for the "Upgrade Station Chilled Water for P&ID" project at the Brooklyn Veterans Affairs Medical Center. The project involves the installation of a new dedicated air-cooled chiller system to support the oncology pharmacy and IV prep room, including necessary structural reinforcements, electrical upgrades, and plumbing work. This procurement is significant as it aims to enhance the facility's HVAC capabilities while ensuring compliance with strict safety and infection control measures. The estimated contract value ranges from $1,000,000 to $5,000,000, with a completion timeline of 365 calendar days from the Notice to Proceed. Interested parties must contact Contract Specialist Samantha Chavanga at Samantha.Chavanga@va.gov for further details and are encouraged to register in SAM.gov and SBA’s Small Business Search, as this is a 100% Service-Disabled Veteran Owned Small Business Set-Aside opportunity.
    Y1DZ--523A4-20-208 Replace Boilers and Upgrade Controls
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is seeking a general contractor for the project titled "Replace Boilers and Upgrade Controls" at the West Roxbury VA Medical Center in Massachusetts. This procurement involves the demolition, modification, and renovation of the existing Central Boiler Plant (Building 8), with an estimated construction magnitude between $50 million and $100 million and a performance period of 943 calendar days. The project is critical for upgrading essential infrastructure to support the medical center's operations. A Request for Proposal (RFP) is expected to be posted around November 21, 2025, and interested contractors must be registered in the System for Award Management (SAM). For further inquiries, contact Contracting Officer Heather Libiszewski-Gallien at Heather.Libiszewski-Gallien@va.gov or by phone at 413-584-4040 ext 6386.
    646-20-109 UD Chiller Capacity and Controls Upgrade
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is soliciting proposals for the "UD Chiller Capacity and Controls Upgrade" project at the Pittsburgh VA Medical Center, specifically targeting contractors with existing Multiple Award Task Order Contracts (MATOC) for the Pittsburgh-Butler-Erie VA Medical Centers. The project entails extensive mechanical, electrical, plumbing, and structural upgrades to enhance the chiller capacity, including demolition and construction across multiple buildings, while adhering to strict safety and compliance standards. This initiative is crucial for modernizing the facility's infrastructure to ensure efficient operations and compliance with federal regulations. Proposals are due by December 30, 2025, at 3:00 PM EST, and interested contractors should contact Amy Demarest at Amy.Demarest@va.gov or Jeffrey Pruett at Jeffrey.Pruett@va.gov for further information.
    Z2DA--OKC Replace Exterior Utility Lines Project 623-24-101 Posted 9-17-25 Closes 10-08-25
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is soliciting bids for the "Replace Exterior Utility Lines Project" at the Jack C. Montgomery VA Medical Center in Muskogee, OK, with a contract value estimated between $2,000,000 and $5,000,000. The project involves replacing exterior water and sewer lines, creating separate fire protection and domestic water loops to mitigate Legionella contamination, and requires compliance with ADA, OSHA, and NFPA standards. This opportunity is a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSBs) and emphasizes the importance of safety, quality assurance, and adherence to federal regulations throughout the construction process. Proposals are now due by December 17, 2025, at 2:00 PM CST, and must be submitted via email to Contract Specialist Jesus A. Villegas at jesus.villegas@va.gov.
    Z1DA--595-26-204 Replace Chillers Buildings 1, 2, and 104 DB (VA-26-00013164)
    Veterans Affairs, Department Of
    The Department of Veterans Affairs, specifically the Lebanon Veterans Administration Medical Center, is seeking proposals for a design-build contract to replace chillers in Buildings 1, 2, and 104, under Project Number 595-26-204. The selected contractor will be responsible for providing all necessary labor, materials, tools, and design-build services to complete the project in compliance with VA guidelines and applicable codes, ensuring minimal disruption during construction. This project is critical for maintaining the facility's HVAC systems, which are essential for patient and staff safety, and is set aside exclusively for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) with a contract value estimated between $1 million and $5 million. Interested parties must submit their Phase I proposals by December 17, 2025, and can direct inquiries to Contract Specialist Kaitlyn V Szlachta at kaitlyn.szlachta@va.gov.
    Z2NZ--CON-NRM 653-23-101 Repair-Replace Campus Sewer and Storm Drain Lines
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is preparing to solicit bids for the project titled "Repair-Replace Campus Sewer and Storm Drain Lines" at the Roseburg VA Medical Center in Oregon. This project involves extensive general construction work, including the repair and replacement of existing sanitary sewer and storm drain systems, with a focus on maintaining continuous operations at the medical center while adhering to strict safety and environmental regulations. The estimated contract value ranges between $20 million and $50 million, with a performance period of 425 calendar days anticipated to begin after the notice to proceed is issued. Interested contractors should note that the solicitation is expected to be posted around mid-December 2025, and they can direct inquiries to Contract Specialist Toni Wiser at toni.wiser@va.gov or by phone at 406-373-3341.
    Z2DA--Replace Auxiliary Chiller
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is soliciting bids for the replacement of a 120-ton auxiliary chiller and two 250 gpm pumps at Building 3 of the Fayetteville VAMC, under project number 565-24-113. The contractor will be responsible for removing the existing chiller, installing a new one of the same capacity, and ensuring integration with the existing Building Automation System, while adhering to all applicable safety and regulatory standards. This project is crucial for maintaining chilled water redundancy for the facility, ensuring continuous operation and safety for its medical services. Interested contractors, particularly Service-Disabled Veteran-Owned Small Businesses (SDVOSB), must submit their bids by January 26, 2026, and can direct inquiries to Contract Specialist Michael R Proctor at Michael.Proctor2@va.gov. The estimated construction magnitude is between $250,000 and $500,000.
    Z2NZ--Replace Air Handling Units 1 & 2 at the Montgomery RO
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is soliciting proposals for a firm-fixed-price contract to replace Air Handling Units 1 & 2 at the Montgomery Regional Office. This project, estimated to cost between $2,000,000 and $5,000,000, involves comprehensive construction, electrical, and mechanical work, including demolition and installation, with a performance period of 270 days. The initiative is crucial for maintaining the operational efficiency and safety of the facility, adhering to various federal and VA-specific codes and standards. Proposals are due by December 17, 2025, at 4:00 PM CT, and interested parties should contact Contract Specialist Jacalyn T. Hainey at Jacalyn.Hainey@va.gov for further information.
    Y1DA--589-703 Construct Addition and Renovate Community Living Center, Building 60 (VA-24-00028736)
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is seeking contractors for the construction of an addition and renovation of the Community Living Center, Building 60, under project VA-24-00028736. This procurement aims to enhance facilities for veterans, aligning with the VA's mission to improve care and living conditions. The estimated project cost is approximately $24.4 million, with bids received ranging from $18 million to nearly $20 million, emphasizing a competitive bidding process. Interested parties should contact Contract Specialist Joshua Slapnicker at joshua.slapnicker@va.gov, and note that responses to the solicitation must be submitted by the specified deadline, with all bids archived 90 days afterward.
    Z1DA--Upgrade HVAC System Phase II
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is seeking qualified contractors for the "Upgrade HVAC System Phase II" project at the Salem VA Medical Center in Salem, Virginia. This project involves the demolition, modification, and installation of a new HVAC system on the second floor of Building 143, with a contract value estimated between $5,000,000 and $10,000,000, specifically set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB). The successful contractor will be responsible for adhering to strict safety, security, and quality control measures throughout the project, which has a performance period of 365 calendar days. Interested parties must submit electronic bids by January 6, 2026, at 5:00 PM EST, with a mandatory pre-bid conference scheduled for December 11, 2025, and all inquiries directed to Contract Specialist Bryant L Guerrant at bryant.guerrant@va.gov.