Wolf Creek GSU Replacement
ID: W912P524R0004Type: Solicitation
Overview

Buyer

DEPT OF DEFENSEDEPT OF THE ARMYW072 ENDIST NASHVILLENASHVILLE, TN, 37203-1070, USA

NAICS

Power, Distribution, and Specialty Transformer Manufacturing (335311)

PSC

INSTALLATION OF EQUIPMENT- ELECTRIC WIRE AND POWER DISTRIBUTION EQUIPMENT (N061)
Timeline
    Description

    The Department of Defense, through the U.S. Army Corps of Engineers, is soliciting proposals for the replacement and installation of Generator Step-Up (GSU) transformers at the Wolf Creek Power Plant in Jamestown, Kentucky. This procurement involves a hybrid supply-construction contract for the design, manufacture, and delivery of three high-capacity power transformers, along with associated installation services, with a total estimated contract value between $25 million and $100 million. The project is critical for enhancing the power distribution capabilities of the facility, ensuring reliable energy supply. Interested contractors must submit their proposals by December 11, 2024, at 2:00 PM Central Time, and can direct inquiries to Andrew Roth or Dellaria Martin at the provided contact information.

    Files
    Title
    Posted
    The control number LRN-FY24-33 corresponds to a procurement initiative aimed at acquiring advanced cybersecurity solutions. The primary objective is to bolster the government's network security infrastructure by procuring and integrating cutting-edge technology. The focus is on robust firewall and intrusion prevention systems, with specific attention to mitigating advanced persistent threats. The preferred solution seeks to unify threat management, providing real-time visibility and control. Vendors are expected to offer comprehensive technical specifications and demonstrations of their systems' capabilities, with rigorous testing and evaluation as part of the selection process. As for the contract, it is anticipated to be a firm-fixed-price agreement, estimated at around $2 million, with vendor performance evaluated based on their ability to meet stringent security and performance benchmarks. The deadline for vendor responses is October 15th, 2024, with a targeted project commencement in early 2025.
    The document outlines an extensive compilation of federal and state funding opportunities, specifically focusing on Requests for Proposals (RFPs) and grants. Its primary purpose is to provide a resource for various governmental entities seeking financial support for their projects. The text presents a structured overview of eligibility criteria, application processes, submission deadlines, and available funding amounts, facilitating potential applicants in navigating through numerous grant opportunities. Key ideas include the emphasis on compliance with federal regulations, the importance of strategic alignment with funding goals, and highlights on community impact considerations. By consolidating this information, the document serves as a crucial tool for local and state governments aiming to enhance public services and infrastructure. The integrity of project proposals in alignment with governmental priorities is underscored, ensuring that applicants focus on delivering measurable outcomes that contribute to community development and sustainability. Overall, the document aims to support the effective allocation of government resources through informed decision-making among public organizations seeking financial aid.
    The file details the General Decision Number KY20240058, dated November 8, 2024, which outlines wage determinations for heavy construction projects in various counties of Kentucky, including work on sewer and water systems. It includes compliance requirements under the Davis-Bacon Act and pertinent Executive Orders that dictate minimum wage rates for federal contractors. Depending on the contract date, contractors must pay workers at least $17.20 or $12.90 per hour. Classification codes are presented for various labor categories like carpenters, electricians, and operators, with corresponding wage rates and fringe benefits listed. The document also explains the appeals process for wage determinations and classifications, emphasizing that adjustments to wage rates may occur annually and reminding contractors of responsibilities regarding worker protections under executive orders. This document serves as a vital reference for compliance in federal contracting, ensuring fair labor practices and establishing clear wage expectations for construction projects.
    The Nashville District Corps of Engineers requires a Foreign National Pre-Bid Meeting or Site Visit Request Form to be completed by non-U.S. citizens wishing to attend such events at their field locations. The form collects personal information and specifies required identification documents, aiming to facilitate access for foreign nationals while ensuring security. The process aims to approve visits two weeks prior, with exceptions considered as needed. This procedure is necessary for positive identification and security clearance, with access potentially denied if information is incomplete. The main procurement objective relates to site access and attendance at pre-bid meetings, focusing on positive identification and security measures for foreign nationals.
    The document pertains to a pre-proposal site visit related to the WOL GSU Transformers project, dated 9 October 2024. It includes a sign-in sheet listing attendees from various companies, including Koontz Electric, Mitsubishi Electric, and RMS Energy. The sign-in sheet records names, companies, and contact details, showcasing participants' interest in the project. This gathering likely serves as a precursor to a Request for Proposals (RFP), providing potential bidders with critical information about project expectations and timelines. The documented names and affiliations suggest collaboration among electrical services and industrial firms, integral to the project's execution. Overall, the meeting indicates proactive engagement in preparing for future RFPs, emphasizing the importance of stakeholder participation within the context of government contracts and funding opportunities.
    The Nashville District Corps of Engineers seeks to authorize access for U.S. citizens to its field locations for pre-bid meetings or site visits. Citizens must submit a request form providing detailed personal information, including full legal name, date of birth, and the last four digits of their Social Security number. This is to ensure security clearance for access to the facilities. The focus here is on facilitating controlled access to the government facilities for prospective bidders.
    The government seeks a firm to design, manufacture, test, and deliver three high-capacity power transformers for the Wolf Creek Power Plant in Kentucky. These transformers, with voltage capacities of 90,000/150,000kVA and 161kV, are to be delivered fully assembled and tested, along with associated services like offloading, storage, and commissioning. The project involves two phases: a supply phase for transformer delivery and a construction phase for installation, with specified timelines. Contractors must provide insurance and adhere to security protocols. The procurement also includes options for designing and constructing transformer foundations, bus systems, and switchyard feeders, as well as training. Critical dates include a 10-day commencement window and specified delivery and completion timelines. Evaluation will consider factors like price, quality, and past performance. This fixed-price contract includes economic price adjustments for certain materials.
    The document is an amendment to the solicitation for the Wolf Creek GSU Transformer Replacement project, indicated as solicitation number W912P524R0004. It outlines several updates to technical specifications, bid requirements, and contract clauses. Key changes include the introduction of updated technical specifications, updated construction wage determinations, specifications on bid guarantees, and updated liquidated damages pertaining to construction delays. The amendment also incorporates relevant FAR clauses and expands upon insurance and bonding requirements. The project involves the design, construction, and installation of new GSU transformers at the Wolf Creek Power Plant, with an estimated contract value between $25 million and $100 million. Offerors must submit proposals that emphasize their past performance and technical approach, evaluated against several factors, including price, efficiency, and small business participation. The amendment stresses the importance of compliance with new provisions and deadlines for submission, highlighting the federal government’s intent to ensure a competitive and fair bidding process while maintaining high standards of contract performance and labor standards compliance.
    The document outlines Amendment 0002 to Solicitation W912P524R0004 for the Wolf Creek GSU Replacement project by the U.S. Army Corps of Engineers. The amendment addresses updates like a site visit scheduled for 9 October 2024 and revisions to the deadlines for submitting inquiries. The project involves replacing ten existing GSU transformers at the Wolf Creek Power Plant in Jamestown, KY, with three new three-phase transformers and carries an estimated value between $25 million and $100 million. The document details eligibility criteria, submission requirements, evaluation factors, and a structured selection process that prioritizes past performance and technical approach over price. It highlights that an electronic proposal must be submitted by the specified deadline via the Procurement Integrated Enterprise Environment (PIEE). Furthermore, it mandates the provision of security access forms for site visits, specifically noting that all participants must bring personal protective equipment. Overall, this amendment aims to facilitate a clear proposal process while ensuring compliance with safety and quality standards in a substantial construction project.
    The document is an amendment to the solicitation for the Wolf Creek GSU Transformer Replacement Project, which aims to provide clarifications and updates to technical specifications and contract terms. Key updates include the revision of operational test phases, clarifying bid guarantee requirements, and modifying various specifications pertaining to the project's technical aspects. Specifically, several paragraphs in technical specifications were revised to ensure accuracy and clarity in project requirements, and contract drawing sheets were updated to reflect current designs. Additionally, responses to queries from industry stakeholders were provided, and the timeline for submitting offers was addressed, although the submission deadline was not extended. The amendment outlines the necessity for contractors to acknowledge receipt of this amendment prior to bid submission to avoid rejection of offers. Overall, this amendment serves to ensure all parties have the latest information necessary for compliance with the contract requirements, maintaining the integrity of the bidding process in federal procurement.
    The document W912P524R0004 pertains to the amendment of the solicitation for the Wolf Creek GSU Transformer Replacement Project by the US Army Corps of Engineers. The primary purpose of this amendment is to provide updated technical specifications, an extended deadline for proposal submissions from December 4, 2024, to December 11, 2024, and revised wage determinations under the Davis-Bacon Act. Additionally, it outlines changes to the warranty clauses associated with supplied materials, specifically altering warranty terms to a one-year period with up to four additional years available. New contract line items related to warranty extensions have been integrated into the price breakout schedule, emphasizing the importance of warranty coverage for supplied materials. The document stipulates specific wage rates and classifications for various labor involved in the project, adhering to federal contracting standards. This initiative reflects the government's adherence to regulatory requirements while ensuring quality standards in major construction projects. Overall, this amendment facilitates a smoother procurement process and upholds labor protections, reinforcing the government's commitment to responsible contracting practices in infrastructure development.
    The document outlines Amendment No. 5 to the solicitation for the Wolf Creek GSU Transformers Replacement project. The primary purpose is to clarify the distinctions between the Supply and Construction Contract Line Item Numbers (CLINs) and note that the proposal deadline remains unchanged at December 11, 2024, at 2:00 PM Central Time. Key updates include modifications to Section C of the solicitation, which detail the hybrid supply/construction contract structure and the necessity for offerors to submit a National Institute of Standards and Technology (NIST) score in the Supplier Performance Risk System (SPRS) before awarding the contract. Previous amendments addressed technical specifications, site visit details, and updated clauses related to bid guarantees and liquidated damages. Compliance with these updates is essential for bidders to ensure their offers are accepted. The structured format of the amendments indicates organizational clarity and a systematic approach to updates, ensuring all prospective contractors are adequately informed and prepared to submit proposals according to the latest requirements. The content reflects federal procurement processes, emphasizing the importance of adherence to guidelines in government contracts.
    Similar Opportunities
    Z--TRD GSU Transformer Replacements
    Interior, Department Of The
    The Department of the Interior, Bureau of Reclamation, is soliciting bids for the replacement of Generator Step-Up (GSU) transformers at three power plants within the Trinity River Division of the Central Valley Project in California. The project involves the supply, installation, and commissioning of nine transformers, along with associated components, while ensuring minimal disruption to power generation during the replacement process. This initiative is crucial for modernizing electrical infrastructure and maintaining operational efficiency, with an estimated contract value ranging from $35 million to $50 million. Interested contractors must acknowledge receipt of amendments and submit their proposals by January 31, 2025, with further inquiries directed to Matthew Thomas at mthomas@usbr.gov or by phone at 916-978-5117.
    Z--Grand Coulee Right Powerplant, GSU Transformer Replacements, Columbia Basin Pro
    Interior, Department Of The
    The U.S. Department of the Interior, through the Bureau of Reclamation, is seeking qualified contractors for the Grand Coulee Right Powerplant Generator Step-Up (GSU) Transformer Replacements project in Washington. The primary objectives include the removal and disposal of three existing GSU transformers, followed by the supply, installation, and commissioning of new transformers, with an estimated project budget exceeding $10 million. This initiative is crucial for maintaining and upgrading the infrastructure of the Columbia Basin Project, ensuring continued power generation capabilities while adhering to safety and environmental standards. Interested firms must submit their qualifications and relevant experience by February 11, 2025, to Lance Fleming at lfleming@usbr.gov, as the anticipated contract award is planned for FY2026.
    K--Nathaniel "Nat" Washington Power Plant GSU Transformer Replacements
    Interior, Department Of The
    The U.S. Department of the Interior, through the Bureau of Reclamation's Pacific Northwest Regional Office, is seeking qualified firms for the replacement of Generator Step-Up (GSU) transformers at the Nathaniel "Nat" Washington Power Plant, part of the Columbia Basin Project in Washington. The project entails the supply, installation, and commissioning of six outdoor, single-phase GSU transformers, including the removal and disposal of existing units, installation of seismic anchorage systems, and modifications to existing equipment. This initiative is crucial for maintaining a reliable power infrastructure and ensuring compliance with safety and environmental regulations during the upgrade process. Interested parties are encouraged to respond to the Sources Sought Notice by February 14, 2025, and participate in an Industry Day scheduled for January 28, 2025. The estimated project cost ranges from $100 to $150 million, and inquiries can be directed to Scott Cooper at smcooper@usbr.gov or by phone at 208-378-5104.
    Little Goose Spare Transformers for Lower Snake River Plants
    Dept Of Defense
    The Department of Defense, through the US Army Corps of Engineers, is seeking proposals for the design, manufacture, and testing of generator step-up transformers for the Lower Snake River Plants, specifically the Little Goose Spare Transformers project. This procurement involves two types of transformers and will utilize a firm fixed-price contract strategy over an estimated period of 1,460 days, with a best value trade-off acquisition approach to ensure optimal proposals are selected. The project is critical for maintaining infrastructure reliability and efficiency, with anticipated solicitation and award dates set for March 2025 and July 2025, respectively. Interested parties can reach out to Alan Inglis at alan.n.inglis@usace.army.mil or Brooke Moore at brooke.n.moore@usace.army.mil for further information and guidance on participation.
    Island Creek Switchyard Transformer
    Dept Of Defense
    The U.S. Army Corps of Engineers, Wilmington District, is soliciting proposals for the design, manufacture, testing, and delivery of two outdoor Class II oil-filled three-phase transformers and associated circuit switchers for the Island Creek Switchyard project in Boydton, Virginia. The contract requires the provision of high-voltage transformers rated at 5,000 kVA and includes specific technical requirements for circuit switchers and load break switches, emphasizing the importance of operational manuals and compliance with safety standards. This procurement is set aside for small businesses, with evaluations based on technical approach, past performance, and pricing, and proposals are due by January 24, 2025. Interested parties can contact Jenifer Garland at jenifer.m.garland@usace.army.mil or Troy Small at troy.d.small@usace.army.mil for further information.
    Procurement of New Transformer, Current Supporting 800kW, 60 Hz DPGDS
    Dept Of Defense
    The Defense Logistics Agency (DLA) at Aberdeen is seeking sources for the procurement of a new transformer, specifically the Transformer, Current supporting 800kW, 60 Hz DPGDS, with the National Stock Number (NSN) 5950-01-500-6328. The government intends to acquire a total of 90 units over five years, with varying quantities each year, and requires suppliers to provide lead times, cost estimates, and supporting documentation, including design drawings and test results. This procurement is crucial for maintaining operational capabilities within the Army Integrated Logistics Supply Center, and interested parties must submit their responses by January 15, 2025, to the designated contacts, Mr. Lawrence Donohue and Mr. Micah Greene, via email. Compliance with the International Traffic in Arms Regulations (ITAR) is mandatory, and companies must have an active status in the Defense Logistics Agency Joint Certification Program (JCP) to access the Technical Data Package (TDP).
    ROUGH RIVER DAM SAFETY MODIFICATION PHASE II: NEW OUTLET WORKS AND CUTOFF WALL PROJECT
    Dept Of Defense
    The Department of Defense, specifically the U.S. Army Corps of Engineers, is soliciting proposals for the Rough River Dam Safety Modification Phase II project, which involves the construction of new outlet works and a cutoff wall at the Rough River Reservoir in Falls of Rough, Kentucky. The procurement aims to enhance the safety and structural integrity of the dam, addressing critical geological and hydrological challenges identified in previous assessments. This project is vital for maintaining the dam's operational capacity and ensuring compliance with federal safety regulations. Interested contractors must submit their proposals electronically by March 20, 2025, with the total contract value estimated between $250 million and $500 million. For further inquiries, contact Adyson Medley at adyson.medley@usace.army.mil or call 502-315-6211.
    Buckhorn Boat Ramp Reconstruction
    Dept Of Defense
    The Department of Defense, through the U.S. Army Corps of Engineers, is soliciting proposals for the reconstruction of the Buckhorn Boat Ramp at Buckhorn Reservoir in Perry County, Kentucky. The project involves the removal of the existing ramp, construction of a new ramp, installation of storm sewers, and pavement work, with an estimated construction cost ranging from $1 million to $5 million. This initiative is crucial for enhancing access and safety at the recreational facility, aligning with federal objectives to improve infrastructure while minimizing environmental impact. Interested contractors must submit sealed bids by February 10, 2025, and are encouraged to attend a pre-bid site visit on January 22, 2025. For further inquiries, contact Marcie Billotto at marcie.billotto@usace.army.mil or call 502-315-6213.
    5 Year Service Contract - GENERATORS AND UNINTERRUPTIBLE POWER SUPPLY (UPS) SYSTEMS - PREVENTATIVE MAINTENANCE AND REMEDIAL REPAIRS
    Dept Of Defense
    The Department of Defense, specifically the Army Contracting Command, is seeking proposals from small businesses for a five-year service contract focused on preventative maintenance and remedial repairs for generators and uninterruptible power supply (UPS) systems at Tobyhanna Army Depot in Pennsylvania. The contract will be structured as a hybrid of firm-fixed-price for scheduled maintenance and time-and-materials for unscheduled repairs, covering 30 generators and 19 UPS systems to ensure operational readiness in the event of power loss. This procurement is critical for maintaining the functionality and safety of essential power systems, with a proposal submission deadline set for January 27, 2025, and a site visit scheduled for January 9, 2025. Interested contractors can contact Deborah Belak at deborah.belak.civ@army.mil or by phone at 570-615-7579 for further details.
    Troy Lock Automatic Transfer Switch Replacement
    Dept Of Defense
    The Department of Defense, through the U.S. Army Corps of Engineers, is seeking proposals for the replacement of the Automatic Transfer Switch (ATS) at the Albany Field Office in Troy, New York. The contractor will be responsible for providing all necessary labor, materials, and equipment to ensure a seamless transition of the ATS, which must not interrupt power for more than 30 minutes during the replacement process. This project is critical for maintaining operational efficiency and safety at the facility, adhering to various federal, state, and industry standards throughout the execution. Proposals are due by December 6, 2024, with the anticipated contract performance commencing after April 15, 2025. Interested parties can contact Brian Winters at brian.h.winters@usace.army.mil for further information.