Cummins Generator Installation (B810 & B845)
ID: FA4686R0025Type: Solicitation
Overview

Buyer

DEPT OF DEFENSEDEPT OF THE AIR FORCEFA4686 9 CONS PKPBEALE AFB, CA, 95903-1702, USA

NAICS

Electrical Contractors and Other Wiring Installation Contractors (238210)

PSC

REPAIR OR ALTERATION OF MISCELLANEOUS BUILDINGS (Z2JZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)
Timeline
    Description

    The Department of Defense, specifically the Department of the Air Force, is soliciting proposals for the installation of new Cummins 20kW diesel generator systems at Beale Air Force Base, California, targeting facilities B810 and B845. The project involves the removal of existing standby generator systems and their Automatic Transfer Switches (ATS), followed by the installation of new generators, complete with fuel tanks and necessary connections, in compliance with various military and safety regulations. This procurement is crucial for enhancing emergency backup power reliability at the base, with an estimated contract value between $500,000 and $1 million. Interested contractors must submit their proposals by September 27, 2024, and can direct inquiries to SrA Cristhian Gonzalez at cristhian.gonzalez_tovar@us.af.mil or SSgt Milton Vasquez at milton.vasquez@us.af.mil.

    Point(s) of Contact
    Files
    Title
    Posted
    The 9th Contracting Squadron seeks bids for repairing and replacing two standby diesel generator systems at different facilities, namely B810 and B845. The primary objective is to enhance emergency backup power reliability. Successful bidders will be responsible for providing a comprehensive solution involving the removal of the existing systems, including Automatic Transfer Switch (ATS), and installing new Cummins 20kW generator systems with fuel tanks and compatible bypass ATS. The work plan must adhere to stringent technical standards and include a rental generator for emergency use during the replacement process. For CLIN 0001 (Facility B810), a 3-wire, remote-start, 120/208 VAC, 60Hz generator is specified, while CLIN 0002 (Facility B845) requires a 3-wire, remote-start, 120/240 VAC, 60Hz unit. Both installations must comply with various codes and regulations, and extensive testing and commissioning procedures are outlined. Importantly, a concrete pad enhancement is added for Facility B845, requiring precise field verification and construction. Contractors have until 24 July 2024 to submit proposals.
    The provided files appear to contain procurement objectives related to a military or aerospace project, specifically referencing "Air Combat Command" and including architectural drawings such as floor plans and site maps. The main goods being procured seem to be construction-related, likely for the renovation or modification of an existing building, possibly a command center. The procurement objective is to engage a contractor for architectural services, including the creation of detailed floor plans and site maps required for a building labeled ACC Phase II. The scope likely involves significant interior modifications, potentially adding or reconfiguring spaces for specific functional areas. The work may also entail structural changes or additions, as the files mention a site plan. The project appears to be divided into phases, with the current focus on phase II, and the successful vendor would likely be responsible for delivering detailed construction drawings, specifications, and possibly construction management services. The contract, valued at around $8–10 million, is likely a firm-fixed-price agreement, with bids being accepted for a few weeks and an anticipated project duration of approximately one year. Evaluating criteria will probably emphasize the bidder's experience with similar large-scale renovation projects, their proposed timeline, and cost effectiveness.
    The government seeks to procure a vast array of materials and services for a large-scale construction project. This comprehensive list encompasses architectural, structural, mechanical, plumbing, and electrical elements required for the development. The focus is on submitting detailed drawings, designs, plans, and specifications for various aspects of the project, with specific attention to engineering details and quality standards. Contractors are expected to provide a range of solutions, from demolition and asbestos plans to intricate mechanical systems and exterior electrical installations. The government also emphasizes health, safety, and environmental considerations alongside quality assurance. Submission deadlines are staggered, with some documents required within seven days of notice to proceed (NTP) and others at later dates. Evaluation of proposals will likely focus on the technical merit of submitted designs and compliance with stringent requirements.
    The government seeks a contractor for the design and installation of 20kW Cummins generators at two locations, Buildings B810 and B845, on a military base. The primary focus is on procuring expert construction services that adhere to DoD regulations. Offerors are required to submit detailed technical and cost proposals outlining their approach, with clarity and precision, for this bid-build project. The technical proposal must include a comprehensive design plan, permitting details, and construction methodology. Cost proposals should provide a breakdown of prices for each project phase. This procurement emphasizes a "Best Value" approach, which goes beyond cost, considering factors like technical expertise, qualifications, and experience. The submission deadline is July 26th, 2024, and the evaluation will prioritize proposals that offer the lowest price coupled with acceptable technical standards.
    The primary objective of this RFP is to procure the design and construction services required to install two 20kW Cummins generators at buildings B810 and B845 on a military installation, ensuring compliance with DoD regulations. The technical proposal must include a detailed plan for installation, emphasizing work sequencing, site preparation, and reporting. Offerors are expected to provide a clear project schedule and demonstrate relevant experience in diesel generator system removal, disposal, and the installation of generator systems. The government seeks a comprehensive proposal addressing all design/build aspects, with particular focus on compliance with DoD regulations. Proposals will be evaluated based on technical approach, cost, and qualifications, prioritizing the lowest priced, technically acceptable bids. Critical dates include the submission deadline of July 26, 2024.
    The Air Force seeks a contractor for the installation of Cummins generators at Beale Air Force Base. The primary objective is to procure a comprehensive installation solution, with a focus on technical expertise and cost-effectiveness. The chosen bidder will be responsible for providing a detailed statement of work, outlining equipment installation procedures, work sequencing, and reporting. The AF 3064 schedule must detail each task with reasonable timelines. Cost proposals should encompass the entire design/build project, accompanied by a bid schedule for evaluation. The evaluation of bids will prioritize the offerors' relevant experience in diesel generator removal, installation of 20kW generator systems, and compliance with military installation regulations. Contractors must showcase qualifications and successful completion of previous relevant projects, especially those involving Cummins generators. The submission deadline is 26 July 2024 at 1:00 PM PST, with the contract awarded based on qualifications, methodology, and cost. The RFP emphasizes the government's desire for an advantageous partnership, hinting at a potential long-term relationship.
    The Air Force seeks a contractor for the installation of Cummins generators at Beale Air Force Base. The primary objective is to procure expert installation services for these generators, ensuring a detailed statement of work that aligns with government requirements. Contractors must provide a comprehensive technical approach and detailed schedules for the design and construction phases. The evaluation of proposals will prioritize the contractor's ability to meet the government's specifications and timeline while offering the most competitive pricing. Relevant experience in diesel generator systems and compliance with military installation regulations are essential. Offerors must submit their proposals electronically by the deadline, emphasizing their qualifications, project expertise, and cost effectiveness. The most advantageous proposal will be selected based on the cumulative evaluation of these factors, with particular weight given to the technical approach and cost proposal.
    The AF FORM 3064 outlines a progress schedule for a government contract focused on project management and installation. The primary objective is to track and manage the contract's progress, ensuring timely completion. The form provides columns for recording planned and actual start and completion dates for each work element, with a percentage of completion indicated for each week. Work elements include subcontractor selection, material submission, and final cleanup. The form also permits the recording of actual progress completed and allows space for signatures and approval from the contractor and government officials. Key dates are present for recommended approval, actual start and completion, with contract and project numbers also provided. This form is a tool for monitoring contractual progress and ensuring accountability in the execution of the project.
    The primary objective of this procurement is the installation of two Cummins generators, B810 and B845, along with associated equipment and services. These generators are required to meet specific run time requirements, initially stated as 24 hours but later clarified at 72 hours, and will need to be installed on new concrete pads per provided drawings and addendums. The contractor is responsible for fuel costs, with a one-time fill required after installation. Key tasks involve the installation of the generators, concrete pads, and associated electrical infrastructure, including transferring switches and main panel connections. Rental equipment is necessary to maintain system operation during the project, and the contractor must carefully coordinate the removal and replacement of existing equipment. Drawings and photographs have been provided to assist in understanding the layout and connections required. The RFI emphasizes the need for precise compliance with the specified Cummins generators, indicating no acceptance of equivalents due to long lead times. The evaluation of proposals will likely focus on the ability to meet these requirements and provide the specified equipment. Lead times and project timelines are critical, with some responses referencing the need for careful coordination. This file does not explicitly mention contract details or values, but the procurement appears to be a firm-fixed-price contract based on the nature of the inquiries. As such, offerors should provide clear and detailed proposals focusing on their ability to deliver the specified generators and meet the stated run time and installation requirements.
    The government seeks to procure a new generator with a 24-hour runtime requirement, which involves replacing existing generators. Contractors will be responsible for fuel costs and must provide drawings and photographs of the current setup. The work entails managing permits, concrete pads, and site excavation, with strict requirements for a Cummins generator as specified in the solicitation. The goal is to ensure uninterrupted power transition, with the project's key focus being the installation of the new generator, transfer switch, and associated infrastructure. The rental of a temporary unit is crucial to maintaining operations during the transition. Drawings and photos have been provided to assist in the bid process, with key dates and evaluation criteria expected to be provided in a subsequent addendum.
    The document outlines the Request for Information (RFI) responses regarding the installation of Cummins generators at two locations (B810 & B845). The primary requirement is for a new generator with a 24-hour runtime, supported by a rental unit during construction phases. Permits will be required, but no stamped architectural drawings are necessary. Responsibilities include the contractor bearing fuel costs and addressing excavation needs for new concrete pads that will be installed. Photos and relevant drawings of existing equipment and locations have been provided in support of the project. The document emphasizes specific requirements, like adherence to NFPA & NEC guidelines and the inclusion of Siemens monitoring for the new generators. Clarifications pertain to the necessity of as-builts, the potential for code upgrades, and the project's dependency on environmental constraints. The proposal's uncertainty around the term "rental" is addressed, affirming that the rental generators are for emergency use during installation. Overall, the RFI seeks clarity on design and operational requirements while emphasizing compliance with safety standards and proper execution of the installation.
    The file contains specifications for the procurement of multiple Onan GenSets, which appear to be a type of generator or power unit. The text emphasizes safety warnings and operational guidelines, indicating that these are critical aspects for any successful procurement. The GenSets are likely required to have protective guards in place during operation and must adhere to strict safety standards. These generators seem to be powered by diesel and likely have a model number of DS-2 F-54. Although the text doesn't explicitly mention the desired quantity, the repeated use of "Onan GenSet" suggests that multiple units are being sought. The procurement appears to be focused on acquiring these GenSets, with an emphasis on their functional capabilities and safety features. No further details about the procurement process or evaluation criteria are present in the provided file contents. However, the inclusion of the term "COLLE" suggests this information might be available in associated documents.
    The procurement objective outlined in the solicitation document revolves around the installation of two new Cummins diesel generators for emergency power. The focus is on replacing existing standby generators with newer models. The main goods being procured include two 20kW generators, along with related components like fuel tanks, automatic transfer switches (ATS), and required cabling. The generators are to be installed at specific locations, adhering to detailed technical specifications and standards. Section B outlines the specific quantities and unit prices for the two generator systems, while Section C provides a detailed statement of work, emphasizing the removal of existing systems and the installation process. Important technical standards, such as UFC 3-540-01, NFPA, and DAFMAN, are referenced. Section F determines the performance period, specifying 60 calendar days from the notice to proceed with a completion timeline of 120 calendar days. Contractors interested in this fixed-price construction contract are required to submit sealed offers, with evaluation criteria likely focusing on the price and compliance with technical requirements. Key dates include the offer submission deadline and the anticipated contract commencement and completion timelines.
    The document comprises a solicitation for the installation of generator systems at Beale Air Force Base, identified as the B810 & B845 Generator Installation project (Solicitation Number: FA468624R00250003). It outlines the requirements for the removal of existing diesel generator systems and the installation of new Cummins 20kW generators, complete with necessary components while ensuring compliance with various military and safety standards. The solicitation specifies a budget magnitude between $500,000 and $1,000,000, and states that funding is currently unavailable, but will be awarded once accessible. A site visit is not formally organized, although contractors can request one. Key deadlines include the submission of proposals by September 23, 2024, with answers to requests for information due by September 19, 2024. The contractor is mandated to begin work within specified calendar days post-award and to furnish performance and payment bonds if required. Additionally, the document details extensive contract clauses relevant to construction and federal guidelines, emphasizing the strategic partnership between the government and contractors in executing projects that ensure operational efficiency and compliance with regulations.
    This document is a solicitation for bids on a government construction project involving the installation of new generator systems at Beale AFB, California. The project requires the removal of existing generators and the installation of Cummins 20kW generator systems compliant with various military standards and local codes. Bids must be submitted by 23 September 2024, with proposals remaining valid until 31 December 2024. The project is estimated to cost between $500,000 and $1 million, though funding is currently unavailable. Contractors are expected to comply with performance requirements and provide necessary performance and payment bonds if required. A site visit is not planned but can be arranged upon request. Key deadlines include a request for information (RFI) deadline and a proposal submission deadline, each with specific time requirements. The document outlines the bidding process, ensures transparency regarding financial arrangements, and emphasizes adherence to safety and regulatory standards as stipulated in the comprehensive specifications laid out. This solicitation reflects the government’s protocol for ensuring competitive bidding and adherence to strict safety and quality standards in public contracting for construction services.
    The procurement seeks to amend a pre-existing solicitation for two new Cummins 20kW generators and the removal of existing generator systems at two locations, B810 and B845. The amendment outlines additional tasks and clarifications, extending the solicitation's deadline. It incorporates detailed requirements for signage, defibrillators, and testing, emphasizing critical emergency response and mission-specific standards. The work involves generator installation, including battery chargers and rental backup provisions, along with associated electrical work and testing. Signage and safety measures are crucial, adhering to NFPA and UFC standards. The evaluation of offers will likely focus on the understanding and adherence to these amended requirements. Offerors must acknowledge the amendment's receipt, and submissions are now extended. Key dates and contract details remain unknown.
    The primary objective of this procurement is to acquire installation services for new diesel generator systems, specifically Cummins 20kW generators. The focus is on replacing existing standby generator systems and their Automatic Transfer Switches (ATS). The government seeks a contractor to provide a comprehensive solution, including removal of the old systems, installation of the new generators with fuel tanks and ATS, and all necessary connections and configurations. This is a firm-fixed price contract, emphasizing the requirement for pricing details in the proposal. Important dates include the extended response deadline, now 4:00 PM Pacific Daylight Time, and the expectation to complete the work within the guidelines of the mentioned NFPA, UFC, and DAFMAN regulations. Evaluation of proposals will likely prioritize technical merit and price, with additional considerations for past performance and small business participation.
    This document serves as an amendment to a solicitation involving the installation of a new standby diesel generator system at Beale AFB, CA. Key updates include a 60-day extension for proposal submission, changing the due date from July 26, 2024, to September 23, 2024, with proposals required to be valid until December 31, 2024. The amendment also introduces a new clause, FAR 52.232-18 on availability of funds, and updates contact information for the Contract Specialist and Contracting Officer. The project involves the removal of existing diesel generator systems and the installation of a new Cummins generator system compliant with various regulations. The estimated project magnitude is between $500,000 and $1,000,000. A site visit is not formally organized, but one can be requested. The document further specifies that funds are currently unavailable until future allocation. All other solicitation terms remain unchanged. This amendment highlights the importance of maintaining updated proposal timelines and regulatory compliance in government contracting, underpinning the need for companies to stay informed on such amendments to take appropriate action in the bidding process.
    This document serves as an amendment to a federal solicitation, specifically extending the proposal due date from September 23, 2024, to September 27, 2024. The proposals are required to remain valid until December 31, 2024. The amendment outlines various methods by which bidders must acknowledge receipt of the amendment, which can include returning copies of the amendment with signatures or confirming receipt via separate communication. It is emphasized that failure to acknowledge the amendment prior to the specified deadline may result in offer rejection. The document also addresses modifications for contracts, highlighting that other existing terms and conditions remain unchanged. This amendment not only provides logistical updates to potential contractors but ensures compliance with federal acquisition regulations by outlining necessary steps for acknowledgment and modifications. The purpose of this amendment reflects the federal government's intent to facilitate the bidding process while adhering to standard protocols for procurement alterations.
    Lifecycle
    Title
    Type
    Similar Opportunities
    Generator Purchase
    Dept Of Defense
    The Department of Defense, specifically the Department of the Air Force, is soliciting offers for the purchase of generators for Larissa Air Base in Greece. The procurement includes 60kW and 100kW generators, with a focus on models Cummins C65D2R and C135D2R, to support military operations. This acquisition is critical for ensuring reliable power supply in operational settings, emphasizing the need for quality equipment that meets stringent government standards. Interested vendors must submit their quotations by January 17, 2025, and can contact Andrew Westbrook at andrew.westbrook@us.af.mil for further details regarding the solicitation.
    60kW Lightweight Generator
    Dept Of Defense
    The Department of Defense, specifically the Air Force Life Cycle Management Center, is conducting market research through a Request for Information (RFI) to identify potential sources for a lightweight 60-kilowatt generator designed for use in austere environments. The primary objectives include assessing existing products or developments, understanding trade-offs in specifications, and gathering insights to inform future contracting strategies. This generator is crucial for providing continuous power in expeditionary settings, with requirements for compatibility with various voltages, multi-fuel capability, and transportability. Interested parties are invited to submit their responses by January 31, 2025, and should direct inquiries to Anna E. Isom at Anna.Isom@us.af.mil or Ayonna M. Webb at ayonna.webb@us.af.mil. Participation in this survey does not guarantee future contract awards, and the government will not reimburse any associated expenses.
    Travis AFB Hangar FCX Power System Repair and Maintenance
    Dept Of Defense
    The Department of Defense, specifically the 860th Aircraft Maintenance Squadron at Travis Air Force Base, is seeking qualified vendors for the repair and maintenance of an FCX Systems power generator. The procurement aims to identify certified technicians capable of conducting onsite inspections, cleaning components, and ensuring operational readiness of the generator, which is critical for military operations. This opportunity is particularly focused on small businesses, including those classified as Small Disadvantaged, HUBZone, Certified 8(a), Service-Disabled Veteran-Owned, and Woman-Owned, emphasizing the importance of compliance with safety regulations and operational standards. Interested parties must submit their responses by November 20, 2024, and direct any inquiries to the designated contacts, SrA Akeim Griffiths and Marcus Thomas, by November 16, 2024.
    BAEY 240015 - Replace Fire Pump Controllers
    Dept Of Defense
    The Department of Defense, specifically the Department of the Air Force, is seeking qualified contractors for the BAEY 240015 project, which involves upgrading fire pump controllers and the fire alarm system at Building 11600 located at Beale Air Force Base in California. The project requires the demolition of outdated fire safety systems, the design and installation of new equipment, and ensuring compliance with current cybersecurity and engineering standards. This initiative is crucial for maintaining operational reliability and safety at military installations, as the existing systems are outdated and pose risks to fire safety equipment functionality. Interested parties should contact SrA Cristhian Gonzalez at cristhian.gonzaleztovar@us.af.mil or 530-634-3308, or SSgt James Buyag at jamesbryan.buyag@us.af.mil or 530-634-2228 for further details regarding the Sources Sought Questionnaire and project requirements.
    CUMMINS Diesel Engine Replacement
    Dept Of Defense
    The Department of Defense, specifically the Department of the Air Force, is seeking potential sources for the procurement of a remanufactured CUMMINS Turbo Diesel Engine Replacement, specifically the 8.9L Engine Model L9 350 for a 2018 Freightliner Model FL112. The objective is to conduct market research to identify competitive suppliers that meet the NAICS code 333618, which pertains to "Other Engine Equipment Manufacturing," while encouraging responses from small businesses, including those with special designations such as 8(a), Service-Disabled Veteran-Owned, HUBZone, and Women-Owned small business concerns. This procurement is crucial for maintaining operational readiness and ensuring high standards in engine performance, with a requirement for a two-year unlimited mileage warranty. Interested parties must submit their qualifications and capabilities by January 15, 2025, and can direct inquiries to Karen V. Broughton at karen.broughton@us.af.mil or Erik Hallberg at erik.hallberg.1@us.af.mil.
    Inspection & Maintenance f/ Fire Dept. Training Facility Systems
    Dept Of Defense
    The Department of Defense, specifically the Department of the Air Force, is seeking proposals for inspection and maintenance services for fire training facility systems at Beale Air Force Base in California. The contract requires a qualified contractor to provide regular preventative maintenance, routine inspections, and corrective maintenance for specialized fire training equipment, including the KFT Fire Trainer System, to ensure compliance with operational and safety standards. This procurement is critical for maintaining the operational readiness and safety of fire training systems, supporting the mission of the 9th Civil Engineering Squadron. Proposals are due by January 23, 2025, at 10:00 AM PST, and interested parties should contact Candice Woods at candice.woods@us.af.mil or Teresa Perez at teresa.perez.9@us.af.mil for further information.
    Solicitation Announcement
    Dept Of Defense
    The Defense Logistics Agency (DLA) is seeking suppliers for the procurement of Generator, Engine AC units, specifically under solicitation number SPRDL1-24-R-0104. The contract involves a firm fixed price for an initial quantity of 162 units, with an option for an additional 162 units, and requires adherence to strict military standards for manufacturing and packaging, including a mandatory First Article Test (FAT). These generators are critical components for military operations, ensuring reliable power supply in various applications. Interested vendors must submit capability statements and comply with export control regulations, with delivery timelines set for 240 days post-award without FAT or 630 days with FAT. For inquiries, contact Sabrina Krafft at sabrina.krafft@dla.mil or call 586-467-1177.
    146 CES Repair Pump House B1203
    Dept Of Defense
    The Department of Defense, specifically the California Air National Guard's 146th Airlift Wing, is seeking qualified contractors for the "146 CES Repair Pump House B1203" project, which involves the repair and upgrade of fire pump systems at Building 1203 in Port Hueneme, California. The project requires the contractor to provide all necessary services, including labor, materials, and supervision, to demolish existing diesel fire pump systems and replace them with new electric motor fire pumps and associated components to ensure effective fire suppression for nearby hangars. The anticipated contract value is between $1,000,000 and $5,000,000, and interested parties must submit a written notice of intent to propose as a prime contractor, along with relevant project experience and socioeconomic status, by the specified deadline to the contacts provided: Ricardo Macias at ricardo.macias.3@us.af.mil and William Tucker at william.tucker.32@us.af.mil.
    5 Year Service Contract - GENERATORS AND UNINTERRUPTIBLE POWER SUPPLY (UPS) SYSTEMS - PREVENTATIVE MAINTENANCE AND REMEDIAL REPAIRS
    Dept Of Defense
    The Department of Defense, specifically the Army Contracting Command, is seeking proposals from small businesses for a five-year service contract focused on preventative maintenance and remedial repairs for generators and uninterruptible power supply (UPS) systems at Tobyhanna Army Depot in Pennsylvania. The contract will be structured as a hybrid of firm-fixed-price for scheduled maintenance and time-and-materials for unscheduled repairs, covering 30 generators and 19 UPS systems to ensure operational readiness in the event of power loss. This procurement is critical for maintaining the functionality and safety of essential power systems, with a proposal submission deadline set for January 27, 2025, and a site visit scheduled for January 9, 2025. Interested contractors can contact Deborah Belak at deborah.belak.civ@army.mil or by phone at 570-615-7579 for further details.
    Lease of 100kW Diesel Generator Sources Sought
    Dept Of Defense
    The Department of Defense, specifically the Department of the Navy, is seeking industry input for the lease of one 100 kW Diesel Generator (DG) to support emergency power supply needs at the Puget Sound Naval Shipyard & Intermediate Maintenance Facility (PSNS & IMF) in Bremerton, Washington. The generator will primarily serve as a backup power source, with an expected operational capacity of less than 20 hours annually, and must meet specific performance standards outlined in the attached Performance Work Statement (PWS). This procurement is critical for ensuring reliable power during maintenance projects at the shipyard, emphasizing safety, performance reliability, and compliance with federal regulations. Interested companies should submit their notice of interest, including relevant capabilities and past performance examples, to the designated contacts, Emily Hamilton and Brian Fergus, by the specified deadline, as this sources sought notice is for information and planning purposes only and does not constitute a formal solicitation.