Inyo NF Prevention Patrol Office HVAC Installation
ID: 12970224Q0058Type: Solicitation
Overview

Buyer

AGRICULTURE, DEPARTMENT OFFOREST SERVICEINYO NATIONAL FORESTBISHOP, CA, 93514, USA

NAICS

Plumbing, Heating, and Air-Conditioning Contractors (238220)

PSC

MAINT/REPAIR/REBUILD OF EQUIPMENT- REFRIGERATION, AIR CONDITIONING, AND AIR CIRCULATING EQUIPMENT (J041)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)
Timeline
    Description

    The U.S. Department of Agriculture, specifically the Forest Service, is seeking qualified contractors for the HVAC installation project at the Inyo National Forest's Fire Prevention/Patrol Office in Bishop, California. The project entails replacing outdated wall heaters and air conditioning units with a new heat pump system, which includes one 36,000 BTU outdoor unit and multiple wall-mounted air handlers, along with necessary electrical work and logistics. This procurement is crucial for enhancing energy efficiency and maintaining optimal indoor climate conditions for fire prevention operations. Proposals are due by September 18, 2024, with a total budget of less than $25,000, and interested contractors should contact Contract Specialist Bob Eberle at bob.eberle@usda.gov for further details.

    Point(s) of Contact
    Contract Specialist: Bob Eberle
    bob.eberle@usda.gov
    Files
    Title
    Posted
    The file outlines a Request for Proposal (RFP) for the installation of HVAC systems at the Inyo National Forest's Fire Prevention/Patrol Office. The project involves replacing old HVAC systems with new units, including a 36,000 BTU outdoor heat pump and two types of wall-mounted air handlers (12,000 BTU and 6,000 BTU). The contractor is responsible for all procurement, installation, and necessary materials, ensuring successful completion of the project. The document demands vendors to complete and submit the provided Excel Statement of Items (SOI), with quotes valid for 30 days post-solicitation closing. It specifies that the selection will culminate in one awarded contract, accounting for taxes in pricing. This RFP serves to enhance the facility's HVAC capabilities, crucial for maintaining appropriate environmental conditions for fire prevention and related activities.
    The document outlines the Request for Proposal (RFP) for the Inyo National Forest Prevention Patrol Office HVAC Installation, issued by the USDA Forest Service. The project involves replacing non-functional wall heaters and air conditioning units in the White Mountain Prevention and Battalion Chiefs Offices located in Bishop, California. It requires a contractor to install a new heat pump system, including one outdoor unit, wall-mounted air handlers, and electrical work, within a budget of less than $25,000. The contractor must commence work within 10 calendar days of receiving the notice to proceed and complete it within a total of 30 days. The RFP details necessary performance and payment bonds, wage determinations, and compliance with federal regulations regarding sustainable products. Other requirements include providing personal protective equipment, adhering to safety protocols, and ensuring quality assurance through inspection clauses. The submission of proposals is due by September 18, 2024, and is crucial for improving HVAC systems in government facilities, reflecting the agency's commitment to safety, environmental stewardship, and efficient operation of federal buildings.
    The U.S. Forest Service is soliciting an HVAC contractor for the installation of a heat pump system at the Fire Prevention/Patrol building in Bishop, California. The project involves installing one 36,000 BTU outdoor unit and multiple wall-mounted air handlers, along with necessary wiring, condensate lines, and power supply. The contractor will handle all logistics, including equipment supply, waste disposal, and coordination of material deliveries. Work is expected to start on June 24, 2024, and will take approximately 30 days, adhering to specific time restrictions and licensing requirements. The contractor must ensure all installations align with industry standards, including appropriate inspections, and must submit product information for approval before installation begins. The HVAC units must be from recognized manufacturers and meet specific operational performance criteria. This RFP aims to enhance energy efficiency and indoor climate comfort at the facility, emphasizing compliance and safety throughout the project execution.
    The document outlines a renovation project involving various types of doors at a facility labeled as the Radio Shop. It specifies the removal and replacement of multiple roll-up doors and the trails door, along with plans to infill and replace windows in the building. The detailed plan view and front elevation renderings suggest a focus on improving access and possibly security features of the facility. The repetitive mention of different doors indicates a comprehensive evaluation of the building's entry points, aiming to enhance efficiency and safety. As part of a government-requested proposal (RFP), this renovation is aligned with federal and state/local standards, indicating a structured approach to maintaining and upgrading governmental facilities. The project entails careful planning and execution, ensuring that all changes comply with safety regulations and operational needs.
    The United States Department of Agriculture (USDA) Forest Service issued an Experience Questionnaire aimed at prospective contractors for upcoming solicitations. The document outlines critical information that contractors must provide, including their name, address, and contact details, as well as their business type (e.g., corporation, non-profit) and years of relevant experience in contracting as either a prime or sub-contractor. Contractors are required to list completed projects from the past three years, current contractual commitments, and details of key personnel, including their experience and roles. Additionally, the questionnaire asks for information on available equipment and self-inspection processes aimed at ensuring quality work. It also emphasizes the importance of certification and accuracy in the information provided, as it is essential for verification of capability to complete the proposed projects. The structure facilitates a comprehensive overview of contractor qualifications and resources, tailored to the USDA Forest Service’s contracting needs, underscoring its role in the federal procurement process.
    The document outlines the requirements for utilizing biobased and sustainable products in the Soldier Creek Boardwalk project at Lassen National Forest, mandated by the Farm Security and Rural Investment Act of 2002 and the Energy Policy Act of 2005. Contractors must prioritize the use of biobased products when available and meeting industry standards, ensuring compliance with specific regulations. The statement form provided allows contractors to indicate either their intent to use biobased products, their choice of non-designated products with justification, or to certify that no biobased products will be used at this time. The completion of this statement is vital for contractor accountability and adherence to federal regulations, emphasizing the government's commitment to sustainability and environmental responsibility in federal contracting processes. Overall, it underscores the importance of aligning procurement practices with sustainability goals while providing necessary compliance mechanisms within the contract framework.
    The document details the designation of representatives for the Soldier Creek Boardwalk project under Solicitation No. 12970224Q0021 for the Lassen National Forest. It assigns key personnel from the contractor, including the contractor representative, project foreman, project manager, and inspector, along with their respective contact information. The delegation of authority includes the ability to perform essential actions related to the contract, such as signing payment estimates and invoices, modifying the contract, and executing termination settlements. This designation underscores the contractor's authority to manage contractual obligations efficiently while ensuring compliance. The structure focuses on personnel assignment, delegation of authority, and the overarching purpose of project execution as mandated in federal and local RFPs.
    The document pertains to the Fire Prevention/Patrol Office within the White Mountain Ranger District Compound. It includes a location map and a site map, indicating the physical layout and specific positioning of the office within the district. The primary focus of the document is to outline the facilities related to fire prevention and patrol operations, essential for safeguarding the region against fire hazards. The mapping information reinforces the significance of strategic placement in enhancing response effectiveness and operational efficiency. This document likely serves as part of a broader governmental initiative to ensure adequate fire safety measures and support community emergency services, aligning with federal and local public safety objectives.
    The document outlines a proposed progress schedule for the Soldier Creek Boardwalk project under the jurisdiction of the USDA Forest Service, specifically at Lassen National Forest. The main purpose of the document is to establish a timeline for contract work, including the calculation of contract time based on square footage. Key components include detailed instructions for completing the contract time block, inserting contract days at specified completion percentages, and tracking actual progress against the proposed schedule. The document requests that contractors visually represent planned work through a line chart without solid blocks. Additionally, it outlines the approval process, emphasizing the need for coordinated communication between the contractor and the contracting officer's representative to ensure projects remain on schedule. This proposal exemplifies routine procedural documentation in federal grants and RFPs, aimed at ensuring accountability, progress tracking, and efficient project management within the context of government projects.
    This government file encompasses a detailed exploration of various federal RFPs (Requests for Proposals) and grants, alongside state and local initiatives. The central theme revolves around advancing infrastructure and health projects aiming to enhance public safety and welfare. Key components include systematic approaches for conducting assessments on hazardous materials like lead paint and asbestos, essential for maintaining health standards during restoration projects. Strategic insights guide the development of efficient methodologies for project execution, emphasizing procedural adherence to safety regulations. Additionally, the document outlines requirements for project proposals, including detailed planning for mechanical, plumbing, and fire suppression systems while ensuring compliance with local and federal regulations. It underlines the importance of coordination among engineers, architects, and contractors to facilitate successful project outcomes. Overall, the file serves as a comprehensive guideline, fostering understanding between public agencies and contractors regarding processes, safety measures, and regulatory compliance important for carrying out vital health and infrastructure improvements across various levels of government.
    Lifecycle
    Title
    Type
    Similar Opportunities
    CA/NV FHC-LAB BUILDING DUCTLESS MINI SPL
    Active
    Interior, Department Of The
    The U.S. Fish and Wildlife Service (FWS) is seeking qualified contractors for the installation of a ductless mini-split HVAC system at the CA-NV Fish Health Center in Anderson, California. This procurement is a total small business set-aside and involves replacing an outdated HVAC system with a new setup that includes a 45,000 BTU heat pump outdoor unit and multiple indoor ceiling cassettes, along with necessary electrical connections and HERS certification. The project emphasizes energy efficiency and aims to enhance facility operations, with contractors required to submit competitive quotes by September 19, 2024, following a site visit on September 17, 2024. Interested parties can reach out to Tanner Frank at tannerfrank@fws.gov for further inquiries.
    CECH REPLACE HVAC UNIT 2024
    Active
    Interior, Department Of The
    The Department of the Interior, National Park Service, is soliciting quotes for the replacement of a packaged unitary air conditioning unit at the Cesar E. Chavez National Monument Visitor Center in Keene, California. The contractor will be responsible for all aspects of the project, including mobilization, labor, materials, and site rehabilitation, with a performance period from September 30, 2024, to March 29, 2025. This project is crucial for maintaining operational efficiency and visitor comfort at the facility, with an estimated contract value between $25,000 and $100,000, and is set aside exclusively for small businesses. Proposals are due by 12:00 PM PST on September 17, 2024, and interested parties should direct inquiries to Brian Roppolo at brianroppolo@nps.gov or Eric Jordan at ericjordan@nps.gov.
    Replace Air Conditioning Unit 3 at Building 23
    Active
    Dept Of Defense
    The Department of Defense, specifically the Department of the Army, is seeking qualified contractors to replace Air Conditioning Unit 3 (ACU-3) at Building 23, Sepulveda Air National Guard Station in California. The procurement involves providing all necessary personnel, equipment, and materials to install a new 10-ton all-electric heat pump, adhering to the Performance Work Statement (PWS) and various security regulations. This project is critical for maintaining operational efficiency and comfort within military facilities, with a total estimated value of $19,000,000. Interested small businesses must submit their quotes by September 18, 2024, and can direct inquiries to Kristian Martin Perlas at 530-634-9179 or via email at 195wg.fal.msc.contracting.org@us.af.mil.
    Durango Air Tanker Base HVAC Repairs
    Active
    Agriculture, Department Of
    The U.S. Department of Agriculture, specifically the Forest Service, is seeking contractors for HVAC repairs at the Durango Air Tanker Base in Colorado. The project involves upgrading the existing heating, ventilation, and air conditioning systems, including the replacement of furnace units and installation of electronic filter systems, to enhance energy efficiency and temperature control. This initiative is crucial for maintaining operational conditions and personnel comfort at the facility, with an estimated contract value between $25,000 and $100,000. Interested small businesses must submit their proposals by September 20, 2024, and can direct inquiries to Elizabeth Ratcliff at elizabeth.ratcliff@usda.gov.
    J--Burley Fire Office HVAC System Replacement
    Active
    Interior, Department Of The
    The Bureau of Land Management (BLM) is soliciting proposals for the replacement of the HVAC system at the Burley Fire Office in Idaho. The project involves the complete demolition of outdated HVAC systems and the installation of new energy-efficient units, including two-stage gas furnaces and programmable thermostats, in compliance with federal standards and building codes. This initiative is crucial for maintaining optimal climate control in government facilities while promoting energy efficiency and environmental responsibility. Interested small businesses must submit their electronic quotes by September 20, 2024, with a project budget estimated between $25,000 and $100,000. For further inquiries, contractors can contact Heather McBride at hmcbride@blm.gov or by phone at 208-373-3993.
    Eufaula Lake Project Office HVAC Replacement
    Active
    Dept Of Defense
    The Department of Defense, specifically the Department of the Army through the W076 Endist Tulsa office, is seeking contractors for the HVAC replacement project at the Eufaula Lake Project Office. The project involves the installation of a new 15-ton packaged heat pump with electric auxiliary heat, requiring specific configurations including a variable frequency drive (VFD) and a 40K electric heater kit, along with additional components such as a hail guard and a manual fresh air damper. This procurement is critical for maintaining the operational efficiency and comfort of the project office, ensuring a reliable heating and cooling system. Interested contractors can reach out to Kylie Secrest at kylie.e.secrest@usace.army.mil or call 918-669-7078 for further details regarding the solicitation.
    820 RHS HVAC Units
    Active
    Dept Of Defense
    The Department of Defense, specifically the Department of the Air Force, is soliciting proposals for the procurement of HVAC units for the 820th Red Horse Squadron at Nellis Air Force Base, Nevada. The requirement includes three specific Trane HVAC systems: a 25-ton and a 15-ton dedicated outdoor air system, as well as a 3-ton split type system, all designed to meet stringent mechanical and plumbing standards for federal facilities. This procurement is crucial for enhancing indoor air quality and temperature control, ensuring compliance with high-performance building standards. Interested small businesses must submit their quotes electronically by September 18, 2024, at 1000 PDT, to Amber Rivera at amber.rivera.2@us.af.mil, and must be registered in the System for Award Management (SAM) database to be eligible for contract award.
    163rd Replace HVAC Building 2275
    Active
    Dept Of Defense
    The Department of Defense, specifically the Department of the Army, is seeking a qualified contractor to replace the HVAC system at Building 2275 located at Moffett Field, California. The project involves the complete replacement of two Trane air handlers and two condensing units, including associated demolition, mechanical, plumbing, electrical work, and roof repairs, with a contract completion timeframe of 90 days after the notice to proceed. This procurement is set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) and has a project magnitude of less than $250,000. Interested contractors must be registered in the System for Award Management (SAM) and can obtain further details from the SAM website. For inquiries, contact David Moreno at david.moreno.34@us.af.mil or Aaron Lay at aaron.lay.2@us.af.mil.
    Barkley Powerhouse Replace HVAC, Zone 3
    Active
    Dept Of Defense
    The Department of Defense, specifically the U.S. Army Corps of Engineers, is soliciting quotes for the replacement of the HVAC system at the Barkley Powerhouse in Kuttawa, Kentucky. This project involves the installation of a new 10-ton air conditioning unit and associated systems, with a completion timeline of 120 calendar days post-award. The procurement is significant for maintaining operational efficiency and compliance with safety standards at the facility. Interested small businesses must submit their quotes by September 20, 2024, at 1300 hours Central Time, and can contact Cierra Vega at cierra.r.vega@usace.army.mil or Samantha Bedard at samantha.j.bedard@usace.army.mil for further information.
    PBA Server Room HVAC
    Active
    Dept Of Defense
    The Department of Defense, specifically the U.S. Army Contracting Command – Rock Island, is seeking proposals from qualified small businesses for the procurement of two packaged HVAC heat pump units to be delivered to Pine Bluff Arsenal (PBA) in Arkansas. The contract will be a Firm-Fixed-Price (FFP) purchase order, with the contractor responsible for the start-up of the units after installation by PBA. This procurement is critical for maintaining operational efficiency in military facilities, ensuring compliance with industry standards for air conditioning equipment. Interested contractors must submit their quotes electronically by September 19, 2024, at 0900 CT, and can direct inquiries to Greg Brown or John Fotos via their provided email addresses.