MAB Building 412 Concrete Work
ID: ISD_361749_DAType: Solicitation
Overview

Buyer

ENERGY, DEPARTMENT OFENERGY, DEPARTMENT OFFERMILAB - DOE CONTRACTORBatavia, IL, 60510, USA

NAICS

Poured Concrete Foundation and Structure Contractors (238110)

PSC

CONSTRUCTION OF OTHER NON-BUILDING FACILITIES (Y1PZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)
Timeline
    Description

    The Department of Energy, through the Fermi National Accelerator Laboratory (Fermilab), is soliciting proposals for the installation of two concrete pads to support HVAC systems at Building 412, located in Batavia, Illinois. The project requires a qualified subcontractor to provide all necessary supervision, labor, materials, tools, and equipment, ensuring compliance with safety and environmental regulations, particularly concerning silica hazards. This initiative is crucial for enhancing the laboratory's infrastructure and operational efficiency. Proposals are due by December 16, 2024, at 5 PM CT, and interested parties can contact Danielle Amico at damico@fnal.gov or 630-840-3207 for further information.

    Point(s) of Contact
    Files
    Title
    Posted
    The Request for Proposal (RFP) ISD_361749_DA issued by Fermi Research Alliance, LLC, invites submissions for concrete work at the MAB Building 412, particularly the installation of two concrete pads to support HVAC systems. This project, classified under the NAICS code 238110 for Poured Concrete Foundation and Structure Contractors, is set aside for small businesses. A pre-proposal meeting is scheduled for November 21, 2024, to clarify RFP details, and proposals must be submitted by December 16, 2024. The evaluation process follows a Lowest Price Technically Acceptable (LPTA) model, necessitating a comprehensive technical proposal and a business/management proposal. Key requirements include experience in similar projects, qualified personnel, and adherence to safety and insurance regulations. The awarded contractor must comply with the Davis-Bacon Act regarding wages and provide necessary bonding and guarantees. The RFP reflects the government's commitment to effective procurement practices while fostering small business participation and ensuring compliance with construction and safety standards.
    The document presents a Request for Proposal (RFP) No. ISD_361749_DA for concrete work at the MAB Building 412. Issued on November 12, 2024, it invites qualified contractors to submit proposals that detail their ability to provide the necessary labor, equipment, materials, and management required for the project, as outlined in the accompanying specifications and drawings. The proposal should include a total cost amount in written form. The RFP specifies that responses must remain valid for 90 days post-opening, with the option for offerors to extend this period. The document includes sections for the proposing company’s name, signature, title of the individual, and date of submission. This RFP is part of the federal procurement process aimed at fostering competition and ensuring that federal funds are utilized effectively for public infrastructure projects.
    The document outlines the registration process for business visitors attending a Pre-Proposal Meeting and Site Visit scheduled for November 21, 2024, at Aspen East, followed by MAB Building 412. It provides detailed directions to the venue from both the West Gate (Pine Street Entrance) and East Gate (Batavia Street Entrance) and emphasizes the importance of arriving early for the meeting. All visitors, except those holding existing badges, must complete an Access Request Form by November 14, 2024, with a preference for U.S. citizens due to access approval regulations. Non-U.S. citizens' requests are subject to additional verification through the Foreign National Access Program. Upon approval, visitors will receive instructions for accessing the site, including presenting a valid REAL ID and an informal letter at the security gate. The document also outlines the information required to complete the Access Request Form, including personal details and the reason for the visit, reinforcing the importance of compliance for successful access to the site. This guidance is essential for ensuring a smooth entry process for attendees of the federal RFP meeting.
    The document outlines a Statement of Work (SOW) for a concrete installation project at the Fermi National Accelerator Laboratory (Fermilab) in Batavia, Illinois. The project involves a qualified subcontractor tasked with creating two concrete pads to support new HVAC systems at Building 412, including specific compliance with silica hazard guidelines. The scope includes mobilization to the site, installation of concrete pads (22’x23’) at both the front and rear of the building, and installation of a total of 12 bollards with plastic sleeves. The work requires complete materials supply, final preparation and finishing, site cleanup, and demobilization. The anticipated project timeline runs from October 31, 2024, to December 31, 2024. This initiative emphasizes the necessity for qualified labor and adherence to safety and operational standards in the execution of critical infrastructure improvements at Fermilab. The document serves as a formal request for proposals (RFP) in the context of federal government contracting, ensuring compliance with regulations and efficient completion of the project.
    The document outlines the general requirements for a concrete work project at Fermilab, Project No. ID165368, focused on the installation of new HVAC pads. Subcontractors are responsible for planning, executing, and delivering the project according to established specifications, acquiring necessary materials, and ensuring compliance with safety and environmental regulations. The scope of work includes mobilization, installation of concrete pads, and bollard installations at specified locations, with a focus on quality control and adherence to the Buy American Act. Fermilab will provide essential services such as electrical power and water, while the subcontractor handles logistics, site access, and safety measures. The document emphasizes the importance of coordination with the FRA Construction Coordinator for permits, utility locates, and inspections. Specific milestones, including a construction schedule and quality control measures, are outlined to ensure timely and compliant project completion. RFIs are the procedure for requesting clarifications on project specifications, ensuring clear communication between subcontractor and project management. The overall intent is to ensure a safe, functional, and compliant construction process that meets rigorous quality standards.
    The FRA ES&H Requirements document outlines the environment, safety, and health (ES&H) protocols for subcontractors working at the Fermi National Accelerator Laboratory (Fermilab). It emphasizes the prioritization of safety for all individuals on site, including employees and visitors, and mandates strict adherence to federal, state, and local regulations. Key elements include an ES&H policy that necessitates the implementation of safety programs, hazard analyses, and effective waste disposal and recycling practices. The document establishes responsibilities for subcontractors, including submitting an ES&H program, conducting job site orientations, and maintaining identification badging procedures. Specific safety precautions regarding personal protective equipment, fall protection, electrical work, and emergency protocols are detailed to prevent accidents and environmental hazards. The document also outlines the need for proper environmental management, including erosion control measures and management of hazardous materials. Overall, this thorough framework aims to ensure a safe working environment at Fermilab, reflecting the laboratory's commitment to rigorous safety management and environmental protection in all construction-related activities, which is crucial for compliance with government mandates as outlined in relevant RFPs and grants.
    The FRA General Terms and Conditions for Construction outline the contractual framework governing construction projects undertaken by the Fermi Research Alliance, LLC. This document defines the relationship between the Subcontractor and FRA, emphasizing independence and liability. Key provisions include the scope of the subcontract, payment structures, superintendence requirements, and stipulations regarding licenses and permits. The document details processes for handling changes, modifications, and equitability adjustments, alongside comprehensive indemnification, warranties, and risk assumptions during project execution. Moreover, it mandates adherence to relevant laws and safety regulations, facilitates dispute resolution strategies, and establishes insurance and bonding requirements based on subcontract values. It also covers federal regulations under the Davis-Bacon Act concerning labor standards. Each section cohesively ensures accountability, safety, and compliance for all involved parties, reinforcing the integrity of governmental contracting processes in alignment with federal and state regulations. Overall, it underscores the importance of collaboration and adherence to standards necessary for successful project completion at Fermilab and the Fermi National Accelerator Laboratory.
    This document outlines the insurance requirements for construction subcontracts at the Fermi National Accelerator Laboratory (Fermilab). Subcontractors must secure various forms of insurance prior to commencing work, ensuring acceptable limits and coverage by insurers with an A.M. Best rating of A, VII or higher. The required coverage includes General Liability, Automobile Liability, Excess Liability, Worker’s Compensation, Contractor’s Pollution Liability, and Contractor’s Professional Liability, each with specified minimum limits. Additional coverages may be required, such as Aircraft Liability and Builder's Risk insurance. All policies must name Fermi Research Alliance, the University of Chicago, and the U.S. Government as additional insureds. The document outlines explicit exclusions in commercial general liability insurance, emphasizes the need for certification of compliance, and mandates similar insurance provisions for sub-subcontractors. Overall, these insurance requirements are designed to mitigate risk and provide financial protection to all parties involved, reinforcing Fermilab's commitment to safety and regulatory compliance in construction projects.
    The document outlines the Bid Bond form used in federal contracting, specifically for the Fermi Research Alliance, LLC. This form is required when a bid guaranty is necessary and mandates the disclosure of the principal's legal name, business address, type of organization, surety details, and penal sum of the bond. The principal and surety must agree to be jointly and severally bound to the United States for the penal sum indicated, supporting the commitment to fulfill the obligations upon bid acceptance. Key conditions include the need for the principal to execute contractual documents and provide necessary bonds within specified timeframes. The surety's obligation remains valid even if there are extensions in the bid acceptance period. Compliance with the Department of Treasury's rules regarding sureties and the proper execution of the bond by authorized representatives are emphasized. The instructions clarify the need for corporate seals, names, and titles of all signatories, ensuring thorough documentation in accordance with federal RFP standards. This form serves to protect the interests of the contracting entity by guaranteeing that the principal will fulfill their bid obligations, maintaining integrity in federal procurements.
    The document outlines the requirements for a Payment Bond associated with federal contracts, specifically for the protection of individuals supplying labor and materials. It details the essential components, including the principal's information, the surety's details, and the bond's penal sum. The bond ensures liability for payment to all who directly provide services or materials under the specified subcontract. Conditions are set to void the obligation if payments are made promptly to all eligible parties. Instructions guide the completion of the form, emphasizing that it must adhere strictly to the prescribed structure. Sureties must be approved by the Department of the Treasury and individual sureties must submit additional documentation. The intent is to secure financial assurance in compliance with federal regulations, facilitating efficient contract execution while safeguarding workers' financial interests.
    The document outlines the requirements for a performance bond related to subcontracts with Fermi Research Alliance, LLC. It establishes the legal framework binding the Principal and their Surety(ies) to fulfill the terms of a subcontract, including payment of taxes imposed by the government. Key details include the need for the bond to guarantee that the Principal performs all obligations and conditions stipulated in the subcontract, including any authorized modifications. The bond becomes void if these conditions are met. Important instructions emphasize that the Principal's full legal name and address must be provided, and that individual sureties must submit an Affidavit of Individual Surety. The document also outlines requirements for corporate sureties, which must be listed on the Department of the Treasury's approved list. Signatures and corporate seals are required for proper execution of the bond. Overall, this performance bond serves as a protective measure for the government, ensuring compliance and financial accountability in federal procurement processes, specifically catering to the stipulations within federal grants and local RFPs.
    The Fermilab ES&H Manual outlines essential protocols for subcontractor injury and illness reporting. It mandates the collection of comprehensive safety data from subcontractors, including details on their Workers' Compensation insurance, past injury records for the last three years, and safety oversight. Subcontractors must provide their experience modification rates, including copies of the NCCI Workers Compensation Experience Rating forms. The document highlights the necessity of utilizing OSHA logs to summarize recordable cases, lost workdays, and fatalities and requires calculations of various case rates to assess workplace safety performance. The form must be completed and certified by an individual responsible for safety within the company, ensuring the accuracy and reliability of the submitted information. This manual serves as a critical component for ensuring compliance with safety standards within the context of federal and state contract applications and grants, emphasizing the importance of a robust safety protocol and accident prevention measures in project evaluations. Overall, it reflects Fermilab's commitment to maintaining a safe working environment in alignment with federal safety requirements.
    The document serves as a Statement and Acknowledgment regarding a subcontract awarded under a prime contract at Fermi Research Alliance LLC for concrete work related to HVAC systems. It outlines the necessary components of the subcontract, including the identification of both the prime contractor and subcontractor, contract details, and the work to be performed. Key clauses from the prime contract, such as compliance with labor standards and safety regulations, are acknowledged by the subcontractor. The scope of work includes labor, materials, transportation, and oversight for the concrete installation related to HVAC pads and bollards, which are essential for the maintenance of equipment at the Fermilab site in Illinois. The document emphasizes adherence to specified safety standards and regulatory requirements, reflecting the structured nature of government contracts and compliance obligations within federal and state RFP frameworks. The information provided is crucial for ensuring contract adherence and operational standards in public project undertakings.
    The document, Proposal Certifications PUR-466, outlines mandatory certifications required from offerors in response to federal proposals, particularly focusing on compliance with various federal regulations and terms. It specifies distinct certifications based on proposal value thresholds, beginning with those applicable to all proposals equal to or exceeding $10,000. Key certifications address areas such as export compliance, Buy American provisions, proposal data rights, and patent rights. Additional certifications for proposals equal to or above $150,000 include assurances regarding independent pricing and lobbying activities. For higher-value proposals (≥ $500,000), certifications related to trafficking in persons compliance plans are required. The structure consists of detailed subsections and clauses referencing Federal Acquisition Regulations (FAR) that delineate the obligations and certifications necessary for government contracts. The main purpose of the document is to ensure that offerors verify their adherence to specific legal and ethical standards, thereby promoting transparency and integrity in government contracting. By mandating these certifications, the federal government safeguards against non-compliance while fostering responsible procurement practices among contractors.
    The Subcontractor Annual Representations & Certifications (SARC) form is utilized by the Fermi Research Alliance (FRA) for federal contracting compliance. The document collects essential business information from subcontractors, including ownership details, business structure, and industry classifications. It mandates certifications relevant to the Federal Acquisition Regulation (FAR), ensuring adherence to U.S. laws, particularly concerning export regulations, equal opportunity compliance, and responsible business practices. Additionally, subcontractors are required to declare their accounting system status and detail their executive compensation if they meet specific federal revenue thresholds. This certification must be completed annually and any changes in status must be reported promptly. The form emphasizes the importance of confidentiality concerning FRA's information and outlines the consequences of non-compliance with the specified regulations. Overall, the SARC form is a comprehensive tool designed to ensure transparency, accountability, and lawful conduct in federal contracting activities.
    The Construction Environmental, Safety & Health Certification (CESHC) is mandatory for all construction projects at the Fermi National Accelerator Laboratory (Fermilab) site. This document serves as a template to assist subcontractors in outlining project conditions, specific hazards, and control strategies. Subcontractors can either follow the prime subcontractor's CESHC or submit individual certifications to the FRA Procurement Office for review by the ES&H and Project Management teams. The CESHC must be updated as the project evolves. All subcontractors must comply with the Department of Energy's Title 10, Code of Federal Regulations, Part 851, which focuses on Worker Safety and Health Standards. They must acknowledge understanding and adherence to these requirements, and engage in medical surveillance for employees working extensive hours on-site or enrolled in relevant monitoring programs. Specific medical evaluations may be required, including task-specific screening. The document outlines necessary medical facilities and mandates the identification of a chosen facility for compliance. By requiring completion of the CESHC, Fermilab emphasizes safety and regulatory adherence, ensuring all construction activities align with established health and safety protocols throughout the project's lifecycle.
    The document outlines various federal and state RFPs and grants indicating a focus on funding opportunities for specific projects. Key elements include proposals seeking funding for local initiatives, detailing eligible projects, funding limits, and application procedures. Emphasis is placed on community development, infrastructure improvements, and health initiatives. Supporting details cover eligibility requirements, project timelines, and evaluation criteria critical for funding success. Each RFP is designed to stimulate local economies, support underserved populations, and address pressing community needs through strategic investments. This structure aims to encourage applicants to align projects with broader governmental goals and community priorities, ensuring compliance and maximizing funding opportunities. The document's primary purpose is to inform potential applicants about available grants and solicit proposals that contribute to sustainable development and improved quality of life within communities.
    This document outlines a firm fixed-price subcontract between Fermi Research Alliance LLC (FRA) and a subcontractor for construction work on the MAB Building 412 Concrete Work project, as part of a larger Prime Contract with the U.S. Department of Energy. The subcontract details the scope of work, which includes labor, materials, insurance, and oversight for concrete work related to HVAC pads and bollards. Performance is expected to meet high professional standards, and acceptance criteria are included. The subcontract specifies a period of performance, invoicing procedures, and payment terms, including monthly progress payments with possible retainage until work is satisfactorily completed. It designates specific individuals at FRA for procurement and technical oversight. Various reports are required from the subcontractor, including monthly progress reports. Additionally, the subcontract incorporates several documents that define requirements, including safety and health regulations. Overall, this document serves as a comprehensive contract for construction services, ensuring compliance with federal conditions and standards, critical for the operations of the Fermi National Accelerator Laboratory.
    The communication from Nigel S. Lockyer, Director of Fermilab, underscores the vital importance of environmental, safety, health, and quality (ESH&Q) protocols for subcontractors working at Fermilab. Lockyer emphasizes that effective business practices integrate quality and safety, which ultimately reduce costs and enhance adherence to schedules. Bidders are urged to thoroughly review solicitation documents, particularly the ESH&Q requirements, as compliance is mandatory and will be strictly enforced. Fermilab expects all subcontractors to maintain a safe workplace, with significant oversight from management. Any incidents indicating unsafe conditions may lead to non-compensable work stoppages and potentially severe consequences for repeated violations, including termination of contracts. Lockyer expresses a sincere commitment to achieving zero accidents and invites cooperation from all parties to prioritize safety and health, aiming to prevent injuries and fatalities. The document reflects Fermilab's stringent safety standards and its collaboration with the U.S. Department of Energy, aligning with overarching goals in federal contracting and grant management contexts. This focus on proactive safety measures illustrates the laboratory's dedication to operational excellence and regulatory compliance.
    The document presents detailed layouts for the replacement of rooftop units (RTUs) at the Argonne National Laboratory. It outlines specifications for two A/C units: a 20-ton and a 25-ton system, emphasizing dimensions, installation parameters, and integrating with existing infrastructure. Each layout includes measurements for supply and return ducts, as well as offsets and bollard placements to ensure compliance with engineering standards. The document is marked with proprietary rights from Draftech, indicating that unauthorized reproduction is prohibited. The purpose of this document aligns with government RFP requirements, aiming to guide contractors in bids for the mechanical work involved in RTU replacement and ensuring adherence to technical specifications for efficient and safe installation.
    The document outlines a concrete pad detail, specifying construction requirements for underpinning or support structures in government projects. It includes dimensions such as a 4-inch minimum duct support, a chamfer of 3/4 inch, and clearances of 1 1/2 inches and 3 inches. The detailing emphasizes the use of #4 rebar, with spacing requirements of 12 inches on center for strength and stability. The concrete pad must be set above a minimum 12-inch layer of CA-7 material. This technical specification aligns with standard practices expected in federal and state RFPs and grants, ensuring that construction adheres to safety and engineering guidelines. Proper documentation of such specifications is vital for project compliance and reliability.
    The Fermilab ES&H Manual FESHM 4195 provides guidelines for managing special toxic hazards associated with respirable crystalline silica. It outlines the potential health risks, especially from activities like sandblasting, grinding, and concrete work. The document specifies roles and responsibilities for various personnel—including managers, supervisors, and medical officers—regarding silica hazard management, exposure assessments, and training requirements. Key components include the implementation of control measures to prevent exceeding the 25 µg/m3 threshold limit value for silica exposure, maintaining effective housekeeping practices, and ensuring proper waste disposal to mitigate exposure risks. It also clarifies the need for a medical surveillance program for employees using respirators regularly. The manual stresses compliance with OSHA standards and emphasizes regular inspections and employee training. This comprehensive approach is essential for safeguarding the health of workers engaged in activities posing silica hazards, reinforcing Fermilab's commitment to environmental, safety, and health standards across all operations.
    The document details a federal Request for Proposals (RFP) aimed at soliciting bids for a project that intends to improve community infrastructure and public services. The main objective is to engage various stakeholders, including local governments, non-profits, and private sector entities, to collaborate on projects that address pressing community needs. Key elements include specific funding allocations for eligible projects, criteria for proposal evaluation, and timelines for submission. The RFP outlines the importance of fostering economic development, enhancing safety, and improving overall quality of life through strategic investments in infrastructure. Additionally, it emphasizes compliance with federal regulations and encourages innovative solutions that leverage existing community resources. The document concludes with contact information and guidelines for submitting proposals, ensuring interested parties have the necessary resources to participate effectively. Overall, the RFP serves as a strategic initiative to mobilize community engagement and resources for infrastructure improvement, reflecting the government's commitment to enhancing public welfare through collaborative efforts.
    The document outlines public access and recreational opportunities at Fermilab, a national particle physics laboratory. It highlights the various activities open to the public, such as observing bison, hiking, biking, and more, while emphasizing accessibility features like parking, restrooms, and handicap access. Key locations include the restored prairie, interpretive trails, ponds, and the Lederman Science Center, encouraging community engagement with nature through defined paths and facilities for outdoor activities. Specific entrances and parking options are provided for easy visitor access, with additional details available on Fermilab's website. The summary serves to inform potential visitors about the lab's offerings and the environment surrounding its facilities.
    This document outlines the requirements for submitting proposals in response to a federal request for proposal (RFP) focused on construction projects. It emphasizes the necessity for offerors to provide a detailed technical proposal addressing specific evaluation criteria, including relevant experience, project management qualifications, and technical competencies in concrete installations. Offerors must demonstrate a minimum of five years of experience and successful completion of similar projects, including providing examples from the past decade. In addition to technical qualifications, the business proposal must include a firm fixed price, a bid guarantee, subcontractor certifications, and safety documentation. Key personnel qualifications are also critical, stipulating specific experience levels for roles such as Project Manager, Superintendent, and Safety Coordinator, all of whom must complete the OSHA 30-hour Training Course. Furthermore, the proposal requires a comprehensive set of documents to ensure compliance with safety and health regulations and corporate safety policies. The structured approach is designed to facilitate the Federal Railroad Administration's (FRA) evaluation of potential contractors, ensuring they meet stringent qualifications for successful project execution while maintaining safety standards.
    Lifecycle
    Title
    Type
    Solicitation
    Similar Opportunities
    Fermilab LBNF NSCF Construction - Beamline Complex RFP
    Active
    Energy, Department Of
    The Department of Energy, through the Fermi Research Alliance, LLC, is soliciting proposals for the construction of the Long-Baseline Neutrino Facility (LBNF) Near Site Conventional Facilities Beamline Complex in Batavia, Illinois. The project aims to select a subcontractor to provide comprehensive construction services, including site preparation, structural work, and installation of various systems essential for neutrino physics research. This facility is critical for advancing scientific capabilities in neutrino studies, with a total funding availability of approximately $278 million. Proposals are due by February 12, 2024, and interested parties should direct inquiries to Brian Quinn at bquinn@fnal.gov or Craig Schmitz at schmitzc@fnal.gov.
    Fermilab - Removal and replacement of roofing systems
    Active
    Energy, Department Of
    The Department of Energy, through the Fermi National Accelerator Laboratory (Fermilab), is soliciting proposals for the removal and replacement of roofing systems at the Site 40 Low Level Waste Handling Building in Batavia, Illinois. The project involves comprehensive work, including the complete tear-off of existing roofing down to the decking, installation of new SBS Asphalt roofing systems, and relocation of existing roof equipment, all while adhering to strict safety and environmental standards. This procurement is critical for maintaining the facility's operational integrity and compliance with federal regulations, including the Davis-Bacon Act for labor wages. Proposals are due by November 15, 2024, and interested contractors should contact Richard Konan at rkonan@fnal.gov or 630-840-2835 for further details.
    Fermilab LBNF NSCF Construction - Near Detector Complex RFP
    Active
    Energy, Department Of
    The Fermi Research Alliance, LLC (FRA) is soliciting proposals for the construction of the Long-Baseline Neutrino Facility (LBNF) Near Site Conventional Facilities (NSCF) Near Detector Complex in Batavia, Illinois. The procurement aims to select a subcontractor to provide comprehensive construction services, including the construction of a service building, shafts, and a detector cavern, essential for advancing neutrino physics research. This project is significant for its role in supporting high-intensity neutrino beams and related scientific endeavors, with an estimated funding availability of $47 million over multiple phases from 2024 to 2028. Proposals are due by February 7, 2025, and interested parties should direct inquiries to Brian Quinn at bquinn@fnal.gov or Craig Schmitz at schmitzc@fnal.gov.
    Installation of Subcontractor-Provided 27.5 Ton Electric Heat HVAC RTU
    Active
    Energy, Department Of
    The Department of Energy, specifically Fermilab, is seeking qualified contractors for the installation of a subcontractor-provided 27.5 Ton Electric Heat HVAC Rooftop Unit (RTU) in Batavia, Illinois. The project entails the procurement and installation of the specified HVAC RTU, which includes associated electrical work, ductwork, controls installation and programming, as well as start-up and commissioning activities. This procurement is crucial for enhancing the facility's heating and cooling capabilities, ensuring efficient climate control for research operations. Interested parties are encouraged to attend a Pre-Proposal Meeting and Site Visit on November 5, 2024, and must contact Chris Bushman at cbushman@fnal.gov or 630-840-5501 for further details and to complete necessary access requirements.
    Hardware
    Active
    Energy, Department Of
    The Department of Energy, through Fermilab, is soliciting proposals for hardware components necessary for ongoing projects at the Fermi National Accelerator Laboratory in Batavia, Illinois. The procurement focuses on specific items, including screws, nuts, and washers, with detailed specifications outlined in accompanying documents, emphasizing compliance with stringent manufacturing standards and quality assurance protocols. These components are critical for the functionality and safety of advanced scientific equipment used in experimental development and research. Interested subcontractors must complete the required SARC (Subcontractor Annual Representations & Certifications) and adhere to the FRA General Terms and Conditions, with inquiries directed to Caylee Swearingen at caylee@fnal.gov.
    Fiber Infrastructure Equipment
    Active
    Energy, Department Of
    The Department of Energy, through the Fermi Research Alliance, LLC, is seeking quotes for fiber infrastructure equipment, specifically electrical parts and equipment, under a Request for Quote (RFQ) process. This procurement, classified under NAICS Code 423690, aims to establish a Firm Fixed Price (FFP) contract, with a single award to be made to the responsible offeror whose proposal is most advantageous to the government, emphasizing that partial quotes will not be accepted. The equipment is critical for supporting the operations of the Fermi National Accelerator Laboratory in Batavia, Illinois, and must be delivered F.O.B. at the laboratory with freight prepaid. Interested vendors must submit their capabilities and qualifications by December 2, 2024, at 4:00 p.m. Central Standard Time, and all inquiries should be directed to Procurement Specialist Cathleen Stadler at cstadler@fnal.gov or by phone at 630-840-2763.
    LBNF Argon Receiving System
    Active
    Energy, Department Of
    The Department of Energy, through Fermilab, is soliciting proposals for the engineering, manufacturing, installation, and testing of an Argon Receiving System at the Sanford Underground Research Facility (SURF) in Lead, South Dakota. This system is critical for the Long-Baseline Neutrino Facility (LBNF) and will facilitate the delivery, storage, and vaporization of liquid argon (LAr) for use in the Deep Underground Neutrino Experiment (DUNE), which aims to advance fundamental physics research. Interested contractors must submit their proposals electronically by December 3, 2024, with inquiries due by October 29, 2024. For further details, potential bidders can contact Jeremy R. Duncan at jeremyd@fnal.gov or by phone at 865-300-0443.
    NW100 FLANGES
    Active
    Energy, Department Of
    The Department of Energy, through Fermilab, is seeking fixed-price quotations for various NW100 flanges and related components as part of a procurement effort under Prime Contract No. DE AC02-07CH11359. The specific items requested include large flanges, centering rings, and banded clamps, all of which must meet established specifications and standards. These components are critical for ongoing research operations at the Fermi National Accelerator Laboratory, ensuring the integrity and functionality of experimental setups. Interested vendors must submit their quotations by December 2, 2024, and direct any inquiries to Procurement Specialist Brian Nielsen at bnielsen@fnal.gov or by phone at 630-840-3554. Additionally, proposals must include the required Subcontractor Annual Representations & Certifications (SARC) and proposal certifications as outlined in the associated documents.
    LBNF Internal Cryogenics
    Active
    Energy, Department Of
    The Department of Energy, through Fermilab - DOE Contractor, is soliciting proposals for the engineering, manufacturing, and delivery of Internal Cryogenics systems for the Long-Baseline Neutrino Facility (LBNF) associated with the Deep Underground Neutrino Experiment (DUNE). The primary objective is to develop cryogenic piping systems that will facilitate the transfer of liquid and gaseous argon within the cryostats, essential for purging, cooling, and maintaining the massive neutrino detectors located at the Sanford Underground Research Facility in Lead, South Dakota. This project is critical for advancing scientific research in neutrino physics and is expected to contribute to transformative discoveries in the field. Proposals are due by November 22, 2024, and interested parties can contact Jeremy R. Duncan at jeremyd@fnal.gov or by phone at 865-300-0443 for further information.
    LBNF Argon Distribution Equipment IDIQ
    Active
    Energy, Department Of
    The Department of Energy, through Fermilab, is seeking proposals for the procurement of Argon Distribution Equipment under an Indefinite Delivery Indefinite Quantity (IDIQ) contract for the Long-Baseline Neutrino Facility (LBNF) project located in Lead, South Dakota. The primary objective is to provide innovative solutions for the transfer of gaseous and liquid argon, as well as nitrogen, essential for the operation of large-scale neutrino detectors housed deep underground. This project is critical for the Deep Underground Neutrino Experiment (DUNE), which aims to advance scientific understanding of neutrino properties and related phenomena. Interested vendors must submit their proposals by December 20, 2024, with a minimum guaranteed contract value of $100,000 and a maximum value of $48 million. For further inquiries, contact Jeremy R. Duncan at jeremyd@fnal.gov or call 865-300-0443.