The Department of Defense, specifically the Department of the Army through the W076 Endist Little Rock office, is soliciting bids for the Cable Tunnel Cooling Rehabilitation project at the Norfork Powerhouse in Baxter County, Arkansas. This project involves the rehabilitation of the cooling system, with a construction magnitude estimated between $1,000,000 and $5,000,000, and is set aside exclusively for small businesses under the SBA guidelines. The selected contractor will be responsible for installation services related to refrigeration, air conditioning, and air circulating equipment, which are critical for maintaining operational efficiency at the powerhouse. Interested bidders should note that a site visit is scheduled for December 11, 2024, at 0830 CST, and the submission period for proposals runs from December 3, 2024, to December 23, 2024. For inquiries, contact Shelby Henson at Shelby.m.henson@usace.army.mil or Sarah Hagood at sarah.n.hagood@usace.army.mil.