This Statement of Work (SOW) outlines a design-build contract for repairing and upgrading the HVAC control system in Building B2122 at Tinker Air Force Base, Oklahoma. The project requires the contractor to furnish all design/engineering services, materials, labor, and equipment to replace existing LonMark controllers with BACnet-compliant direct digital controls across various HVAC components. Key personnel requirements, including Project Manager, Design Project Manager, Quality Control Manager, Site Safety and Health Officer, and Project Superintendent, are detailed with specific experience qualifications. The SOW also covers critical aspects like site investigations, adherence to government standards and codes, safety protocols (including FOD awareness and VPP compliance), environmental regulations, and specific documentation and reporting procedures. Design submittals at 35%, 65%, 95%, and 100% stages are mandated, along with a comprehensive commissioning process for the HVAC system. The facility will remain occupied during construction, requiring careful coordination and adherence to strict access and security procedures for personnel and vehicles.
The document outlines the "REPAIR FACILITY HVAC CONTROL SYSTEM, B2122" project at Tinker Air Force Base, Oklahoma. It details general notes for contractors, emphasizing responsibility for all construction documents, brand name equivalency, site protection (fencing, barricades), and repair of any damage to existing facilities at no additional cost to the government. All work requires new labor and materials unless explicitly noted otherwise. The document includes a project drawing index, signatures for various review and design personnel, and a vicinity map of Tinker AFB, highlighting the project's location. Mechanical HVAC layouts for the overall ground floor, partial ground floor, second floor, and roof level are provided, illustrating the scope of work which involves numerous HVAC units, controls, and associated infrastructure within the facility.