Al Udeid Air Base - Multiple Award Construction Contract
ID: FA570225R0001Type: Solicitation
Overview

Buyer

DEPT OF DEFENSEDEPT OF THE AIR FORCEFA5702 379 ECONSAPO, AE, 09309-0000, USA

NAICS

Commercial and Institutional Building Construction (236220)

PSC

CONSTRUCTION OF RESTORATION OF REAL PROPERTY (PUBLIC OR PRIVATE) (Y1QA)
Timeline
  1. 1
    Posted Mar 27, 2025, 12:00 AM UTC
  2. 2
    Updated Apr 22, 2025, 12:00 AM UTC
  3. 3
    Due May 1, 2025, 1:00 PM UTC
Description

The Department of Defense, through the Department of the Air Force, is soliciting proposals for a Multiple Award Construction Contract (MACC) to support the 379th Expeditionary Civil Engineer Squadron at Al Udeid Air Base (AUAB) in Qatar. This Firm-Fixed Price (FFP) contract will encompass a variety of construction tasks, including the repair and alteration of existing facilities, with a base period of five years and two optional one-year extensions. The government anticipates awarding up to four contracts, with a maximum expenditure of $200 million, emphasizing the importance of past performance evaluations and compliance with federal acquisition regulations. Interested contractors must submit their proposals, including a seed project for technical evaluation, by the specified deadlines, and can direct inquiries to Joseph Russell at joseph.russell.10@us.af.mil or Jacob Hambrick at jacob_demarcus.hambrick@us.af.mil.

Point(s) of Contact
Files
Title
Posted
Apr 22, 2025, 11:11 AM UTC
The document outlines the Statement of Work (SOW) for a Multiple Award Construction Contract (MACC) at Al Udeid Air Base (AUAB), Qatar. It details the contractor's responsibilities for maintenance, repair, and minor construction works on real property, including airfield facilities. The scope comprises diverse tasks from providing design submissions at various completion percentages to adhering to specific environmental and safety regulations. Key points include definitions of design milestones (such as 35% and 95% designs), requirements for contractor proposals based on project urgency, and the necessary technical documentation needed for government approval. The proposal review process and evaluation criteria are explained, alongside stipulations for contractor performance assessment. The document emphasizes the importance of compliance with health, safety, and environmental standards and outlines processes for managing hazardous materials. Additionally, it sets requirements for project management, quality assurance, and subcontracting capabilities while detailing infrastructure specifications necessary for construction operations. Overall, this SOW serves as a comprehensive framework for contractors participating in federal construction projects at AUAB, ensuring efficiency, compliance, and quality in project execution.
Apr 22, 2025, 11:11 AM UTC
The document outlines the construction project for the "ESFS North Gate Complex" at Al Udeid Air Base in Qatar, designated as Project No. 25-0040. The submission, which is a 35% design completion report, includes architectural, civil, mechanical, and electrical plans, along with site details. Key components consist of a proposed floor plan, lighting and HVAC configurations, and various utility installations necessary for the complex's functionality and security. The project also emphasizes adherence to Unified Facilities Criteria (UFC), local regulations, and rigorous safety standards throughout the construction process. Notably, the drawings specify contractor responsibilities for field verification, utility management, and compliance with building codes. The overall objective is to establish a secure and efficient entry complex that aligns with military operational needs while ensuring durability and modern design standards. This initiative highlights the government's commitment to enhancing infrastructure in support of military readiness.
Apr 22, 2025, 11:11 AM UTC
The document outlines the requirements for a Design/Build project to construct the ESFS North Gate Complex for the government. The project includes design, engineering, procurement, and construction of essential facilities such as a guardhouse, parking areas, utilities, and security systems. Contractors must adhere to both local Qatari and strict U.S. codes during construction. The scope involves detailed specifications for construction materials and systems, including plumbing, electrical, mechanical, and fire protection. Contractor responsibilities are emphasized, highlighting the need for thorough design analysis and project submittal phases, including preliminary and final design submissions. All activities, from obtaining necessary permits to ensuring compliance with safety standards, must be clearly documented and approved by the Contracting Officer. Additionally, the document specifies a structured schedule for project phases, review periods, and provides guidance for submittals throughout the build process. The timeline includes an administrative phase, design/materials preparation, construction, and project closeout with detailed as-built documentation submission. This comprehensive framework ensures project accountability, adherence to standards, and ultimately the successful completion of the complex while meeting governmental operational needs.
Apr 22, 2025, 11:11 AM UTC
The document outlines requirements for offerors responding to a Department of the Air Force Request for Proposal (RFP). It emphasizes the importance of past performance evaluations and necessitates a Client Authorization Letter to be sent to points of contact (POCs) for relevant commercial contracts. Offerors must also secure similar letters from any critical subcontractors or joint venture partners. The letter authorizes clients to complete an attached questionnaire regarding the offeror's performance, which can be submitted electronically, by fax, or via mail. Specific instructions for encryption, mailing, and direct communication with the government are provided to ensure secure handling of source selection information. The overall aim is to ensure a thorough evaluation of past performance, vital for the proposal's success, while safeguarding sensitive data.
Apr 22, 2025, 11:11 AM UTC
The RFP FA5702-25-R-0001 outlines the proposal preparation instructions for a design-build project involving the construction of the ESFS North Gate Complex at Al Udeid Air Base in Qatar. The document emphasizes that Offerors must adhere to specific submission guidelines to ensure equitable evaluation, including a clear and complete proposal, which must demonstrate an understanding of the project requirements. It specifies the structure of proposals divided into three volumes: Technical, Past Performance, and Price, each with detailed content and page limits. Key components include a comprehensive technical approach, a Quality Management Plan, and a Base Access Management Plan, reflecting the contractor's ability to perform the work. The Past Performance section requires documentation of relevant prior contracts to evaluate the Offeror's capability. Additionally, the Price volume must justify the proposed costs related to the technical approach. The document also establishes deadlines for questions and submissions, the necessity for SAM and JCCS registration, and disallows elaborate embellishments in submissions. The overall intent is to maintain a structured selection process for qualified contractors while ensuring compliance with federal acquisition regulations.
Apr 22, 2025, 11:11 AM UTC
The document outlines the evaluation factors for awarding contracts under RFP FA5702-25-R-0001, focused on a Multiple Award Construction Contract (MACC) for projects in Qatar. The Government plans to award up to four contracts based on a best value selection process, incorporating technical quality, past performance, and pricing considerations. The evaluation consists of three main factors: 1. **Technical** - Assessed through three sub-factors: execution of a seed project, a quality management plan, and base access management. 2. **Past Performance** - Evaluated based on recent, relevant performance quality, recency, and relevancy of previous contracts. 3. **Price** - Analyzed for completeness and reasonableness against independent estimates and other proposals. The process includes stringent compliance requirements, emphasizing each offeror’s legitimacy to work in Qatar and the anticipated timeline for approvals. Total Evaluated Prices will be calculated and reviewed against governmental expectations for fairness. Offerors must submit their best proposals initially, as discussions are generally not expected. The document highlights the commitment to a structured and objective evaluation process in line with federal procurement regulations.
Apr 22, 2025, 11:11 AM UTC
The document outlines the base access procedures for contractors at the Al Udeid Air Base (AUAB) in Qatar, detailing various types of access applications required for personnel and vehicles. Key applications include the Vehicle Entry Authorization Application (VEAA), Entry Authorization Application (EAA), Unescorted Entry Authorization Application (UEAA), Multi-Media (MM) pass, and Installation Access Application (IAA). Each application has specific eligibility criteria, costs, and submission processes, generally requiring an approval time of approximately 60 days. Contractor personnel must have specific documents and adhere to punctuality for appointments related to base access. Critical responsibilities are assigned to both the contractors, including timely documentation submission, and the Unit Pass Coordinator (UPC), who manages the entry request process. Notably, contractors cannot submit individuals from certain countries to avoid potential entry denial. The document emphasizes the requirement for military escorts within the base and stipulates advanced notice for any escort needs. This structured framework ensures compliance with security protocols while facilitating necessary access for contract fulfillment within the military context.
Apr 22, 2025, 11:11 AM UTC
The United States Air Force's 379 Expeditionary Contracting Squadron is seeking contractors for their Multiple Award Construction Contract (MACC) at Al Udeid Air Base, Qatar. As part of the proposal evaluation, the agency is requesting feedback on the past performance of potential offerors through a Past Performance Questionnaire. This feedback is essential to assess the contractors' ability to perform maintenance, repair, and construction tasks effectively. Organizations with firsthand experience of the offerors’ work are asked to complete the questionnaire, which includes sections on contract identification, customer identification, respondent identification, and performance information. Respondents are to rate various aspects of contractor performance, such as management effectiveness, quality control adherence, and problem-solving capabilities. The completed questionnaires should be submitted electronically by April 23, 2025, to aid in timely contractor selection. This process highlights the importance of past performance evaluations in government contracting, aimed at ensuring efficient and competitive procurement processes.
Apr 22, 2025, 11:11 AM UTC
The document provides instructions for using the Department of Defense Secure Access File Exchange (DoD SAFE) to securely send solicitation and contract documents to USAF personnel. It emphasizes the necessity of submitting all documents to the proper contracting officer before the solicitation deadline, specifying that request for a drop-off link must be made at least 24 hours prior. To initiate a submission, users must email the contracting officer to request a drop-off link, which is valid for 14 days. Once the link is received, users can upload documents, but they will no longer be able to submit additional files after clicking the drop-off button. If more documents are needed, another link must be requested. This guide serves to ensure compliance with document submission protocols within government Request for Proposals (RFPs) and grants, highlighting the importance of secure and timely communication in federal contracting processes.
Apr 22, 2025, 11:11 AM UTC
The document outlines the requirements for a consent letter allowing the disclosure of past performance information from subcontractors and teaming partners to the prime contractor in connection with a government RFP. It emphasizes that such information can only be shared with the consent of the subcontractors, as the prime contractor is classified as a private entity. The consent letter must be completed by significant subcontractors or teaming partners named in the proposal and submitted as part of the Past Performance Volume. The document includes a template for the consent letter, which affirms the subcontractor's understanding of the importance of past performance evaluations in the government's selection process, thereby facilitating the evaluation of performance confidence. Overall, the file underscores the government's focus on past performance when assessing proposals for contracts, such as the one related to the Al Udeid Air Base construction project. This requirement aims to enhance the efficacy and credibility of contractor selection, ensuring the best value for the government.
Mar 25, 2025, 11:04 AM UTC
The document is a Contractor Capability Survey aimed at gathering information from businesses interested in providing UPS (Uninterruptible Power Supply) systems, particularly for military or secure data center environments. Key areas of inquiry include business information, relevant experience in UPS systems installation, and technical capabilities related to specific manufacturers like Vertiv Liebert and Eaton. The survey requests details about past projects completed within the last five years, including project names, locations, descriptions, completion dates, and client contacts. Additionally, it seeks to ascertain the company’s personnel qualifications, including active U.S. Secret Clearances and factory certifications for UPS system installations. The document also emphasizes the importance of international project experience, especially in the Middle East, along with knowledge of compliance with U.S. and local regulations. Lastly, respondents are invited to submit any further relevant information demonstrating their capabilities. Overall, this survey serves as part of the assessment process for government RFPs, ensuring qualified contractors can effectively fulfill specific technical needs and regulatory requirements for crucial infrastructure projects.
Mar 25, 2025, 11:04 AM UTC
The Central Command's Statement of Work outlines the installation of Uninterrupted Power Supply (UPS) systems at Al Udeid Air Base, Qatar, specifically in buildings B5506 and B5507. The project aims to ensure reliable power protection for critical equipment, with the Contractor responsible for design, procurement, installation, testing, and commissioning of the UPS systems, all in adherence to applicable regulations and standards. Key tasks include submitting detailed designs, procuring components, installing the systems, conducting rigorous testing, and providing comprehensive documentation to the government. Personnel requirements emphasize that all involved technicians must be factory-certified and possess US Secret Clearance for access to sensitive areas. The project is categorized as mission-essential, underlining its importance to operations. Government-provided resources include access to the sites and basic utilities, while the Contractor must manage waste disposal, compliance with safety regulations, and procurement approvals. Additionally, all work must follow strict environmental, health, and safety guidelines, including proper handling of hazardous materials. This document serves as a formal request for proposal (RFP) to solicit bids from qualified Contractors to execute this critical upgrade, reflecting the government's commitment to maintaining operational integrity and support for military installations.
The document outlines the construction project for the ESFS (Entry Control Facility) North Gate Complex at Al Udeid Air Base in Qatar, designated as Project No. 25-0040. It presents a 35% submittal package intended for contractor review, comprising various drawings detailing the site layout, existing and proposed conditions, and the technical specifications required for the construction. Key components of the project include civil, architectural, mechanical, and electrical plans, with emphasis on the installation of utility systems, HVAC solutions, structural elements, and security features. The contractor is tasked with ensuring compliance with local codes and performing necessary field verifications. Additional details such as landscaping, parking arrangements, and security installations are included to enhance operational efficiency and safety. The summary of the project underscores the importance of thorough planning and adherence to military guidelines, ensuring the facility's functionality and security at a critical military location.
Apr 22, 2025, 11:11 AM UTC
The document outlines a series of questions and responses regarding site conditions, design specifications, and construction requirements for a government project, following guidelines established by Qatar Construction Specifications (QCS) and Unified Facilities Criteria (UFC). Key topics include responsibilities for site surveys, soils investigations, utility connections, environmental and design loads, and structural elements. The contractor is responsible for adhering to specific codes related to concrete grades, structural stability, and safety measures, including blast resistance for security facilities. Additionally, it details requirements for landscaping, temporary site fencing, and traffic management during construction phases. The emphasis is on compliance with safety regulations, infrastructure integration, and proper documentation for all phases of the project. This comprehensive outline serves to clarify expectations for contractors, ensuring that all project components meet the necessary legal and operational standards.
Mar 27, 2025, 1:04 PM UTC
The document is a solicitation for an Indefinite-Delivery, Indefinite-Quantity (IDIQ) Multiple Award Construction Contract (MACC) at Al Udeid Air Base (AUAB) in Qatar, titled "AUAB MACC On Boarding." The U.S. Government seeks to onboard between two to four contractors to provide a broad spectrum of construction services, including maintenance, repairs, renovations, and minor construction projects to enhance operational facilities at AUAB. The anticipated performance period starts on July 8, 2025, lasting until July 7, 2027, with a maximum expenditure limit of $200 million across all awarded contracts. Proposals are required by May 1, 2025, and all questions must be submitted by April 14, 2025. The document outlines the need for performance and payment bonds, inspections, and compliance with local labor laws, stipulating strict timeframes for response to contract notifications and maintenance requests. Security access to AUAB adds another layer of responsibility for contractors. The government reserves the right to cancel the solicitation or to adjust the number of awarded contracts based on contractor pool assessments and performance issues. This solicitation serves to ensure efficient management and execution of construction services at a strategically significant military base.
Apr 22, 2025, 11:11 AM UTC
The document outlines a solicitation for bids on the "AUAB MACC On Boarding" project at Al Udeid Air Base (AUAB) in Qatar, structured as a Multiple Award Construction Contract (MACC). The government aims to onboard multiple vendors for a project with a maximum expenditure of $200 million over a performance period from July 8, 2025, to July 7, 2027. Contractors must submit their proposals, ensuring compliance with performance standards and local labor laws, with no less than two and no more than four awards anticipated. A seed project for technical evaluation is mandated, alongside a site visit scheduled for April 7, 2025. The contract includes obligations for performance and payment bonds, progress payments, and adherence to security and pass requirements. Furthermore, the document elaborates on proposal evaluations, including both Lowest Priced Technically Acceptable (LPTA) and Technical Tradeoff methods. The contractor's responsibility extends to materials, labor, and compliance with safety and environmental regulations, necessitating attendance at meetings and prompt warranty responses. The solicitation denotes strict adherence to FAR and DFARS clauses, emphasizing integrity, ethical conduct, and compliance with security protocols at the installation. This comprehensive solicitation reflects the government's commitment to maintaining a robust construction workforce while ensuring safety and operational efficiency in support of military facilities.
Mar 25, 2025, 11:04 AM UTC
The Department of the Air Force is seeking interested parties for market research regarding the installation of an Uninterruptible Power Supply (UPS) system at Al Udeid Air Base (AUAB), Qatar. This Sources Sought Notice is intended to identify contractors with the necessary expertise and capabilities to fulfill the requirements outlined in the Statement of Works (SOW). The project encompasses the design, procurement, installation, and testing of a UPS system to ensure reliable backup power for critical equipment. Interested vendors are invited to submit responses to a Contractor Capability Survey and provide feedback on the SOW to enhance the project's scope. The submission deadline is set for March 31, 2025, and any future solicitations will be published on www.sam.gov. Overall, the initiative underscores the Air Force's commitment to ensuring operational reliability through proper infrastructure support at AUAB.
Lifecycle
Title
Type
Solicitation
Sources Sought
Similar Opportunities
Al Dhafra Air Base (ADAB), UAE, Multiple Award Construction Contract (MACC)
Buyer not available
The Department of Defense, through the 380th Expeditionary Contracting Squadron, is seeking local vendors for a Multiple Award Construction Contract (MACC) at Al Dhafra Air Base (ADAB) in the United Arab Emirates. The procurement aims to identify capable contractors who can perform both simple and complex construction services, with future contracts potentially ranging from a minimum of $2,000 to a maximum aggregate value of $45 million. This initiative is crucial for enhancing the infrastructure and operational capabilities at ADAB, and interested vendors must submit a Statement of Capabilities (SOC) along with their maximum annual capacity by May 16, 2025, to Tamara Morris at tamara.morris@us.af.mil. All contractors must be registered in SAM.gov and the Joint Contingency Contracting System (JCCS) to be eligible for consideration.
Offutt AFB Multiple Award Construction Contract (MACC)
Buyer not available
The Department of Defense, through the Department of the Air Force, is soliciting proposals for a Multiple Award Construction Contract (MACC) at Offutt Air Force Base in Nebraska, specifically aimed at small businesses. This contract will encompass a variety of construction and design-build projects, with an emphasis on two seed projects: the repair of a water main and HVAC systems, with estimated costs ranging from $250,000 to $1 million. The selected contractors will be required to adhere to stringent safety and environmental standards while ensuring compliance with federal regulations, including the Davis-Bacon Act. Interested parties must submit their proposals by April 28, 2025, and can direct inquiries to Michael Madison at michael.madison.2@us.af.mil or Cassandra Janousek at cassandra.janousek@us.af.mil.
FY25 Multiple Award Construction Contract (MACC)
Buyer not available
The Department of Defense, through the Department of the Air Force, is soliciting proposals for the FY25 Multiple Award Construction Contract (MACC) at Fairchild Air Force Base in Washington. This contract aims to provide indefinite delivery and indefinite quantity (IDIQ) construction services, including maintenance, repair, and new construction projects, with a total value not to exceed $95 million over a five-year period, plus an optional two-year extension. The work will encompass various construction disciplines, including facility upgrades, utility work, and airfield pavement, emphasizing rapid response capabilities for emergencies affecting Air Force operations. Interested contractors must submit their proposals by May 15, 2025, and are encouraged to attend a mandatory orientation seminar on January 22, 2025. For further inquiries, contact Richard Hedrick at richard.hedrick.2@us.af.mil or Tuyen Nguyen at tuyen.nguyen.2@us.af.mil.
2025 Altus Air Force Base Multiple Award Construction Contract (MACC)
Buyer not available
The Department of Defense, through the Department of the Air Force, is soliciting proposals for the 2025 Altus Air Force Base Multiple Award Construction Contract (MACC). This opportunity is set aside for 8(a) certified businesses and focuses on commercial and institutional building construction, specifically involving the repair or alteration of miscellaneous buildings. A mandatory site visit is scheduled for April 18, 2025, at 10:00 AM Central Daylight Time (CDT), where potential offerors are strongly encouraged to attend to gain a comprehensive understanding of the project scope. For further inquiries, interested parties can contact Jacolbi Thomas at jacolbi.thomas.1@us.af.mil or Jarrod Ford at jarrod.ford@us.af.mil.
Multiple Award Construction Contract (MACC) - Large Scale Military Projects
Buyer not available
The Department of Defense, through the Naval Facilities Engineering Systems Command (NAVFACSYSCOM), is soliciting proposals for a Multiple Award Construction Contract (MACC) focused on large-scale military projects in Washington D.C., Maryland, and Virginia. This contract encompasses Design-Build and Design-Bid-Build projects, primarily involving general construction activities such as new construction, renovation, and infrastructure improvements for various facility types, including administrative, medical, and training facilities. The total contract value is capped at $8 billion over an eight-year period, with a two-year base and two additional three-year option periods, emphasizing the government's commitment to enhancing military infrastructure. Interested contractors must submit their proposals by May 6, 2025, and can reach out to Molly Lawson at molly.lawson@navy.mil or Vivienne Moore at vivienne.e.moore.civ@us.navy.mil for further inquiries.
Multiple Award Construction Contract for Inspection, Repair, and Renovation Construction Services for Petroleum, Oil, and Lubricant Fuel Systems at Various Locations Worldwide
Buyer not available
The Department of Defense, through the Naval Facilities Engineering and Expeditionary Warfare Center (NAVFAC EXWC), is soliciting proposals for a Multiple Award Construction Contract (MACC) focused on inspection, repair, and renovation services for petroleum, oil, and lubricant fuel systems at various global locations. The contract aims to provide essential construction and engineering services, including the cleaning, inspection, and repair of fuel storage tanks and pipelines, as well as the modernization of associated facilities and equipment. This procurement is critical for maintaining the operational integrity of fuel systems, ensuring safety and compliance across military installations. Interested contractors should note that the maximum contract value is $997 million, with a minimum guaranteed amount of $10,000 per contractor, and proposals are due by April 28, 2025. For further inquiries, contact Analaura Montalvo at analaura.montalvo.civ@us.navy.mil or 805-982-5605.
PNQS 09-4491 Repair Dining Facility Bldg. 668, Maxwell AFB, AL (Sources Sought)
Buyer not available
The Department of Defense, through the 42d Contracting Squadron at Maxwell Air Force Base, Alabama, is seeking industry input for Project Number PNQS 09-4491, which involves the repair and renovation of Dining Facility Building 668. The project aims to modernize the facility's interior and exterior, including kitchen renovations and the installation of new bathrooms, while ensuring compliance with health and safety standards, particularly regarding hazardous materials like asbestos. The estimated contract value exceeds $10,000,000, with a project duration of approximately 516 calendar days, structured into a procurement phase followed by a construction phase after the ROTC season. Interested parties must submit their responses by April 29, 2025, via email to the designated contacts, SSgt Khadijah Jones and Marc Engel, for further consideration.
Travis AFB MACC BOA
Buyer not available
The Department of Defense is seeking qualified contractors for the establishment of a Multiple Award Construction Contract (MACC) Basic Ordering Agreement (BOA) for construction projects at Travis Air Force Base in California. The procurement aims to create two pools of contractors: Pool 1 for minor non-complex construction projects and Pool 2 for major construction projects that require design-build capabilities. This initiative is crucial for maintaining and enhancing the infrastructure at the base, ensuring compliance with federal regulations and quality standards. Interested contractors must submit their applications for Pool 1 by May 9, 2025, and are encouraged to register with the System for Award Management (SAM) prior to submission. For further inquiries, potential applicants can contact Stephen Platt at stephen.platt.2@us.af.mil or Karly Zamiar at karly.zamiar@us.af.mil.
Design Build and Design Bid Build Indefinite Delivery Indefinite Quantity Medium Multiple Award Construction Contract for the NAVFAC Area of Operations
Buyer not available
The Department of Defense, through the Naval Facilities Engineering Systems Command Southeast (NAVFAC SE), is seeking qualified small businesses to participate in a Design-Build and Design-Bid-Build Indefinite Delivery Indefinite Quantity (IDIQ) Multiple Award Construction Contract (MACC) for various construction projects within its area of operations, primarily in the southeastern United States. The contract will encompass new construction, renovation, alteration, and repair of medium general construction projects, including facilities such as barracks, administrative buildings, and medical facilities, with a total funding ceiling of $1.5 billion over five years. Interested small businesses must submit proposals electronically via the Procurement Integrated Enterprise Environment (PIEE) after the solicitation is released, which is expected to occur within 15 days of this presolicitation notice, with Phase-One proposals due no earlier than 30 days thereafter. For further inquiries, contact Matthew Abbott at matthew.j.abbott5.civ@us.navy.mil or Marina 'Gaby' Mote at marina.g.mote.civ@us.navy.mil.
Construction of P992 Fleet Maintenance Facility (FMF) & Tactical Operations Center (TOC), Isa Air Base, Bahrain
Buyer not available
The Department of Defense, through the U.S. Army Corps of Engineers (USACE), is seeking qualified contractors for the construction of the Fleet Maintenance Facility (FMF) and Tactical Operations Center (TOC) at Shaikh Isa Air Base in Bahrain. This project involves the construction of a two-story steel-frame FMF and a single-story TOC, which will support the maintenance and operational needs of P-8A aircraft, including various infrastructure and security enhancements. The estimated construction cost ranges from $10 million to $25 million, with a projected period of performance of 599 calendar days from the Notice to Proceed. Interested firms must possess a Facility Clearance Level (FCL) of SECRET or higher and submit their qualifications, including a signed Non-Disclosure Agreement, to the designated contacts by May 13, 2022.