Y--GLCA 318744 Rehabilitate Critical Utility Systems
ID: 140P2024R0112Type: Solicitation
Overview

Buyer

INTERIOR, DEPARTMENT OF THENATIONAL PARK SERVICEDSC CONTRACTING SERVICES DIVISIONDENVER, CO, 80225, USA

NAICS

Water and Sewer Line and Related Structures Construction (237110)

PSC

CONSTRUCTION OF SEWAGE AND WASTE FACILITIES (Y1ND)
Timeline
    Description

    The Department of the Interior, through the National Park Service, is soliciting proposals for the "Rehabilitate Critical Utility Systems" project at the Glen Canyon National Recreation Area, with an estimated construction cost exceeding $10 million. The project aims to modernize wastewater management systems in the Wahweap and Lone Rock areas of Arizona and Utah, focusing on upgrading wastewater collection, treatment systems, and the SCADA control network while ensuring compliance with environmental regulations. This initiative is crucial for enhancing the park's infrastructure and maintaining uninterrupted services for public use. Interested contractors must submit their proposals by September 25, 2024, at 1600 hours MDT, and can direct inquiries to James Waller at james_waller@nps.gov or by phone at 303-969-2488.

    Point(s) of Contact
    Files
    Title
    Posted
    The Glen Canyon National Recreation Area Solicitation 1443N RFP outlines the Design-Build (DB) project to rehabilitate critical utility systems, primarily wastewater management, in Wahweap and Lone Rock areas of Arizona and Utah. The project includes upgrading wastewater collection and treatment systems, the SCADA control network, and related electrical systems. Key tasks involve thorough assessments, design development, construction, and ongoing coordination with the National Park Service (NPS) to maintain service throughout the upgrade process. Contractors are required to follow strict specifications regarding sustainability, environmental compliance, and permitting processes necessitated by various state and federal regulations. Deliverables will include multiple phases of design documentation, construction drawings, and a comprehensive waste management plan. Additionally, the RFP details project schedules, progress invoicing protocols, and further instructions for site management and communication through the NPS SharePoint project website. Through this initiative, the NPS aims to enhance the park's infrastructure while ensuring uninterrupted services and adherence to environmental standards, reinforcing their commitment to preserving natural resources while accommodating public usage.
    The document outlines the technical specifications and design details for the Wahweap Wastewater Structural/Mechanical Sanitary Sewer Forcemain Bridge at Glen Canyon National Recreation Area. It includes a series of detailed engineering drawings dated March 3, 2023, indicating the installation of various structural and mechanical components, such as expansion joints for thermal movement, pipe supports, and bulkheads for the 10" casing and 6" carrier pipes. The plans emphasize compliance with safety and engineering standards, with careful notes on the selection of materials and construction techniques to ensure durability and functionality. The document reflects the need for a methodical approach to manage wastewater infrastructure, ensuring it meets both environmental regulations and practical usability for maintenance personnel. Overall, it serves as a vital resource for contractors involved in the construction and renovation processes, providing a comprehensive overview of the project's scope and technical requirements.
    The solicitation document (140P2024R0112) initiated by NPS seeks proposals for the "Rehabilitate Critical Utility Systems" project at the Glen Canyon National Recreational Area. It aims to modernize water and wastewater infrastructures, notably in Wahweap and Lone Rock, to align with Arizona and Utah DEQ standards. The acquisition is open for bids and structured as a Two Phase Design-Build solicitation, valued over $10 million. Responses are expected by 09/17/2024, with a bid validity period and a construction timeline of up to 730 days. Essential requirements include licensing, safety protocols, and adherence to construction wage regulations. Offerors must ensure compliance with detailed inspection standards, prompt payment clauses, and electronic invoicing systems as stipulated. The contract emphasizes the importance of key personnel, with restrictions on substitutions and specific requirements for reporting past performance evaluations. This project reflects the government's initiative to improve critical infrastructure, demonstrating compliance with sustainable and quality standards in public works.
    The document outlines a structured format for submitting resumes of key personnel involved in a government contract proposal. It includes specific sections for essential information such as the individual's name, role in the contract, years of experience (both total and with the current company), company name and location, educational background, and other qualifications such as safety training and awards. A significant component is the relevant experience section, which requires detailed accounts of past projects, including titles, locations, dates, descriptions, specific duties, roles, employer details, and contact information. This structured approach ensures that the contracting authority can evaluate the qualifications and experience of personnel proposed for the project, aligning with the objectives of federal and state/local RFPs and grants. The emphasis on comprehensive qualifications and experience highlights the importance of expertise in successfully executing government contracts, ensuring reliability and compliance throughout the process.
    The document outlines the structure and requirements for government contracting proposals, including federal and state RFPs and grants. It specifies essential sections such as project title, location, timeline, brief project descriptions, duties performed, specific roles, and contact information. Additionally, key personnel resumes are required, detailing experience, qualifications, and education. Two standardized letters of commitment for subcontractors are provided, expressing readiness to fulfill contract duties if awarded to the primary contractor. The purpose of this document is to guide applicants in preparing comprehensive proposals that meet government contract obligations, ensuring essential personnel qualifications and commitments are clearly articulated. By structuring the submission with detailed project descriptions and commitments, the document emphasizes accountability and thoroughness, aligning with regulatory standards for public sector contracting.
    The government document outlines a Project Experience Questionnaire and Past Performance Questionnaire as part of an RFP process for construction or related services. It requests submitters to provide details on past projects relevant to specified evaluation criteria, including project descriptions, contractor roles, pricing changes, schedule adjustments, encountered problems, and effective methodologies. Key sections include a solicitation brief, requirements for submitting project information, information for contractor evaluation, and a rating scale for past performance encompassing quality, schedule management, cost control, and regulatory compliance. Each contractor's performance is assessed, and the document emphasizes that submitted information is sensitive, not implying government endorsement. The purpose of this documentation is to ensure that contractors demonstrate competence and reliability based on previous work, facilitating informed decision-making for government contracts. The questionnaires are structured to collect comprehensive project-related data that reflect a contractor's capacity to meet contract requirements effectively.
    The document outlines requirements for contractors to provide a comprehensive Subcontracting Plan in response to government solicitations, particularly concerning the engagement of small businesses. It emphasizes the necessity for offerors to include general references, disclose any past unsatisfactory relationships, and detail corrective actions taken. The plan requires information about the contractor's surety, banking relationships, insurance, and lists of relevant subcontractors and material suppliers, ensuring that a significant portion of subcontracting opportunities is directed toward small, disadvantaged, women-owned, and veteran-owned businesses. Key components of the plan include setting specific subcontracting goals, reporting requirements, methods for identifying potential subcontractors, and maintaining accurate records. The contractors must ensure equitable opportunities for these businesses and develop outreach programs to promote participation. Additionally, the document stipulates that subcontractors must comply with established clauses to foster small business involvement. In summary, this Subcontracting Plan serves as a directive for contractors to actively engage small businesses, ensuring compliance with federal requirements while promoting economic opportunities for these firms within government contracts.
    The document outlines the requirements for construction contract administration under the Federal Acquisition Regulation (FAR) 36.211(b), which mandates agencies to describe their policies and procedures regarding the definitization of equitable adjustments for change orders in construction contracts. Additionally, it requires agencies to provide data on the time taken to finalize these adjustments. The relevant information can be accessed via a designated URL from the Department of the Interior. This directive plays a crucial role in ensuring transparency and accountability in managing construction contracts, aligning federal regulations with practices in handling change orders, ultimately enhancing efficiency and compliance in contract administration across federal, state, and local RFPs and grants.
    The Preliminary Geotechnical Report prepared by Shannon & Wilson, Inc. for Jacobs Government Services addresses the rehabilitation of critical utility systems at Glen Canyon, which spans Arizona and Utah. The report outlines geotechnical considerations related to the Wahweap and Lone Rock wastewater and water systems, based on existing geological assessments and field explorations. It details a variety of services, including the installation and upgrade of wastewater lagoons, waterlines, and sewage bypass systems, emphasizing the necessity for thorough subsurface evaluations through borings and infiltration tests. Key geological conditions include a mix of eolian sands, alluvium, and underlying bedrock. The report provides preliminary geotechnical recommendations for foundation design, seismic considerations, and construction methods, indicating the importance of subgrade evaluation and proper drainage to ensure structural integrity. It stresses the need for additional explorations prior to final design and highlights construction considerations, including site preparation and material handling. This comprehensive analysis demonstrates the project's scope to enhance utility services while addressing environmental and structural stability in accordance with federal and local guidelines.
    The "Design-Build Rehabilitate Critical Utility Systems" RFP for Glen Canyon National Recreation in Arizona addresses queries related to the proposal requirements. Key clarifications include: companies may use their own resume formats as long as they meet specific criteria; projects must be completed within the last five years; and bonding capacity requirements were corrected to a minimum of $40 million for single projects. Electronic copies of bonding letters are acceptable, eliminating the need for original sealed copies. The document emphasizes the need for precise compliance and documentation from bidders to ensure that all submission requirements are met and acknowledges the importance of current project experience and appropriate financial backing in the bidding process. The design-build contract aims to rehabilitate critical infrastructure, contributing to improved utility systems within the national recreation area.
    The document outlines Amendment 0001 to the solicitation identified as 140P2024R0112, concerning the rehabilitation of critical utility systems at Glen Canyon National Recreation Area. The primary purpose of this amendment is to address and provide responses to questions raised by offerors regarding the proposal. It specifies that offers must acknowledge receipt of the amendment to be considered valid and emphasizes the importance of timely acknowledgment, as neglecting to do so may lead to the rejection of offers. The proposal submission deadline remains unchanged, set for September 17, 2024, at 1600 hours MDT. Additional administrative procedures, such as changes in accounting data or contract modifications, are referenced. Overall, this amendment serves to clarify the solicitation while adhering to federal contracting protocols.
    The document is an amendment to a solicitation for the Glen Canyon National Recreation Area, specifically for the project titled "Rehabilitate Critical Utility Systems." The primary purpose of Amendment 0001 is to extend the due date for Phase I of the solicitation to September 25, 2024, at 1600 hours MDT. The amendment outlines the necessary processes for acknowledging receipt of the amendment, noting that failure to do so may result in the rejection of the offer. It details actions contractors must take to update their submissions if changes are needed. The amendment clarifies that all other terms and conditions of the initial solicitation remain unchanged. Furthermore, it emphasizes the importance of the extension and adherence to the specified procedures in the contract modification process, reflecting standard practices in government contracting. Overall, this document ensures clarity and compliance for potential contractors engaging in the bidding process for the project.
    The document is a solicitation for a two-phase design-build project titled "Rehabilitate Critical Utility Systems" with an estimated construction cost exceeding $10 million. It is issued by the National Park Service's Contracting Services Division in Denver, Colorado, under solicitation number 140P2024R0112. This acquisition is open to all qualified bidders, following the guidelines established by the North American Industrial Classification System. Key points include mandatory performance and payment bonds, details around a pre-proposal site visit, and stipulations regarding submission of bids, which must be sealed and labeled accordingly. The contractor is responsible for all applicable taxes, and the requirement is currently unfunded, with a strong possibility of funding in the future. Proposals must adhere to the submission requirements detailed in Section "L." The document emphasizes the importance of meeting the outlined specifications and has a timeline for proposal submission with the expectation that work would begin upon award notice. Overall, it articulates the government's requirements for interested parties to undertake the specified rehabilitation work comprehensively and in compliance with established regulations.
    Similar Opportunities
    GLCA 318876 Low Water Access Ramp at Antelope Point
    Active
    Interior, Department Of The
    The Department of the Interior, through the National Park Service, is seeking qualified firms for the GLCA 318876 project, which involves the construction of a low water access ramp at Antelope Point, Lake Powell. The project aims to reconstruct a non-functional boat launch ramp and enhance parking area infrastructure, requiring specialized skills in underwater construction and mass grading, with a project value exceeding $20 million. This initiative is part of the NPS's efforts to address infrastructure challenges and improve recreational access in response to environmental conditions. Interested contractors must submit their qualifications electronically by 1:00 pm Mountain Time on November 18, 2024, and should possess bonding capability, certified registration on www.SAM.gov, and relevant experience with federal agencies in sensitive environments. For further inquiries, interested parties can contact Zaira Lupidi at zairalupidi@nps.gov.
    Y--YOSE 196416 Rehabilitate El Portal Wastewater Treatment Facility and Admin Camp.
    Active
    Interior, Department Of The
    The National Park Service (NPS) is preparing to solicit proposals for the rehabilitation of the El Portal Wastewater Treatment Facility and Administrative Camp located in Yosemite National Park, California. This project aims to upgrade the 45-year-old wastewater treatment plant, which is critical for managing wastewater for Yosemite Valley and surrounding communities, by replacing outdated infrastructure and systems, demolishing obsolete structures, and creating RV sites for construction workforce housing at the former administrative camp. The estimated cost for this comprehensive project exceeds $150 million, with a performance period of approximately 1460 days, including potential environmental shutdowns. Interested contractors must be registered with the System for Award Management (SAM) to participate, and solicitation documents are expected to be issued around September 30, 2024. For further inquiries, contact Patrick Naulty at patricknaulty@nps.gov or call 303-987-6701.
    Y--Archimedes pump construction for Topock
    Active
    Interior, Department Of The
    The U.S. Department of the Interior, through the Bureau of Reclamation, is soliciting proposals for the construction of a 60 cubic feet per second (cfs) pumping station at Topock Marsh within the Havasu National Wildlife Refuge in Mohave County, Arizona. The project involves the installation of an Archimedes Screw Pump, concrete structures, a dewatering system, and solar power modifications, with an estimated project cost ranging from $10 million to $15 million. This initiative is crucial for enhancing local water management capabilities and supporting ecological preservation efforts in the region. Interested contractors must submit their proposals by November 21, 2024, at 2:00 PM Pacific Time, and can direct inquiries to Diane Rodriguez at DLRodriguez@usbr.gov or by phone at 702-293-8368.
    GLCA 210865 Replace Wahweep Government Dock
    Active
    Interior, Department Of The
    The Department of the Interior, through the National Park Service, is seeking qualified firms for the replacement of the Wahweep Government Dock at Lake Powell, identified as project GLCA 210865. This procurement involves the design and construction of a new dock structure to replace the existing dock, which is over 40 years old and has suffered from environmental degradation. The project is significant for maintaining safe and functional access to the lake, with an estimated cost ranging from $7 million to $12 million and a performance period from February 2025 to February 2026. Interested parties must demonstrate relevant experience in design-build projects, submit responses by November 18, 2024, and ensure registration in SAM.gov; contact Zaira Lupidi at zairalupidi@nps.gov for further inquiries.
    Y--Source Sought Notice
    Active
    Interior, Department Of The
    The Department of the Interior, through the National Park Service, is seeking proposals for the rehabilitation of the Painted Desert Community Complex located within Petrified Forest National Park. The project aims to address structural deficiencies, restore historical features, and upgrade facilities to meet current standards, with an estimated construction cost exceeding $10 million. This initiative reflects the federal government's commitment to preserving national landmarks while enhancing visitor experiences and public engagement. Interested contractors must submit their proposals by November 15, 2024, and can direct inquiries to James Waller at jameswaller@nps.gov or by phone at 303-969-2488.
    Y--YELL 310533 Rehabilitate and Improve Old Faithful
    Active
    Interior, Department Of The
    The Department of the Interior, through the National Park Service, is soliciting proposals for the rehabilitation and improvement of the Old Faithful Water Treatment System at Yellowstone National Park (Solicitation No. 140P2024R0050). The project aims to construct a new water treatment facility, including advanced water treatment technology, while adhering to environmental protection standards and minimizing disruptions to park activities. This initiative is crucial for maintaining essential infrastructure within the park, ensuring compliance with federal regulations, and safeguarding natural resources. Interested contractors must submit their proposals by December 4, 2024, at 2:00 PM MT, with questions accepted until November 18, 2024. For further inquiries, contact Vicki Freese-supler at vickilfreese-supler@nps.gov or call 720-402-8467.
    Z--ORPI 240841 Replace Primary Water System for Maint
    Active
    Interior, Department Of The
    The Department of the Interior, through the National Park Service, is soliciting proposals for the replacement of the primary water system at Organ Pipe Cactus National Monument in Ajo, Arizona. The project aims to improve water distribution systems currently utilizing outdated asbestos-cement pipes, with a focus on installing a new 100,000-gallon potable water tank and upgrading associated infrastructure. This initiative is critical for ensuring reliable water supply and enhancing operational capabilities within the national monument, which is vital for both visitor services and environmental stewardship. Interested small businesses must submit their proposals by November 14, 2024, at 2:00 PM MST, and can direct inquiries to Joy Ewalt at JoyEwalt@nps.gov or by phone at 720-400-3897.
    Y--LAKE 318673; 324894; 332529 Extend Public Launch R
    Active
    Interior, Department Of The
    The Department of the Interior, through the National Park Service, is soliciting bids for the construction project titled "Extend Public Launch Ramp at Hemenway Harbor" in Lake Mead National Recreation Area, Boulder City, Nevada. The project involves extending a public launch ramp by 529 feet, requiring excavation, grading, and the installation of precast concrete panels to enhance recreational access as lake levels decline. This initiative is crucial for maintaining public access to recreational facilities while adhering to environmental regulations and best management practices to protect local wildlife and water quality. Interested contractors must submit sealed offers by November 12, 2024, and can direct inquiries to Contracting Officer Dayna Omiya at daynaomiya@nps.gov or by phone at 720-910-0477. The expected contract magnitude exceeds $10 million, with a performance period from December 1, 2024, to December 1, 2026.
    Z--YELL 307127 - Rehabilitate historic Structures
    Active
    Interior, Department Of The
    The Department of the Interior, through the National Park Service, is soliciting proposals for the rehabilitation of historic structures at Fort Yellowstone in Yellowstone National Park, under Solicitation No. 140P2024R0177. The project aims to restore the exteriors of seventeen historic buildings, focusing on preserving their historical integrity while upgrading structural and aesthetic elements, including roof repairs, masonry restoration, and the installation of modern safety features. This initiative is crucial for maintaining the cultural heritage of the park and ensuring the longevity of these significant structures, with an estimated project value exceeding $10 million. Interested contractors must submit their proposals by November 4, 2024, and can direct inquiries to Vicki Freese-supler at vickilfreese-supler@nps.gov or by phone at 720-402-8467.
    Y--ROMO 327127 Bridge Preservation
    Active
    Interior, Department Of The
    The Department of the Interior, through the National Park Service, is soliciting proposals for the "Y--ROMO 327127 Bridge Preservation" project, aimed at preserving multiple bridges within Rocky Mountain National Park. The project encompasses various preservation tasks, including concrete repairs, masonry work, and scour countermeasures, with an estimated contract value between $1,000,000 and $5,000,000. This initiative is critical for maintaining infrastructure integrity and ensuring public safety while adhering to environmental regulations within the park. Interested contractors should submit their proposals by November 8, 2024, at 2 PM MT, and can direct inquiries to Shellie Murphy at shelliemurphy@nps.gov or call 720-610-2690.