Z--YELL 307127 - Rehabilitate historic Structures
ID: 140P2024R0177Type: Solicitation
Overview

Buyer

INTERIOR, DEPARTMENT OF THENATIONAL PARK SERVICEDSC CONTRACTING SERVICES DIVISIONDENVER, CO, 80225, USA

NAICS

Commercial and Institutional Building Construction (236220)

PSC

REPAIR OR ALTERATION OF FAMILY HOUSING FACILITIES (Z2FA)
Timeline
    Description

    The Department of the Interior, through the National Park Service, is soliciting proposals for the rehabilitation of historic structures at Fort Yellowstone in Yellowstone National Park, under Solicitation No. 140P2024R0177. The project aims to restore the exteriors of seventeen historic buildings, focusing on preserving their historical integrity while upgrading structural and aesthetic elements, including roof repairs, masonry restoration, and the installation of modern safety features. This initiative is crucial for maintaining the cultural heritage of the park and ensuring the longevity of these significant structures, with an estimated project value exceeding $10 million. Interested contractors must submit their proposals by November 4, 2024, and can direct inquiries to Vicki Freese-supler at vicki_l_freese-supler@nps.gov or by phone at 720-402-8467.

    Point(s) of Contact
    Files
    Title
    Posted
    The document outlines a rehabilitation project for seventeen historically significant housing units in Yellowstone National Park, specifically in the Fort Yellowstone and Mammoth areas. The National Park Service aims to preserve these buildings, which are part of the Fort Yellowstone National Historic Landmark District and the Mammoth Hot Springs Historic District. The project encompasses exterior refurbishments, including roof repairs, siding restoration, window and door upgrades, chimney stabilization, masonry cleaning, and installation of radon systems. Additionally, structural enhancements will be made to roofs, walls, and foundations. The site work includes concrete sidewalk replacements and landscape vegetation management. The project adheres to the Secretary of the Interior's standards for historic properties, ensuring minimal disturbance to the historic fabric of the buildings. The contractor is responsible for maintaining the integrity of the site while following safety protocols due to the presence of geothermal activity. The project also includes provisions for radon mitigation, as the area has exceeded safe concentration limits according to regulatory standards. Overall, this initiative reflects a commitment to preserving cultural heritage while enhancing the physical environment for current and future public use.
    The document outlines a comprehensive rehabilitation project targeting the exteriors of historic buildings at Fort Yellowstone, Yellowstone National Park, specifically focusing on Building #03 (Field Officer's Quarters). Constructed in 1909, this four-level structure requires substantial repairs including the replacement of concrete slabs, chimney caps, and various wood and masonry components. The scope also encompasses extensive structural upgrades to enhance the building's integrity and restore its historical features. Key tasks involve repairing existing masonry, improving drainage systems, and ensuring compliance with preservation standards. Additionally, the project addresses necessary demolitions and removals, like outdated fixtures and elements that hinder restoration efforts. The goal is to maintain the building's historical significance while ensuring sustainability and structural soundness, aligning with federal guidelines for preservation. This initiative not only represents a commitment to heritage but also adheres to regulations governing restoration practices in federally funded projects.
    The document outlines a project to rehabilitate the exteriors of historic Fort Yellowstone buildings, specifically focusing on Building #05, the Double Officer's Quarters, originally constructed in 1897. The scope of work includes significant structural repairs and replacements, such as new precast chimney caps, masonry repairs, updated roofing systems with metal shingle coverings, insulation, and weather barriers. Key elements involve removing and reinstalling wood siding and trim, repairing stairs, adding new drainage systems, and ensuring compliance with modern safety standards. Additional details highlight the replacement and rehabilitation of groundwork and structural elements, including basement repairs and porch enhancements. Demolition plans specify procedures for removing existing systems and restoring them post-renovation. The project aims to preserve the historical integrity of the building while upgrading its facilities to meet current standards. This initiative aligns with federal guidelines for maintaining historical sites, demonstrating the government's commitment to both restoration and modernization of these cultural assets in Yellowstone National Park.
    The document outlines a comprehensive plan for the rehabilitation of multiple historic buildings at Fort Yellowstone, Yellowstone National Park. It includes key demolition and restoration activities, focusing on maintaining structural integrity while preserving the historic character of the buildings. Specific tasks include selective demolition of existing structures, removal, and salvage of materials (such as wood siding), as well as masonry repointing using specified mortar types. Other priorities include restoring window sashes, coordinating electrical and plumbing system adjustments, and ensuring compliance with standards for historic treatment. The document serves as a guide for contractors involved in the rehabilitation project, emphasizing the importance of coordinating actions with the contracting officer and ensuring that all work aligns with architectural and engineering specifications. The detailed elevation sketches, with corresponding keynotes, illustrate the planned interventions. Overall, the project aims to enhance the safety, functionality, and aesthetics of the historical structures, aligning construction practices with preservation goals.
    The document outlines a comprehensive plan to rehabilitate the exteriors of historic buildings at Fort Yellowstone, Yellowstone National Park. It details selective demolition activities, including the removal, repair, and restoration of various architectural elements like roofs, masonry walls, and windows. Key tasks involve salvaging historic materials and reusing them, ensuring compliance with preservation standards. Specific instructions address roof repairs, including the treatment of different roofing materials, coordination of utilities, and venting systems. It emphasizes collaboration with a contracting officer for overseeing the execution of tasks and adherence to safety and construction standards. The document serves as a framework for contractors, indicating the project's reliance on historical integrity while modernizing infrastructure, thus aligning with governmental RFPs focused on preservation and renovation initiatives.
    The document outlines the rehabilitation project for the exteriors of historic buildings within Fort Yellowstone, Yellowstone National Park. The primary aim is to restore and improve structural integrity while preserving historical features. Key aspects include renovations of windows, doors, masonry, roofing, and drainage systems. Specific tasks involve replacing and repairing wooden components, installing new insulation, and ensuring compliance with historical preservation standards. The project will also address existing hazards such as radon through appropriate ventilation systems. The scope comprises both external and internal structural work, with a focus on compatibility with existing architectural styles. The project further emphasizes environmental responsibility, including the proper management of hazardous materials encountered during renovations. The handling of these issues aligns with government protocols for federal grants and RFPs by ensuring that cultural heritage is protected and maintained for future generations while adhering to safety and design standards. This comprehensive approach demonstrates the commitment to both the historic value of Fort Yellowstone and the significant investment in its restoration and improvement.
    This document outlines the renovation of historic Fort Yellowstone buildings within Yellowstone National Park. It details selective demolition and rehabilitation tasks necessary for restoring the buildings' exteriors while preserving their historical integrity. Key actions include the removal of existing roofing materials, reconstruction of specific structural elements, and upgrading insulation while adhering to architectural and historical preservation standards. Notable requirements include the salvage and reinstallation of original materials, clean masonry surfaces, and repointing of stone and brick foundations using specified mortar types. The plan mandates coordination with contracting officers for modifications and location confirmations of existing utilities and systems. Compliance with the latest construction guidelines is emphasized, ensuring enhancements contribute to both aesthetic value and functional reliability while respecting the site's historical context.
    The National Park Service (NPS) is soliciting proposals for the rehabilitation of historic Fort Yellowstone's exteriors through a competitive bidding process (Solicitation No. 140P2024R0177). The project encompasses extensive preservation work on seventeen historic housing units, focusing on repair rather than replacement, aligning with guidelines established by the Secretary of the Interior. The estimated cost exceeds $10 million, and potential contractors are urged to include all applicable taxes in their submissions. The contract will be awarded only when funds are confirmed available. Bidders must provide a detailed proposal including a fixed price for base and optional items. The awarded contractor will commence work within ten calendar days of notice and must complete it within 1,009 days. The contract specifies quality assurance protocols, including work inspections by government officials. Liquidated damages will apply for delays, emphasizing the project's strict timeline. The solicitation emphasizes environmental compliance, requiring adherence to federal standards. Additionally, all-terrain vehicles are prohibited on-site, while alternative vehicle use is regulated. This solicitation reflects the NPS’s commitment to preserving national heritage while ensuring compliance with statutory requirements.
    The document details a project aimed at preserving and rehabilitating seventeen historically significant buildings located in Fort Yellowstone and the Mammoth areas of Yellowstone National Park. The work includes extensive exterior renovations such as roof and siding repairs, window restorations, masonry cleaning, and structural enhancements, while adhering to the Secretary of the Interior's standards for historic preservation. Key aspects include the installation of new radon systems and landscape management to prevent environmental disturbances. The renovation will ensure minimal disruption to the historic fabric of the buildings, emphasizing selective demolition and the responsible handling of any cultural materials uncovered during the process. Safety protocols, especially concerning the park's wildlife and visitor safety, are critical throughout the project. The overarching purpose of this initiative is to maintain the integrity of the historic landmarks while upgrading essential infrastructure to comply with modern standards. The project is managed under the jurisdiction of the National Park Service, utilizing strict adherence to building codes and regulatory requirements relevant to historic preservation.
    The document outlines a comprehensive rehabilitation plan for the exteriors of historic buildings within Yellowstone National Park, specifically focusing on Building #03, the Field Officer's Quarters, built in 1909. The scope of work involves extensive preservation activities, including the replacement of concrete slabs, chimney repairs, masonry restoration, and upgrades to structural components such as stairways and foundations. Additional tasks include the removal and reinstallation of existing elements, installation of drainage systems, and ensuring compliance with historic preservation guidelines. The plan emphasizes maintaining the architectural integrity of the historic structure while addressing necessary repairs. It also includes detailed demolition plans for affected areas across multiple floors, accounting for selective demolition to facilitate new construction seamlessly. This project not only reflects the government's commitment to preserving historical landmarks but also demonstrates adherence to safety and environmental regulations during renovation efforts. Overall, this initiative serves to enhance the functionality and longevity of the building while honoring its historical significance.
    The document outlines the rehabilitation plans for the historic Double Officer's Quarters located in Yellowstone National Park. The project, numbered FMSS 5847, aims to restore and improve the building's exterior, which was constructed in 1897. Key facets of the renovation include structural repairs to masonry foundations and walls, restoration of wooden components, improvements to wall and roof envelopes with new insulation and metal shingle roofing, and updated safety features like metal handrails. The project also entails environmental enhancements, such as installing a radon mitigation system and upgrading drainage systems around the foundation. The detailed scope of work emphasizes preserving the building's historical integrity while ensuring compliance with modern standards. It includes selective demolition, the repair of existing features, and installation of new systems to accommodate current regulations and enhance the building's overall longevity. The comprehensive plan reflects adherence to federal guidelines, underlining the importance of maintaining historic sites while integrating modern safety and efficiency measures throughout the process.
    The document outlines a project proposal for the rehabilitation of the exteriors of historic Fort Yellowstone buildings in Yellowstone National Park. It includes detailed construction drawings and scope of work, focusing on selective demolition, material salvage, and restoration of historical elements. Key tasks involve removal of existing materials such as siding and trim for repair and reinstalling after structural improvements. Specific instructions are provided for masonry cleaning, repointing, and wood repair across various building levels. The proposal emphasizes the integration of modern systems, such as ventilation and drainage, while adhering to historical preservation standards. The project's aim is to restore the buildings' historical integrity while ensuring functionality and compliance with safety regulations. This initiative highlights the government’s commitment to maintaining cultural heritage within national parks.
    The document outlines the rehabilitation plans for the exteriors of historic buildings at Fort Yellowstone in Yellowstone National Park. It includes various demolition and construction specifications focusing on preserving historical integrity while upgrading structural and aesthetic elements. Key activities involve the selective removal and salvage of existing materials, such as siding, downspouts, and roofing components, along with the installation of new features that align with historical standards. The document emphasizes coordination of demolition work with rehabilitation efforts, as well as adherence to safety and historical preservation guidelines. There are specific tasks detailed for masonry repair, wood repairs, and window restoration, as well as instructions for handling potential hazardous materials like lead paint. Overall, the project aims to enhance the long-term preservation and usability of these historically significant structures while ensuring regulatory compliance. The detailed plans suggest that this initiative addresses both preservation and modernization in a sensitive historic context.
    The document outlines the rehabilitation scope for the exteriors of historic Fort Yellowstone buildings in Yellowstone National Park. The primary aim is to restore and upgrade the structures while maintaining historical integrity. Key actions include repairing masonry, wood components, and roofing, installing new weather barriers and insulation, and enhancing drainage systems around building perimeters. Specific plans involve new metal roofing, replacement of deteriorated stairs and railings, repair of existing doors and windows along with the installation of new storm windows, and the addition of chimney caps and gable vents. The construction entails attention to detail, such as repointing and cleaning masonry, protecting existing features, and ensuring structural integrity by replacing vulnerable framing. Planting plans indicate enhancements to the landscape while consideration of radon systems for ventilation is also noted. This endeavor is crucial for preserving these historic structures, ensuring they meet safety standards, and enhancing their longevity for educational and recreational use in the park. The document serves as a comprehensive guideline for all rehabilitation works required, emphasizing adherence to preservation standards and specifications.
    The document outlines the demolition and rehabilitation plans for historic buildings in Fort Yellowstone, Yellowstone National Park. It emphasizes selective demolition and rehabilitation techniques while preserving historical integrity. Key details include removing or salvaging existing roofing materials, including clay tiles, metal shingles, and wood shingles, while ensuring insulation replacement and roof waterproofing through proper detailing and adherence to manufacturer standards. The plans also address exterior masonry treatments, such as cleaning and repointing, along with the restoration of windows and the removal of modern installations such as conduits and electrical panels for updated repositioning. Each section is meticulously detailed with annotated drawings indicating various structural modifications, ensuring coordination between demolition and ongoing construction activities. The project aims to restore the exterior features uniformly, preserving the historical significance while improving structural integrity and compliance with current building standards. This initiative reflects government investment in maintaining and preserving historic sites while aligning with federal and local regulations regarding construction and environmental safety. The comprehensive approach to planning demonstrates a commitment to executing the project efficiently while minimizing disruptions to the park's natural and architectural heritage.
    Tetra Tech, Inc. conducted a hazardous materials inspection of 17 historical housing units at Fort Yellowstone, Yellowstone National Park, in preparation for exterior renovations. The inspection focused on identifying asbestos-containing materials (ACM), lead-based paint (LBP), mercury components, polychlorinated biphenyls (PCBs), and chlorofluorocarbon (CFC) components. Findings included asbestos identified in window glazing of several buildings, with LBP present in various components, often exceeding safety thresholds set by regulatory agencies. No mercury, PCB, or CFC components were detected. The report also outlines specific materials in need of abatement and includes detailed regulatory criteria for managing hazardous materials. Tetra Tech emphasizes the need for compliance with federal safety standards and provides guidance for ongoing management and remediation efforts, ensuring that future renovations prioritize occupant safety and environmental protection.
    The report prepared by Built Environment Evolution (BEE) details a Portable XRF (pXRF) study of historic Fort Yellowstone, Yellowstone National Park. Commissioned by Hennebery Eddy Architects, the study analyzes paint samples from various buildings to understand paint adhesion issues and to identify historical applications. The samples were tested using the Bruker Tracer XRF Spectrometer, revealing high levels of Titanium, Iron, and Zinc, indicative of post-WWII paints, alongside traces of Lead, suggesting earlier paint layers. Key findings indicate two main causes for paint adhesion problems: the differing paint binder compositions and historic wood preservatives affecting adhesion. Full results and individual findings begin on page 12 and conclusions on page 83. The report emphasizes the importance of elemental composition in conservation, enabling informed restoration strategies and underscoring the efficacy of portable XRF analysis in distinguishing between original materials and later treatments. This document is essential for federal and local preservation efforts, ensuring historical accuracy and structural integrity during rehabilitation projects.
    Tetra Tech, Inc. completed a radon assessment for 16 historical housing units at Historic Fort Yellowstone, under the National Park Service. The assessment, prompted by a request from Hennebery Eddy Architects, involved sampling radon levels within the buildings, which are located in Park County, Wyoming—a region designated as Radon Zone 1 by the EPA, indicating a high potential for elevated radon levels. The assessment collected radon samples from various locations in December 2022, with laboratory analysis showing that several areas exceeded the EPA and CDC's recommended actionable level of 4.0 picocuries per liter (pCi/L). Notably, Building 4 exhibited a radon concentration of 10.5 pCi/L, necessitating further investigation. Tetra Tech recommends additional seasonal testing over the next year to monitor and adaptively manage radon levels, highlighting the importance of maintaining health safety standards. The report emphasizes that continued monitoring is advised even if initial results are below the threshold, ensuring consistent compliance with health guidelines. Tetra Tech's findings are intended specifically for use by the architects and the Park Service, outlining the critical need for future actions based on these evaluation results.
    The document outlines a draft construction phasing plan for the Fort Yellowstone Rehabilitation project, created by Hennebery Eddy Architects. The plan details the overall site and the various phases of construction scheduled from 2025 to 2028. It emphasizes the management of displaced housing units and the introduction of temporary housing options during each phase. The structure includes a map detailing the site layout, designating different areas for temporary housing, staging, and units categorized by type and occupancy—such as single, couple, and family spaces. The phases are sequentially organized and labeled, indicating future development stages with a focus on accommodating personnel without displacing existing units unnecessarily. The document serves as a strategic guide for coordinating construction activities in the Fort Yellowstone area, reflecting compliance with zoning and operational needs while facilitating ongoing housing provisions for personnel during renovations. The overall aim is to modernize the facilities while ensuring minimal disruption and effective resource allocation throughout the project duration.
    The document provides the updated wage determination for building construction projects in Montana, specifically Meagher and Yellowstone National Park Counties. It outlines the minimum wage rates required under the Davis-Bacon Act, stipulating the application of Executive Orders 14026 and 13658 based on contract initiation dates. For contracts begun or renewed after January 30, 2022, the minimum wage is set at $17.20 per hour, while contracts awarded between January 1, 2015, and January 29, 2022, require a minimum of $12.90 per hour. The file details various construction labor classifications, including specific rates and fringe benefits for trades such as electricians, carpenters, and laborers, with zone definitions for applicable pay rates based on distance from certain towns. Additional directives regarding worker protections, sick leave under Executive Order 13706, and procedures for appealing wage determinations are also included. This document serves as a key resource for contractors involved in federally funded construction projects, ensuring compliance with wage standards and promoting fair compensation throughout Montana's construction industry.
    The document outlines the requirements for construction contract administration as dictated by the Federal Acquisition Regulation (FAR) 36.211(b). Agencies are mandated to provide clear descriptions of policies and procedures regarding the definitization of equitable adjustments related to change orders in construction contracts. Additionally, it emphasizes the necessity of data concerning the time needed to finalize these adjustments. For detailed guidance on these policies and procedures, agencies can refer to the provided link to the Department of the Interior's acquisition policy. This document is significant within the context of federal RFPs and grants, as it ensures compliance and standardization across government construction contracts, ultimately aiming for transparency and efficiency in managing changes to contracts.
    The document outlines a Contract Price Schedule for a project managed by the National Park Service’s Denver Service Center. The project, titled "Rehabilitate Exteriors of Historic Fort Yellowstone Buildings," focuses on construction activities for multiple historic buildings within Fort Yellowstone. The description specifies contract line items (CLIs) that include main construction tasks for buildings 4 through 9, along with various optional tasks for additional buildings and sitework. Offerors are instructed to provide detailed pricing for each line item, highlighting that lump-sum amounts are required for each building and additional sitework. The document emphasizes the importance of accurate calculations and conformity with solicitation documents. It also identifies the overall proposed total price, combining both the base prices and any selected options. Overall, the file serves as a crucial reference for bidders responding to the solicitation, ensuring transparency and adherence to project budgeting and specifications, critical in the context of government-funded rehabilitation projects.
    The document outlines the resume format required for key personnel involved in a government contract proposal. It mandates detailed information for each key staff member including their name, role, years of experience, educational qualifications, additional qualifications, and relevant project experience. The project experience section is particularly extensive, requiring a detailed breakdown of up to three past projects. For each project, details such as title, location, dates, project scope and costs, specific duties, role, employer, and contact information must be included. This structured format aims to ensure clarity and comprehensiveness in presenting the capabilities of personnel, which is critical when responding to Federal RFPs and grants. The document serves as a guideline for submitters, emphasizing the importance of showcasing applicable qualifications and experiences to meet contract requirements effectively.
    The document outlines a "Letter of Commitment for Subcontractor" intended for use in federal RFPs (Requests for Proposals) and grants. This letter serves as a formal declaration from a subcontractor affirming their dedication to fulfilling specified roles if a main contractor is awarded the project. Each letter requires essential details such as the name of the offeror and the specific duties of the subcontractor, alongside the signatory's title and date. The structure is straightforward, ensuring clarity in commitment between the primary contractor and the subcontractor. This document is crucial in the bidding process, establishing accountability and collaborative intentions while ensuring adherence to project obligations, thereby enhancing the integrity of submissions in governmental contracting processes. The letter signifies a foundational step in fostering reliable partnerships, which is vital for successful contract execution.
    The Past Performance Questionnaire is a source selection document designed to evaluate contractors submitting proposals under Solicitation No. 140P20XXRXXXX. Offerors must complete Sections A and B, providing details about their company and past project experience, which includes project title, contract type, awarded price, and a brief description of work performed. References will complete Sections C and D, where they assess the contractor's performance in several categories, including quality, schedule management, cost control, management, small business subcontracting, and regulatory compliance. Each category is rated on a scale from "Exceptional" to "Unsatisfactory," with space provided for comments supporting ratings. The document emphasizes that all information is source selection sensitive and prohibits contractors from using it for promotional purposes. The completed questionnaire is to be returned to the designated Contracting Officer at the National Park Service's Denver Service Center. This questionnaire is crucial for ensuring that contractors are evaluated based on their past performances, aiding the government in making informed decisions about awarding contracts in compliance with federal regulations.
    The document details the project specifications for the rehabilitation of historic buildings in Fort Yellowstone, Yellowstone National Park, overseen by the National Park Service. The project, designated YELL - 307127, focuses on restoring exteriors of 17 historic buildings, addressing lead and asbestos abatement, roof and siding repairs, window and door restoration, structural improvements, and radon mitigation. Work is organized into multiple phases, allowing for efficient and orderly progression while minimizing disruption to park operations. The document outlines responsibilities for various engineering disciplines and includes extensive guidelines for contractor operations, safety requirements, and environmental considerations. It also emphasizes the importance of adhering to the historic preservation treatment procedures and the necessity for project management coordination to ensure compliance with regulations. Construction activities will be conducted with limited site access to protect surrounding natural features and minimize public disruption. The contractor must develop a detailed sequencing plan that encompasses scheduling, staging areas, and safeguarding measures against weather and disruption. Overall, this project reflects the federal commitment to preserving the historic integrity of Fort Yellowstone while upgrading facilities for operational requirements and staff housing. The comprehensive nature of the document underscores its importance in facilitating a well-managed and compliant construction process.
    The document outlines the Statement of Structural Tests and Special Inspections for the Fort Yellowstone Exterior Rehabilitation project at Yellowstone National Park, as required by the 2021 International Building Code (IBC-21). It details essential structural engineering requirements concerning seismic and wind forces, alongside qualifications for inspectors and testing technicians. The responsibilities of the Construction Contractor's Quality Control Supervisor include furnishing special inspection reports to the Contracting Officer, who will oversee remedying any identified deficiencies. It specifies the criteria for special inspections, including qualifications needed (professional engineers, certified technicians), the nature of tests required (e.g., welding, bolting, concrete construction), and the categorization of inspections as continuous or periodic, based on project needs. Additionally, it emphasizes an organized process for ensuring the quality and safety of structural elements, such as steel constructions and concrete. This document serves as a critical component of the management plan, guiding compliance with regulatory standards to ensure structural integrity throughout the project lifecycle while fulfilling federal grant requirements and enhancing local infrastructure safety.
    The document outlines the Submittal List and Review Estimate Instructions for the National Park Service (NPS) project titled "Rehabilitate Exteriors of Historic Fort Yellowstone Buildings." It serves as a guide for architects and engineers in managing construction documentation and submittals during the project. The responsible parties, including the Design Architect/Engineer and Construction Contracting Officer Representative, must follow specified procedures for submittal documentation, including completion of a structured template that details action and informational submittal requirements by discipline. Key tasks include recording submittal requirements, estimating review times for action submittals, and attaching the completed template to the project scope. The document emphasizes the distinction between informational (no action required) and action submittals (requiring agency response) and specifies the need for careful tracking and coordination of all documents. These procedures ensure effective management, organization, and compliance with federal contracting requirements, aiming to maintain historical integrity while executing the necessary rehabilitation and restoration work on Fort Yellowstone buildings. This comprehensive approach aligns with the standards expected in federal grants and RFP processes, underscoring the importance of detailed planning in public service project execution.
    The National Park Service (NPS) - Denver Service Center (DSC) outlines a Closeout and Operation & Maintenance (O&M) Requirements Template intended for ensuring proper transition and maintenance of park project facilities. This comprehensive checklist includes essential topics such as project record drawings, system training for maintenance (including irrigation and pest control), field quality control reports for construction materials, and warranties for various installed products. The document specifies required submittals, emphasizing the necessity for thorough O&M data, training on mechanical and security systems, and the delivery of extra stock and tools. A significant component of the file includes guarantees provided by manufacturers for a range of materials, ensuring that quality issues can be addressed within specified periods. The ultimate goal is to ensure that all projects comply with NPS operational standards, facilitating efficiency and safety in park management and maintenance post-construction. This encapsulates the NPS's commitment to maintaining infrastructures in respect to environmental stewardship and operational efficacy within national park settings.
    The Fort Yellowstone Condition Assessment report details the rehabilitation of the historic Fort Yellowstone buildings in Yellowstone National Park. Prepared by Hennebery Eddy Architects for the National Park Service, the assessment focuses on preserving 17 structures, predominantly from the late 19th and early 20th centuries. The overarching goal is to develop a scope of work for long-term preservation, addressing vital concerns such as health, safety, accessibility, and structural integrity. Key findings highlight the need for roof repairs, chimney stabilization, masonry repointing, and replacement of deteriorated wood components while ensuring compliance with the Secretary of the Interior’s Standards for Historic Properties. Significant structural issues include rot in wood posts, deterioration of stone materials, and unsafe drainage practices adversely affecting building foundations. A thorough methodology employed varied assessments, including visual inspections, material sampling, and blower door tests. Ultimately, the report seeks to inform RFPs for a Design-Build procurement aimed at necessary restorations. Emphasizing historical integrity, adherence to safety standards, and the importance of ecosystem preservation, the assessment underlines the government's commitment to maintaining cherished national landmarks while enhancing functionality for staff and visitors.
    The National Park Service has issued a rehabilitation plan for the exteriors of several historic buildings at Fort Yellowstone within Yellowstone National Park. The document focuses on paint color schemes for buildings constructed between 1891 and 1909, detailing specific paint codes for each building component, including window sash, trim, porches, and siding. The plan emphasizes the importance of utilizing color schemes based on historical samples from sister buildings to maintain architectural integrity. Key points include the identification of original linseed oil paint layers on most components, with careful consideration of which colors and materials correlate with original designs. The plan also outlines the role of preservationists in overseeing the project to ensure compliance with historical restoration standards. This initiative illustrates the commitment to preserving the cultural heritage of the park while providing updated facilities that respect the park’s historical significance.
    The document pertains to Amendment No. 2 of Solicitation No. 140P2024R0177 for a construction project aimed at rehabilitating the historic Ft. Yellowstone Structures in Yellowstone National Park. The amendment serves to extend the proposal submission deadline to November 4, 2024, and includes updates to construction specifications and responses to contractor inquiries. Key modifications involve the removal and replacement of various construction specifications, including project management coordination guidelines, and updated construction drawings excluding references to Building 83, which is no longer part of the project scope. The document details requirements for the contractor, including project scheduling, environmental management, coordination with park operations, and compliance with historical preservation standards. It establishes protocols for handling hazardous materials, storage requirements for salvaged items, and defines the contractor's responsibilities regarding permits and site management. The overall goal is to ensure that the rehabilitation aligns with historical integrity while meeting safety and regulatory standards during construction within a national park setting.
    The document is an amendment to solicitation 140P2024R0177 for the rehabilitation of Ft. Yellowstone Structures. Key changes include updates to the self-performance requirement, now reduced from 60% to 40%, and provisions for the latest wage determination. The amendment addresses various contractor inquiries, clarifying project specifications and requirements regarding the staging area, restoration work, and historic preservation standards. Notable responses include confirmation of the availability of specific staging areas, responsibilities for paint removal, and provisions for contractor access to park facilities. The proposal due date has been extended to November 4, 2024, allowing bidders additional time to prepare. The document emphasizes compliance with federal and state standards, highlighting the importance of safety and detailed specifications for executing culturally sensitive work in a historical context. This structured communication is essential for managing expectations and ensuring that all parties are informed of the updated protocols and requirements necessary for successful bid submissions and project execution.
    The document is an amendment related to the solicitation for the rehabilitation of Fort Yellowstone structures within Yellowstone National Park. The amendment addresses various contractor inquiries regarding project specifications, including clarifications on project scope, operational requirements, and responsibilities concerning safety, materials, and scheduling. Key points include the confirmation of existing structures' involvement, specific construction requirements, and contractor responsibilities like snow removal and the management of hazardous waste. The amendment extends the proposal due date to November 4, 2024, and allows for the inclusion of additional questions regarding the project. It also specifies that contractors are not permitted to combine managerial roles for safety oversight and emphasizes that the contractor must provide their own temporary facilities. Furthermore, a Q&A section details responses to specific questions raised by contractors, underscoring the project's emphasis on adhering to historical preservation standards and regulatory compliance. This amendment reflects the government's rigorous approach to project management and stakeholder communication in public works contracts, ensuring clarity and precision in the execution of government-funded projects.
    The document pertains to the amendment of solicitation number 140P2024R0177 issued by the National Park Service (NPS) for the rehabilitation of exterior structures at Fort Yellowstone. It outlines the need for offerors to acknowledge the receipt of the amendment before the specified date to prevent rejection of their offers. The main update includes a revised price schedule and a pre-proposal conference attendee list, along with a PowerPoint presentation from the conference. Offerors must provide a Firm-Fixed-Price (FFP) offer that adheres to the details provided in the solicitation documents. The price schedule includes a breakdown of base line items and optional line items for construction across multiple buildings and site work. Clarity on pricing methodology is emphasized to ensure accurate bids. This amendment seeks to ensure potential contractors have the necessary information to submit compliant offers for the project, facilitating the preservation efforts at Fort Yellowstone while adhering to federal procurement standards.
    The Project Experience Questionnaire is part of a federal solicitation process aimed at assessing the experience of contractors related to specific project elements. It requires contractors to provide detailed information about referenced projects including project titles, locations, descriptions, and contact details for project owners. The document includes a form for contractors to list their roles, pricing, and performance periods, distinguishing between prime contractors and subcontractors. Contractors are also prompted to answer a series of questions that dive into their project experience. These questions address the specifics of the work performed, relevance to the solicitation's requirements, any price or schedule changes, issues faced during execution, successful methods employed, and any extra project information deemed important. The questionnaire is structured to evaluate the offerors systematically, ensuring comprehensive insights into their previous project performances, which is critical for decision-making in government contracting processes. The document emphasizes the importance of thoroughness and clarity in the responses provided by contractors, aligning with federal standards for RFP submissions.
    The document details an amendment to a solicitation for the rehabilitation of structures at Ft. Yellowstone, specifically referenced as YELL 307127. It outlines the requirements for contractors to acknowledge receipt of the amendment either by submitting a signed copy, confirming electronically, or through a separate letter. The amendment includes critical updates such as a revised price schedule, a list of attendees from a pre-proposal conference, and a PowerPoint presentation from the conference. Additionally, it reinforces that all other terms and conditions of the initial solicitation remain unchanged. The submission deadline for offers and the inclusion of updated pricing information are stressed, emphasizing the importance of timely acknowledgment to avoid rejection. This amendment illustrates the government's procedure in managing changes to contracts and solicitations, ensuring all parties have the latest information for compliance and bidding. It stands as part of the federal contracting process aimed at encouraging participation and transparency in government procurement.
    The document pertains to the amendment of solicitation number 140P2024R0177 related to the rehabilitation of Fort Yellowstone structures. The main purpose of this amendment is to extend the deadline for proposal submissions to November 4, 2024, and to address inquiries received up to that date. It includes important updates to construction specifications and drawings, such as replacing and revising several technical documents dated October 3, 2024, and eliminating references to work involving Building 83 from the construction drawings. The amendment also mentions the provision of a Mortar Sample Log and updated guidelines on archeology and historic preservation. All other terms and conditions remain unchanged, maintaining the integrity of the solicitation process. This amendment reflects adherence to regulatory standards and the need for detailed specifications in compliance with federal guidelines, ensuring project clarity for potential contractors.
    This document is an amendment to solicitation number 140P2024R0177, concerning the rehabilitation of Ft. Yellowstone Structures. Its primary purpose is to communicate modifications, including responses to previously submitted questions and updates to the contract terms. Notably, the self-performance requirement has been adjusted from 60% to 40%, and the applicable wage determination has been updated in accordance with General Decision Number: WY20240013 dated 10/18/2024. The amendment outlines instructions for offerors regarding acknowledgment of receipt and the submission of changes to existing offers. All other terms and conditions of the solicitation remain unchanged. This amendment plays a crucial role in the procurement process by ensuring that contractors remain informed of changes that may affect their proposals, thus facilitating a fair and competitive bidding environment.
    This document serves as an amendment to solicitation number 140P2024R0177, specifically concerning the rehabilitating of Fort Yellowstone structures. The amendment facilitates the submission process by detailing steps contractors must follow to acknowledge receipt and potential changes to their offers prior to the specified deadline. Key modifications include the provision of a final round of questions and answers. Importantly, the amendment reiterates that all other terms and conditions of the solicitation remain unchanged and fully enforceable. The document outlines administrative processes for amending contracts/orders, specifying that contractors may need to sign and return copies of the amendment to the issuing office. This amendment is part of the federal government’s contracting procedures, which are designed to maintain transparency and clarity in the procurement process while adhering to applicable regulations.
    The document outlines a federal government solicitation for an Invitation for Bid (IFB) or Request for Proposal (RFP) related to the rehabilitation of exteriors at the Historic Fort Yellowstone in Yellowstone National Park, under the Great American Outdoors Act (GAOA). This acquisition is classified as an unrestricted full and open competition, with an estimated value exceeding $10 million. The document details specific project requirements and stipulates that all proposals must adhere to federal, state, and local tax regulations, as the project is not tax exempt. The solicitation calls for performance and payment bonds, with the contractor expected to start work within a specified time after receiving a notice to proceed. A pre-proposal site visit is indicated for interested bidders, alongside stipulations regarding proposal submissions, which are due by a designated deadline. Importantly, it is noted that the funding for this project is currently uncertain, although there is a strong expectation that funds will be allocated in the future. Bidders are instructed to ensure compliance with all proposal requirements and to acknowledge any solicitation amendments. This solicitation serves as a formal invitation for qualified contractors to engage in a significant restoration effort in a national historic site, reflecting the government's commitment to preserving historic landmarks while fostering competitive procurement processes.
    The Yellowstone National Park project's solicitation (140P2024R0177) aims to rehabilitate the exteriors of Fort Yellowstone structures, emphasizing the historical significance of the site, established in 1872 and managed by the US Army until 1918. A pre-proposal conference took place on September 24, 2024, discussing project logistics, site conditions, and proposal requirements. Key project considerations include unique execution challenges due to ongoing simultaneous heating line work. Proposals are due by October 28, 2024, with an emphasis on a firm fixed-price contract exceeding $10 million, aiming for completion within 1,009 days post-award. Evaluation criteria prioritize technical approach, project experience, and management strategies, with a focus on historical preservation aligned with the Secretary of the Interior’s standards. Applicants must showcase experience in historic constructions, demonstrate effective project coordination and safety management, and detail plans for resource logistics. The document outlines essential proposal submission guidelines, including deadlines for questions and electronic submission instructions, reinforcing the competitive nature of the solicitation while remaining open to all qualified businesses. The focus on rigor in assessment and the importance of historic standards underscores the commitment to preserving Fort Yellowstone's heritage.
    Lifecycle
    Similar Opportunities
    HAMP 326087 -
    Interior, Department Of The
    The Department of the Interior, specifically the National Park Service, is soliciting proposals for the preservation of historic structures at the Hampton National Historic Site under project number HAMP 326087. The project aims to ensure the maintenance and restoration of significant historical properties, with an estimated contract value ranging between $5,000,000 and $10,000,000. This initiative is crucial for preserving cultural heritage and enhancing visitor experiences at the site. Interested contractors should note that proposals must be submitted in sealed formats, adhering to specific guidelines outlined in the solicitation document, and can contact Linda Melnick at lindamelnick@nps.gov for further information.
    CHIR - REHAB QUARTERS 5
    Interior, Department Of The
    The Department of the Interior, specifically the National Park Service, is soliciting proposals for a firm fixed-price contract to rehabilitate Quarters 5 at Chiricahua National Monument in Arizona, under Solicitation 140P1525Q0014. The project involves addressing deferred maintenance, including lead abatement, HVAC system installation, and various repairs, with additional options for garage door and wood-burning stove replacements. This initiative is crucial for maintaining the safety and functionality of residential facilities within the national park, ensuring compliance with federal and state regulations. Proposals are due by January 17, 2025, and interested contractors should contact Donald Tremble at donaldtremble@nps.gov or 720-450-1198 for further details.
    Z--FRRI 253825 Rehabilitate Civil Rights Structures
    Interior, Department Of The
    The National Park Service (NPS) is seeking qualified contractors for the rehabilitation of two historically significant structures—the Greyhound Bus Depot and the Mural Building—located within the Freedom Riders National Monument in Anniston, Alabama. The project aims to enhance visitor access and educate the public about the Civil Rights Movement, with an anticipated budget ranging from $1 million to $5 million, focusing on improving thermal performance, structural integrity, and compliance with preservation standards. Interested businesses are encouraged to respond to the Sources Sought Notice by submitting their qualifications, bonding capacity, and relevant experience by December 13, 2024, as the NPS plans to issue a formal Request for Proposals (RFP) in Spring 2025. For further inquiries, interested parties may contact Carlos Garcia at carlosgarcia@nps.gov or call 720-900-6595.
    Y--BICY 229154
    Interior, Department Of The
    The Department of the Interior, through the National Park Service, is soliciting proposals for the construction of a fire station at the Big Cypress National Preserve Headquarters Complex in Florida, designated as project number 140P2024R0084. The project involves constructing a 5,142 square foot facility that includes administrative spaces and utilities, with an estimated contract value between $1 million and $5 million, specifically set aside for women-owned small businesses. This initiative is part of the government's efforts to enhance infrastructure within national parks, ensuring safety and operational efficiency. Interested contractors must submit their proposals by February 13, 2025, and can direct inquiries to John Babcock at johnbabcock@nps.gov or call 303-969-2626 for further information.
    45--CAVO Rehabilitate VC and Wellhouse
    Interior, Department Of The
    The National Park Service (NPS) is seeking qualified contractors for the rehabilitation of the Visitor Center Building and Wellhouse at Capulin Volcano National Monument in New Mexico. The project involves comprehensive work including the installation of heating and ventilation systems, removal of biohazardous materials, and upgrades to electrical systems, requiring expertise in mechanical and electrical engineering, fire safety, and environmental health. This initiative is crucial for ensuring the safety and functionality of the facilities, with an estimated construction cost between $500,000 and $1 million. Interested small businesses must submit their qualifications, bonding capabilities, and socio-economic status certifications by January 23, 2025, to justinerdley@nps.gov, referencing the number 140P1225R0004 in the subject line.
    56--5200 Tons of Road Chips for Yellowstone
    Interior, Department Of The
    The Department of the Interior, through the National Park Service (NPS), is seeking qualified small businesses to provide 5,200 tons of road chips for Yellowstone National Park. The procurement aims to enhance park infrastructure while ensuring compliance with environmental standards, including a weed management plan and vehicle cleaning protocols to prevent contamination. This project is critical for maintaining the park's roadways and supporting its operational needs, with a performance period scheduled from May 19 to July 3, 2025. Interested vendors must submit their quotations by February 3, 2025, to the contracting officer, Stacy Vallie, via email at StacyVallie@nps.gov.
    Z--Renovate Visitors Center, Whiskeytown NRA
    Interior, Department Of The
    The National Park Service (NPS) is soliciting proposals for the renovation of the Visitors Center at Whiskeytown National Recreation Area in California. The project involves comprehensive refurbishment of the facility, which includes upgrades to infrastructure, accessibility enhancements, and compliance with historical preservation standards. This renovation is critical for improving visitor services and maintaining the historical integrity of the site, with an estimated budget between $500,000 and $1,000,000. Interested small businesses must submit their proposals by January 17, 2025, with work expected to commence on February 3, 2025, and conclude by June 3, 2025. For further inquiries, contact Brenda Lewis at BrendaLewis@nps.gov or call 206-220-4018.
    Z--Greenhouse Rehabilitation
    Interior, Department Of The
    The Department of the Interior, through the National Park Service, is soliciting proposals for the rehabilitation of two greenhouses at Indiana Dunes National Park, specifically focusing on the removal and replacement of damaged polycarbonate panels. The project aims to enhance the operational efficiency and environmental sustainability of the greenhouses, which are vital for plant management within the park. This federal contract, set aside for small businesses, has an estimated value between $100,000 and $250,000, with a completion timeline of 180 days from the Notice to Proceed. Interested contractors must submit their proposals by January 31, 2025, and can direct inquiries to Jarrod Brown at jarrodbrown@nps.gov or call 330-468-2500.
    Z--NEZ PERCE NATIONAL HISTORICAL PARK VC RESTROOM REHAB.
    Interior, Department Of The
    The Department of the Interior, through the National Park Service, is issuing a pre-solicitation notice for a project aimed at rehabilitating the restroom facilities at the Spalding Visitor Center within the Nez Perce National Historical Park. The project involves replacing existing restroom fixtures and partitions to meet federal accessibility standards, including the installation of modern, energy-efficient fixtures and a reconfiguration of the restroom layout to ensure full wheelchair accessibility in compliance with the Architectural Barriers Act Accessibility Standards (ABAAS). This initiative is crucial for enhancing public facilities, promoting sustainability, and ensuring compliance with accessibility regulations. Interested contractors must register in the System for Award Management (SAM) and qualify as small businesses under NAICS code 238990, with an estimated project budget ranging from $100,000 to $325,000. Proposals will be accepted starting January 22, 2025, with work expected to commence in November and be completed within 65 days.
    Z-- HAMP 326087: Preserve Historic Structures
    Interior, Department Of The
    The Department of the Interior, through the National Park Service, is preparing to issue a competitive 8(a) Request for Proposal (RFP) for the construction and rehabilitation of historic structures at the Hampton National Historic Site in Towson, Maryland. The project aims to preserve the historical integrity of various buildings, including historic enslaved quarters, overseer’s house, and mule barn, while improving accessibility and modernizing building systems. This initiative is significant for maintaining the cultural heritage of the site and is expected to have a contract duration of 18 months with a performance magnitude exceeding $10 million. Interested parties must register in the System for Award Management (SAM) to participate, and they are encouraged to engage as subcontractors, particularly small and disadvantaged businesses. For further inquiries, interested vendors can contact Linda Melnick at lindamelnick@nps.gov.