SP-POL-CMP-INSPECT-FY25-ELM
ID: W9128F25Q0016Type: Solicitation
Overview

Buyer

DEPT OF DEFENSEDEPT OF THE ARMYW071 ENDIST OMAHAOMAHA, NE, 68102-4901, USA

NAICS

All Other Professional, Scientific, and Technical Services (541990)

PSC

INSPECTION- FUELS, LUBRICANTS, OILS, AND WAXES (H391)

Set Aside

Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14) (SDVOSBC)
Timeline
    Description

    The U.S. Army Corps of Engineers, Omaha District, is seeking proposals for the inspection of fuel tanks at Joint Base Elmendorf-Richardson (JBER) in Alaska, specifically for the API 653 internal inspection of facility 738. The contract is set aside exclusively for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) and requires compliance with federal, state, and local regulations regarding fuel storage and environmental safety. This procurement is critical for ensuring the operational integrity and safety of military fuel storage facilities, with the solicitation closing on December 20, 2024, at 2 PM CST. Interested contractors can direct inquiries to Ryan L. Saville at ryan.l.saville@usace.army.mil.

    Point(s) of Contact
    Files
    Title
    Posted
    The document outlines the security requirements for employees seeking access to closed military installations. It mandates identity proofing, vetting procedures that include checks against criminal databases, and the necessity for valid identification. Employees without a current government security clearance must provide approved forms of ID, and disqualifiers for access range from felonies to associations with terrorist organizations. The prime contractor is responsible for ensuring compliance with these security measures, maintaining employee conduct, and notifying the installation's security office of any personnel changes. A base pass is required for entry, renewable annually, with specific identification and documentation criteria established. During heightened security conditions (FPCONs), access procedures may be further restricted. Employees must adhere to strict identification and reporting protocols regarding lost credentials and must be escorted in restricted areas without appropriate badges. The document emphasizes the seriousness of access control and reflects the government's commitment to maintaining security at military sites in accordance with existing regulations.
    The document outlines specifications for the inspection and remediation of fuel tanks at the JB Elmendorf-Richardson installation in Alaska. It details the tank's characteristics, including an extensive capacity of 3,360,000 gallons of JP-8 fuel. The inspection includes protocols for removing fuel and wastewater, with an indication of remaining gallons that may need storage or disposal. Key requirements specify the need for certified strapping charts, with a note that existing external tanks are not a primary focus. The inspection process is highlighted as critical for ensuring environmental compliance and operational safety. This instance of government documentation showcases the regulatory expectations tied to fuel management, aligning with broader federal compliance and safety protocols in facility maintenance.
    The Defense Logistics Agency's Energy Division is proposing a project aimed at constructing product containment areas and replacing secondary containment areas at Fort Indiantown Gap, Pennsylvania. This initiative, led by Project Manager Rick Rivera, addresses critical deficiencies in fueling facilities that threaten environmental safety and personnel safety due to potential fuel releases. The estimated cost is $1,150,000, with a desired completion date set for November 11, 2011. The project's objectives include installing secondary spill containment systems, refueling stations, and overfill protection systems, ensuring compliance with federal, state, and local regulations. The business justification focuses on preventing contamination of soil and groundwater as well as reducing the fire hazard associated with fuel operations. The project involves collaboration across several business units, including project management, engineering, budgeting, and contracting, necessitating various approvals and stakeholder engagement. This project underscores the federal government's commitment to environmental safety and risk management in military operations by addressing essential infrastructure improvements.
    The government file outlines the status and reporting for a specific program managed by Adam Ashton, with an emphasis on task orders and inspections. It includes an executive summary highlighting the overall status, key accomplishments, concerns, and a prospective month look ahead. The document presents a detailed status schedule of various services, installations, inspections, and their respective completion percentages, indicating timelines for submissions and reports. There is a section dedicated to lessons learned, emphasizing significant takeaways that can benefit future projects or programs without reiterating the executive summary action points. The file serves to track the progress and fulfillment of contractual obligations within federal and state/local project frameworks, ensuring transparency and accountability. Ultimately, it aims to inform better practices based on previous experiences in project execution and reporting.
    The document outlines the findings of a fuel system inspection for an out-of-service storage tank, conducted in compliance with API Standard 653. The inspection was executed by [Company Name] on [date], categorizing the findings into three levels of urgency: Mandatory, Short Term, and Long Term. Future inspection dates are recommended for both out-of-service and in-service evaluations, as well as specific assessments such as UT Roundness and corrosion concerns. The document notes applicable state regulations pertaining to the inspections, mandating compliance by specified deadlines. The inspection report, prepared by a certified API 653 inspector, will be included in the final closeout documentation as required by the task order. This report emphasizes the importance of maintaining regulatory standards in managing fuel storage facilities and underscores the systematic approach to safety assessments.
    The API-653 Out-of-Service Inspection Report, developed by the US Army Corps of Engineers, details a comprehensive assessment of storage tanks at a designated facility. The report outlines inspection protocols in compliance with API standards, emphasizing tank condition, structural integrity, and necessary repairs. It includes sections on the general project information, inspection findings, state regulations, and recommended future inspection dates. Specific tank features such as construction materials, grounding systems, and firefighting protocols are evaluated. The document categorizes required repairs into mandatory, short-term, and long-term categories, providing critical observations and recommendations for each. Appendices include engineering calculations, 3-D documentation, and checklists for thorough inspections. This report serves to guide facility managers and ensure regulatory compliance and safety standards are met during operations, ultimately aiming to prevent environmental and safety hazards linked with tank failures.
    The file presents a Return to Service Letter for a fuel storage tank, inspected according to API STD 653 standards. The inspection was conducted by [Company Name] and confirmed that the tank is in suitable condition for re-service, with no urgent repairs needed to mitigate risks to operators, equipment, or the environment. Future inspections are recommended following the outlined dates for both Out-of-Service and In-Service evaluations, along with additional assessments for roundness and corrosion. The document complies with state regulations, and final reports will be incorporated into the task order's closeout documentation. The letter is prepared by a certified API 653 inspector and includes necessary acknowledgments from the installation point of contact and the USACE Fuels Project Manager, indicating their roles in the process.
    The API 653 Out-Of-Service Inspection Report documents the evaluation of a storage tank to ensure its suitability for service, following federal and state regulations regarding petroleum storage. Conducted by a certified inspector, the report details the condition of the tank, including construction, foundation, bottom, and shell integrity, as well as appurtenances, coatings, and protection systems. Mandatory repairs were completed, and the report outlines the timeline for future inspections, highlighting adherence to API standards and state regulations. The inspection process includes thorough engineering calculations and visual documentation to substantiate findings. Critical analysis reveals the tank's condition and the necessary remedial actions required for safe operation. This report serves as an essential reference for compliance, safety, and maintenance of storage facilities managed by federal entities, contributing to environmental protection and operational readiness within the regulatory framework.
    The report provides a comprehensive inspection assessment and suitability evaluation of Tank 738 at Elmendorf Air Force Base, conducted by Enterprise Engineering, Inc. (EEI) under Contract FA5000-10-D-0024. The inspection followed API Standard 653 guidelines on August 17-18, 2010, determining that the tank is suitable for service with no mandatory repairs needed before return to operation. Key findings indicate acceptable hydraulic and structural integrity, although various non-mandatory repairs are recommended for long-term preservation, including seal replacement on the floating pan and maintenance on other components. Future maintenance suggests scheduling external inspections by August 2015 and internal inspections by September 2025, with recommendations for regular monitoring of certain elements such as ground seals and float gauge conditions. The document emphasizes meticulous adherence to repair standards and outlines specific actions to enhance tank serviceability, reflecting a commitment to maintaining operational safety and compliance with regulatory standards. This inspection documentation serves as a historical record for ongoing maintenance and ensures all findings and recommendations are systematically addressed, reinforcing the commitment to safety and structural integrity of military facilities.
    The report outlines the results of an API 653 in-service inspection of Tank 738 at Joint Base Elmendorf-Richardson, Alaska, conducted by Enterprise Engineering, Inc. The inspection aims to evaluate the tank's structural and hydraulic integrity, ensuring its suitability for continued service. The findings indicate that Tank 738, constructed in 1998, remains suitable for service with no mandatory repairs needed. The inspection, performed on June 18, 2014, followed established guidelines such as API Standard 653 and federal regulations. Key recommendations include scheduling the next in-service external inspection by June 2019 and an out-of-service internal inspection by September 2025, with subsequent maintenance actions advised to prolong the tank's service life. Several non-mandatory repairs are also suggested to address minor issues, including replacing corroded latch mechanisms and addressing localized coating failures. The report serves as a historical record, ensuring compliance with regulatory standards while providing guidance for ongoing maintenance. Overall, the inspection confirms the tank's current integrity and outlines essential steps for its continued operation and safety.
    The Preliminary Inspection Report for Tank 738 at Joint Base Elmendorf-Richardson, Alaska, outlines the findings from an external inspection conducted by Enterprise Engineering Inc. (EEI) between April 29 and May 1, 2019. The inspection adhered to API Standard 653 and revealed that Tank 738, an above-ground storage tank constructed in 1998, is suitable for service with no mandatory repairs required. However, several non-mandatory repair suggestions were made to enhance long-term integrity and preservation, including installing an NFPA emergency responder diamond, addressing sealant deterioration, repairing failing roof vent latches, and removing moss from the tank roof. The report further assesses compliance with military standards, indicating areas where Tank 738 meets or exceeds requirements. Overall, the report emphasizes the need for regular inspections and maintenance while ensuring compliance with safety standards, thereby underscoring the importance of operational integrity for military assets.
    The Q&A letter addresses key queries regarding the procedures for liquid storage and handling in relation to an upcoming internal tank inspection. It clarifies that the contractor will have a pre-cleaned tank and will not need to temporarily store liquid. The contractor is not responsible for pumping out liquids, as their main requirement is to clean any dirt or gravel from the tank before closing it. The only liquid present will be residual water or condensation within the tank, which does not need moving. However, in a different context where fuel may be present, the contractor will need to separate the fuel from water and pump the liquids, as no vac truck will be available for assistance. The determination of what the liquids are to be moved into falls solely on the contractor. This document highlights essential protocols for liquid handling during inspections, ensuring compliance and efficient operations in line with procedural requirements within government contracts.
    The document outlines a Request for Proposal (RFP) issued by the U.S. Army Corps of Engineers for a contract focusing on inspections of Department of Defense fuel tanks. It specifies the scope of work, detailing the responsibility of the contractor to perform non-personnel services, including replacing wiper seals and carrying out aboveground storage tank inspections. The work involves key activities such as conducting kick-off meetings, performing API internal inspections, and creating inspection reports compliant with regulatory standards. Significant guidelines include ensuring appropriate safety measures, maintaining equipment standards, and a structured reporting process. The contractor is required to provide all necessary supplies, tools, and personnel while maintaining compliance with various federal, state, and military regulations. A comprehensive list of inspection criteria, deliverables, and applicable publications is included to ensure the project’s success. The RFP emphasizes the importance of safety, regulatory compliance, and environmental protection throughout the inspection process in support of the U.S. military's operations. Ultimately, the document serves as a formal solicitation inviting qualified contractors, particularly small businesses and service-disabled veteran-owned firms, to participate in the bidding process, fostering competition and meeting federal contracting goals.
    Lifecycle
    Title
    Type
    Solicitation
    Similar Opportunities
    Eielson AFB Tank Inspection, AK
    Active
    Dept Of Defense
    The Department of Defense, through the U.S. Army Corps of Engineers, is soliciting proposals for tank inspection services at Eielson Air Force Base in Alaska. The contract involves conducting internal and external inspections of fuel storage tanks, specifically for JP-8 aviation fuel, in compliance with API standards and federal regulations. This procurement is crucial for ensuring the safety and integrity of fuel storage facilities, which play a vital role in military operations and environmental protection. Interested service-disabled veteran-owned small businesses (SDVOSB) must submit their proposals electronically by the specified deadline, with further inquiries directed to MAJ Minh Thu Vu at minhthu.t.vu@usace.army.mil or Brent Bertrand at Brent.D.Bertrand@usace.army.mil.
    SP-POL-CMP-INSPECT-FY25-EDW (PO 05)
    Active
    Dept Of Defense
    The Department of Defense, specifically the U.S. Army Corps of Engineers, is soliciting bids for inspection services related to fuel storage tanks at Edwards Air Force Base in California. The contract involves conducting an STI External inspection with strapping charts for Tank 5, ensuring compliance with federal, state, and local regulations, and addressing any identified deficiencies in accordance with API 653 standards. This procurement is critical for maintaining safety and environmental compliance in military fuel management operations. Interested Service-Disabled Veteran-Owned Small Businesses (SDVOSB) must submit their proposals by December 12, 2024, and can direct inquiries to Ryan L. Saville at ryan.l.saville@usace.army.mil.
    F-22 Fuel Dispensing System, JBER, ALASKA (JBE081)
    Active
    Dept Of Defense
    The Department of Defense, through the Department of the Army, is seeking proposals for the F-22 Fuel Dispensing System project at Joint Base Elmendorf-Richardson (JBER) in Alaska. This procurement aims to establish Petroleum, Oil, and Lubricant (POL) infrastructure to support the operational readiness of the 5th generation F-22 fighter aircraft, which includes the construction of a new JP-8 Tank Farm and associated facilities to significantly increase fuel storage capacity. The estimated contract value ranges from $50 million to $75 million, with a performance period of approximately 931 calendar days, and proposals are expected to be submitted electronically via the PIEE Solicitation Module by the anticipated solicitation release date of January 8, 2025. Interested parties can contact Ronald K. Jackson at ronald.k.jackson@usace.army.mil or Theresa Afrank at theresa.m.afrank@usace.army.mil for further information.
    POL Tank Inspection DVN- Davenport ARNG, Iowa
    Active
    Dept Of Defense
    The Department of Defense, specifically the U.S. Army Corps of Engineers, is seeking qualified small businesses to provide inspection services for fuel storage tanks at the Army Air Support Facility in Davenport, Iowa. The procurement involves conducting comprehensive inspections, cleaning, fuel removal, and generating detailed reports for five tanks, each with a capacity of 10,000 gallons, in compliance with industry standards such as STI SP001 and API STD 653. These inspections are critical for ensuring the safety, integrity, and regulatory compliance of fuel storage systems, which play a vital role in military operations. Interested parties must submit their quotations by 3:30 PM CDT on January 2, 2025, and can direct inquiries to Madeleine Ouedraogo at madeleine.h.ouedraogo@usace.army.mil or by phone at 402-996-3818.
    Fuel Storage Tanks Inspection, Testing, Repairs, and Upgrades
    Active
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is seeking contractors to provide inspection, testing, repairs, and upgrades for fuel storage tanks at the Dallas VA Medical Center. The primary objective of this procurement is to ensure compliance with EPA and TCEQ regulations through comprehensive management of underground (UST) and aboveground (AST) storage tanks containing petroleum products, including mandated inspections and testing protocols. This initiative is crucial for maintaining the operational readiness and regulatory compliance of the VA's fuel systems, thereby minimizing downtime and maximizing efficiency. Interested vendors should contact Melanie Williams at melanie.williams5@va.gov or call 210-694-6378 for further details regarding this Sources Sought notice.
    Z1PZ--Clean/Inspect Water Tower & Ground Storage Tank Correct Offeror Due Date
    Active
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is seeking proposals for the cleaning and inspection of a 100,000-gallon water tower and a 110,000-gallon ground storage tank at the Amarillo VA Health Care System. The contract, budgeted at approximately $16.5 million, requires the contractor to provide all necessary labor, materials, and equipment within 10 days of contract award, including sediment removal, annual inspections, and comprehensive reporting of activities performed. This procurement is designated as a Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside, emphasizing the government's commitment to supporting veteran-owned businesses while ensuring compliance with federal acquisition regulations. Interested parties must submit their proposals by December 30, 2024, at 4 PM Central Time, and can direct inquiries to Contract Specialist Sherine Brooks at Sherine.Brooks@va.gov or by phone at 254-899-6034.
    Provide Secondary Containment at JP-8 Rail Offload Yokota Air Base, Japan
    Active
    Dept Of Defense
    The Department of Defense, specifically the U.S. Army Corps of Engineers, Japan District, is preparing to solicit proposals for the construction of secondary containment at the JP-8 Rail Offload facility at Yokota Air Base, Japan. The project involves providing concrete secondary containment under active rail car offload positions, repairing existing containment systems, and ensuring proper drainage and spill containment measures are in place. This construction is critical for maintaining safety and environmental compliance in fuel supply operations. The anticipated Request for Proposal (RFP) will be issued in December 2024, with a project magnitude estimated between ¥500,000,000 and ¥1,000,000,000. Interested vendors must be registered in the System for Award Management (SAM) and meet local sourcing requirements to be eligible for contract award. For further inquiries, contact Jiro Miyairi at jiro.miyairi.ln@usace.army.mil or Ryan Marzetta at ryan.j.marzetta@usace.army.mil.
    Fuel Dispensing PM & ER
    Active
    Dept Of Defense
    The Department of Defense, specifically the Department of the Army, is soliciting offers for non-personal maintenance services for government-owned fuel dispensing equipment at the Anniston Army Depot in Alabama. The contractor will be responsible for providing four preventative maintenance service calls annually, including an annual inspection in January, as well as emergency repair services for environmental and non-environmental hazards. This contract is crucial for ensuring the operational efficiency and environmental compliance of fuel management systems at military installations. Interested contractors must submit their proposals by December 17, 2024, and can direct inquiries to Katherine B. Fuller at katherine.b.fuller2.civ@army.mil or Amber Burdett at amber.e.burdett.civ@army.mil.
    This solicitation is still suspended until further notice. The purpose of this amendment is administrative and is only to push out the date to fiscal year 2025.
    Active
    Dept Of Defense
    The Department of Defense, specifically the U.S. Army Engineer District Mobile, is seeking contractors for the construction of an Aviation Storage Facility at Soto Cano Air Base. This project involves the design and construction of a fuel storage facility with a capacity of at least 300,000 gallons, including three factory-fabricated storage tanks and a POL Ops building equipped with a fuel laboratory. The procurement is significant for ensuring the operational readiness of U.S. forces by providing essential fuel storage and handling capabilities. Interested contractors can reach out to Jacob Mcgriff at jacob.l.mcgriff@usace.army.mil or Christopher Brunner at christopher.e.brunner@usace.army.mil for further details, noting that the solicitation is currently suspended until fiscal year 2025.
    Diesel Engine BPA
    Active
    Dept Of Defense
    The Department of Defense, through the Department of the Air Force, is conducting a Request for Information (RFI) to identify potential vendors for a Diesel Engine Blanket Purchase Agreement (BPA) to supply Deutz Diesel engines for Joint Base Elmendorf-Richardson in Alaska. The procurement aims to support the mandatory overhaul of the BAK-12 and Mobile Aircraft Arresting Systems, requiring vendors to provide necessary materials, equipment, labor, and transportation, while ensuring compliance with quality assurance standards. Interested parties are encouraged to respond by December 30, 2024, with details regarding their business categorization under the NAICS code 33599, capacity to supply the engines, estimated lead times, and any questions regarding the draft Statement of Work. For further inquiries, vendors may contact Brandon Biggerstaff at brandon.biggerstaff@us.af.mil or Christie Moyer at christie.moyer@us.af.mil.