Awarded ContractSolicitationTotal Small Business Set-Aside (FAR 19.5)

Y--Repave Willow Beach Road

INTERIOR, DEPARTMENT OF THE 140P8125B0002
Total Obligated
$2,075,395
SAM.gov
Current Recipient
CORE CONTRACTING GROUP 153 W LAKE MEAD PKWY STE 1120 Henderson NV 89015 USA
Sep 9, 2025
Set-Aside
Total Small Business Set-Aside (FAR 19.5)
Notice Type
Solicitation

Contract Opportunity Analysis

The Department of the Interior, through the National Park Service, is soliciting bids for the repaving of Willow Beach Road within the Lake Mead National Recreation Area, located near Boulder City, Nevada. The project aims to rehabilitate approximately 4.63 miles of severely deteriorated roadway, enhancing safety and minimizing future maintenance costs while ensuring public access during construction. This initiative reflects the government's commitment to maintaining infrastructure in high-traffic recreational areas, with a contract value estimated between $1 million and $5 million. Interested contractors must submit their bids by July 2, 2025, at 1:00 PM PDT, and can direct inquiries to Michelle Bennett at Michelle_Bennett@nps.gov.

Classification Codes

NAICS Code
237310
Highway, Street, and Bridge Construction
PSC Code
Y1LB
CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS

Solicitation Documents

24 Files
Questions_and_Answers_Updated_6-13-2025_0004.pdf
PDF140 KBJun 24, 2025
AI Summary
The document addresses questions and answers related to the solicitation No. 140P8125B0002 for the repaving of Willow Beach Road, as updated on June 13, 2025. The primary focus is on clarifications regarding construction requirements, specifications, and conditions. Key points include the allowance for single lifts of asphalt pavement instead of two, adjustment provisions for road elevation and tolerances for pulverized materials, and guidelines for contractor responsibilities related to water sourcing and traffic management during construction. The contract emphasizes the necessity for the road to remain open during operations, with limitations on traffic interruptions. Contractors are also informed that testing requirements must be fulfilled by licensed testing firms, and they are allowed to propose staging and turnaround areas for their operations. The document serves to ensure that contractors understand the expectations and technical requirements of the project, facilitating efficient execution within the prescribed guidelines. The context of this communication is essential as part of the federal RFP process, aimed at ensuring compliance and clarity for all bidding parties.
Sol_140P8125B0002_Amd_0004.pdf
PDF84 KBJun 24, 2025
AI Summary
This document is an amendment to solicitation number 140P8125B0002, primarily concerned with the modification of contract details. The amendment serves two key purposes: it attaches updated questions and answers relevant to the solicitation, and it extends the bid submission deadline to July 2, 2025, at 1:00 PM PDT. Contractors are required to acknowledge receipt of this amendment for their offers to be considered, which can be done through various methods outlined in the document. Additionally, the amendment details the administrative changes made under the authority of FAR 43.103(b), while all other terms of the original solicitation remain unchanged. By emphasizing the application of this notice, the document highlights compliance with procedural regulations governing federal contracts. Overall, this amendment provides crucial updates to potential contractors and ensures clarity about the bidding process and requirements.
Project_Specifications_Revised_6-09-2025_0003.pdf
PDF3235 KBJun 24, 2025
AI Summary
The project focuses on repaving Willow Beach Road within the Lake Mead National Recreation Area, near Boulder City, Nevada. The existing two-lane asphalt road, measuring 4.63 miles, is severely deteriorated, with soft shoulders, worn markings, and numerous potholes. The objective is to rehabilitate and reconstruct this roadway to improve safety and minimize future maintenance costs. The project entails pulverizing the existing asphalt, grading the base, and applying a new 22-foot-wide asphalt surface. The plan includes maintaining public access during construction, implementing traffic control, and managing dust control measures. Construction must adhere to specified requirements, including project management protocols, environmental protections, and safety standards. Quality control will involve density testing of materials and daily logging of work progress. The contractor is responsible for obtaining any necessary permits, coordinating laydown areas, and ensuring compliance with safety and environmental regulations. The performance period is set for 190 days, which includes time for submittals and on-site construction. This project illustrates the commitment of the National Park Service to maintain infrastructure in high-traffic recreational areas while ensuring ongoing public safety and environmental stewardship.
Revised_Clause_52_211-10_0003.pdf
PDF180 KBJun 24, 2025
AI Summary
Solicitation 140P8125B0002, Amendment 0003 outlines the timeline for contract execution within the federal government framework. It mandates that the contractor starts work within 10 calendar days after receiving the notice to proceed (NTP). The completion of the entire project is required within 120 calendar days following the issuance of a second notice to proceed (NTP 2) for onsite activities. The initial NTP (NTP 1) is contingent upon the Contracting Officer’s receipt of performance and payment bonds. Notably, the stipulated completion timeline encompasses the final clean-up of the worksite. This structured approach is vital for ensuring timely delivery and accountability in federal contracting, reflecting standard procedures in government Requests for Proposal (RFPs) and grants while maintaining compliance with relevant regulations.
Road_Plans_Revised_6-03-2025_0003.pdf
PDF15110 KBJun 24, 2025
AI Summary
The document details the construction specifications for the rehabilitation of Old Willow Beach Road, spanning from station 108+48 to 307+67, including the approach road. The plans outline various components of road improvement, such as the removal of existing asphalt, the incorporation of pulverized materials into the base, and the installation of new asphalt concrete pavement. Specific measurements, such as existing pavement depths and construction limits, are included, along with notes on safety edge installations and drainage considerations. Plans for sub-grade preparation and shoulder reconfiguration are also specified, with directives to match existing road features. The document serves as a technical guideline for contractors involved in federal and local roadway improvement projects, ensuring compliance with required engineering standards for road construction and maintenance. It underscores the importance of aligning construction practices with government regulations while improving infrastructure safety and functionality.
Sol_140P8125B0002_Amd_0001.pdf
PDF85 KBJun 24, 2025
AI Summary
The document pertains to Amendment 0001 of a federal solicitation (140P8125B0002) for contractors, issued by the National Park Service. The amendment primarily alerts bidders to pending revisions or rescissions of FAR Clause 52.222-55 regarding minimum wages for contractor workers under Executive Order 14026. It underscores the necessity for bidders to acknowledge receipt of the amendment by specific methods prior to the established deadline, to avoid rejection of their offers. The amendment outlines administrative changes and emphasizes the importance of compliance with updated federal acquisition regulations, linking the adjustments to a presidential directive aimed at revoking previous executive actions deemed harmful. Overall, this document is essential for maintaining adherence to government regulations affecting contract modifications and offers a clear directive to potential contractors regarding compliance and acknowledgment procedures.
Site_Visit_Participant_Log_0002.pdf
PDF74 KBJun 24, 2025
AI Summary
No AI summary available for this file.
Site_Map_Willow_Beach.pdf
PDF428 KBJun 24, 2025
AI Summary
The project entails the repaving of Willow Beach Road, which spans approximately 1 mile. The construction will commence at the entrance station and conclude at the developed area of Willow Beach. This infrastructure initiative focuses on improving road conditions, enhancing safety, and facilitating access to the recreational area. It reflects the government's commitment to maintaining and upgrading roadways to support public use and foster community development. Proper planning and execution are vital to ensure minimal disruption during the construction phase while adhering to safety and environmental standards.
Construction_Contract_Administration_Notice.pdf
PDF83 KBJun 24, 2025
AI Summary
The document addresses the requirements outlined in the Federal Acquisition Regulation (FAR) 36.211(b) concerning the definitization of equitable adjustments for change orders in construction contracts. It mandates that agencies provide a clear description of the policies and procedures involved in this process, along with data on the timeframes required to definitize these adjustments. Further details and guidance can be found through a provided link to the Department of the Interior's policy on acquisition management in construction contracts. This document serves as a vital reference for federal, state, and local government entities when navigating contract administration specifics tied to change orders, ensuring compliance and clarity in the implementation of construction contracts.
Road_Plans.pdf
PDF14810 KBJun 24, 2025
AI Summary
The government file outlines a detailed plan for road construction and improvement for Old Willow Beach Road. It includes a series of road plans with specifications for existing conditions, such as asphalt pavement and aggregate base depths, along with construction instructions like building a safety edge and managing drainage. Key components include the removal of pulverized asphalt, the incorporation of material into the base, and the placement of asphalt concrete in two lifts. The document emphasizes adhering to approximate dimensions and constructing slopes that ensure safety. The planned works also involve meticulous attention to conditions and specifications, such as clear zones and the overall typical section design necessary for fulfilling project requirements. The file serves as a guideline for contractors responding to the Request for Proposals, illustrating the detailed expectations for road construction projects managed by government entities.
343791-Road Alignment.dwg
DWG1036 KBJun 24, 2025
AI Summary
No AI summary available for this file.
343791-XCOND - 2.dwg
DWG36402 KBJun 24, 2025
AI Summary
No AI summary available for this file.
343791-GIS Road Alignment Export.dwg
DWG764 KBJun 24, 2025
AI Summary
No AI summary available for this file.
343791-PROAD.dwg
DWG1088 KBJun 24, 2025
AI Summary
The Transmittal Report details the AutoCAD drawings related to the Willow Beach Road repaving project. It lists included root drawing files such as "343791-PROAD.dwg," "343791-Road Alignment.dwg," and others, while noting exclusions and files that could not be located, including "Exsit-Terrian_LAKE113(2).dwg." Additionally, the report provides instructions on setting the FONTALT variable to ensure correct text styles are displayed correctly, pointing to a specific file path for consistency. The report emphasizes the need for users to unzip associated XML manifest and cache files to the drawing directory and to update the cache manifest to connect to the unzipped data files. The document is structured to provide essential instructions for users working with the AutoCAD files, ensuring smooth operation and adherence to project requirements. Overall, this report facilitates effective collaboration and file management for stakeholders involved in the procurement and design processes of the repaving project.
Sol_140P8125B0002.pdf
PDF363 KBJun 24, 2025
AI Summary
The document is a solicitation for bids (IFB 140P8125B0002) related to the repaving of Willow Beach Road within the Lake Mead National Recreation Area, Arizona. This is a competitive small business set-aside project with an estimated value between $1,000,000 and $5,000,000, categorized under NAICS code 237310. The contractor is expected to commence work within 10 calendar days and complete it within 150 days after receiving the notice to proceed. A site visit is scheduled for May 20, 2025, and pre-registration is required. Bids must be submitted via email as a single PDF file by the specified deadline, which requires thorough documentation, including acknowledgment of any amendments and a bid bond. The solicitation outlines payer responsibilities, including compliance with federal labor standards and safety regulations, emphasizing the importance of contractor performance assessments via the Contractor Performance Assessment Reporting System (CPARS). Additionally, the document includes numerous clauses related to contractor obligations, significant requirements for hazardous material reporting, and compliance with various labor laws. This solicitation embodies the government's intention to foster small business participation while ensuring high standards of construction and compliance with federal regulations.
Sol_140P8125B0002_Amd_0005.pdf
PDF91 KBJun 24, 2025
AI Summary
The document outlines Amendment 0005 to solicitation number 140P8125B0002, pertaining to a federal contract with the NPS, PWR - Lake Mabo in Boulder City, NV. The amendment serves to incorporate a previously omitted provision (52.204-22 Alternative Line Item Proposal) and provides updated instructions for bid submission. Bidders are required to submit their entire bid package as one PDF file via email to a specified address by July 2, 2025, at 1:00 PM PDT. The amendment also indicates that the bid opening will be conducted virtually on July 3, 2025, via Microsoft Teams. Participants must use the provided link and credentials to attend. Notably, bidders must acknowledge the receipt of the amendment through various means, and any changes to submitted offers must be communicated accordingly before the specified deadline. The amendment emphasizes the importance of correct referencing and submission protocols to avoid disqualification. Overall, it aims to clarify processes and ensure compliance within the bidding structure for federal projects.
Contract_Bid_Schedule.pdf
PDF150 KBJun 24, 2025
AI Summary
The document outlines a Request for Proposal (RFP) for the repaving of Willow Beach Road, identified by PMIS number 343791. It itemizes various necessary components for the project, including mobilization, traffic control, dust control, site condition assessments, full-depth reclamation, base rock material placement, asphalt surfacing, shoulder grading, pavement markings, project management, demobilization, insurance, and bonding. Each line item specifies a quantity of one for the corresponding services, with the total bid awarded to a single offeror based on the overall proposal. This RFP serves as a formal solicitation for bids to undertake the road repaving project and emphasizes the importance of adhering to specified operational parameters and safety protocols throughout the process. The structured nature of the document facilitates clear communication of project requirements and expectations to potential contractors.
Sol_140P8125B0002_Amd_0002.pdf
PDF83 KBJun 24, 2025
AI Summary
The document outlines Amendment 0002 to a federal solicitation, modifying the contract related to a project in Boulder City, NV. It primarily serves to extend the deadlines for submission of questions and bids. The new deadline for submitting questions is set for May 30, 2025, at 5:00 PM PDT, while bids must be submitted by June 23, 2025, at 1:00 PM PDT. Additionally, the amendment includes the Site Visit Participants Log as an attachment. The contractors must acknowledge receipt of this amendment before the specified dates to avoid rejection of their offers. This amendment is part of the administrative process for managing government contracts and ensuring adherence to submission protocols within the framework of federal grants and RFPs. The document emphasizes the importance of timely communications and procedural compliance as part of the solicitation process.
Wage_Determination.pdf
PDF263 KBJun 24, 2025
AI Summary
The document appears to be a fragmented and corrupted government file, possibly related to federal and state/local Requests for Proposals (RFPs) and grant processes. It contains disordered text with sections that suggest discussions about grant opportunities and requirements for project proposals. Topics likely include various funding initiatives aimed at community enhancement, public service improvements, or infrastructure development, though the specifics are obscured by the file's corruption. Key points extracted, despite the garbled nature of the text, suggest that the document addresses eligibility, application procedures, and project criteria. The emphasis is on the importance of compliance with regulatory standards, budget constraints, and guidelines for successful submissions. The intended audience appears to be potential applicants, including non-profit organizations, local governments, or businesses seeking federal support. Overall, the document serves as a memo for stakeholders engaged in competitive bidding for government funds, encouraging adherence to application frameworks while supporting community development through financial assistance. The fragmented nature of the text limits clarity but underscores the ongoing relevance of federal and state funding initiatives in public sector planning and investment.
Project_Specifications.pdf
PDF3115 KBJun 24, 2025
AI Summary
The Lake Mead National Recreation Area RFP outlines a project to repave the Willow Beach Access Road to address significant deterioration and safety concerns. This two-lane roadway, essential for visitor access to recreational activities, will be rehabilitated through the pulverization of existing asphalt, regrading, and installation of a new asphalt surface with a width of 22 feet. Traffic control measures will be implemented during construction, maintaining access for both the public and park staff. The project will follow federal guidelines and requires contractors to manage dust control, safety procedures, and equipment maintenance. The work site will involve various environmental protections, including training on local wildlife, specifically desert tortoises. Compliance with quality control standards will be expected, with routine inspections and documentation required throughout the project. The estimated period for construction is 90 calendar days. The RFP ultimately aims to enhance road safety and visitor experience while adhering to federal and park regulations.
343791-XCOND - 1.dwg
DWG74297 KBJun 24, 2025
AI Summary
No AI summary available for this file.
343791-PROAD.txt
Text3 KBJun 24, 2025
AI Summary
The Transmittal Report details the AutoCAD drawings related to the Willow Beach Road repaving project. It lists included root drawing files such as "343791-PROAD.dwg," "343791-Road Alignment.dwg," and others, while noting exclusions and files that could not be located, including "Exsit-Terrian_LAKE113(2).dwg." Additionally, the report provides instructions on setting the FONTALT variable to ensure correct text styles are displayed correctly, pointing to a specific file path for consistency. The report emphasizes the need for users to unzip associated XML manifest and cache files to the drawing directory and to update the cache manifest to connect to the unzipped data files. The document is structured to provide essential instructions for users working with the AutoCAD files, ensuring smooth operation and adherence to project requirements. Overall, this report facilitates effective collaboration and file management for stakeholders involved in the procurement and design processes of the repaving project.
Sol_140P8125B0002_Amd_0003.pdf
PDF87 KBJun 24, 2025
AI Summary
This document is an amendment for Solicitation No. 140P8125B0002, which outlines important updates regarding a federal contract. The primary purpose of Amendment 0003 is to facilitate the acknowledgment of receipt of the amendment by contractors, detailing that offers must confirm receipt through specific methods before a specified deadline, or risk rejection. The amendment provides crucial updates, including the attachment of Questions and Answers dated June 9, 2025, and revised project specifications and road plans, all of which replace previous versions. The amendment also includes updates to the project clause governing the commencement and prosecution of work and adds Computer-Aided Design (CAD) files as part of the documentation. The involvement of federal contracting authorities is emphasized, and the original terms remain unchanged unless indicated. This amendment plays a crucial role in maintaining clarity and compliance in contractual obligations under government contracts, ensuring that all parties are aware of updates relevant to the execution of the project.
Questions_and_Answers_0003.pdf
PDF374 KBJun 24, 2025
AI Summary
The document outlines the Questions and Answers segment for Solicitation No. 140P8125B0002 regarding the repaving of Willow Beach Road, addressing contractor inquiries. Key topics include approval processes for construction practices, surveying requirements, asphalt pavement specifications, and project conditions. Contractors can propose turnaround areas and adjust road elevations to accommodate construction materials. Clarifications on job roles indicate no requirement for separate individuals for the Superintendent, SSHO, and QC Manager. The anticipated start date for the project is September 2025, contingent on contract award, with specified requirements for ongoing traffic, testing standards, material sources, and environmental considerations, including no need for a SWPPP. Contractors must use Colorado River water and avoid hydrants. The document emphasizes compliance with federal and state specifications while maintaining project timelines and traffic flow. Overall, it serves as a comprehensive guide for bidders, detailing construction expectations and regulatory adherence vital for a successful project.

Related Contract Opportunities

Project Timeline

postedOriginal Solicitation PostedNov 13, 2024
amendedAmendment #1· Description UpdatedMay 16, 2025
amendedAmendment #2· Description UpdatedMay 21, 2025
amendedAmendment #3· Description UpdatedJun 12, 2025
amendedAmendment #4· Description UpdatedJun 13, 2025
amendedLatest Amendment· Description UpdatedJun 23, 2025
deadlineResponse DeadlineJul 2, 2025
awardAwarded to CORE CONTRACTING GROUP 153 W LAKE MEAD PKWY STE 1120 Henderson NV 89015 USASep 9, 2025
expiryArchive DateJul 17, 2025

Agency Information

Department
INTERIOR, DEPARTMENT OF THE
Sub-Tier
NATIONAL PARK SERVICE
Office
PWR LAME(81000)

Point of Contact

Name
Bennett, Michelle

Official Sources