Z--Colorado River Irrigation Project (CRIP) Main Canal Checks with Lateral 73
ID: 140A1624R0015Type: Special Notice
Overview

Buyer

INTERIOR, DEPARTMENT OF THEBUREAU OF INDIAN AFFAIRSCENTRAL OFFICERESTON, VA, 20192, USA

NAICS

Other Heavy and Civil Engineering Construction (237990)

PSC

REPAIR OR ALTERATION OF CANALS (Z2KB)
Timeline
    Description

    The Bureau of Indian Affairs (BIA) is soliciting bids for the Colorado River Irrigation Project (CRIP) Main Canal Checks with Lateral 73, focusing on the construction and rehabilitation of critical irrigation infrastructure in La Paz County, Arizona. The project involves replacing check structures, realigning segments of the canal, and modifying electrical transmission lines, with a performance period of 900 days post-award. This initiative is vital for enhancing water management systems and ensuring efficient irrigation operations within Indigenous territories. Interested contractors must submit their proposals by November 1, 2024, and can direct inquiries to William McLaughlin at William.McLaughlin@bia.gov or (850) 281-3444.

    Point(s) of Contact
    Files
    Title
    Posted
    The Department of the Interior (DOI) is preparing to solicit proposals for the Colorado River Irrigation Project (CRIP) involving the construction and rehabilitation of main canal check structures and the replacement of a failed lateral check structure. This pre-solicitation notice, targeting Indian-Owned Small Business Economic Enterprises (ISBEEs), outlines a project that requires contractors to rehabilitate three main canal check structures, realign segments of the canal and electrical transmission lines, and construct a new check structure downstream of an existing failed facility. The project aims to ensure efficient irrigation operations while adhering to environmental regulations. The job has a duration of 900 days, with a competitive ISBEE set-aside acquisition indicated. Specific instructions for proposal submission will be released on or around September 23, 2024. Interested contractors must be registered in the System for Award Management (SAM) to engage with the federal government. Contact information for the contract specialist and contracting officer is provided for inquiries.
    The CRIP Check Structures Pricing Schedule from La Paz County, Arizona, outlines procurement details for a construction project aimed at rehabilitating check structures associated with water management. Bidders must submit pricing for various items categorized under several CLINs, including a Base Bid and a Bid Additive. The Base Bid consists of components such as mobilization, demolition, concrete repairs, installation of radial and lateral gates, and electrical systems. Each item has an estimated quantity, unit costs, and TERO fees, which bidders must acknowledge and include in their pricing. Additional CLINs cover specialized works, such as contractor-furnished radial gates and electrical modifications necessary for the project. The Bid Additive focuses on the MC420 check replacement, involving structural excavation, culvert installation, and control building construction. The project emphasizes compliance with the CRIT TERO Ordinance and includes a specific rate for TERO fees. Overall, the document facilitates transparent bidding procedures, ensuring contractors understand requirements and pricing structures while complying with local and federal regulations.
    The file outlines the MC420 Check Replacement project in La Paz County, Arizona, managed by the Bureau of Indian Affairs. The project involves the replacement of a check structure within the Colorado River Irrigation Project. Key components include detailed engineering plans, construction sequencing for multiple phases, existing condition assessments, structural material specifications, and specific elevation and grading plans. It emphasizes the need for compliance with various engineering codes (ASCE, ACI, AISC) and construction safety regulations. The project documentation includes extensive notes on site access, excavation requirements, groundwater data, and environmental considerations that may affect construction activities. The plans specify quantities for earthwork, materials, safety features, and installation processes for structural components like gates and railings. This document serves as a comprehensive guide for contractors and engineers, ensuring adherence to project specifications, construction standards, and successful project execution within the federally funded framework of RFPs and grants, thus underscoring the government's commitment to infrastructure improvement in irrigation systems.
    The document outlines the construction plans for a 69kV transmission line and associated distribution infrastructure, focusing on specifications, materials, and design drawings. It includes detailed sections covering various components, such as plan and profile drawings, stake sheets, structure coordinates, phasing diagrams, and stringing charts. Key details include the installation of new poles and conductors, the removal of existing structures, and specifications for the type of materials to be used, such as the "Penguin" and "Sparrow" ACSR conductors. The document emphasizes the importance of matching existing tensions for stringing wires and outlines the necessary equipment and quantities for construction. Additionally, it highlights safety measures and structural support details, including grounding techniques and equipment specifications, critical for ensuring a successful installation. The document serves as a comprehensive guide for contractors involved in the project, supporting compliance with standard construction practices essential for government-funded projects, such as those governed by federal RFPs and local grant requirements. Overall, it reflects a systematic approach to developing electric infrastructure while addressing safety and regulatory compliance.
    The Bureau of Indian Affairs is soliciting bids for the replacement of Lateral 73-36 Check 1 as part of the Colorado River Irrigation Project in La Paz County, Arizona. The project encompasses significant construction activities such as site excavation, foundation work, and installation of hydraulic structures, including lateral headgates and canal gates. Key phases of the project include temporary bypass construction scheduled from January to February 2024, followed by the main construction period expected to last until June 2024. Specific details about construction methodologies, materials specifications, and environmental considerations are outlined in accompanying documents, emphasizing compliance with structural engineering standards and safety protocols. This initiative aims to enhance irrigation efficiency and ensure the integrity of water management systems in the region. The document serves as an essential part of the federal RFP process, detailing project scope, timelines, and bidding regulations to attract qualified contractors for successful project execution.
    The file "1CH74_1" outlines a federal government request for proposals (RFPs), focusing on funding opportunities and specific requirements for applicants. The document emphasizes the importance of aligning project goals with federal priorities, encouraging collaboration among state and local agencies. Key topics include eligibility criteria, application processes, evaluation standards, and funding allocation methods. It specifies that proposals must demonstrate a clear impact on community needs and outline measurable outcomes. Additionally, the RFP emphasizes compliance with federal regulations and the necessity for transparency in financial reporting. A structured timeline for proposal submission and review is provided, underlining the commitment to efficient processing. The overall purpose of this document is to guide potential applicants in developing proposals that meet the requirements and priorities set forth by the federal government, ultimately fostering projects that support public welfare and enhance community services. This framework is essential for ensuring that government resources are effectively utilized and that projects align with broader state and local objectives.
    The provided file consists of a series of identifiers (1CH3_1 to 1CH3_7) relevant to government Requests for Proposals (RFPs) and grants at the federal, state, and local levels. Although specific content is not detailed in the identifiers, it generally pertains to opportunities for public and private sector entities to submit proposals for funding or project collaborations aimed at addressing various governmental priorities. The document likely contains frameworks for potential bidders to engage with government entities, ensuring compliance with necessary regulations and guidelines. Additionally, it may outline the scope of work, funding availability, eligibility requirements, and evaluation criteria, essential elements for successful proposal submission. This file serves as part of the government's ongoing efforts to facilitate community development and enhance service delivery through structured funding mechanisms.
    The document outlines specifications for the installation and modification of sluice gates as part of the Colorado River Irrigation Project in Poston, AZ. It provides detailed measurements and dimensions related to the embedment depths of various threaded studs, the specifications of materials to be used, and the design requirements for the sluice gate assembly. Key points include the verification of existing anchors, proposed installation alignments, and required core drilling for new installations. The document also emphasizes the necessity of using specific epoxy products for securing anchors and includes notes for contractors regarding alignment and adjustments during the installation process. Overall, this technical document serves as a guideline for contractors to ensure compliance with engineering standards for hydraulic structures while facilitating the successful operation and maintenance of the sluice gates involved in the project.
    The CRIP Main Canal Check Structures Geotechnical Data Report, prepared by DOWL for the Bureau of Indian Affairs, provides an analysis and recommendations for rehabilitating and reconstructing check structures MC 185, MC 270, and MC 420. The report confirms the sites' suitability for project activities, outlining subsurface conditions, which consist of gravel fill over silty and sandy materials, with notable liquefaction risks during seismic events. It advises on conventional mat foundations for MC 420 and highlights geotechnical considerations such as potential liquefaction-induced settlements, soil stability, Lateral Earth pressures, and necessary compaction for structural fills. The recommended mitigation for liquefaction includes densifying soils or using deep foundation elements. The report emphasizes the necessity of ongoing geotechnical oversight throughout construction to adapt to any variations in subsurface conditions. Overall, it serves as a critical resource to ensure the project's structural integrity and compliance with engineering standards. This document highlights the government's commitment to addressing infrastructure challenges in water management, particularly for irrigation projects within Native American territories.
    The geotechnical report by DOWL focuses on the assessment and recommendations for the CRIP Lateral 73-36 Check Structure on the Colorado River Irrigation Project, intended for the Bureau of Indian Affairs. The report highlights that the existing structure is in poor condition and requires complete replacement. Key findings from the subsurface investigation indicate suitable conditions for construction using a conventional mat foundation, but challenges with liquefiable sandy soils during seismic events are noted. To enhance safety against liquefaction risks, the report suggests placing a geotextile in the canal embankment. Investigations included two test pits, laboratory tests, and site-specific analyses to provide recommendations for foundation parameters, excavation requirements, and soil stabilization methods. Among these, structural fill specifications and compaction requirements are essential to ensure the integrity of the new structure. The report emphasizes the importance of continuous geotechnical oversight during construction to adapt to any unforeseen subsurface conditions. Overall, the document serves to guide the BIA in the correct implementation of geotechnical measures to ensure the safety and functionality of the irrigation structure, highlighting critical considerations in the context of public infrastructure projects.
    The asbestos survey conducted by Ninyo & Moore on the Colorado River Irrigation Project Main Canal assessed four concrete structures (MC 420, MC 270, and MC 185) for the presence of asbestos-containing materials (ACM). The survey aimed to determine ACM in light of upcoming rehabilitation and construction activities. Conducted on August 10, 2022, a total of 35 bulk samples were collected and analyzed under standard protocols in compliance with EPA guidelines. The results indicated no detectable asbestos in any samples, allowing for the continuation of the project without concerns regarding ACM. Recommendations included adhering to worker safety regulations and sampling any additional suspect materials discovered during construction activities. The report underscores the importance of an asbestos assessment within the context of government-funded projects, ensuring compliance with health and safety regulations while facilitating infrastructure improvements. This survey is a critical preliminary step towards safe construction practices on federally-managed native lands, reflecting both regulatory adherence and proactive environmental management.
    Ninyo & Moore conducted a survey of the concrete check structure and culvert on the Colorado River Indian Reservation in La Paz County, Arizona, to assess asbestos-containing materials (ACM) and lead-based paint (LBP) in preparation for possible demolition or repair. Eight bulk samples were collected for asbestos analysis, which revealed no detectable asbestos, thus concluding no ACMs were present. The LBP survey identified two areas with lead content exceeding EPA thresholds: the white painted metal framing of the vault containing 1.40 mg/cm² and a vertical I-beam measuring 5.30 mg/cm². Recommendations include employing trained personnel for removing LBP if necessary, along with proper debris cleanup. The report emphasizes notifying all contractors involved of the survey's findings and advises further testing if additional suspect materials are encountered during renovation. This document serves as a critical assessment for health and safety compliance regarding hazardous materials in construction scenarios on tribal lands, aligning with federal regulations for environmental protection.
    The Colorado River Irrigation Project seeks a construction contractor to rehabilitate and replace three check structures along the Main Canal, realign segments of the canal, and modify nearby electrical transmission and distribution lines. The Bureau of Indian Affairs (BIA) emphasizes the need for close coordination with irrigation operations and adherence to environmental work restrictions, which include specific timelines for construction activities, especially during a two-week annual dry-up period scheduled each January. The project encompasses both rehabilitation of existing structures (MC185 and MC270) and the reconstruction of a new structure (MC420), with particular emphasis on safety improvements and operational efficiency. The contractor must navigate complex logistics, including the procurement of long-lead components such as radial gates and electrical poles, ensuring timely completion to align with the scheduled dry-up periods from 2025 to 2027. The document outlines the comprehensive scope of work required for each construction line item, specifying mobilization, excavation, structural repairs, installation of control systems, and extensive electrical modifications. With strategic planning and coordination, this project aims to bolster the irrigation infrastructure in the region while ensuring minimal disruption to ongoing agricultural water delivery systems.
    The CRIP Main Canal Check Structures Groundwater Monitoring Report, prepared for the Bureau of Indian Affairs (BIA) and conducted by DOWL, outlines the groundwater monitoring activities associated with the rehabilitation of three check structures on the Colorado River Irrigation Project (MC 185, MC 270, and MC 420). Monitoring was performed to support design and construction, involving the installation of five monitoring wells and the collection of pressure and temperature data over a period from August 2022 to October 2023. Significant findings include varying groundwater elevations, with the highest levels typically recorded in summer and the lowest in winter. Monitoring well data indicated that the maximum groundwater elevation observed at MC 185 was 346.5 ft on August 7, 2023, while minimum values were recorded during the winter months. The report highlights the importance of barometric pressure data in interpreting groundwater levels and notes a loss of some barometric equipment that affected comprehensive data collection. Overall, this report emphasizes the careful monitoring of groundwater to inform and ensure effective management and rehabilitation of irrigation infrastructure within the Colorado River Indian Reservation.
    The document discusses General Decision Numbers AZ20240007 and AZ20240037 concerning labor standards for construction contracts in Arizona, specifically focusing on heavy dam and heavy construction projects. It outlines wage rates that contractors must adhere to under the Davis-Bacon Act, which requires payment of prevailing wage rates for public contracts. The document specifies minimum wage requirements based on recent Executive Orders, establishing different rates depending on contract award dates and their applicability. For example, contractors with contracts initiated after January 30, 2022, must pay at least $17.20 per hour, while those between January 2015 and January 2022 are held to a minimum of $12.90 per hour. The document also provides detailed classifications of various labor types, including boiler operators, electricians, and laborers, along with their respective wage rates and zones based on geographic locations. Furthermore, it highlights requirements for paid sick leave under Executive Order 13706 for federal contractors. This information is vital for ensuring compliance with labor laws and regulations in the bidding and execution of construction projects funded or facilitated by federal and state initiatives.
    The Bureau of Indian Affairs (BIA) is conducting a pre-proposal meeting for the CRIP MC Check Structures project (Solicitation No. 140A1624R0015) on October 8, 2024, at their Colorado River Agency in Parker, AZ. The agenda includes an overview by BIA and DOWL, followed by an on-site field review of four controlled-access project sites: MC185, MC270, MC420, and Lateral 73-36. The meeting aims to provide potential bidders with essential project information and facilitate understanding of administrative procedures and site conditions. Attendees will have opportunities for additional questions and site visits, although specific access restrictions apply to controlled areas. Essential logistical details, including timings and site coordinates, are provided for participants. The purpose of the meeting aligns with standard practices for federal RFPs, ensuring clear communication and access to information necessary for proposal preparation.
    The document outlines inquiries from contractors regarding the CRIP Main Canal rehabilitation project, emphasizing concerns about a constrained two-week dry-up period for construction activities. Key issues raised include the curing times for concrete materials, the impact of adverse weather on work schedules, and the feasibility of employing local labor given the limited time for training. Questions also pertain to project specifications, responsibilities regarding owner-furnished equipment, and the clarity of contract documentation. Responses indicate awareness of the tight timeline, mentioning that “high-early strength” concrete is specified to meet strength requirements within the available period. The Bureau of Indian Affairs (BIA) is considering extending the dry-up duration to mitigate these challenges. Contractors are advised to incorporate weather-related risks into their bids, comply with local hiring requirements, and utilize specialty workforce for the project's specialized tasks. Additionally, an extended Q&A period has been initiated to address complex scheduling issues. Overall, the document serves as a Q&A log providing clarity on various aspects of the project while emphasizing the urgency and logistical intricacies of executing construction within the defined time constraints. It aligns with standard practices in government RFP processes, ensuring that contractors are well-informed and adequately prepared for the project requirements.
    The document is a Questions and Answers Log for Solicitation # 140A1624R0015 regarding the CRIP Main Canal C project. It outlines contractor queries related to the project, specifically for the section dealing with CRIP Main Canal Checks alongside Lateral 73. The structure includes the contractor's name, the date each question was received, the details of the question, and the date it was sent to the Contracting Officer's Representative (COR) for a response, alongside the date the response was provided. This log serves as a reference to address contractor inquiries, ensuring clarity in the bidding process and compliance with federal procurement standards. It is pivotal in maintaining transparency between the government agency and potential bidders while facilitating an informed and competitive bidding environment.
    The document outlines the requirements for enterprises submitting offers under the Buy Indian Act, emphasizing eligibility criteria that must be maintained from the proposal stage to the full term of the contract. It specifies that Contracting Officers can request additional documentation regarding eligibility at any point during the acquisition life cycle. The form serves as a self-certification by the Offeror, confirming their designation as an "Indian Economic Enterprise" (IEE) in accordance with the Department of the Interior Acquisition Regulation. Key information required includes the name of the federally recognized tribal entity, the unique entity ID, the legal business name, and details about the ownership of the IEE. Any dishonesty or false claims made during the submission process can incur legal penalties. This summary reflects the document's focus on compliance with federal procurement laws and protects the integrity of the contracting process, specifically for enterprises eligible under the Buy Indian Act.
    This document is a Bid Bond form used in federal contracts requiring a bid guaranty. The main purpose is to ensure that the Principal (bidder) and their Sureties are legally bound to the U.S. Government for the total amount listed as the penal sum on the bond. Key components include the identification of the Principal, Sureties, bid identification information, and the conditions under which the bond becomes void—primarily if the Principal fulfills contract execution requirements after bid acceptance. The document outlines obligations of the Principal and Sureties in case the Principal fails to formalize the contract or requires the government to cover costs exceeding the bid. It also specifies how Sureties, whether corporate or individual, must comply with bonding regulations, including the necessity for approval from the Department of the Treasury. The Bond form directs that all signatories must have appropriate authority and outlines procedural requirements for any related documentation. This ensures compliance within the context of government requests for proposals (RFPs) and grants, where financial security is essential.
    The document outlines the requirements and components of a Performance Bond within the context of U.S. government contracts. It serves as a guarantee that a contractor (the Principal) will fulfill the obligations stipulated in a specified contract, binding both the Principal and the Surety(ies) to a penal sum. The conditions under which the bond becomes void are detailed, including the Principal's performance of contractual terms and payment of taxes. The form includes sections for signatures and corporate seals of the involved parties, ensuring legal accountability. It specifies information regarding corporate and individual sureties, including their liability limits and requirements for approval from the Department of the Treasury. The instructions emphasize the necessity of compliance with the form's structure and the importance of disclosing the Principal's full legal name and address, reinforcing the need for transparency in government contracting processes. Overall, this document is integral to managing risks and ensuring performance in federal, state, and local government contracts, highlighting the government's expectation for accountability and thorough adherence to contractual obligations.
    The document outlines the requirements for a payment bond as part of federal contracting agreements under 40 USC Chapter 31, Subchapter III. It details the obligations of the Principal and Surety(ies) to ensure payment for labor and materials supplied in accordance with the contract. The executed bond must provide a penal sum, which is the total liability limit, and it can involve one or more corporate sureties. The obligations are void if payments are made promptly to all parties involved in the contract. The form prescribes procedures for completion, including legal names, business addresses, seals, and signatures of all parties involved. It emphasizes the need for corporate sureties to be listed on the Treasury's approved list and for individual sureties to provide additional documentation. Overall, this payment bond form is critical for safeguarding the interests of individuals and entities supplying services and materials under government contracts, ensuring financial accountability and compliance with federal regulations.
    The Bureau of Indian Affairs (BIA) is seeking a construction contractor to replace Check One of Sublateral 73-36, a key structure within the Colorado River Irrigation Project (CRIP) that failed in July 2023 due to erosion and void formation. The project entails demolishing the existing structure and constructing a new one downstream, including building a temporary bypass channel to manage irrigation flows during construction. Key tasks include installing temporary structures to maintain water levels, constructing the new check structure with associated sluice gates, and demolishing outdated turnout structures. The project's critical timelines must align with the CRIP's annual dry-up periods in January and February to minimize disruptions. This initiative underscores the BIA's commitment to sustaining irrigation operations and ensuring effective water delivery in an area where irrigation is vital.
    The document outlines specifications for the design, fabrication, delivery, and installation of radial gates as part of the CRIP MC185/MC270 Check Rehabilitation project in La Paz County, Arizona. It details the required components, including radial gate assemblies, gate hoist systems, and cathodic protection systems. Essential qualifications for contractors and manufacturers, such as experience and certifications, are specified to ensure quality and compliance. The section emphasizes adherence to various design codes and standards, including those set by USACE and ASTM. Key requirements include submission of detailed shop drawings, specifications for materials, and proof of compliance with testing and installation procedures. The document highlights quality control measures, including BIA Representative inspections and factory acceptance testing before shipping. The maintenance of a high standard of safety and functionality is paramount, with provisions for training, operational manuals, and post-installation testing outlined to ensure long-lasting effectiveness and reliability of the structures involved. Overall, it serves as a comprehensive guide to the procurement and implementation processes related to the radial gate project within the framework of government contracting and engineering standards.
    The document consists of a series of contractor inquiries and government responses related to the CRIP Main Canal Checks project. Key concerns raised by Tribal 1 and Miami Marine Services include the viability of a 14-day dry-up period for construction, specifications for concrete curing, the impact of adverse weather on work schedules, local labor hiring requirements, and requests for timeline extensions for questions and bids. The Bureau of Indian Affairs (BIA) acknowledges the challenges regarding the tight schedule, emphasizing the need for high-early strength materials that can meet the specifications within the limited timeframe. Various responses detail requirements for clean-up of invasive species on construction sites and clarify the bidding process, including Q&A deadlines and exceptions to certain specifications. Ultimately, the document serves to facilitate communication between contractors and the government, ensuring clarity and adherence to specifications while addressing specific project challenges and compliance requirements. The ongoing dialogues highlight the project's complexity and the necessity for adaptability in scheduling and requirements.
    The CRIP MC185/MC270 Check Rehabilitation project in La Paz County, Arizona, undertaken by the Bureau of Indian Affairs, focuses on the repair and rehabilitation of two irrigation canal checks – MC185 and MC270. This detailed project manual outlines the procurement and construction requirements, including demolition, structural repairs, and installation of new gates and electrical systems. Key phases of work are organized into three segments: pre-drawdown preparations, activities during the Main Canal drawdown, and post-drawdown tasks. Environmental considerations and restrictions on irrigation operations are emphasized, requiring coordination with Bureau representatives throughout the project. Specific attention is given to payment procedures, detailing a lump-sum pricing structure for various work items, including mobilization, demolition, concrete repairs, and installation of gates and control systems. The plan necessitates careful scheduling and submittal processes to ensure compliance with all regulations and construction standards, prioritizing functionality and environmental protection as the project aims to enhance irrigation operations on the Colorado River Indian Reservation. Overall, this comprehensive manual serves as a fundamental guide for all contractors involved, ensuring clarity in expectations, timelines, and deliverables throughout the rehabilitation duration.
    The CRIP MC420 Check Replacement project in La Paz County, Arizona, involves significant rehabilitation of the Colorado River Irrigation Project Main Canal Check structure (MC420). This project, prepared by the Bureau of Indian Affairs, encompasses demolition of the existing check structure and appurtenances, installation of new radial gates, and construction of a new concrete check structure along with electrical systems for control and monitoring. Key phases include managing stormwater, coordinating dewatering processes, and ensuring minimal disruption to irrigation operations. The project adheres to strict environmental protection guidelines and emphasizes compliance with construction standards. Detailed submittal procedures and payment protocols are defined for contractors, and the overall construction progress will be planned using Critical Path Method (CPM) strategies, ensuring a structured approach to project timeline management. The project underscores the importance of efficient irrigation system operation while upgrading infrastructure and promoting environmental stewardship, reflecting federal commitment to managing essential water resources within Indigenous territories.
    The CRIP MC420 Check Replacement project in La Paz County, Arizona, overseen by the Bureau of Indian Affairs, involves significant electrical transmission and distribution modifications. The contractor is responsible for comprehensive construction tasks, including installing new transmission lines, environmental measures, and coordination of outages within an eight-hour window between November 1 and February 28. All work must align with the specific contract documents, and close coordination with the BIA representative is mandated to ensure safety and minimal disruption to ongoing operations. Key responsibilities of the contractor include establishing access, removing vegetation, submitting construction and safety plans, and ensuring utility operations remain uninterrupted. Compliance with strict working hours, notification requirements for outages, and comprehensive documentation management is required. The project entails submittals for product substitutions where necessary and maintaining a detailed Schedule of Values correlating financial allocations with project activities. The document outlines a structured coordination process, detailing administration and scheduling requirements, including preparation of preliminary and baseline schedules for effective project management. It emphasizes a collaborative approach, ensuring all stakeholders, including subcontractors, are adequately engaged to adhere to the rigorous standards and timelines outlined. Overall, the project underscores the importance of effective communication and operational planning in federal construction initiatives.
    The project manual outlines the CRIP Lateral 73-36 Check 1 Replacement located in La Paz County, Arizona, overseen by the Bureau of Indian Affairs. The project encompasses a series of construction and environmental management tasks to replace an existing irrigation check structure without disrupting ongoing irrigation activities. Key tasks include earthwork, the construction of a temporary bypass canal, a new long-crested weir, and a headgate structure. The manual details the work sequence, emphasizing adherence to irrigation schedules and environmental regulations, and stipulates specific payment procedures for contractors based on completed work milestones. Additionally, it outlines submittal procedures for quality control measures and temporary facilities management, ensuring compliance with safety and environmental standards. This document serves as a comprehensive guide for contractors bidding on the project, detailing essential components, regulatory requirements, and procedural frameworks necessary for successful execution of the work. It plays a pivotal role within the context of federal RFPs and grants by promoting transparency, accountability, and coordination essential for public infrastructure projects on tribal lands.
    The CRIP MC185 Check Rehabilitation project aims to enhance water management infrastructure in La Paz County, Arizona. It involves comprehensive rehabilitation efforts for the check structure located along the Colorado River, encompassing demolition, construction, and installation of new components. This RFP outlines the engineering specifications necessary for the project, including structural general notes, existing conditions, and detailed demolition plans for various existing structures, such as gates, railings, and electrical enclosures. Key elements of the project include concrete rehabilitation, structural adjustments, and safety enhancements, all driven by rigorous compliance standards. The deliverables include site-specific plans and a concrete rehabilitation strategy to ensure the effective restoration of the functionality of the irrigation system. The project's scope requires meticulous adherence to safety protocols and design specifications while maintaining operational integrity during construction. This initiative reflects the government's commitment to sustainably managing water resources while advancing critical infrastructure improvements in the region.
    The document outlines the plans for the rehabilitation of the Colorado River Irrigation Project (CRIP) MC270 Check structure located in La Paz County, Arizona. The project includes extensive demolition and reconstruction activities aimed at enhancing the functionality and safety of the irrigation system. Key elements involve the removal of existing components such as gates and supporting structures, as well as the implementation of foundational rehabilitation and structural enhancements in accordance with federal guidelines. DOWL, the engineering firm responsible, details specific construction practices, emphasizing compliance with industry standards, including load-bearing requirements and material specifications. The project entails intricate coordination of construction activities to ensure minimal disruption to existing systems. Additionally, safety measures for construction workers and environmental considerations are carefully defined throughout various phases of the project. This file serves as a formal request for proposals (RFP) from potential contractors to bid on executing the outlined plans, highlighting a commitment to modernizing essential infrastructure while maintaining regulatory compliance and safety standards in public works. The detailed technical specifications aim to aid contractors in preparing their bids effectively, reflecting the federal government's focused investment in managing water resources responsibly.
    The document serves as a sign-in sheet from the CRIP Main Canal event, listing various participants and their organizations involved in construction and engineering sectors. It details contact information, including names, emails, and phone numbers for representatives from multiple companies, such as DOWL, BIA, and others. The presence of multiple individuals and organizations suggests collaboration likely tied to federal or state RFPs (Requests for Proposals) and grants within engineering and construction. The inclusion of various contractors and engineering firms indicates an effort to pool expertise for upcoming projects, signaling an organized approach towards meeting governmental requirements and initiatives focused on infrastructure development. This collaborative framework highlights the importance of networking and communication among different stakeholders in public works or infrastructure projects. Overall, the document encapsulates logistical information crucial for tracking engagement and participation in state or local government contracting processes.
    The document is an amendment regarding the solicitation for a government project, with the purpose of updating the proposal schedule and addressing specific evaluations related to construction tasks. Key modifications include the timeline for contractor activities, focusing on rehabilitation and electrical transmission works. The document specifies detailed deadlines for various tasks, including the completion of substantial projects during designated dry-up periods in early 2026 and 2027. Additionally, contractors are instructed to confirm receipt of the amendment and incorporate required changes into their submissions. The amendment emphasizes the necessity for acknowledgment through specific communication channels to avoid rejection of offers, reflecting typical procedures in federal RFP processes. Overall, this amendment serves to clarify expectations for contractors and ensure compliance with future project timelines and requirements.
    This document is an amendment pertaining to the solicitation numbered 140A1624R0015, issued by a federal contracting office. The amendment primarily revises the submission deadlines for offers and the Q&A process related to the solicitation. The new deadline for submitting offers has been extended to November 4, 2024, at 12:00 PM Eastern Time, and the deadline for submitting questions has also been adjusted to October 28, 2024, at 12:00 PM Central Time. Additionally, the amendment includes the publication of the sign-in sheet from the pre-proposal conference and the most recent Q&A responses. Contractors must acknowledge receipt of this amendment in the specified manner to ensure their offers are considered. The document also emphasizes the importance of adhering to the new deadlines and the structured process for submitting inquiries. Overall, this amendment updates relevant details for stakeholders involved in the solicitation process, ensuring clarity and compliance with procedural requirements.
    This document serves as an amendment to a solicitation related to a federal contract, identified as 140A1624R0015. The main purpose of this amendment is to update the solicitation details, including a revised submission deadline, which has been extended from November 4, 2024, to November 7, 2024, at 12:00 P.M. Eastern Time. Additionally, it includes the publication of the second and final round of questions and answers (Q&A) and an update to the specifications for Section 35 22 46 regarding Radial Gates. The amendment outlines the requirements for acknowledgment of receipt, stipulating that contractors must confirm receipt of the amendment prior to the specified deadline to avoid rejection of their offers. The structure of the document comprises several sections detailing the amendment's effective date, acknowledgment methods, administrative modifications to the contract, and the specific changes made. Overall, the amendment ensures that all parties are informed of the updated solicitation terms and maintains legal compliance with federal contracting protocols.
    The document outlines an amendment to a federal solicitation, identified by the number 140A1624R0015. The key purpose of this amendment is to inform potential contractors that the solicitation has been cancelled in its entirety. The document specifies required actions for contractors regarding their acknowledgment of the amendment, including submission methods and the importance of timeliness to avoid rejection of offers. It details the organization of the contract modification and outlines that it does not extend any contract terms or appropriations. The document emphasizes that aside from the changes made, all other terms and conditions remain unchanged and in full force. The signature of the contracting officer is included, indicating official approval of the amendment. This summary highlights the cancellation of a solicitation as a critical aspect while maintaining the document's formal tone and focus on procedural integrity in government contracting processes.
    The government solicitation 140A1624R0015 seeks bids for the Colorado River Irrigation Project (CRIP) Main Canal Checks with Lateral 73, focusing on construction, alteration, or repair. It is designated as a competitive ISBEE set-aside acquisition, encouraging submissions from responsible Indian Small Business Economic Enterprises (ISBEE). The solicitation outlines strict submission guidelines, including deadlines and required documentation, with a closing date of November 1, 2024. Key project provisions include a performance period of 900 days post-award, a mandatory use of site surveillance and video monitoring, and requirements for performance and payment bonds. The estimated project cost exceeds $10 million, emphasizing compliance with various regulatory standards and adherence to local laws regarding taxes. A pre-proposal conference is scheduled for October 8, 2024, and all inquiries regarding the bid must be submitted before October 11, 2024. The contract will be awarded based on the lowest price technically acceptable (LPTA) criteria, as outlined in the proposal requirements. The document details numerous federal acquisition regulations that will govern the contract, encompassing areas such as labor standards, equal opportunity, and environmental compliance, ensuring comprehensive oversight throughout the project lifecycle.
    Similar Opportunities
    7A--Drilling Data Subscription for OTS DEMD
    Active
    Interior, Department Of The
    The Bureau of Indian Affairs (BIA) within the Department of the Interior is seeking proposals for a Drilling Data Subscription service to support the Office of Trust Services, specifically through the Division of Energy and Mineral Development (DEMD). The contract aims to provide comprehensive well drilling information, including real-time rig updates, production reports, and analytical tools, to assist Tribes and Tribal entities in leveraging energy and mineral resources for economic development. This initiative aligns with federal mandates to empower tribes and is critical for facilitating energy development on Indian land. The contract will span a base year from March 1, 2025, to February 28, 2026, with options extending through February 28, 2030. Interested contractors must acknowledge the solicitation amendments and submit their proposals by the specified deadline, with all communications directed to Michael Furey at michael.furey@bia.gov.
    Ductile iron utility poles
    Active
    Interior, Department Of The
    The Department of the Interior, specifically the Bureau of Indian Affairs (BIA), is soliciting proposals for the provision of ductile iron utility poles as part of an unrestricted acquisition with a small business set-aside. The procurement requires suppliers to quote prices for 100 sixty-five-foot poles to be delivered to Coolidge, Arizona, with all associated costs included, such as taxes and shipping. These utility poles are essential for infrastructure projects, particularly in supporting electrical distribution systems in various applications. Interested contractors must submit their bids by December 19, 2024, and can direct inquiries to Randall Brown at Randall.Brown@bia.gov or by phone at 520-723-6208.
    Disconnect switches
    Active
    Interior, Department Of The
    The Bureau of Indian Affairs (BIA) is seeking quotes for the procurement of disconnect switches as part of a Request for Proposal (RFP) under solicitation number 140A1125Q0012. The procurement aims to supply disconnect switches that meet specific performance metrics, including voltage and current ratings, to a designated location in Coolidge, Arizona, with a focus on supporting Indian Economic Enterprises and promoting small business participation. This acquisition is crucial for ensuring reliable electrical infrastructure, aligning with federal standards for procurement and inclusivity. Interested vendors must submit their quotations by December 19, 2024, and can direct inquiries to Randall Brown at Randall.Brown@bia.gov or by phone at 520-723-6208.
    69 kV circuit breakers
    Active
    Interior, Department Of The
    The Department of the Interior, specifically the Bureau of Indian Affairs (BIA) Western Region, is seeking quotes for the provision of 69 kV circuit breakers to be delivered to Coolidge, Arizona. The procurement emphasizes compliance with federal contracting regulations, including specific technical specifications for the circuit breakers, and aims to support Indian Small Business Economic Enterprises (ISBEE) by ensuring significant work is retained by these businesses. This opportunity is crucial for maintaining electrical infrastructure and enhancing operational capabilities within the region. Interested vendors must submit their proposals by December 19, 2024, and can direct inquiries to Randall Brown at Randall.Brown@bia.gov or by phone at 520-723-6208.
    Chatfield Irrigation Conduits Repair
    Active
    Dept Of Defense
    The Department of Defense, through the U.S. Army Corps of Engineers, is soliciting bids for the repair of irrigation conduits at the Chatfield Dam and reservoir in Colorado. The project involves the rehabilitation of a 48-inch pipe and an optional 54-inch pipe, focusing on sealing leaks and ensuring the pipes' functionality for at least another 25 years. This work is critical for maintaining the water supply infrastructure in the region. Interested contractors must submit their quotes by January 10, 2025, and are encouraged to contact Tina L. Keimig or Lee M. McCormick for further details. The estimated budget for the project ranges from $100,000 to $250,000, and compliance with federal regulations, including insurance and material usage guidelines, is mandatory.
    Z--PIR Road Maintenance No. 1
    Active
    Interior, Department Of The
    Presolicitation INTERIOR, DEPARTMENT OF THE is planning to issue an Invitation for Bid (IFB) Solicitation for the Project PIR Maintenance No. 1 - Road Construction on the Tohono O'odham Nation, Pima County, Arizona. The project involves scarifying the existing disturbed roadway width to a depth of 6 inches, incorporating soil cement, grading, shaping, and compacting for 39.20 miles on Routes 2, 12, 18, 24, and 181. The estimated project magnitude is between $1,000,000.00 and $5,000,000.00, with a performance period of 150 calendar days. Contractor registration in the Government's System for Award Management (SAM) is required. The solicitation package is anticipated to be released on or about the week of April 18, 2024, with a thirty-day solicitation period.
    Z--Arroyo Canal Fish Screen/Sack Dam Fish Passage
    Active
    Interior, Department Of The
    The Department of the Interior, through the Bureau of Reclamation, is soliciting proposals for the Arroyo Canal Fish Screen and Sack Dam Fish Passage Project, aimed at enhancing fish passage and ecological conditions along the San Joaquin River in California. The project involves extensive construction activities, including the installation of fish screens, dewatering, and rehabilitation of existing structures, with a total estimated contract value between $100 million and $200 million. This initiative is critical for improving local infrastructure and supporting environmental restoration efforts, ensuring compliance with federal regulations throughout the project lifecycle. Interested contractors must submit their proposals by December 19, 2024, and can direct inquiries to Sydney Johnson at sgjohnson@usbr.gov or by phone at 916-978-5431.
    Z--Battle Creek - South Diversion Dam and Canal Removal
    Active
    Interior, Department Of The
    The Bureau of Reclamation, part of the Department of the Interior, is preparing to issue a Request for Proposal (RFP) for a firm fixed-price construction contract focused on the removal of the Battle Creek South Diversion Dam and associated canal. The project involves significant demolition work, including the dismantling of multiple diversion dams and the excavation and filling of the South Canal, with an estimated project cost ranging from $10 million to $15 million. This procurement is crucial for environmental restoration efforts in the region and is open to all responsible sources, with a requirement for 100% performance and payment bonds. Interested contractors must be registered in the System for Award Management (SAM) and can expect the solicitation to be posted on or around January 3, 2025, with proposals due approximately by February 3, 2025. For inquiries, contact Rosana Yousef Goarji at RYousefgoarji@usbr.gov or call 916-978-5004.
    Z--Reaches 21 Utility Potholing
    Active
    Interior, Department Of The
    The Department of the Interior, specifically the Bureau of Reclamation, is seeking qualified contractors for the "Reaches 21 Utility Potholing" project, which involves locating and verifying existing underground utilities as part of the Navajo-Gallup Water Supply Project. The contractor will utilize air or hydro-excavation methods to expose utility tops for survey data collection, ensuring compliance with safety regulations and coordination with utility owners during excavations. This project is crucial for enhancing water supply infrastructure while adhering to environmental and safety standards. Interested small businesses must attend a mandatory site visit on January 2, 2025, and submit their proposals by acknowledging the amendments to the solicitation, with the performance period set from January 15, 2025, to February 15, 2025. For further inquiries, potential bidders can contact Brittney Nielson at bnielson@usbr.gov.
    Y--GVIC FISH SCREEN REHABILITATION
    Active
    Interior, Department Of The
    The Department of the Interior, through the Bureau of Reclamation, is soliciting bids for the rehabilitation of fish screens at the Grand Valley Irrigation Company (GVIC) located in Mesa County, Colorado. This project, estimated to cost between $1,000,000 and $5,000,000, aims to enhance water infrastructure as part of the Upper Colorado River Endangered Fish Recovery Program, focusing on the installation of new concrete structures and fish screens, along with a control and cleaning system. The rehabilitation is crucial for preserving aquatic ecosystems and ensuring compliance with environmental regulations. Interested small businesses must submit their sealed bids by January 29, 2025, with inquiries due by January 10, 2025, and the expected performance period running from April 1, 2025, to May 1, 2026. For further details, potential bidders can contact Ana Fife at afife@usbr.gov or by phone at 801-524-3671.