NCAO Klamath River FAR Compilation Report
ID: 140R2025Q0011Type: Combined Synopsis/Solicitation
Overview

Buyer

INTERIOR, DEPARTMENT OF THEBUREAU OF RECLAMATIONMP-REGIONAL OFFICESACRAMENTO, CA, 95825, USA

NAICS

Environmental Consulting Services (541620)

PSC

SPECIAL STUDIES/ANALYSIS- ENVIRONMENTAL ASSESSMENTS (B510)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)
Timeline
    Description

    The Department of the Interior, specifically the Bureau of Reclamation, is seeking proposals for the Klamath River Flow Augmentation Releases Compilation Report, aimed at analyzing environmental impacts on fish disease dynamics, particularly focusing on Ichthyophthirius and Columnaris infections in adult salmon. The project involves a comprehensive study that includes reviewing environmental data, analyzing water temperature and flow dynamics, and developing management strategies to enhance salmon populations following a significant die-off event in 2002. This initiative is critical for informing future water management practices and ensuring the ecological sustainability of the Klamath River ecosystem. Interested small businesses can contact Steven Teves at steves@usbr.gov or call 916-978-4302 for further details, with the contract expected to last 18 months under a total small business set-aside.

    Point(s) of Contact
    Teves, Steven
    (916) 978-4302
    (916) 978-5175
    steves@usbr.gov
    Files
    Title
    Posted
    The Draft Performance Work Statement (PWS) outlines a study commissioned by the Bureau of Reclamation aimed at improving the understanding of fish disease dynamics, particularly Ich and Columnaris, in the Lower Klamath River. This initiative follows a significant 2002 salmon die-off, leading to the implementation of flow augmentations from upstream reservoirs to mitigate such events. The scope includes analyzing relationships between various environmental factors and fish health, with the goal of developing a conceptual model that informs future management actions to protect adult Chinook salmon populations. Key tasks involve comprehensive reviews of historical data, flow and temperature analyses, meteorological impacts, water chemistry assessments, and monitoring salmon migration patterns. Special attention will be given to the implications of recent dam removals on river conditions. The contractor will engage with multiple stakeholders through workshops and peer reviews, ensuring a collaborative approach to resource protection and sustainable water use. The project duration is set for 18 months, culminating in a detailed report aimed at guiding future fish management decisions and strategies for disease prevention in the Klamath Basin.
    The document outlines a series of tasks related to water management, environmental analysis, and reporting for the Klamath River region, indicating activities as part of a government contract. The tasks include comprehensive reviews and analyses of various environmental factors such as water temperature, chemistry, biology, meteorological influences, and the impacts of dam removal on the river system. Additionally, the scope encompasses flow management, trigger criteria assessment, report drafting, and peer reviews to ensure quality and accuracy in findings. A workshop dedicated to developing conceptual models and providing recommendations is also integrated into the plan. The structure reflects a methodical approach to environmental data analysis and collaborative reporting, vital for informed decision-making and policy formulation regarding river management and ecological health in compliance with regulatory frameworks.
    The Klamath River Fish Die-off Report, compiled by the U.S. Fish and Wildlife Service, details an incident occurring in September 2002, which resulted in the death of an estimated 34,056 fish, predominantly Chinook salmon. The report highlights the collaboration among various agencies, including the California Department of Fish and Game and local tribes, to assess the die-off's scale and environmental impacts. The findings indicate that approximately 98.4% of the dead fish were adult anadromous salmonids, with fall-run Chinook comprising the vast majority at over 97%. The report reveals significant details about hatchery contributions, with around 21.7% of dead Chinook thought to have originated from hatcheries. Pathological examinations identified white spot disease and columnaris as primary causes of mortality. Multiple survey methods across different reaches of the river provided insights into the demographic and health status of affected populations. The report suggests that the estimated count likely underrepresents the actual mortality, emphasizing the need for thorough investigation and assessment of contributing environmental factors. Future reports aim to detail water quality, pathological analysis, and wider ecological implications stemming from the die-off event. Overall, the document serves to inform natural resource agencies and stakeholders of the incident's scale, calling for ongoing assessments to understand and mitigate the impact on local fisheries and ecosystems.
    The U.S. Fish and Wildlife Service's report on the Klamath River fish die-off in September 2002 documents a significant mortality event, estimating the death of 34,056 fish, primarily fall Chinook salmon. The deaths were primarily attributed to infections from pathogens, Ichthyophthirius multifiliis (Ich) and Flavobacterium columnare (columnaris), exacerbated by environmental conditions. Factors contributing to the outbreak included a large salmon run, low river discharges, warm water temperatures, and resultant high fish density, creating a conducive environment for parasites. The report's structure includes an introduction, methods for data collection and analysis, detailed results regarding mortality estimates, environmental conditions, and discussions on water quality and pathology. It examines historical data on salmon runs, river discharge, and various environmental factors. This document serves as a critical analysis for understanding fish health in the Klamath River ecosystem and the interplay of biological and environmental factors impacting fish mortality, underscoring the importance of effective management strategies for future salmonid populations. The findings could inform future federal and state grant proposals and RFPs relating to water quality management and wildlife conservation efforts in the region.
    The Trinity River Water Temperature Synthesis Report, dated August 16, 2023, aims to synthesize 87 years of scientific inquiry regarding Trinity River water temperatures, highlighting the impacts of dam operations and restoration efforts guided by the Trinity River Record of Decision (ROD). It was prepared for the Trinity River Restoration Program (TRRP), focusing on the relationship between flow and temperature, and how these dynamics affect fish populations and ecological health. The report underscores significant alterations in water temperature due to the construction of the Trinity River Division (TRD), revealing that the regulated flow releases have resulted in an unnaturally warm winter and cold summer environment hindering the growth of juvenile salmonids. Major objectives included compiling comprehensive temperature datasets, evaluating historical temperature patterns and compliance with water temperature targets, updating thermal models, and providing management recommendations for better alignment with restoration goals. Key recommendations include adjusting flow releases to enhance instream biology, developing proactive temperature management strategies, and improving monitoring efforts to retain cold-water environments and support beneficial aquatic habitats. The report serves as a crucial guide for optimizing water management practices under current climate change projections while preserving aquatic ecosystems in the Trinity River basin.
    The report, "The Klamath River Fish Kill of 2002; Analysis of Contributing Factors," investigates a significant fish kill event affecting Chinook salmon in the Klamath River, resulting in over 34,000 dead fish. It identifies several interrelated factors contributing to this unprecedented event, including low water flows from Iron Gate Dam, high fish densities, and favorable conditions for pathogens, particularly the protozoan parasite Ichthyophthirius multifiliis (ich) and the bacterial pathogen Flavobacter columnare (columnaris). The report emphasizes that the environmental conditions in 2002, characterized by low river flow and warm temperatures, created a perfect storm for disease outbreak. Key findings indicate that had flow rates been maintained above 1000 cubic feet per second (cfs), similar to previous years with healthier fish populations, the fish kill could have been mitigated. The analysis reviews historical data to contrast the conditions of 2002 with prior years, underscoring the lack of historical precedents for such a massive fish kill. Ultimately, this report aims to inform future management actions to prevent recurrence, stressing the critical nature of managing water flows and conditions in support of salmon health in the Klamath ecosystem.
    The "Record of Decision" from the U.S. Department of the Interior outlines a Long-Term Plan to Protect Adult Salmon in the Lower Klamath River following a significant fish die-off in 2002. This incident highlighted the risks associated with high fish densities and poor water conditions. To mitigate future outbreaks of disease, the Bureau of Reclamation proposes to implement an augmentation flow strategy from mid-August to late September, targeting a flow of 2,800 cubic feet per second from Lewiston Dam when necessary. The strategy consists of three components: a preventive base-flow release, a preventive pulse flow, and a contingency volume for emergencies. The plan is designed to adaptively manage water flows using real-time monitoring and was developed in coordination with various tribal and federal partners. Although a No Action alternative exists, the Proposed Action was chosen due to its immediate implementability and alignment with existing legal frameworks. Alternative 2 was identified as environmentally preferable due to minimal impacts on water supply, but other factors led to the selection of Alternative 1. The document reflects the ongoing prioritization of fish health and ecosystem management in the context of federal and state water resource policies.
    The 2024 Flow Augmentation Releases Technical Meeting #8 focused on updates regarding environmental conditions and fish health in relation to water management efforts. Key participants included representatives from the U.S. Fish and Wildlife Service, several tribes, the California Department of Fish and Wildlife (CDFW), and the National Marine Fisheries Service (NMFS). Paul Zedonis provided insights on current conditions, including water release rates and the health of fish populations, noting concerns over diseases like columnaris and ich observed in catches. Reports indicated several tribes experienced varying fish catches, with increasing turbidity and potential health issues among the fish. The consensus among attendees was that no immediate follow-up meeting was necessary to discuss flow management, as they were outside the current action window. Future discussions regarding fish health and injuries were suggested to shift to the Klamath Fisheries Action Team (KFAT) meetings. Overall, the meeting underscored the collaborative efforts of agencies and tribes in monitoring environmental impacts on fish populations while assessing the need for further action regarding managing fish health concerns.
    The report from the California Department of Fish and Game evaluates the September 2002 fish-kill in the Klamath River, which resulted in the loss of over 33,000 adult salmonids, primarily fall-run Chinook salmon. This unprecedented mortality event was triggered primarily by an epizootic of pathogens such as ich and columnaris, exacerbated by several stressors: low river flows, high fish densities due to a large salmon run, and elevated water temperatures. The report highlights that the only manageable factor is river flow, suggesting that increased flows during adult salmon migration could mitigate future fish-kills. The fish-kill notably impacted tribal fisheries, especially in the Trinity River, where the loss of harvest opportunities may have cost tribal and sport anglers thousands of fall-run Chinook salmon. Additionally, the report provides a comprehensive analysis of environmental factors, historical fish populations, and recommended management strategies to avoid similar incidents in the future, emphasizing the need for coordinated efforts among agencies and stakeholders to restore and manage fish resources effectively in the Klamath Basin.
    The U.S. Fish and Wildlife Service conducted a comprehensive survey to assess the fishery resources of the Trinity River, California, amid increasing demands for water diversion for irrigation and power generation. This study, initiated in 1942, focused on determining key biological and environmental factors impacting fisheries, particularly king salmon and steelhead trout. Major objectives included evaluating fish population size and composition, studying seaward migration patterns, and assessing spawning gravel utilization. The Trinity River, approximately 159 miles long, exhibits significant seasonal flow variations and temperature fluctuations that affect fish survival rates, especially during critical spawning periods. The findings raised concerns about proposed water diversion plans, highlighting potential severe impacts on salmon spawning habitats and overall fish populations. The report notes the historical significance of the river to local Indigenous tribes and stresses the necessity for habitat protection measures to ensure the sustainability of fishery resources. Conclusively, the investigation's interim findings underline the balance needed between environmental conservation and developmental pressures, informing future management strategies for the river's fishery resources.
    The memorandum outlines recommendations for fall flow releases in the Klamath River to protect the fall-run Chinook salmon population during the 2013 migration season. Following a significant fish kill in 2002 attributed to low river discharge and high temperatures, the Bureau of Reclamation sought guidance from the US Fish and Wildlife Service and the National Marine Fisheries Service to avert similar occurrences. Given predictions of below-average river flows and a large projected salmon run in 2013, the document emphasizes implementing preventative flow augmentation strategies, starting when a cumulative harvest of Chinook salmon exceeds 7,000 adults by the Yurok Tribal fishery. If not met by August 22, flow releases should be initiated based on temperature thresholds. Specific flow targets and monitoring plans to observe fish health and pathogen presence are outlined, with recommendations for an adaptive management approach to use limited water resources effectively. The memorandum aims to mitigate disease risks and support salmon migration, emphasizing a strategic response to expected environmental conditions while adhering to federal water management objectives. Overall, it underscores the significance of coordinated action between tribal and federal authorities to enhance fishery management in light of critical ecological challenges.
    The report "Endangered and Threatened Fishes in the Klamath River Basin" evaluates the decline of three fish species listed under the Endangered Species Act, identifying critical issues affecting their survival and potential recovery strategies. The shortnose sucker and Lost River sucker were listed as endangered in 1988, primarily due to overfishing, habitat alteration, and water management practices. The coho salmon was listed as threatened in 1997, with similar causes for its decline. The report outlines the implications of water management decisions made by the U.S. Bureau of Reclamation during severe droughts, which restricted water supplies vital for irrigation and increased tensions among agricultural stakeholders and conservationists. The committee found limited progress in restoring sucker populations and highlighted ongoing challenges, such as poor water quality in Upper Klamath Lake induced by eutrophication. Recommendations include improving habitat conditions, addressing barriers to fish migration, and enhancing water quality management. The report emphasizes a collaborative approach among federal agencies, local stakeholders, and scientific communities in developing effective recovery strategies for these endangered fish species. The overarching aim is to foster a better understanding of the complexities involved in ecosystem restoration and species recovery within the Klamath River Basin.
    The document outlines a Request for Quotation (RFQ) #140R2025Q0011 from the Bureau of Reclamation, focusing on the Klamath River Flow Augmentation Releases Compilation Report intended to analyze environmental impacts on fish disease dynamics, specifically addressing Ichthyophthirius and Columnaris infections in adult salmon. Following a significant salmon die-off in 2002, flow augmentation releases (FARs) have been implemented to improve conditions for salmon populations. The contractor is expected to conduct a comprehensive study encompassing various tasks, such as reviewing environmental data, analyzing water temperature, flow dynamics, and pathogen infections, and creating a conceptual model for effective management strategies. The contract is anticipated to last 18 months with deliverables that include detailed reports and analysis, contributing to the stewardship of salmon resources and informing future flow management to mitigate disease risks. This initiative reflects the government's commitment to ecological sustainability and the protection of natural aquatic habitats through informed decision-making based on scientific data and stakeholder input.
    Lifecycle
    Title
    Type
    Combined Synopsis/Solicitation
    Similar Opportunities
    MRG RGSM Population Monitoring
    Buyer not available
    The Department of the Interior, Bureau of Reclamation, is soliciting proposals for the MRG RGSM Population Monitoring project, aimed at monitoring the population of the Rio Grande Silvery Minnow (RGSM). The procurement requires qualified contractors to conduct monthly field sampling, generate reports, and participate in optional scientific workshops over a performance period from March 15, 2025, to March 14, 2030. This initiative is critical for the ecological protection of a threatened species, reflecting the Bureau's commitment to regulatory compliance and environmental stewardship. Quotations must be submitted by 5:00 PM Mountain Time on February 27, 2025, and interested parties can contact Mary Maestas at mmaestas@usbr.gov or by phone at 505-462-3581 for further information.
    B--International St. Mary and Milk River Study
    Buyer not available
    The Department of the Interior, specifically the U.S. Geological Survey, is seeking information from qualified entities regarding the International St. Mary and Milk River Study. This opportunity is categorized as a Sources Sought notice, aimed at identifying potential contractors who can provide scientific and technical consulting services related to water quality analysis. The study is crucial for understanding and managing water resources in the St. Mary and Milk River regions, which are vital for ecological and community health. Interested parties are encouraged to reach out to Philip Robinson at probinson@usgs.gov for further details, although specific funding amounts and deadlines have not been disclosed at this time.
    Spring Chinook salmon spawning surveys above Green Peter Dam
    Buyer not available
    The Department of Defense, specifically the Department of the Army through the W071 Endist Portland office, is seeking qualified contractors to conduct spawning surveys of Spring Chinook salmon above Green Peter Dam in Oregon. The contract, which is a firm-fixed price for a duration of 12 months, requires the contractor to provide personnel, equipment, and materials necessary for conducting comprehensive surveys, including carcass sampling and the delivery of detailed reports. This project is crucial for assessing salmon abundance, distribution, and spawning behavior, particularly in Quartzville Creek and the Middle Santiam River, with results to be reported monthly to the contracting officer’s representative. Interested parties should contact Rattiya Oaks at rattiya.p.oaks@usace.army.mil or Justin Figueredo at Justin.F.Figueredo@usace.army.mil for further details, with a final report and presentation due by April 30, 2026.
    B6 HATCHERY TANKS AND FILTERS
    Buyer not available
    The Bureau of Reclamation, under the Department of the Interior, is soliciting proposals for the procurement of six 600-gallon fiberglass tanks designed for larval use, as outlined in RFQ No. 140R3025Q0021. The tanks must meet specific technical specifications and be delivered within 30 days of contract award, with a focus on compliance with federal regulations and the inclusion of small businesses, particularly those classified under NAICS Code 326199. This procurement is crucial for supporting commercial fishing operations and environmental conservation efforts. Interested vendors must submit their quotes electronically via SAM.gov by February 28, 2025, and direct any inquiries to Nicholas Clements at nclements@usbr.gov or by phone at 702-293-8156.
    Z--KLAMATH RIVER CANYON FENCE RECONSTRUCTION
    Buyer not available
    The Department of the Interior, through the Bureau of Land Management's Oregon State Office, is seeking contractors for the Klamath River Canyon Fence Reconstruction project. This presolicitation opportunity is specifically set aside for Indian Small Business Economic Enterprises (ISBEE) and involves the repair or alteration of non-building facilities, categorized under NAICS code 238990. The reconstruction of the fence is crucial for land management and conservation efforts in the area. Interested parties can reach out to Lorri Schoellkopf at lschoellkopf@blm.gov for further details, although specific funding amounts and deadlines have not been disclosed at this time.
    REPAIR OF WATER LEAK OF BURROWS POND
    Buyer not available
    The U.S. Geological Survey (USGS) is seeking qualified contractors to repair a leaking underground water line at the Conte Anadromous Fish Lab Facility in Turners Falls, Massachusetts. The project involves significant excavation and repair work on the water supply system for the facility's upper burrows ponds, which are critical for fisheries holding and experimentation. This initiative is part of the federal commitment to maintaining environmental research facilities and ensuring operational efficiency, with a contract duration of 86 days following the notice to proceed. Interested small businesses must submit their proposals by February 21, 2025, and are encouraged to attend a site visit on February 12, 2025. For further inquiries, contact Dayna Parkin at dparkin@usgs.gov or 703-648-7374.
    EFO-WDFW LAW ENFORCEMENT SERVICES
    Buyer not available
    The Department of the Interior, specifically the Bureau of Reclamation, is seeking proposals for law enforcement services to be provided by the Washington Department of Fish and Wildlife (WDFW) across the Columbia Basin Project, which spans over 1 million acres in Ephrata, Washington. The primary objective of this contract is to ensure public safety, protect natural resources, and enforce state and federal regulations through regular patrols and thorough documentation of activities and incidents. This contract, valued at approximately $91,344.52 for the first year and totaling $484,960.46 over five years, is critical for maintaining order and preventing criminal activities on federal lands, with a performance period set from April 1, 2025, through March 31, 2030. Interested parties can contact Paula Gross at PGross@usbr.gov or by phone at 509-633-6132 for further details.
    Z--Battle Creek - South Diversion Dam and Canal Removal
    Buyer not available
    The Bureau of Reclamation, part of the Department of the Interior, is preparing to issue a Request for Proposal (RFP) for a firm fixed-price construction contract focused on the removal of the Battle Creek South Diversion Dam and associated canal. The project involves significant demolition work, including the dismantling of multiple diversion dams and the excavation and filling of the South Canal, with an estimated project cost ranging from $10 million to $15 million. This procurement is crucial for environmental restoration efforts in the region and is open to all responsible sources, with a requirement for 100% performance and payment bonds. Interested contractors must be registered in the System for Award Management (SAM) and can expect the solicitation to be posted on or around January 3, 2025, with proposals due approximately by February 3, 2025. For inquiries, contact Rosana Yousef Goarji at RYousefgoarji@usbr.gov or call 916-978-5004.
    J--Hidden Lake Septic System Kenai NWR Alaska
    Buyer not available
    The U.S. Department of the Interior, through the U.S. Fish and Wildlife Service (FWS), is seeking proposals for the installation of a new septic system at Hidden Lake within the Kenai National Wildlife Refuge in Alaska. This project, designated as a Total Small Business Set-Aside under NAICS code 238910, involves the complete demolition of the existing septic system and the construction of a new system compliant with state regulations, with a budget estimated between $250,000 and $500,000. The initiative is crucial for maintaining the functionality and environmental safety of recreational facilities, enhancing visitor experiences while adhering to federal environmental standards. Interested contractors must submit their proposals electronically by March 7, 2025, and are encouraged to contact Johnny Luang-Khot at johnnyluang-khot@fws.gov or 703-358-2313 for further details.
    Z--Folsom Right Wing Dam Ditch Bypass Modifications
    Buyer not available
    The U.S. Department of the Interior, Bureau of Reclamation, is soliciting bids for the Folsom Right Wing Dam - North Fork Ditch Bypass Modification project, designated as a Total Small Business set-aside. The project aims to enhance the safety and functionality of the Folsom Dam system through significant engineering modifications, including the installation of drainage systems and inspection wells to mitigate seepage-induced erosion. With an estimated project cost between $5 million and $10 million, contractors are required to submit sealed offers by February 21, 2025, with the performance period set from April 25, 2025, to April 30, 2026. Interested parties can contact Ronald Gamo at rgamo@usbr.gov or by phone at 916-978-4304 for further information.