Z--2025 PHILLIPS RESERVOIRS REPAIR
ID: 140L3625B0001Type: Presolicitation
Overview

Buyer

INTERIOR, DEPARTMENT OF THEBUREAU OF LAND MANAGEMENTMONTANA STATE OFFICEBILLINGS, MT, 59101, USA

NAICS

Other Heavy and Civil Engineering Construction (237990)

PSC

REPAIR OR ALTERATION OF DAMS (Z2KA)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)
Timeline
    Description

    The Bureau of Land Management (BLM) under the Department of the Interior is soliciting bids for the 2025 Phillips Reservoirs Repair project, which involves critical construction activities to repair four reservoirs located in South Phillips County, Montana. The project aims to address significant structural issues, including spillway reconstruction and dam embankment repairs, to prevent potential failures of the Taint, Paleface, Whiteface, and Wapati Reservoirs. This initiative is vital for maintaining dam safety and environmental stewardship, ensuring the integrity of public lands. Interested contractors must submit sealed bids by January 15, 2025, with an estimated contract value between $250,000 and $500,000, and are encouraged to contact Christine Mundt at cmundt@blm.gov or (406) 896-5030 for further information.

    Point(s) of Contact
    Files
    Title
    Posted
    The document is a solicitation for bids regarding the renovation of the Phillips Reservoirs in South Phillips County, Montana, issued by the Bureau of Land Management (BLM). It outlines the project scope, specifying that it involves construction, alteration, or repair work on four reservoirs located approximately 60 miles south of Malta, Montana. Key details include the estimated budget range of $250,000 to $500,000 and a total small business set-aside procurement status. Potential contractors must begin work within 10 calendar days after the award notice and complete it within 120 calendar days. Offerors are required to submit sealed bids by January 15, 2025, and must furnish any necessary performance and payment bonds. The document emphasizes adherence to all work requirements and solicitation provisions. The NAICS code for the project is listed as 237990, with a small business size standard of $45 million. The BLM is responsible for overseeing the project, ensuring compliance with federal regulations, and facilitating an open bidding process. This solicitation represents a structured approach to awarding federal contracts while supporting small businesses in government projects.
    The 2024 Phillips Reservoirs Repair project in Phillips County, Montana, involves significant repair initiatives for Taint, Paleface, Whiteface, and Wapati Reservoirs under the Bureau of Land Management's supervision. Key tasks include dewatering, excavation, installation of new culverts, and erosion control measures using HDPE materials and Flexamat Plus. Specific actions for each reservoir focus on restoring structural integrity and preventing erosion, including grading embankments and replanting disturbed areas with perennial vegetation. The document outlines various sections covering general requirements, site work, permits, project meetings, and quality assurance, establishing responsibilities and procedures for all phases of construction. Contractors are required to adhere to environmental protection guidelines, specifically concerning wildlife and stormwater management. Emphasis is placed on compliance with quality standards and the necessity for required permits, including the Stormwater Pollution Prevention Plan. This detailed approach ensures systematic execution of repairs and adherence to ecological considerations, highlighting the government's commitment to maintaining dam safety and environmental stewardship throughout the project's duration.
    The Bureau of Land Management, part of the U.S. Department of the Interior, has submitted a detailed plan involving the construction of new spillways and erosion control measures at various reservoirs, including Taint, Paleface, Whiteface, and Wapati. The main objectives are to replace existing culverts, enhance primary and secondary spillways, and stabilize dam embankments to prevent erosion. Key tasks include excavating headcuts, building up earthen embankments using borrow materials, and installing Class II riprap for permanent erosion control. Specific notes detail the dimensions and placement of new infrastructure, such as a larger 36" HDPE culvert, and the proper installation of geotextile fabrics under riprap to bolster soil stability. The project underscores the government’s commitment to maintaining and improving public lands while adhering to safety and environmental regulations. The document serves as a comprehensive framework for contractors involved in the reclamation and construction phases, ensuring alignment with federal guidelines for land management and infrastructure development.
    The document outlines wage determinations for heavy construction projects governed by the Davis-Bacon Act in Montana's various counties. It specifies minimum wage rates under two Executive Orders: Executive Order 14026 requires contractors to pay at least $17.20 per hour for contracts entered into or renewed after January 30, 2022, while Executive Order 13658 applies to contracts awarded between January 1, 2015, and January 29, 2022, stipulating a minimum of $12.90 per hour. The document lists wage rates for various construction roles, including electricians, power equipment operators, ironworkers, carpenters, laborers, and welders, with details about their corresponding fringe benefits. It emphasizes the necessity for contractors to comply with these wage rates and outlines the appeals process for disputes about wage determinations, including contacting the Wage and Hour Division of the Department of Labor. This file serves as an essential reference for contractors responding to federal and state RFPs, ensuring compliance with labor standards and supporting fair labor practices in construction projects across Montana.
    The Bid Bond form, Standard Form 24 (Rev. 10/2023), is utilized in federal solicitations requiring a bid guaranty. It ensures that the principal (the bidder) and surety(ies) are financially bound to the U.S. Government for a specified penal sum, signifying their commitment upon successful bid acceptance. The document outlines the responsibilities of the principal to execute contractual documents and provide necessary bonds within set timeframes. The sureties must be approved by the Department of the Treasury, and their financial liability can be structured through co-surety arrangements as long as the total equals the bond amount. It also details execution requirements, including the need for corporate seals and signatures, establishing a legal obligation for the principal and surety(ies) under specific conditions. This form serves as a fundamental tool in the procurement process, ensuring compliance and accountability in government contracts.
    The document outlines the Performance Bond requirements for government contracts, specifically Standard Form 25, which is mandated for federal and state contracts. The bond serves as a financial guarantee that the contractor (Principal) will fulfill all obligations as per the contract terms. It includes signatures from the Principal and various Sureties, affirming their joint responsibility for the bond amount in case of default. The bond stipulates that its obligation becomes void if the Principal performs the contract adequately and pays relevant taxes. The form details necessary instructions for completion, including legal names, liability limits, and corporate seals, ensuring compliance with the Department of Treasury's regulations regarding approved sureties. This document is critical in safeguarding government interests during contract execution, reinforcing accountability among contracting parties. Ultimately, it supports the effective oversight of federal grants and RFPs by ensuring that contractors meet their commitments.
    The document outlines the requirements for a payment bond, typically used in federal contracts to protect individuals supplying labor and materials. It is a legal form that binds the Principal and Surety(ies) to pay a specified penal sum to the United States Government, ensuring that obligations to workers and subcontractors are met. The form includes spaces for the Principal's name, type of organization, contract details, and surety information, emphasizing that the liability limit must be indicated. Additional instructions clarify the importance of adherence to approved surety guidelines, especially regarding the limits in co-surety arrangements. The document also notes the need for corporate seals and signatures from authorized representatives, ensuring proper execution. Overall, this payment bond serves as an essential financial safeguard in government contracts, promoting accountability for contractual obligations between various parties involved.
    The document is a Release of Claims form from the United States Department of the Interior, pertinent to a specific federal contract. It requires the contractor to provide a release of all claims against the United States upon completion of the contract work and before receiving the final payment. The contractor agrees to release the United States from any debts, obligations, and claims related to the contract, with certain exceptions. The form includes sections for contractor information, signature, and certification if the contractor is a corporation, affirming that the release was executed properly. This document is a standard procedural requirement within federal RFPs and grants, ensuring that all claims are settled before the disbursement of final payment and protecting the government from future liabilities related to the contract. The structure emphasizes clarity in contractor obligations and outlines the legal discharge of claims against the United States, reflecting standard risk management practices in government contracting.
    The Bureau of Land Management (BLM) is preparing to solicit bids for the repair of four reservoirs in South Phillips County, Montana, specifically the Wapati, Taint, Paleface, and Whiteface Reservoirs, to prevent imminent failures. The primary work includes reconstructing spillways, repairing dam embankments, and implementing permanent erosion control measures. The solicitation is expected to be released on December 3, 2025, with bids due around January 8, 2025. The estimated project cost ranges from $250,000 to $500,000, and the contract will be set aside for small businesses under the NAICS code 237990. Prospective contractors are encouraged to inspect the reservoirs prior to bidding and participate in a scheduled site visit on December 12, 2024. The successful contractor must commence work within 10 days of receiving the notice to proceed and complete all tasks before November 15, 2025, with stipulated environmental considerations. Additionally, contractors must be registered in the System for Award Management (SAM) and are required to submit payment requests digitally through the U.S. Department of Treasury's Invoice Processing Platform. This project reflects the government's focus on infrastructure maintenance and disaster prevention in vulnerable areas.
    The document is a government solicitation for a construction project titled "Phillips Reservoirs Repair" in Phillips County, Montana, aimed at addressing necessary repairs to four reservoirs near Malta. The project is estimated to cost between $250,000 and $500,000 and is categorized as a Total Small Business Set-Aside procurement, adhering to NAICS Code 237990, with a small business size standard of $45 million. The contractor is expected to commence work within 10 calendar days following contract award, with a completion timeline negotiated between the government and the contractor. Offers must be sealed and submitted by a specified due date. Additionally, the requirement for performance and payment bonds is noted, underscoring the government's need for assurance of contract fulfillment. The solicitation outlines various stipulations regarding the bidding process, including submission guidelines and conditions under which offers will be rejected. This document serves as a formal request for proposals, guiding potential contractors in responding effectively while ensuring compliance with federal requirements.
    Lifecycle
    Title
    Type
    Similar Opportunities
    Z--Battle Creek - South Diversion Dam and Canal Removal
    Active
    Interior, Department Of The
    The Bureau of Reclamation, part of the Department of the Interior, is preparing to issue a Request for Proposal (RFP) for a firm fixed-price construction contract focused on the removal of the Battle Creek South Diversion Dam and associated canal. The project involves significant demolition work, including the dismantling of multiple diversion dams and the excavation and filling of the South Canal, with an estimated project cost ranging from $10 million to $15 million. This procurement is crucial for environmental restoration efforts in the region and is open to all responsible sources, with a requirement for 100% performance and payment bonds. Interested contractors must be registered in the System for Award Management (SAM) and can expect the solicitation to be posted on or around January 3, 2025, with proposals due approximately by February 3, 2025. For inquiries, contact Rosana Yousef Goarji at RYousefgoarji@usbr.gov or call 916-978-5004.
    Z--Folsom Right Wing Dam - North Fork Ditch Bypass
    Active
    Interior, Department Of The
    The Department of the Interior, specifically the Bureau of Reclamation, is preparing to solicit proposals for a firm fixed-price construction contract for modifications to the Folsom Right Wing Dam’s North Fork Ditch Bypass, with a focus on small business participation. The project involves critical tasks such as site preparation, removal of existing infrastructure, installation of drainage systems, and utility installations, with estimated costs ranging from $5 million to $10 million. This initiative underscores the government's commitment to enhancing infrastructure while supporting small businesses in significant construction projects. The solicitation, identified as 140R2025R0004, is expected to be posted on the Government Point of Entry around January 3, 2025, with proposals due by February 3, 2025; interested contractors must be registered in the System for Award Management (SAM) to qualify for bidding. For inquiries, contractors can contact Ronald Gamo at rgamo@usbr.gov or by phone at 916-978-4304.
    Y--Pre-Solicitation Notice - DEAN S. RECREATION SITE
    Active
    Interior, Department Of The
    The Department of the Interior, Bureau of Land Management (BLM), Montana State Office, is preparing to solicit proposals for the reconstruction of the Dean S. Recreation Site, which includes the construction of a new access road, parking area, camping sites, and supporting facilities in Custer County, Montana. The project entails building approximately 4,600 feet of access road, a parking area for 10 to 15 vehicles, double vault toilets, an RV Camp Host pad, and a walking trail system, all while adhering to environmental regulations and minimizing earth disturbance. This initiative aims to enhance recreational accessibility while preserving the natural environment, reflecting the government's commitment to improving public facilities. The estimated contract value ranges from $500,000 to $1 million, with proposals due around February 14, 2025. Interested parties should contact Jorge Alvarez at jalvarez@blm.gov or (854) 500-1840 for further information and must submit their responses by December 30, 2024.
    LaBarge Watershed Water Wells
    Active
    Interior, Department Of The
    The Department of the Interior, specifically the Bureau of Land Management, is soliciting bids for the LaBarge Watershed Water Wells construction project in Sublette County, Wyoming. This project involves the development of water supply facilities, with a firm fixed-price contract valued between $250,000 and $500,000, aimed exclusively at small businesses. The successful contractor will be responsible for drilling and constructing eight water wells, adhering to strict safety, environmental, and regulatory standards, with a completion timeline of 300 calendar days from the notice to proceed. Bids are due by January 13, 2025, and interested parties can contact Nathan Roush at nroush@blm.gov or (303) 236-2211 for further information.
    IRA DOTY/BADWATER FENCE
    Active
    Interior, Department Of The
    The Bureau of Land Management (BLM), under the Department of the Interior, is soliciting proposals for the removal and construction of approximately 18,051 linear feet of wildlife-friendly fencing as part of the Doty/Badwater Fence project in Carbon County, Wyoming. The project involves replacing existing fencing with a four-strand wire fence, including specific components such as steel line posts, wood stays, corners, H-braces, end panels, and gates, aimed at enhancing wildlife conservation and land management. This initiative reflects the government's commitment to infrastructure improvement and sustainable practices in public lands, with a contract value estimated between $25,000 and $100,000, set aside for small businesses. Interested contractors must submit their bids by January 10, 2025, and direct any inquiries to Huong Le at hle@blm.gov by December 27, 2024.
    Z--SPRNCA Boundary Fence Reconstruction, Phase II
    Active
    Interior, Department Of The
    The Bureau of Land Management (BLM) is seeking qualified contractors for the reconstruction of boundary fences within the San Pedro Riparian National Conservation Area (SPRNCA) in Cochise County, Arizona. This project encompasses five phases, totaling approximately 28.21 miles of fencing, aimed at conserving and enhancing the area's ecological values as mandated by Public Law 100-696. The work will involve clearing vegetation, installing T-posts and gates, and removing existing fencing materials, with a focus on minimizing ecological impact and adhering to wildlife-friendly standards. The estimated construction cost ranges from $1 million to $5 million, with a project duration of 455 calendar days following the notice to proceed. Interested bidders must qualify as small businesses under NAICS Code 238990 and are encouraged to contact Paula Johnson at pjohnson@blm.gov for further details, with proposals expected to be solicited around January 3, 2025.
    IRA WILLOW LAKE ELK FENCE
    Active
    Interior, Department Of The
    The Bureau of Land Management, part of the Department of the Interior, is soliciting quotes for the construction of the IRA Willow Lake Elk Fence project in Wyoming. The project involves the removal of approximately 3,500 linear feet of existing elk fencing that disrupts wildlife migration patterns and the installation of around 3,000 linear feet of new elk fencing, including structural components such as stress panels and metal gates. This initiative is crucial for wildlife management and habitat preservation, aligning with federal and state conservation goals. Interested contractors must submit their quotations by January 13, 2025, and direct any questions to Contract Officer Crystal Martinez at crystalm@blm.gov. The estimated contract value ranges from $25,000 to $100,000, with the performance period set from June 1, 2025, to October 1, 2025.
    MUDDY CREEK FENCE, WY
    Active
    Interior, Department Of The
    The Bureau of Land Management (BLM) is seeking quotations for a construction project to convert existing barbed wire fencing to a wildlife-friendly design along Muddy Creek in Sublette County, Wyoming. The project involves the removal and replacement of approximately 3.63 miles of fencing, with specific requirements for the new construction, including a 4-wire, all-wood post fence that accommodates wildlife crossings while ensuring livestock containment. This initiative is part of the BLM's commitment to enhancing land management practices and promoting ecological safety. Quotations must be submitted by January 13, 2025, and the contractor is expected to complete the work within 287 days after receiving the notice to proceed. Interested contractors can contact Jonathan Peterson at jrpeterson@blm.gov or by phone at 314-708-0329 for further details.
    Z--Reclamation - Interior Region 10 California - Grea
    Active
    Interior, Department Of The
    The Bureau of Reclamation, part of the Department of the Interior, is soliciting proposals for the B.F. Sisk Dam Safety of Dams (SOD) Modifications, Phase II project, located in California. This project aims to enhance dam safety through significant structural modifications, including the construction of shear keys, drainage systems, and monitoring systems for slope stability, with an estimated cost between $250 million and $500 million. The procurement is unrestricted, and contractors are required to adhere to strict environmental and labor standards, including compliance with the Davis-Bacon Act. Proposals must be submitted electronically by January 27, 2025, with a performance period extending from June 2, 2025, to June 2, 2028. Interested parties can contact Roxana Ahola at rahola@usbr.gov or by phone at 916-978-5549 for further information.
    F--PETROLEUM COUNTY NOXIOUS WEED INVENTORY & TREATMEN
    Active
    Interior, Department Of The
    The Bureau of Land Management (BLM) is soliciting proposals for the Petroleum County Noxious Weed Inventory & Treatment project in Montana, aimed at managing invasive weed species over a four-year period. The contractor will be responsible for systematically inventorying BLM-managed lands, mapping noxious weed infestations using GPS technology, and applying appropriate herbicides, with a focus on species such as sulphur cinquefoil and spotted knapweed. This project is critical for environmental conservation and compliance with federal regulations, ensuring effective management of noxious weeds in the region. Interested small businesses must submit their quotes by December 26, 2024, and can contact Christine Mundt at cmundt@blm.gov or 406-896-5030 for further information. The total contract value is capped at $9.5 million, with a performance period from May 15, 2025, to May 14, 2029.