The U.S. Department of the Interior, Bureau of Reclamation, is soliciting bids for the Hungry Horse Excitation System Replacement project located at the Hungry Horse Powerplant in Montana. This procurement, designated under solicitation number 140R1025B0003, is a total small business set-aside and involves the replacement of excitation system equipment, with an estimated contract value between $5 million and $15 million. The project is critical for maintaining the operational efficiency and reliability of the powerplant's electrical systems. Interested contractors must submit their bids by December 17, 2025, at 1:00 PM MDT, with all submissions required to be mailed to the Columbia Pacific Northwest Regional Office in Boise, ID, as electronic submissions will not be accepted. For further inquiries, contact Colby Clifford at cclifford@usbr.gov or by phone at 208-809-1372.

Classification Codes

NAICS Code
237990
Other Heavy and Civil Engineering Construction
PSC Code
Y1PZ
CONSTRUCTION OF OTHER NON-BUILDING FACILITIES

Solicitation Documents

17 Files
B0003_HH_Powerplant_Excitation_System_Replacement_1.pdf
PDF33457 KBNov 12, 2024
AI Summary
The U.S. Department of the Interior, Bureau of Reclamation is seeking bids for the replacement of the excitation system at the Hungry Horse Powerplant in Montana, under Solicitation No. 140R1025B0003. The project involves designing, furnishing, installing, testing, and commissioning fully digital excitation systems for four generator units. Key tasks include removing existing components, installing new systems, modifying generator configurations, and ensuring operational continuity. Contractors are required to provide their own personal protective equipment during site visits and adhere to safety regulations. A detailed price schedule outlines specific contract line items for service delivery, emphasizing that no partial bids will be considered. The document also sets forth strict requirements for project management, submittals, and the handling of project documentation through a Contract Document Management System. Moreover, the successful contractor must proactively collaborate with the Bureau to ensure timely completion while managing service interruptions and coordinating site access. This solicitation reflects the federal government's commitment to modernizing energy infrastructure and ensuring the continued functionality of vital power generation systems through stringent compliance and safety standards.
Hungry_Horse_Excitation_Q_A_Log_Government_Answer_(2)_0002.pdf
PDF146 KBDec 10, 2025
AI Summary
The document contains questions and answers regarding Solicitation 140R1025B0003 for the Hungry Horse Excitation project. Key points include clarifications on the scope of work, such as the relocation of the N4A panel (not included) and the requirement for a bid bond. The USBR will issue amendments to clarify that either fixed or draw-out SCR bridges are acceptable and that assembled 3-phase SCR modules should be complete for easy replacement. Significant changes are also forthcoming regarding the outage schedule, pushing back the dates for G1/G2 and G3/G4 by approximately one year due to equipment lead times. The contractor will likely be required to provide a qualified crane operator for exciter removal. Many questions regarding specific technical details, system preferences, interface wiring, and training requirements were met with the response that “the solicitation speaks for itself.” However, the government did confirm that facility staff would handle switching and unwatering of penstocks.
Clause_52_228-1_Bid_Guarantee_0002.pdf
PDF71 KBDec 10, 2025
AI Summary
This government file outlines Section L, "Instructions, Conditions, and Notices to Bidders," for a solicitation, focusing on the inclusion of FAR clause 52.228-1, "Bid Guarantee." This section is crucial for potential bidders in federal, state, or local RFPs as it details the mandatory requirements and conditions that must be met when submitting a bid, particularly regarding financial assurances. The specific mention of a bid guarantee indicates that the government agency is requiring bidders to provide a security deposit to ensure they will enter into the contract if awarded. This clause is a standard element in government contracting to protect the government's interests and ensure the seriousness of bids.
Sol_140R1025B0003_Amd_0006.pdf
PDF87 KBDec 10, 2025
AI Summary
Amendment 0006 to Solicitation 140R1025B0003, issued by the Bureau of Reclamation, Pacific Northwest Region, clarifies bid submission procedures and sets the bid opening details. The amendment emphasizes that electronic submissions (email, fax) are not permitted and will not be considered. All bids, amendments, modifications, and withdrawals must be mailed to the Columbia Pacific Northwest Regional Office in Boise, ID, and received by the bid opening date and time. The bid opening will occur on December 17, 2025, at 1:00 PM MD, in the Grand Coulee Conference Room 339 at 1150 N. Curtis Road, Boise, ID. A teleconference option is available for contractors not attending in person. The government does not intend to extend the bid date further, and all other solicitation terms and conditions remain unchanged. Sealed envelopes or packages adhering to bid submission procedures are required.
FAR_52_214-5_Submission_of_Bids_0006.pdf
PDF112 KBDec 10, 2025
AI Summary
The document, 140R1025B0003, pertains to the Hungry Horse Powerplant Excitation System Replacement Project in Montana. It outlines Section L,
Sol_140R1025B0003_Amd_0005.pdf
PDF82 KBDec 10, 2025
AI Summary
This document, Amendment of Solicitation/Modification of Contract 140R1025B0003, is issued by the Bureau of Reclamation, Pacific Northwest Region, Acquisition Management Division. Its primary purpose is to provide pictures of the possible location of a shaft brush, which was requested in a previous Question and Answer session. The amendment explicitly states that the government does not intend to extend the bid date further, and all other solicitation terms and conditions remain unchanged. Offers must acknowledge receipt of this amendment by completing and returning copies of the amendment, acknowledging it on each offer copy, or via separate communication referencing the solicitation and amendment numbers. Failure to acknowledge receipt by the specified time may result in the rejection of the offer. The effective date of this amendment is September 15, 2025.
Hungry_Horse_Excitation_Q_A_Log-Photos_(2)_0005.pdf
PDF2414 KBDec 10, 2025
AI Summary
No AI summary available for this file.
Sol_140R1025B0003_Amd_0004.pdf
PDF82 KBDec 10, 2025
AI Summary
Amendment 0004 to Solicitation No. 140R1025B0003, issued by the Bureau of Reclamation, Pacific Northwest Region, on September 15, 2025, provides updated specifications and clarifies the bid submission process. This amendment explicitly states that the government does not intend to extend the bid date further. Offerors must acknowledge receipt of this amendment by completing and returning copies, acknowledging receipt on their offer, or sending a separate communication referencing the solicitation and amendment numbers. Failure to acknowledge receipt by the specified deadline may result in the rejection of the offer. All other terms and conditions of the original solicitation remain unchanged.
Hungry_Horse_Excitation_Updated_Specifications_0004.pdf
PDF966 KBDec 10, 2025
AI Summary
This government file, Amendment No. P00004 for Solicitation No. 140R1025B0003, details the "Hungry Horse Powerplant Excitation System Replacement" project in Montana. It outlines specific requirements for the use of the project site, interruption of services, and a comprehensive list of submittals. Key aspects include guidelines for using government land, managing construction facilities, and adhering to strict access and working hour protocols. The document also specifies procedures for requesting and scheduling service interruptions, with defined windows for generator outages in 2027 and 2028. A substantial portion is dedicated to submittal requirements, categorizing them as "Approval" or "Informational" and detailing formats, due dates, and responsible codes for various documents such as safety plans, quality control plans, environmental controls, and technical drawings. The use of government cranes and elevators is also covered, emphasizing operator qualifications, safety, and scheduling. The overall purpose is to provide clear, detailed instructions and requirements for contractors undertaking this federal project.
Sol_140R1025B0003_Amd_0003.pdf
PDF82 KBDec 10, 2025
AI Summary
Amendment 0003 to Solicitation 140R1025B0003, issued by the Bureau of Reclamation, Pacific Northwest Region, on September 15, 2025, serves to incorporate FAR 52.228-1 Bid Guarantee in full text. This amendment clarifies that the bid date will not be extended further. Offerors must acknowledge receipt of this amendment by completing and returning copies of the amendment, acknowledging it on their offer, or sending a separate communication referencing the solicitation and amendment numbers. Failure to acknowledge receipt by the specified time may result in the rejection of the offer. All other terms and conditions of the original solicitation remain unchanged. The document outlines procedures for modifying submitted offers in light of this amendment, emphasizing timely submission of any changes.
Clause_52_228-1_Bid_Guarantee_Full_Text_0003.pdf
PDF118 KBDec 10, 2025
AI Summary
The
Sol_140R1025B0003_Amd_0002.pdf
PDF82 KBDec 10, 2025
AI Summary
Amendment 0002 to Solicitation 140R1025B0003, issued by the Bureau of Reclamation, Pacific Northwest Region, modifies the original solicitation. The primary purposes of this amendment are to provide answers to submitted questions, advise of an upcoming amendment for updated specifications, change the bid open date from December 16, 2025, to December 17, 2025 (time and location remain unchanged), and incorporate FAR 52.228-1 Bid Guarantee. All other terms and conditions of the solicitation remain unchanged. Offerors must acknowledge receipt of this amendment by one of the specified methods prior to the revised bid opening date.
Hungry_Horse_Excitation_Q_A_Log-Photos_0002.pdf
PDF8265 KBDec 10, 2025
AI Summary
The provided file appears to be a list of visual inspection points or locations within a facility, likely for maintenance, assessment, or inventory purposes. The entries, such as "Behind C4C," "Grounding transformer - View 1," "N4A heater MCC behind G4," "Wall behind C1C," "Wall behind G1," and "Wall behind G2," suggest a focus on specific equipment, infrastructure, and structural elements. This type of document is common in government RFPs or facility management grants where detailed site assessments or work specifications are required. The purpose of this file is to document or specify locations within a building or site, possibly for a maintenance project, an upgrade, or an environmental assessment. It serves as a reference for technicians or contractors to identify areas needing attention or work, indicating a need for detailed site understanding in a potential government contract or grant application.
Sol_140R1025B0003.pdf
PDF104 KBDec 10, 2025
AI Summary
The Bureau of Reclamation is issuing a Request for Proposal (RFP) for the Hungry Horse Excitation System Replacement project in the Pacific Northwest Region. This solicitation, number 140R1025B0003, is 100% set-aside for small businesses under NAICS 237990, with an anticipated magnitude of $5,000,000.00 to $15,000,000.00. Key dates include a site visit on October 1, 2025, a deadline for questions seven days after the site visit, and an offer due date of December 16, 2025, at 1300 MDT. On-site work must be completed within 1096 calendar days after the notice to proceed. Offerors must submit a Federal Non-Disclosure Agreement to receive sensitive project drawings. The bid opening will occur at the Columbia Pacific Northwest Regional Office in Boise, ID, with a teleconference option available.
Hungry_Horse_Excitation_System_Replacement_Sol_No__140R1025B0003.pdf
PDF34449 KBDec 10, 2025
AI Summary
The U.S. Department of the Interior, Bureau of Reclamation, is soliciting bids for the Hungry Horse Excitation System Replacement project in Hungry Horse, Montana. This solicitation, number 140R1025B0003, is a 100% small business set-aside under NAICS code 237990 (Other Heavy and Civil Engineering Construction) with a $39.5 million size standard. The project involves replacing excitation system equipment at the Hungry Horse Powerplant. A site visit is strongly encouraged for October 1, 2025, with specific safety gear required. Proposals are to be delivered as per Standard Form 1442. The contract includes provisions for safety, health, environmental controls, and specific electrical and power generation work, including the excitation system. Bidders must submit a Federal Non-Disclosure Agreement to access drawings containing sensitive information. Bids will be publicly opened on December 2025.
Sol_140R1025B0003_Amd_0001.pdf
PDF82 KBDec 10, 2025
AI Summary
This amendment (140R1025B0003/0001) to a solicitation by the Bureau of Reclamation, Pacific Northwest Region, modifies the original document by distributing the pre-bid site visit sign-in sheet and extending the deadline for written questions to October 23, 2025, at 2:00 PM MST. The effective date of this amendment is September 15, 2025. All other terms and conditions of the solicitation remain unchanged. Offerors must acknowledge receipt of this amendment by completing items 8 and 15 and returning copies, by acknowledging receipt on each offer copy, or via separate communication referencing the solicitation and amendment numbers. Failure to acknowledge receipt by the specified time and date may result in the rejection of the offer.
Pre-bid_Site_Visit_Sign-in_Sheet_0001.pdf
PDF559 KBDec 10, 2025
AI Summary
No AI summary available for this file.

Related Contract Opportunities

Project Timeline

postedOriginal Solicitation PostedNov 12, 2024
amendedAmendment #1Oct 14, 2025
amendedAmendment #2Nov 20, 2025
amendedAmendment #3Nov 20, 2025
amendedAmendment #4Dec 2, 2025
amendedAmendment #5Dec 4, 2025
amendedLatest AmendmentDec 10, 2025
deadlineResponse DeadlineDec 17, 2025
awardAwarded to BURKE ELECTRIC, L.L.C. Tukwila WA USAMar 5, 2026
expiryArchive DateJan 1, 2026

Agency Information

Department
INTERIOR, DEPARTMENT OF THE
Sub-Tier
BUREAU OF RECLAMATION
Office
PACIFIC NW REGION PN 6615

Point of Contact

Name
Clifford, Colby

Official Sources