NM NP MULTI PMS(1), Pavement Preservation New Mexico
ID: 69056724R000026Type: Presolicitation
Overview

Buyer

TRANSPORTATION, DEPARTMENT OFFEDERAL HIGHWAY ADMINISTRATION690567 WESTERN FEDERAL LANDS DIVVANCOUVER, WA, 98661, USA

NAICS

Highway, Street, and Bridge Construction (237310)

PSC

CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS (Y1LB)
Timeline
    Description

    The Department of Transportation, through the Federal Highway Administration, is soliciting proposals for the NM NP MULTI PMS(1) Pavement Preservation project in New Mexico, which encompasses various national parks and monuments. The project aims to perform essential roadway maintenance, including crack sealing, patching, chip sealing, micro surfacing treatments, and pavement marking across approximately 33.49 miles of paved routes. This initiative is crucial for maintaining safe and accessible infrastructure within the National Park System, ensuring the preservation of historical sites while enhancing visitor experiences. Interested contractors should note that the estimated contract value ranges from $5 million to $10 million, with a tentative completion date set for Winter 2025. For inquiries, contact the Contracts G. Office at contracts@mail.wfl.fhwa.dot.gov or call 360-619-7520.

    Point(s) of Contact
    Contracts G. Office
    (360) 619-7520
    (360) 619-7932
    contracts@mail.wfl.fhwa.dot.gov
    Files
    Title
    Posted
    The document outlines a proposed project for the resurfacing of roads and bridges managed by the Western Federal Lands Highway Division under the Federal Highway Administration. It includes detailed specifications for construction methods and materials for multiple national parks and monuments in New Mexico, emphasizing pavement preservation techniques. Key aspects cover various types of asphalt concrete, crack sealing, chip sealing, and micro surfacing. The outlined project locations include significant sites like White Sands National Park, Carlsbad Caverns, and several national monuments. The project also encompasses a comprehensive bid schedule and estimated quantities required for the tasks, detailing mobilization, traffic control, and construction quality controls. The plan includes maps specifying project areas and construction limits, expected equipment, and labor requirements. Overall, the document serves as a federal Request for Proposal (RFP) aimed at ensuring proper preservation and maintenance of vital infrastructure within protected areas, reflecting the government's commitment to sustainable and effective transportation systems while protecting cultural heritage sites.
    The document outlines plans for a pavement preservation project within several national parks and monuments in New Mexico, managed by the Western Federal Lands Highway Division under the Federal Highway Administration, U.S. Department of Transportation. The project includes resurfacing and maintenance of roads and parking areas with different techniques like micro surfacing, chip sealing, and fog sealing, aimed at enhancing road safety and longevity. Key locations involved include White Sands National Park, Gila Cliff Dwellings, Pecos National Historical Park, and others, with specific attention given to bridge repairs and drainage improvements. Each area map details roads and parking installations that will undergo preservation practices, ensuring compliance with both federal standards and environmental considerations. The document emphasizes a strategic approach to maintain access for visitors while preserving the integrity of historic sites. The project, described as preliminary and not yet for construction, underlines the commitment to infrastructure improvement in national parks, enhancing both visitor experience and environmental stewardship in alignment with governmental funding and grant initiatives.
    The technical memorandum by Shannon & Wilson details the geotechnical exploration for the pavement preservation project at Pecos National Historical Park's Visitor Center parking lot in San Miguel County, New Mexico. Groundwater issues have led to asphalt damage and safety concerns due to standing water during freezing temperatures. An exploration program involved drilling eight borings to assess subsurface conditions, revealing layers of granular fill with moisture entrapment beneath asphalt. A subsurface drainage system is recommended to alleviate groundwater accumulation, which may consist of a perforated pipe in a trench or an aggregate base layer beneath the pavement. Proper drainage is crucial due to fluctuating groundwater levels, influenced by seasonal changes. The memorandum concludes that a well-implemented drainage plan will improve pavement longevity and maintain safety standards for the parking facility. This document is significant as it informs federal and state compliance with infrastructure maintenance projects funded through grants and RFP processes, emphasizing the necessity for geotechnical evaluations in project planning.
    The document is an amendment to the solicitation for the Pavement Preservation Project in New Mexico (NM NP MULTI PMS(1)). It updates the bid schedule by introducing new bid items related to the removal and installation of pipe culverts along with detailed descriptions and quantities. The amendment also specifies modifications to special contract requirements regarding the schedule for completion, work limitations during missile flight closures, and winter shutdown protocols. Additionally, it outlines new construction and material specifications, particularly concerning metal pipe culverts and drainage systems, ensuring compliance with government standards. Contractors are directed to acknowledge amended terms when submitting tenders. The overarching purpose of this amendment is to clarify technical requirements and terms for construction bids related to roadway preservation, reflecting the federal government's process for managing public infrastructure contracts effectively.
    The FLH Bridge Oversized/Overweight Permit Load Request is a standardized application form used for requesting permits for the transport of oversized or overweight loads. Key components include the applicant's details (name, company, contact information), a description of the load, and the intended route of movement. Applicants must provide specific measurements regarding the vehicle configuration, including width, height, length, and gross weight. Additionally, an Axle table must detail axle numbers, spacing, weight per axle, and tire counts. The form features a review process where submitted applications are either approved or denied, with conditions outlined for each. Notably, it emphasizes the importance of legibility and completeness, indicating that incomplete applications will be returned for correction. This document plays a crucial role in ensuring compliance with transport regulations, thereby facilitating safe and efficient movement of heavy loads on federal, state, and local roadways. Overall, it is designed to streamline the permit application process while ensuring necessary safety and structural considerations are met.
    The Bridge Inspection Report for the Pueblo Bonito Bridge, located over Chaco Wash in Chaco Culture National Historical Park, was executed by the Federal Highway Administration on May 17, 2022. The bridge, constructed in 1991 and spanning 190 feet, is a prestressed concrete multi-beam structure. The overall condition is assessed as good to fair, with notable issues such as extensive cracking in the concrete deck, transverse cracks with efflorescence, and moderate settlement of the asphalt approaches. Recommendations for maintenance include repairing erosion at wingwalls and the installation of a waterproofing membrane on the deck, estimated to cost $47,500. The report categorizes the structural improvement urgency as minor (Priority D), suggesting preventive maintenance to avoid critical deterioration. The inspection further details specific findings, such as minor spalling and cracking throughout the structure, which should be monitored in future assessments. This comprehensive inspection aligns with government protocols for bridge safety, emphasizing the importance of regular assessments and proactive repairs to ensure infrastructure integrity within federally managed areas.
    The Chaco Wash Bridge - Fajada inspection report, prepared by the Federal Highway Administration, assesses the bridge's condition as of May 18, 2022. This prestressed concrete channel beam bridge, built in 1975 and reconstructed in 1991, is located on State Highway 57 in New Mexico. The inspection identified the structure as being in fair condition, with significant issues including cracking in the abutment walls and pier caps, accumulation of debris in the expansion joints, and missing hardware on the railing system. The report recommends maintenance actions totaling approximately $15,000, highlighting the need for debris clearing, replacement of missing rail bolts, and reattachments of guardrails. Additionally, the structure’s bearing pads show signs of distortion, yet no immediate replacements are required. The report advises the necessity for ongoing monitoring and states previous recommendations for extending deck drains have been reversed due to their ineffective positioning. The inspection underscores the importance of preventative measures to avert future structural failures, with strategic guidance for future work amidst compliance and safety assessments. This report serves as a critical resource for state and federal infrastructure planning and funding initiatives aimed at maintaining transportation safety and structural integrity within historical guidelines.
    The Gallo Wash Bridge Inspection Report, prepared by the Federal Highway Administration on May 18, 2022, evaluates the condition of a double barrel corrugated steel plate arch culvert located at Chaco Culture National Historical Park, New Mexico. The structure was assessed to be in fair overall condition, presenting issues like cracking and spalling of concrete patches on headwalls, widespread corrosion of steel barrels, minor galvanizing loss, and a buildup of tumbleweeds upstream. While the structure does not require immediate corrective measures, ongoing monitoring is advised, along with recommendations to remove tumbleweeds and apply engineered riprap to manage scour holes. The preliminary cost for maintenance and rehabilitation is estimated at $24,000, with maintenance prioritized as “minor.” This inspection is essential for maintaining roadway safety and compliance with structural management protocols, ensuring protection of both the infrastructure and the surrounding historical significance of the park.
    The Bridge Inspection Report for the Forked Lightning Ranch Bridge, conducted by the Federal Highway Administration on May 17, 2022, outlines the structural and safety conditions of the bridge located in Pecos National Historical Park, New Mexico. The bridge, built in 1950 and reconstructed in 1999, is primarily a glue-laminated timber multi-beam structure in fair overall condition. Noted issues include deteriorated running boards, weathered decking, and cracks in the abutments and piers. Minor scour holes and debris were observed at piers, indicating ongoing concerns. The inspection recommended immediate repairs to prevent further deterioration, including tightening or replacing timber runners, repainting beams, and addressing the PVC conduit issues. The total estimated cost for necessary maintenance is approximately $18,500. The report emphasizes the importance of ongoing monitoring and suggests replacing the timber rail with a system that meets current safety standards due to insufficient strength to redirect errant vehicles. The inspection's findings guide future maintenance and budget considerations, reflecting the government's commitment to infrastructure safety and preservation.
    The report focuses on the Federal Highway Administration's (FHWA) Road Inventory Program (RIP) Cycle 6 assessment of paved roads and parking areas at the Aztec Ruins National Monument in New Mexico. It details the methodology used to inventory and evaluate the condition of approximately 5,700 miles of paved surfaces within the National Park System. This assessment employs both automated data collection vehicles and manual ratings to determine the Pavement Condition Rating (PCR), which informs future maintenance and rehabilitation priorities. Key findings include an introduction to the historical context of the RIP, outlining its evolution since the mid-1970s, and a summary of condition ratings, where areas are categorized as excellent, good, fair, or poor based on specific metrics for road surface distresses. Additionally, the report discusses improvements made to the rating methodologies, emphasizing more accurate assessments of road conditions. It serves not only as a record of current road conditions but also sets the groundwork for identifying and prioritizing necessary maintenance actions to preserve and enhance the infrastructure supporting visitor access to the monument efficiently. This document is integral to ongoing efforts to ensure the safety and usability of national park roads.
    The Federal Highway Administration (FHWA) conducts the Road Inventory Program (RIP) to assess and document the conditions of paved routes within the National Park System, including Carlsbad Caverns National Park. This report represents the findings from Cycle 6 of the program, which utilizes both automated and manual methods for evaluating road conditions. The assessments help prioritize maintenance and rehabilitation efforts for the park's road network, consisting of approximately 5,700 miles of paved roads and parking areas. The report details a historical overview of the RIP, including previous cycles and legislative mandates that shaped the program. Key findings include condition ratings for various routes and parking areas, utilizing a Pavement Condition Rating (PCR) system. The documented conditions aim to support future infrastructure maintenance decisions and enhance the overall management of transportation facilities within the National Park System. With ongoing assessments, the FHWA aims to provide updated information that contributes to a comprehensive pavement management system, ensuring optimal resource allocation for road maintenance and upgrades.
    The document presents the results of the Cycle 6 Road Inventory Program (RIP) conducted by the Federal Highway Administration (FHWA) for Capulin Volcano National Monument, New Mexico. It outlines the condition assessment of paved roads and parking areas, utilizing both automated inspection vehicles and manual ratings. The document details the methodology behind the assessment, including historical context for the program, which began in the 1970s, and its evolution through various cycles with a focus on developing a comprehensive pavement management system. Cycle 6 includes evaluations of approximately 5,700 miles of paved roads and parking areas in all parks, emphasizing improved predictive capabilities for future maintenance and interventions based on current conditions. The report highlights the significance of pavement condition ratings (PCR), offering a categorization system to prioritize maintenance actions. Additionally, it provides detailed maps, condition summaries, and recommendations for treatments tailored to specific road conditions. Ultimately, the report serves as a vital tool for managing the infrastructure of national park roadways, ensuring safety and accessibility, and guiding federal investments in road repair and maintenance projects.
    The report prepared by the Federal Highway Administration (FHWA) discusses the Cycle 6 assessment of paved roads and parking areas in the Chaco Culture National Historical Park as part of the Road Inventory Program (RIP). This program, initiated in the 1970s, evaluates the condition of road infrastructure to prioritize maintenance and rehabilitation efforts across the National Park System. The assessment utilized advanced automated technology and manual inspections to gauge the condition of approximately 5,700 miles of paved roads and parking areas, with additional focus on primary road routes in large parks. Cycle 6 of the RIP, initiated in 2014 and expected to conclude by 2020, aims to collect up-to-date condition data and enhance the overall pavement management system for better forecasting of infrastructure needs. Historical context is provided, detailing previous cycles of data collection that have contributed to the understanding of maintenance requirements. The report concludes with an invitation for feedback directed to the national RIP Coordinator, reflecting a professional commitment to continuous improvement and informed infrastructure management for national parks.
    The Federal Highway Administration (FHWA) Road Inventory Program (RIP) assesses the condition of paved roads and parking areas within the National Park System, particularly focusing on El Malpais National Monument in New Mexico. The Cycle 6 report details the results of this comprehensive inventory, conducted using both automated inspection vehicles and manual assessments. The inventory covers approximately 5,700 miles of paved routes and parking lots, aiming to establish a pavement management system that prioritizes maintenance and rehabilitation projects. Key data collected includes pavement condition ratings based on various distress types, surface condition ratings (SCR), and extensive methodologies for calculating pavement condition ratings (PCR). The assessment categorizes pavements into four ratings: Excellent, Good, Fair, and Poor, each designating specific maintenance required. Since the program began in the 1970s, it has evolved to incorporate technological advances in data collection and condition assessment methodologies, with a clear focus on improving future road conditions and facilitating efficient resource allocation. This document is essential in guiding federal and state entities in their planning and funding decisions for road maintenance projects, ensuring sustainable infrastructure management across national parks while enhancing visitor safety and accessibility.
    The document presents the Cycle 6 evaluation of paved routes and parking areas within El Morro National Monument, conducted by the Federal Highway Administration (FHWA) as part of the Road Inventory Program (RIP). It outlines the assessment methodology employing both automated and manual inspection techniques to measure pavement conditions, informing maintenance and rehabilitation priorities for over 5,700 miles of park roads. The report highlights the program’s history, tracking inventories and inspections from the mid-1970s to the present, detailing the ongoing improvements in data collection and evaluation methods. Key findings include comprehensive pavement condition ratings indicating areas needing preventive maintenance or substantial rehabilitation. Notably, it emphasizes the importance of accurate data in effectively managing national parks' infrastructure, aligning with legal mandates for maintaining transportation facilities. The findings are critical for state and local transportation planning, supporting RFP processes for future grants and maintenance projects. By ensuring rigorous assessment and management of road conditions, the FHWA aims to enhance safety and accessibility for park visitors while optimally allocating federal resources for road infrastructure.
    The Federal Highway Administration (FHWA) conducted Cycle 6 of the Road Inventory Program (RIP) focused on evaluating paved routes and parking areas within the Fort Union National Monument, New Mexico. This comprehensive assessment aims to inventory conditions using both state-of-the-art automated vehicles and manual evaluations to prioritize maintenance and rehabilitation efforts for the National Park Service (NPS). The report details the methodology for data collection, identification of highway conditions, and the Pavement Condition Rating (PCR) used to classify the quality of surfaces—ranging from excellent to poor—based on specific distress indices such as cracking and roughness. Cycle 6 commenced in 2014, covering approximately 5,700 miles of paved roads in various parks, with the objective of improving pavement management through accurate data reporting and future condition forecasting. The report underscores the collaborative effort by both the FHWA and NPS to enhance road maintenance strategies, incorporate technological advancements in data collection, and ensure the safety and efficiency of park roadways for visitors. The findings serve as a guide for necessary interventions and funding priorities, contributing to effective infrastructure management within the National Park System.
    The Federal Highway Administration (FHWA) prepared a report on the Road Inventory Program (RIP) for the Gila Cliff Dwellings National Monument, documenting the condition of paved routes within the park. This report, resulting from Cycle 6 of the RIP, details the assessment process, which utilized advanced pavement inspection technology and manual evaluations to analyze all paved roads and parking areas. The data collected helps prioritize maintenance and rehabilitation efforts based on current pavement conditions. Cycle 6, spanning 2014 to 2020, aims to assess all paved roads (approximately 5,700 miles) across the National Park System, producing updated condition data that informs more accurate pavement performance predictions. The report includes various appendices, such as condition rating methodologies, route maps, and detailed ratings for specific routes and paved parking areas. The overall goal of the RIP is to maintain and improve the infrastructure of the National Park System, ensuring safety and accessibility for visitors while supporting long-term environmental sustainability. This comprehensive assessment plays a crucial role in federal transportation planning and resource allocation for park maintenance projects.
    The Federal Highway Administration (FHWA) conducted a Road Inventory Program (RIP) to assess the condition of paved roads and parking areas within the National Park System, specifically focused on Cycle 6, which spans from 2014 to 2020. This report, finalized in July 2017, utilizes automated vehicle inspections alongside manual methods to rate road conditions across approximately 5,700 miles of primary park routes. Key findings include a detailed methodology for evaluating pavement condition ratings (PCR) and recommendations for maintenance based on different severity levels. The document outlines the extensive history of the RIP, established in the mid-1970s, and details the evolution of the data collection methodologies aimed at improving maintenance strategies. Each road's condition is rated on a scale from "Excellent" to "Poor," guiding federal funding and resource allocation for future projects. The report emphasizes compliance with recent legislative amendments that direct the FHWA and National Park Service (NPS) to maintain a comprehensive inventory of transportation infrastructure needs. Ultimately, this assessment aims to enhance the overall safety and accessibility of roads within national parks, ensuring effective use of public funds for maintenance and rehabilitation projects.
    The Federal Highway Administration (FHWA) conducted a Cycle 6 Road Inventory Program (RIP) assessment of paved roads and parking areas in Pecos National Historical Park, New Mexico, resulting in this comprehensive report. It details the condition of approximately 5,700 miles of NPS roads and outlines methodologies for data collection, including automated and manual inspections. The assessment aims to prioritize maintenance and rehabilitation projects, utilizing a Pavement Management System for efficient resource allocation. The report includes an overview of the RIP's history, participation of parks over various cycles, and insights into pavement conditions through a Pavement Condition Rating (PCR) system. Key findings are organized into sections, including route inventories, condition summaries, and methodology descriptions. The document provides thorough guidance on interpreting the ratings, including proactive maintenance strategies tailored to specific road conditions and needs. Overall, this report serves as a vital resource for the management of the National Park System's paved infrastructure, guiding decisions on maintenance priorities and ensuring the reliable assessment of roadway conditions to enhance public safety and accessibility.
    The Federal Highway Administration's (FHWA) Road Inventory Program (RIP) assesses the condition of paved roads and parking areas within the National Park Service (NPS). The Cycle 6 report for the Petroglyph National Monument, dated November 2017, outlines the results of inspections conducted between 2014 and 2020 using both automated and manual assessment methods. The goal of the RIP is to identify surface deficiencies and establish maintenance priorities for park roads and parking lots. The report details the inventory of approximately 5,700 miles of paved roads, emphasizing the tracking of conditions to inform future maintenance and rehabilitation projects. Historical context is provided on the development of the program since the 1970s, highlighting legislative changes that have shaped the management of park infrastructure. Final assessments include condition ratings and detailed evaluation sheets for various routes within the park, with specific indices for evaluating pavement conditions. The report serves as a critical tool for ensuring the longevity and accessibility of highway systems within federal lands, reinforcing the commitment to preserving infrastructural integrity for public use.
    The Federal Highway Administration (FHWA) conducted a comprehensive Road Inventory Program (RIP) assessment of paved routes at Salinas Pueblo Missions National Monument as part of Cycle 6. This report provides the condition ratings of all roads and parking areas, aiding in prioritizing maintenance and rehabilitation projects. The assessment utilized both automated and manual rating methods, contributing to a management system that estimates future road conditions across approximately 5,700 miles of National Park Service (NPS) paved routes. Following its inception in the mid-1970s, the RIP has undergone several cycles, with Cycle 6 commencing in 2014 and expected to encompass all NPS parks served by paved assets. Key findings highlight the significance of continuous assessment for effective pavement management, ensuring timely repairs based on the detailed Pavement Condition Rating (PCR) system. The report contextualizes historical data for resource allocation, validation of treatment effectiveness, and the determination of future infrastructure needs, illustrating FHWA and NPS's collaborative approach to maintaining national park infrastructure and enhancing travel safety.
    The Federal Highway Administration's (FHWA) Cycle 6 report details the Road Inventory Program (RIP) results for paved roads and parking areas at White Sands National Monument, dated July 2017. This assessment utilized advanced pavement inspection vehicles and manual evaluations to determine the condition of approximately 5,700 miles of paved assets. The report outlines the history of the RIP, which began in the 1970s, detailing the evolution of its data collection methodologies and the establishment of a Pavement Management System (PMS) in collaboration with the National Park Service (NPS). Key sections include the park route inventory, methodology for determining pavement conditions, and detailed condition rating sheets that summarize findings. The report identifies routes with varying conditions, enabling prioritization for future maintenance and rehabilitation projects based on systematic assessments. A description of the rating system, condition definitions, and relevant appendices complete the document, which is essential for managing and funding improvements within the NPS. This comprehensive report underscores the FHWA’s commitment to maintaining infrastructure within national parks while providing vital data for ongoing enhancements to road conditions and safety.
    The Western Federal Lands Highway Division has issued a Notice to Prospective Offerors for the NM NP MULTI PMS(1) Pavement Preservation Project in New Mexico, under Solicitation No. 69056724R000026. The project involves preserving selected parking areas and approach roads within various National Parks through roadway milling, pavement upgrades, and minor repairs. Due to potential snow conditions, prospective contractors are advised to assess project sites during the fall, as access may be limited post-November 1, 2024. No Federal Highway Administration personnel will conduct tours. All technical inquiries should be directed via email, while general questions can be addressed to the specified contact. Solicitation documents will be made available in winter 2024/2025, and interested parties are encouraged to monitor the SAM site for updates. This project reflects the government's objectives of maintaining park infrastructure while minimizing visitor disruptions, marking a commitment to enhancing national park facilities through strategic road maintenance and preservation efforts.
    The document outlines a Request for Proposal (RFP) for pavement preservation work in New Mexico, specifically targeting various National Park Service sites and surrounding counties. The project involves crack sealing, patching, chip seal application, micro-surfacing treatments, and pavement marking over a total length of 33.49 miles. The estimated cost for this project ranges between $5 million and $10 million, with a tentative completion date set for Winter 2025. Key locations include prominent sites such as Aztec Ruins National Monument, Carlsbad Caverns National Park, and White Sands National Park, among others. The RFP details specific construction requirements categorized under various divisions, including earthwork, asphalt pavements, incidental construction, and temporary traffic control, specifying quantities and methods for each task. The document emphasizes the importance of contractor quality control and construction scheduling, fundamental to achieving project goals. This RFP is part of a federal initiative to maintain and improve infrastructure within national parks, reflecting the government's commitment to preserving natural and cultural heritage while enhancing visitor safety and experience.
    The New Mexico National Park Service is issuing a request for proposals (RFP) for a pavement preservation project encompassing multiple national park sites and counties in New Mexico. The scope of work includes crack sealing, patching, chip sealing, micro-surfacing, and pavement marking along a project length of 33.49 miles. The anticipated completion date is set for Winter 2025, with an estimated project cost ranging from $5 million to $10 million. Locations targeted for work include prominent sites like Carlsbad Caverns National Park, Chaco Culture National Historic Park, and White Sands National Park, among others. The document outlines detailed requirements across various project divisions, detailing tasks such as earthwork, asphalt pavement treatments, traffic control, and temporary signage installations. Selection criteria for bidders include mobilization and quality control measures, contributing to a structured approach to managing the project. This RFP reflects the federal government's commitment to maintaining infrastructure in protected areas while ensuring compliance with construction standards.
    The New Mexico National Park Service is soliciting proposals for a pavement preservation project across multiple national monuments and parks within the state, encompassing a total project length of 33.49 miles. The scope of work includes crack sealing, patching, chip seal application, micro surfacing treatments, and pavement markings, contributing to improved road safety and infrastructure longevity. The estimated budget ranges from $5 million to $10 million, with a target completion by Winter 2025, contingent on the solicitation process aligned with FAR Clause 52.211-10. Locations include significant sites such as Aztec Ruins, Carlsbad Caverns, and White Sands National Park, primarily affecting regions across Bernalillo, Catron, and other counties. The document specifies required construction practices, quantities, and materials needed for various tasks, ensuring detailed compliance with quality control, sampling, and testing standards. This initiative reflects the federal commitment to maintaining and enhancing critical access routes to natural heritage sites, supporting tourism and conservation efforts throughout New Mexico.
    The Western Region Pavement Preservation (WRPP) is soliciting proposals for Task Order No. 69056724R000026, focusing on the Pavement Preservation project in New Mexico. This initiative, managed by the U.S. Department of Transportation, addresses various tasks across multiple national parks and monuments, including significant work on roadway surfaces. The project involves strict adherence to Federal Highway Administration's FP-14 specifications, utilizing U.S. Customary units. Potential contractors are reminded to submit printed proposals with specific forms fully completed and to include a bid bond. The project encompasses a Base schedule and two Option schedules, with the lowest combined bid determining the award. Contractor inquiries about the project must be submitted by January 9, 2025, with plans available electronically at the outlined website. The document detailed requirements for bidders, including criteria for subcontracting plans, representations, and certifications, emphasizing small business engagement. Mandatory insurance, performance, and payment bonds are also outlined. This solicitation reflects the government's commitment to infrastructure preservation while ensuring compliance with federal regulations and standards for highway construction projects in New Mexico.
    Similar Opportunities
    NM NP MULTI PMS(1), Pavement Preservation New Mexico
    Active
    Transportation, Department Of
    The Department of Transportation, through the Federal Highway Administration, is seeking contractors for the NM NP MULTI PMS(1) Pavement Preservation project in New Mexico, which involves maintenance work across various national parks and monuments. The project includes tasks such as crack sealing, patching, chip seal application, micro surface treatments, and pavement marking over a total length of 33.49 miles, with an estimated completion date in Winter 2025. This initiative is crucial for maintaining infrastructure and ensuring the safety of public roadways while preserving national heritage sites. Interested vendors can contact the Contracts G. Office at contracts@mail.wfl.fhwa.dot.gov or by phone at 360-619-7520, with the estimated project cost ranging between $5 million and $10 million and anticipated solicitation in Fall 2025.
    CA NPS PP MANZ 2019(1), Pavement Preservation Manzanar
    Active
    Transportation, Department Of
    Presolicitation notice from the Department of Transportation, Federal Highway Administration, for a pavement preservation project at Manzanar National Historic Site and Mojave National Preserve in California. The project includes crack sealing, patching, micro surface treatment, pavement markings, and other small items of work. The project is approximately 5.39 miles long and is expected to be completed by Spring 2020. The estimated price range for the project is between $1 million and $2 million. Interested vendors must register on the FBO website. The project will be solicited to the Western Region Pavement Preservation MATOC. Anticipated solicitation date is Fall 2019.
    Z--GWMP 335115 Bridge Preservation
    Active
    Interior, Department Of The
    The National Park Service (NPS) is issuing a presolicitation notice for the George Washington Memorial Park Bridge Preservation project, inviting proposals from small businesses. This contract, valued at over $10 million, encompasses comprehensive preservation and maintenance activities for roads and bridges within the park, including bridge preservation, preventive maintenance, repairs, and roadway preservation tasks such as asphalt pavement repair and installation of pavement markings. The project is significant for maintaining the infrastructure of the park, ensuring safety and accessibility for visitors. Interested vendors must be registered in the System for Award Management (SAM) and possess a DUNS number, with the solicitation expected around December 27, 2024, and an estimated work completion timeframe of 416 days post-notice to proceed. For further inquiries, contact Jeremiah Rogers at jeremiahrogers@nps.gov or call 303-969-2633.
    YELL: FRICTION SEAL SURFACE TREATMENT
    Active
    Interior, Department Of The
    The Department of the Interior, through the National Park Service, is seeking qualified contractors for the application of a friction seal surface treatment to 36,000 square yards of roads within Yellowstone National Park. This project aims to enhance road maintenance and safety by applying an emulsified Gilsonite-asphalt mixture, scheduled for execution between July 1 and August 31, 2025, specifically at Grant Village. The solicitation is a 100% Total Small Business Set Aside, emphasizing the importance of small business participation in federal contracts, with proposals due by January 6, 2025. Interested contractors must demonstrate relevant experience and comply with wage determinations, with the award going to the lowest-priced offer meeting technical specifications. For further inquiries, potential bidders can contact Kiara Stewart at kiarastewart@nps.gov.
    Resurface of Uniform Tire Quality Grading Standards Traction Asphalt Test Surface
    Active
    Transportation, Department Of
    The National Highway Traffic Safety Administration (NHTSA) is seeking proposals for the resurfacing of the asphalt test surface at the San Angelo Test Facility located on Goodfellow Air Force Base in Texas. The primary objective of this procurement, under Request for Proposal (RFP) number 693JJ925R000012, is to replace the existing traction test surface to meet specific performance standards outlined in the Uniform Tire Quality Grading System (UTQGS). This project is critical for ensuring compliance in tire traction testing, which is essential for the enforcement of consumer safety standards. Interested contractors must submit their proposals by 4:00 p.m. EST on January 13, 2025, and can direct inquiries to Thomas J. Bub at nhtsaOAM@dot.gov or (202) 366-9571.
    Y--ELMA-CREATE UNIVESALLY ACCESSIBLE TRAIL
    Active
    Interior, Department Of The
    The Department of the Interior, through the National Park Service, is soliciting proposals for the construction of a universally accessible trail at El Malpais National Monument in Grants, New Mexico. The project aims to enhance visitor access and experience by creating a 0.75-mile trail compliant with accessibility standards, along with additional features such as an amphitheater and boardwalk installations. This initiative is part of a broader effort to improve public infrastructure within national parks, ensuring compliance with federal regulations and environmental preservation. Interested contractors must submit their proposals by January 8, 2025, with the contract performance period running from January 6, 2025, to October 3, 2025. For further inquiries, potential bidders can contact Brian Dankmeyer at BrianDankmeyer@nps.gov or by phone at 202-573-5697.
    MT DAR MALM 2025(1), Defense Access Roads FY 2025
    Active
    Transportation, Department Of
    The Department of Transportation, specifically the Federal Highway Administration, is seeking qualified contractors for the MT DAR MALM 2025(1) project, which involves resurfacing existing Minuteman Missile Base Roads in Fergus County, Montana. The primary objective of this firm-fixed-price construction contract is to enhance roadway surfaces by applying four inches of new aggregate and calcium chloride, along with necessary subexcavation and drainage improvements across eight road segments totaling up to 48.90 miles. This project is crucial for maintaining access to defense facilities and is anticipated to be advertised in Spring 2025, with construction expected to commence in Summer 2025. Interested parties should respond to this sources sought notice by submitting the required MS Form by January 15, 2025, at 1400 PT, with an estimated contract value between $5 million and $10 million.
    Idaho, Montana, and Surrounding Areas Multiple Award Task Order Contract (MATOC)
    Active
    Transportation, Department Of
    The Department of Transportation, specifically the Federal Highway Administration, is announcing a forthcoming solicitation for a Multiple Award Task Order Contract (MATOC) focused on construction work in Idaho, Montana, and surrounding areas. The opportunity includes a sample project for the rehabilitation of the parking area at the Glacier National Park Headquarters, designated as MT NP GLAC P HQ(3), which will be evaluated based solely on pricing, although it will not be awarded or constructed. This initiative underscores the government's commitment to enhancing infrastructure within national parks while adhering to federal and state guidelines for construction projects. Interested contractors are encouraged to visit the project site in West Glacier, Montana, before winter conditions limit access, and should direct technical inquiries via email to the provided address. The MATOC solicitation documents are expected to be available during the winter of 2024/2025, with updates accessible on the SAM site.
    MT NP GLAC P HQ(3), GLAC HQ Parking Area Rehabilitation, Phase
    Active
    Transportation, Department Of
    Presolicitation notice from the Department of Transportation, Federal Highway Administration, for the rehabilitation of the GLAC HQ Parking Area in West Glacier, Montana. The project involves pavement removal, clearing and grubbing, drainage, and installation of curb and gutter, sidewalks, pavement, and signage. The estimated price range for the project is between $2,000,000 and $5,000,000. The completion date is tentatively set for Summer 2025. This solicitation is offered as a small business set-aside. Interested vendors can view the Interested Vendors List by registering as a SAM user.
    NV FLAP 500(1) Red Rock Trail
    Active
    Transportation, Department Of
    The Department of Transportation, through the Federal Highway Administration, is soliciting bids for the NV FLAP 500(1) Red Rock Trail project located in Las Vegas, Nevada. This total small business set-aside opportunity involves the construction of a multi-use trail, a pedestrian bridge, and the widening of State Highway 159, covering approximately 1 mile with an optional extension of 0.34 miles. The project is significant for enhancing local infrastructure and promoting environmental stewardship in the Red Rock Conservation Area, with an estimated cost between $5 million and $10 million. Interested bidders must submit printed proposals by the specified deadline, ensuring compliance with federal regulations and project specifications, and can contact Laura Vallejos or Leslie Karsten at CFLcontracts@dot.gov for further information.