Front Range JFP CODI
ID: FA2550JFPCODIType: Sources Sought
Overview

Buyer

DEPT OF DEFENSEDEPT OF THE AIR FORCEFA2550 50 CONS PKPSCHRIEVER SFB, CO, 80912-2116, USA

NAICS

Highway, Street, and Bridge Construction (237310)

PSC

MISCELLANEOUS CONSTRUCTION MATERIALS (5680)
Timeline
    Description

    The Department of Defense, specifically the Department of the Air Force, is seeking qualified small businesses to provide construction paving services under the "Front Range JFP CODI" initiative, with a program value estimated between $100 million and $150 million. The procurement aims to maintain and repair existing paved and unpaved structures, as well as construct new roadways, bridges, sidewalks, and airfields, ensuring safe and efficient transportation across military installations in Colorado. This sources sought notice is part of a market survey to identify potential contractors capable of fulfilling these requirements, with no contract awarded at this stage. Interested parties should submit a detailed capability statement to the primary contact, Jac M Nichols, at jac.nichols.1@spaceforce.mil, by the specified deadline, as further details and requirements are outlined in the associated documents.

    Files
    Title
    Posted
    The Joint Forces Paving contract for Colorado Department of Defense installations encompasses extensive management and construction tasks related to paving, maintaining, and repairing various structures at multiple military bases including Fort Carson and Peterson Space Force Base. The contract spans from March 26, 2026, to March 31, 2033, with a five-year primary period and a two-year option for renewal. Key responsibilities include providing labor, materials, and equipment for projects related to roadways, airfields, and related infrastructure while adhering to specific installation design standards. The contractor must possess the capability to handle simultaneous projects across different bases and is subject to removal from the program for deficiencies in performance. Task orders dictate specific requirements, and contractors must comply with numerous directives concerning safety, environmental regulations, and communication protocols with designated officers. Contractors must also track their proposal submissions and manage operational challenges like utility outages and traffic control measures. There are provisions for both on-ramping and off-ramping additional contractors during the contract period, ensuring a competitive environment for task order solicitations. Compliance with these requirements is pivotal for maintaining the integrity of operations and supporting military infrastructure needs.
    The document outlines requirements for a Contractor to manage paving tasks for Colorado Department of Defense (DoD) installations under multiple task orders. It specifies the need for a management plan that defines key personnel roles including a Program Manager, Installation Project Superintendent, Job Foremen, and various trade specialists. Key personnel must possess relevant experience and qualifications, including at least a four-year degree for the Program Manager. The Contractor's management plan must be developed within 30 days of contract award, detailing personnel qualifications, an organizational chart, and the roles of subcontractors. Regular meetings with government representatives are mandated to discuss project status, performance, and other critical issues. The document emphasizes qualifications related to quality control and environmental management, reinforcing the necessity of compliance with management plans and certifications. These arrangements aim to ensure effective project oversight and alignment with government expectations, focusing on quality, efficiency, and adherence to safety and regulatory standards. Overall, the document serves as part of a federal Request for Proposal (RFP) aimed at securing reliable contractor support for paving initiatives at military installations.
    The document outlines the quality control requirements for a paving contractor working on Colorado DoD installations. It mandates that the contractor develop an effective quality control system in accordance with contract regulation 52.246-12, which must be submitted for approval within 30 days of contract award. This system addresses all construction operations, covering both on-site and off-site activities. The contractor is obligated to promptly correct any noncompliance issues as identified by the contracting officer. The quality control plan must detail personnel responsibilities, procedures for reviewing submissions, and methods for documenting inspection results, including tracking deficiencies. Furthermore, the contractor is required to maintain comprehensive documentation of quality control activities, ensuring that all aspects of work performed, including subcontractor involvement and safety evaluations, are recorded accurately. Records should be made available to government personnel upon request. Coordination meetings between the contractor and government representatives are mandated to discuss quality control approaches and resolve issues that may arise, emphasizing continuous communication throughout the project. This framework aims to maintain high standards of compliance and quality assurance in construction projects guided by federal RFPs and contract regulations.
    The document outlines safety, health, and environmental requirements for contractors involved in paving projects at Colorado DoD installations. The main purpose is to ensure that contractors maintain safe work environments and comply with all relevant safety and environmental standards. Key components include the establishment of a comprehensive safety program, specific safety requirements for activities like welding and confined space work, and guidelines for emergency response. Contractors must report incidents promptly and secure accident scenes for investigation. Compliance with environmental regulations, including OSHA and hazardous material standards, is mandatory, as is adherence to specific security protocols relevant to each installation. Overall, this document emphasizes the importance of safety and environmental stewardship in government contracting, particularly under federal guidelines for RFPs and grants.
    The document outlines special provisions for contractors working on or near active airfields and hangars within Colorado's Department of Defense (DoD) installations. Key points include the necessity for coordination with the cognizant Contracting Officer for any work that affects runway operations, requiring scheduled closures to minimize disruption. Contractors must prioritize personnel safety due to high noise levels and adhere to restrictions on vehicle movement in active areas. Cleanliness is emphasized to prevent foreign object damage (FOD), with the requirement to maintain a tidy work environment. The document also covers protocols for emergency situations, necessitating quick evacuation of the worksite when aircraft emergencies are declared. These provisions aim to ensure safety and operational efficiency for military installations during construction activities.
    The "Joint Forces Paving for Colorado DoD Installations" document outlines the requirements for task order close-out procedures related to construction projects. It details inspection protocols, emphasizing the necessity of an internal quality control pre-final inspection by the Contractor before requesting a government inspection. The Contractor must provide thorough documentation of as-built drawings, capturing all changes and subsurface utility locations to be submitted before final payment. Furthermore, the Contractor is required to prepare a DD Form 1354 for installed properties and provide operation and maintenance manuals for systems installed, with strict guidelines on content and presentation. The document also stipulates warranty responsibilities, including response times for routine, urgent, and emergency calls. Ultimately, the purpose of this document is to ensure compliance and thorough documentation is maintained throughout construction projects under federal guidelines, ensuring quality standards and proper operation of completed work. This systematic approach seeks to promote accountability and facilitate effective management of government contracts, reflecting the rigorous requirements associated with federal and state project funding.
    The document outlines the acronyms relevant to the Joint Forces Paving initiative for Colorado Department of Defense (DoD) installations, specifically detailing terms utilized in Requests for Proposals (RFPs), federal grants, and state/local government RFPs. It serves as an essential reference for stakeholders involved in construction and engineering projects across military bases in Colorado. The list includes key government entities such as the Air Force Civil Engineer Center (AFCEC), regulatory bodies like the Environmental Protection Agency (EPA), and construction-related terminology such as Performance Work Statement (PWS) and Statement of Work (SOW). Each acronym is accompanied by its full form to facilitate understanding among contractors and teams handling legal, regulatory, and operational compliance aspects. By defining these terms, the document aims to streamline communication and enhance clarity during the proposal and execution phases of the paving projects, reflecting the importance of precision in a highly regulated environment.
    Lifecycle
    Title
    Type
    Front Range JFP CODI
    Currently viewing
    Sources Sought
    Similar Opportunities
    Temporary Lodging Facility (TLF), Peterson Space Force Base (PSFB), Colorado (CO)
    Active
    Dept Of Defense
    The Department of Defense, through the U.S. Army Corps of Engineers, is soliciting proposals for the construction of a Temporary Lodging Facility (TLF) at Peterson Space Force Base in Colorado. The project entails the construction of three single-story, wood-framed buildings, designed to provide temporary accommodations for military personnel, with a total estimated construction cost between $10 million and $25 million. This facility will include essential amenities such as independent HVAC systems, community laundry facilities, and staff areas, adhering to Department of Defense design standards and sustainable construction practices. Interested contractors must submit their proposals by November 19, 2024, at 2:00 PM CST, and should direct inquiries to Brandon Landis at brandon.p.landis@usace.army.mil or Brittany Gull at brittany.c.gull@usace.army.mil.
    Sources Sought - Renovate Sijan Hall Dormitory - Phase 1, USAFA CO
    Active
    Dept Of Defense
    The U.S. Army Corps of Engineers-Omaha District is seeking qualified contractors for the renovation of Sijan Hall, a cadet dormitory at the United States Air Force Academy in Colorado Springs, Colorado. The project aims to renovate approximately 135,000 square feet of the facility, which includes architectural, mechanical, electrical, and fire protection upgrades, ensuring compliance with current USAFA Design Standards and building codes. This renovation is critical for modernizing the infrastructure and maintaining operational efficiency for cadet housing, with the anticipated contract value ranging between $100 million and $250 million. Interested prime contractors must submit their qualifications and responses by November 18, 2024, to Jessica Beckman at Jessica.l.merrill2@usace.army.mil.
    USACE SPK Design Bid Build (DBB) Construction - Defense Logistics Agency (DLA) Lot 4 Open Storage, Hill Air Force Base, Utah.
    Active
    Dept Of Defense
    Sources Sought DEPT OF DEFENSE is seeking construction services for an open storage facility at Hill Air Force Base, Utah. The facility will consist of asphalt and concrete pavement, loading ramp and dock, administrative office, and site improvements. The estimated construction cost is between $10,000,000 and $25,000,000. Small business firms are encouraged to submit capability statements. The potential requirement may result in a solicitation issued in February 2024, with an estimated completion time of 425 calendar days.
    FY25 Multiple Award Construction Contract (MACC)
    Active
    Dept Of Defense
    The Department of Defense, through the 92d Contracting Squadron of the Department of the Air Force, is seeking industry input for a potential Indefinite Delivery/Indefinite Quantity (IDIQ) Design/Build Multiple Award Construction Contract (MACC) program at Fairchild Air Force Base, Washington. This Sources Sought Notice aims to identify qualified small businesses capable of executing a wide range of construction services, including maintenance, repair, and renovation projects, with individual task orders valued between $500 and $10,000,000, primarily in the $1,000,000 to $5,000,000 range, and a total program ceiling of $95,000,000 over a five-year period. Interested contractors must possess in-house design capabilities and are required to register in the System for Award Management (SAM) prior to contract award. Capability Statements must be submitted by mail or email to the primary contact, Mr. Tuyen Nguyen, by the expected solicitation release date of January 19, 2025.
    PKA Restriping 500 Ramp
    Active
    Dept Of Defense
    The Department of Defense, through the Department of the Air Force, is seeking qualified contractors for the PKA Restriping 500 Ramp project at Travis Air Force Base (AFB) in California. This pre-solicitation notice outlines the requirement for professional services, permits, equipment, labor, materials, and tools necessary to restripe a 500 ramp area and nearby taxiways, adhering to military and Federal Aviation Administration (FAA) standards. The project is a total small business set-aside under NAICS Code 237310, with a small business size standard of $45 million, and proposals will be evaluated based on a Lowest Priced Technically Acceptable strategy. Interested contractors must be registered with SAM.gov to participate, and the government will release a solicitation approximately 15 days from the date of this notice. For further inquiries, potential offerors can contact Paula Rodriguez at paula.rodriguez.1@us.af.mil or William Rife at william.rife.1@us.af.mil.
    FY25 Airfield Striping and Rubber Removal
    Active
    Dept Of Defense
    The Department of Defense, specifically the Department of the Air Force, is seeking contractors for the "FY25 Airfield Striping and Rubber Removal" project at Dover Air Force Base in Delaware. The objective of this procurement is to provide all necessary labor, materials, and equipment to remove existing paint and rubber buildup, as well as to repaint and apply new pavement markings across a total of 290,000 square feet, including 225,000 square feet of reflective markings. This project is critical for maintaining operational efficiency and safety on the airfield, and it will be executed in two phases during the spring and fall of 2025, requiring strict adherence to security and safety protocols. Interested contractors should contact Russell Burton at russell.burton.7@us.af.mil or 302-677-5214, or Ms. Omelia Saunders at omelia.saunders.2@us.af.mil or 302-677-5545 for further details.
    RANGE D-51 BY-PASS ROAD CONSTRUCTION PROJECT, EGLIN AIR FORCE BASE, FLORIDA (OKALOOSA COUNTY) Amendment 0002
    Active
    Dept Of Defense
    The Department of Defense, through the U.S. Army Engineer District Mobile, is soliciting proposals for the construction of the Range D-51 By-Pass Road at Eglin Air Force Base in Florida. This project, categorized under the NAICS code 237310 for Highway, Street, and Bridge Construction, aims to enhance infrastructure and improve access within the base. The solicitation is part of the government's ongoing commitment to infrastructure development, emphasizing collaboration between federal agencies and private contractors to ensure compliance with federal and local guidelines. Interested contractors should refer to the attached revised specifications and drawings for Amendment No. 0002 and can contact Rocky Harkless at rocky.a.harkless@usace.army.mil or Stephanie Scalise at stephanie.m.scalise@usace.army.mil for further information. A site visit is scheduled for October 1, 2024, at 9:00 AM CST, highlighting the importance of stakeholder engagement in the bidding process.
    FTW508 Airfield Pavement, Vault, and Lighting Repairs
    Active
    Dept Of Defense
    The Department of Defense, specifically the U.S. Army Corps of Engineers, Alaska District, is conducting a sources sought announcement for the FTW508 Airfield Pavement, Vault, and Lighting Repairs project at Fort Wainwright, Alaska. The project aims to address sub-grade and pavement deficiencies identified in a previous evaluation, including the removal and replacement of asphalt, subgrade repairs, and the abandonment of an underground utility vault. This work is critical for maintaining the operational integrity of the airfield and ensuring safety for aircraft operations. Interested firms must submit a capabilities package by November 19, 2024, with an estimated project value between $1 million and $5 million, and a performance period of approximately 200 calendar days. For further inquiries, contact Jason Linn at jason.linn@usace.army.mil or Mark Corn at mark.r.corn@usace.army.mil.
    Child Development Center, Mountain Home Air Force Base (MHAFB) Mountain Home, Idaho
    Active
    Dept Of Defense
    The Department of Defense, through the U.S. Army Corps of Engineers (USACE), is seeking small businesses to participate in a Sources Sought Notice for the construction of a new Child Development Center at Mountain Home Air Force Base in Idaho. The project involves building a facility of up to 36,745 square feet, which will include various child activity areas and administrative spaces, while adhering to Department of Defense construction guidelines, including antiterrorism and force protection measures. This initiative is crucial for providing quality child care services on military installations and supports the economic development of small businesses within the defense sector. Interested firms must submit a capabilities package by November 12, 2024, and the project is valued between $25 million to $100 million, requiring at least 15% of the work to be completed in-house.
    Sources Sought - B21 ADAL Flight Simulator Phase 2 Construction
    Active
    Dept Of Defense
    The Department of Defense, specifically the U.S. Army Corps of Engineers, Omaha District, is conducting market research for the construction of a new B21 ADAL Flight Simulator facility at Ellsworth Air Force Base in South Dakota. The project involves a design-bid-build delivery method for a 15,788 GSF addition and alteration to an existing building, aimed at supporting the transition to a B-21 simulator facility. This military construction project is significant for the Air Force's operational capabilities, with an estimated value between $25 million and $100 million. Interested contractors with bonding capabilities of at least $25 million must submit their qualifications and project experience by 2:00 p.m. CST on November 20, 2024, to Scott Dwyer at Scott.Dwyer@usace.army.mil.