ContractSources Sought

REQUEST FOR INFORMATION - Large Caliber Penetrators

DEPT OF DEFENSE EBDA_RFI_LCP_01
Response Deadline
Dec 12, 2025
Deadline passed
Days Remaining
0
Closed
Set-Aside
No Set aside used
Notice Type
Sources Sought

Contract Opportunity Analysis

The Department of Defense, through the Air Force Life Cycle Management Center (AFLCMC), is conducting a Request for Information (RFI) to identify industry capabilities for developing a Large Caliber Penetrator, specifically focusing on maturing a tailkit (TK) design, development, and flight testing to demonstrate system accuracy. The initiative aims to gather insights into technological, manufacturing, and business capabilities within the industrial base to inform the development of a material solution that meets operational objectives. This procurement is critical for enhancing the USAF's munitions capabilities, particularly in GPS-denied environments, and involves the production of three to five prototypes for flight testing. Interested vendors are encouraged to submit white papers detailing their capabilities by December 12, 2025, with questions due by November 25, 2025. For further inquiries, contact Mandi Johnson at mandi.johnson.4@us.af.mil or Christy Cross at christy.cross.2@us.af.mil.

Classification Codes

NAICS Code
334511
Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufacturing
PSC Code
1325
BOMBS

Solicitation Documents

3 Files
Large Caliber Penetrator - Q_A Response.pdf
PDF43 KBDec 4, 2025
AI Summary
The government is in the planning phase for a new tail kit requirement, seeking capabilities for an existing Level 2 TDP design. While a final decision on an incumbent replacement is pending, all offered solutions will be considered. The government is open to small business-led efforts with large OEM sub-contractors, preferring an all-inclusive response. The contract type and funding profile are currently unknown, and funding has not yet been secured. The anticipated contract award is FY27 Q1, with a requirement for three to five tail kits, including those for testing. The specific aircraft for this munition will be identified later. Flight testing is included in the 9-12 month period of performance, and vendors are responsible for store-to-aircraft integration for non-government aircraft.
Amend 1_Large Caliber Penetrator - Phase 1B RFI.pdf
PDF213 KBDec 4, 2025
AI Summary
The Department of the Air Force's Air Force Material Command is issuing a Request for Information (RFI) for a Large Caliber Penetrator. This RFI seeks industry capabilities for developing and producing a materiel solution, specifically focusing on maturing a tailkit (TK) design, development, and flight testing for system accuracy. The Air Force Life Cycle Management Center is conducting market research for an industry analysis. Interested parties can request a controlled document with system attribute details by submitting a valid DD Form 2345. The RFI requests white papers on notional TK, integration, and test capabilities, including Guidance, Navigation, and Control (GNC), integration onto government-supplied warheads, and flight testing without government aircraft. Submissions are due by December 12, 2025, and questions by November 25, 2025. This RFI is for planning purposes only and does not constitute a solicitation for bids or proposals.
Large Caliber Penetrator - Phase 1B RFI.pdf
PDF212 KBDec 4, 2025
AI Summary
The Department of the Air Force's Air Force Material Command is conducting a Request for Information (RFI) for a Large Caliber Penetrator. The RFI seeks to identify industry capabilities for developing and producing a materiel solution, specifically focusing on maturing the tailkit (TK) design, development, and flight testing to demonstrate system accuracy. Key requirements include a Navigation System capable of accuracy in GPS-denied environments, the ability to develop TK system Critical Design Review (CDR) Technical Data Packages (TDP) Level 3, produce 3-5 full-scale TK system prototypes for flight tests, and develop associated software. Vendors must also demonstrate the ability to integrate the TK system onto a Government-supplied warhead and conduct flight tests without Government aircraft. Submissions are requested in white papers covering GNC, integration, and test capabilities, with an optional all-inclusive submission. Small businesses are encouraged to respond. Responses are due by December 12, 2025, and questions by November 21, 2025.

Related Contract Opportunities

Project Timeline

postedOriginal Solicitation PostedNov 7, 2025
amendedAmendment #1· Description UpdatedNov 18, 2025
amendedLatest Amendment· Description UpdatedDec 4, 2025
deadlineResponse DeadlineDec 12, 2025
expiryArchive DateDec 27, 2025

Agency Information

Department
DEPT OF DEFENSE
Sub-Tier
DEPT OF THE AIR FORCE
Office
FA8672 AFLCMC EBDM

Point of Contact

Name
Mandi Johnson

Place of Performance

Florida, UNITED STATES

Official Sources