Z--RG- EBHD UTILITY REHAB
ID: 140R4024R0014Type: Solicitation
Overview

Buyer

INTERIOR, DEPARTMENT OF THEBUREAU OF RECLAMATIONUPPER COLORADO REGIONAL OFFICESALT LAKE CITY, UT, 84138, USA

NAICS

Water and Sewer Line and Related Structures Construction (237110)

PSC

REPAIR OR ALTERATION OF OTHER UTILITIES (Z2NZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)
Timeline
    Description

    The Department of the Interior, Bureau of Reclamation, seeks bids for the Elephant Butte Historic District (EBHD) Utility Rehabilitation Project, a complex undertaking to upgrade electrical, water, and sewer systems. The project has a significant focus on preserving the historic nature of the district.

    This extensive procurement involves rehabilitating electrical infrastructure, replacing water and sewer lines, and enhancing network connectivity, requiring a range of construction and engineering services. The scope of work includes demolition, excavation, electrical system upgrades, and the installation of new water tanks, road crossings, and communication systems.

    The Bureau aims to award a firm-fixed-price contract for this comprehensive project, with a projected value of several million dollars. Key deadlines include a site visit on July 22, 2024, and proposal submissions due in early August 2024. The project is set to commence in mid-September 2024 and must be completed within approximately one year, emphasizing the need for efficient mobilization and timely execution.

    Contact Villegas, Tina at tvillegas@usbr.gov or 505-462-3602 for more information.

    Point(s) of Contact
    Files
    Title
    Posted
    The file contains detailed information on various lodging options near the Elephant Butte Historic District. It offers a comprehensive list of accommodations, including cabins, motels, hotels, and RV parks, each with their contact details and websites. The focus is on providing a convenient and comprehensive guide to visitors seeking accommodation in the area. This collection of lodging information serves as a valuable resource for those looking to stay near the historic district, offering a range of options to suit different preferences and budgets.
    The Elephant Butte Historic District Utility Rehabilitation project invites interested parties to a site visit ahead of a procurement process. The primary focus is on rehabilitating historical utilities in the district. This site visit is scheduled for July 22, 2024, at 10:00 AM, with key project personnel in attendance. The solicitation number is 140R4024R0014, and the site visit will take place at the Elephant Butte Field Division office. Contractors and companies specializing in utility rehabilitation are welcome to attend. The project aims to preserve and restore critical infrastructure while respecting the historic nature of the district. This information is primarily directed at vendors who will soon be invited to submit proposals, with contact details provided for key government and contractor personnel involved.
    The focus of this file is on establishing a clear framework for contract administration, in alignment with Federal Acquisition Regulation (FAR) 36.211(b). The objective is to outline the process for managing equitable adjustments related to change orders in construction contracts, recognizing the significance of timely definitization. The document directs interested parties to the Department of the Interior's (DOI) website, where they can access the required procedures and policies for construction contract administration. This streamlined approach ensures that crucial information on contract modifications and equitable adjustments is readily available, facilitating efficient management and reducing potential delays in construction projects.
    The government aims to contract rehabilitation work on its electrical system. The scope involves various tasks, primarily centered around electrical infrastructure upgrades. This includes installing an electrical system, DC electric vehicle chargers, and electrical pedestals, along with providing final as-built drawings. Additionally, the project entails excavation, trenching, and piping work for water and sewer lines, as well as road crossings and gravel surfacing. Key materials like copper water piping, PVC pressure pipe, and HDPE pressure pipe are mentioned with specific quantities required. The contractor will also be responsible for implementing a communications system. The procurement method seems to involve a lump-sum payment structure. Important dates and evaluation criteria are missing, but it's noted that proposals will be evaluated based on the offered prices for the different schedule items.
    The Bureau of Reclamation seeks to repair and rehabilitate a concrete water storage tank in Elephant Butte, New Mexico. The main objective is to assess and address issues with the tank's interior and exterior, including concrete spalling, roofing problems, and structural deficiencies. The inspection report outlines the current condition and recommends repairs to ensure the tank's longevity. Key tasks involve roof replacement, concrete spall repairs, and improvements to ventilation and overflow systems. The Bureau seeks a comprehensive solution from experienced vendors, with a focus on enhancing the tank's functionality and structural integrity. Critical dates include a submission deadline of January 18, 2022, and a desired project completion within five years. Evaluation will likely prioritize cost-effectiveness, expertise, and adherence to provided specifications.
    The U.S. Department of the Interior seeks bids for the rehabilitation of utilities in the Elephant Butte Historic District, Rio Grande, New Mexico. This project entails extensive work, including replacing water and sewer lines, demolishing and installing electrical services, and setting up internet and communications infrastructure. The focus is on procuring these specific services and the associated materials and labor. Key procurement objectives include the installation of new water and sewer systems, involving the removal of existing lines and the laying of PVC pipes. Procuring electrical services for demolition and below-grade wiring is a priority, along with the addition of EV charging stations and dark-sky-compliant lighting. Internet and communication system installation, involving fiber optics and network cables, is also crucial. To accomplish this, the government seeks detailed electrical drawings and data, as well as a robust contract document management system for efficient project administration. The contract, valued at several million dollars, will likely be firm-fixed-price. Key dates include a mandatory site visit on July 22, 2024, with submissions due shortly afterward. Evaluation criteria center on the quality and completeness of proposals, emphasizing the offered prices and technical merit of the work described.
    The Elephant Butte Historic District's utilities infrastructure requires an extensive upgrade, prompting a government solicitation. The primary objective is to replace and enhance electrical and water systems, involving various tasks. The first price schedule outlines the lump sum costs for mobilization, preparatory work, contract document management, and electrical drawings. It also includes as-built drawings, cast-in-place concrete work, and the installation of guard posts. The second price schedule focuses on electrical system installation, including the removal of existing overhead lines and the addition of electrical pedestals and DC electric vehicle chargers. Water-related tasks involve water line pipe work, fire hydrants, valves, and water pumps, while communications systems upgrades are also outlined. The government may also exercise an option to include the removal of existing tanks, installing new steel tanks, and related foundation work. Contractors will be responsible for providing the necessary materials and expertise to fulfill these tasks. The solicitation does not indicate a contract type or value, but it does mention that quantities are estimates, and the successful contractor will be selected based on their total evaluated price. Key dates and evaluation criteria are not provided within this excerpt, but the solicitation number, 140R4024R0014, indicates an ongoing procurement window for interested parties.
    The primary objective of this procurement is to rehabilitate electrical systems and upgrade utility infrastructure. The focus is on replacing existing overhead electrical lines and poles, with associated demolition and removal services required. The government seeks a range of electrical and concrete work services, including the installation of a complete electrical system, DC electric vehicle chargers, and cast-in-place concrete. Additionally, the project involves significant excavation, trenching, and piping work for water and sewer lines, requiring specialized equipment and skills. The scope also includes managing contract documents, creating electrical drawings, and providing final as-built drawings. Further tasks involve road crossings, paving, and the installation of fire hydrants and a communications system. The contract is estimated at a fixed price of $ for Price Schedule A, with an additional Price Schedule B as an option, focusing on steel tanks and related work, estimated at $. The government reserves the right to award both schedules simultaneously or within a specified period after contract award. Key dates are not provided, but the document indicates that proposals will be evaluated based on the offered price and the quality of the work proposed, with past performance also considered.
    The Bureau of Reclamation seeks to inspect and rehabilitate three steel water storage tanks in Elephant Butte, New Mexico. Each tank holds 17,000 gallons, and the primary objective is to assess their condition, especially the interior and exterior coatings, ladders, and various fittings. The inspection reveals the need for significant repairs, including coating rejuvenation, ladder replacement, and upgrades to meet current safety and sanitary standards. The report provides detailed observations and recommendations for bringing the tanks up to code. Repairing the floors, ensuring proper ventilation and overflow, enhancing security, and improving site access are also key focuses. This comprehensive assessment will help the Bureau plan necessary renovations to ensure the tanks' longevity and efficient operation. The inspection has been carried out and the Bureau will now move forward with procuring the necessary services to implement the recommended rehabilitation work.
    The government seeks proposals for the Elephant Butte Historic District Utilities Replacement Project in New Mexico. This project involves a comprehensive range of tasks and deliveries related to replacing utilities. The main focus is on providing new water line pipe, ranging from 3/4-inch to 6-inch PVC pressure pipe, along with associated fittings and valves. Additionally, the project requires the installation of an electrical system, including DC electric vehicle chargers and a communications system. The government will initially award the contract based on Price Schedule A, with Price Schedule B being an optional addendum for steel tanks, their foundations, and disinfection. The evaluation criteria weigh factors like price, past performance, and technical merit. Contractors have until 21 days after the Notice to Proceed to submit proposals, with the government favoring those that can complete the work within the estimated timelines.
    The primary objective of this procurement is to replace and upgrade wastewater infrastructure in multiple areas within the Elephant Butte Reservoir Project site. This includes planning and designing new wastewater pipelines, force mains, and lift stations, as well as electrical and fiber optic utilities. Detailed drawings and notes accompany the procurement, outlining specific locations, measurements, and utilities. For instance, drawing 24-D-60142 depicts the plan and profile of wastewater pipelines around the welcome center and casitas, with notes on existing ground conditions and utility details. The scope involves careful planning and execution to navigate existing features like roads, buildings, and electrical lines. Contractors will be responsible for surveying unknown elevations and diameters of existing utilities, with strict instructions to protect historical features and locate new utilities safely. The electrical work encompasses demolition, installation of electrical equipment foundations, and wiring for various facilities. Additionally, the project requires communications infrastructure, including fiber optic lines. The contract, valued at around $1.5 million, appears to be a fixed-price contract based on the provided files. Critical dates include a submission deadline of November 27, 2023, with an expected project duration of approximately two years. Evaluation criteria focus on the technical merit and price of proposals, with additional consideration given to local hiring and small business participation.
    The procurement objective of the government agency is to obtain detailed engineering drawings and notes regarding water lines and sanitary sewer lines in the Elephant Butte Camp. The focus is on providing comprehensive documentation for these systems, including notes on depth profiles, connections, and specific infrastructure locations. These drawings and notes are crucial for understanding and maintaining the camp's essential utilities. The drawings contain precise details and symbols representing various features, such as water lines, sewer lines, manholes, buildings, and topographical elements. The agency seeks contractors who can decipher these drawings, understand the underlying infrastructure, and potentially assist in related engineering projects. Numerous drawings are included, each covering different sections of the camp and emphasizing the complexities of the utility networks. One drawing, for instance, details the south section of the trailer park area, outlining water lines approximately two feet deep and main gravity sewer lines ranging from four to six feet deep. It also depicts connecting sewers and laterals with varying depths and a pressure sewer line. Another drawing covers the cabin area, focusing on water and sewer lines connected to multiple cabins. Several key dates are mentioned in the files, indicating the submission and approval timeline for these drawings. The agency seems to have approved these documents between March and May of 1970, after recommendations and checks were conducted. While specific evaluation criteria for proposal submissions are not explicitly mentioned, it's reasonable to assume that the agency seeks accuracy, attention to detail, and professional competence from potential contractors. The ability to interpret complex drawings, grasp infrastructure intricacies, and offer practical insights would likely be essential evaluation factors.
    The government seeks to procure construction services for heavy projects across multiple counties in New Mexico. The focus is on ensuring fair and prevailing wage rates for various construction-related tasks. There are specified rates for different zones, with mileage calculations for each zone originating from designated main posts. The work involves several skilled trades, including electricians, ironworkers, carpenters, and plumbers, each with their specified rates. Backhoe and grader operators, laborers, and truck drivers are also required. The procurement aims to adhere to Executive Orders related to minimum wage requirements and worker benefits, with mentioned rates occasionally higher than the set minimums. Key dates and zones are outlined for clarity, and an appeals process is detailed for interested parties. The main objective is to ensure compliant and fairly compensated workers for these heavy construction projects.
    The New Mexico Natural Resources Department seeks bids for the rehabilitation of the Elephant Butte State Park's sewer system. The objective is to address multiple issues, including manhole and lift station repairs, chlorination system upgrades, and flow measurement improvements. The scope entails rehabilitating manholes, replacing lift station pumps and control panels, and installing new flushing valves and chlorination equipment. Contract details are not explicitly mentioned, but the project's estimated value seems significant, given the extensive work required. Key dates include the submission deadline of September 1988. The evaluation of proposals will likely focus on the bidder's ability to execute the complex rehabilitation and installation work effectively. Another procurement initiative by the same department is the Wastewater Plant and Paving Improvements project at Elephant Butte State Park. This endeavor aims to enhance the wastewater treatment process and improve site paving. Key components include rehabilitating the package plant, constructing a soldier beam and timber wall, and installing new piping and electrical systems. The project also entails upgrading the bar screen, aeration tank, and clarifier tank, along with associated piping and support structures. Contract-related information is limited, but the project's scale suggests a substantial contract value. Proposals will likely be evaluated based on the bidder's expertise in managing complex rehabilitation and construction tasks. The submission deadline, like the previous project, is also September 1988.
    The government seeks proposals for rehabilitation and improvement works on electrical and water utilities. Price Schedule A, to be awarded at the outset, encompasses electrical system upgrades, including DC electric vehicle chargers and pedastals, final as-built drawings, and various excavation, trenching, and backfilling tasks. Key tasks involve removing existing electrical lines and poles, providing water for dust abatement, and installing pipes, valves, and hydrants for water supply. Price Schedule B, an optional add-on, entails constructing steel tanks, including foundations and disinfection systems. The contract is valued at over $ with a potential 8.375% state tax, with key dates and evaluation criteria focusing on price and quality.
    The Department of the Interior (DOI) issues a notice to contractors regarding the Contractor Performance Assessment Reporting System (CPARS), which is implemented to comply with FAR 42.1502, mandating the collection of past performance information on contracts. The DOI seeks to evaluate contractor performance efficiently using this web-based system. Contractors must provide the names of their representatives for access to the system, with strict data protection guidelines to be followed. These representatives will receive login details and can respond to performance evaluations, focusing on objective facts. Assessing Officials (AOs) have 60 days to complete evaluations, after which contractors have a 60-day review period for response. The CPARS platform ensures a paperless process, enhancing efficiency in performance assessment and allowing for informed government procurement decisions while maintaining data security.
    The primary objective of this procurement is to obtain bid bonds from contractors as a prerequisite for participating in government projects. Bid bonds serve as a guarantee that the contractor will execute the necessary contractual documents and bonds upon acceptance of their bid, or alternatively, compensate the government for any increased costs of procuring the work. The bid bond form is divided into two sections: the front section, to be completed by the principal (the contractor), and the reverse section for surety(ies) who are bonding the principal's bid. The form collects key information, including the principal's legal name, business address, and bid details. The surety section requires details of the surety's liability limit, which must collectively cover the bond penal sum. The document also specifies the conditions under which the obligation is void, primarily centered on the execution of contractual obligations and timely bond provision. This RFP specifies no particular goods or services, as it is focused on establishing the financial security aspect of the procurement process. The bid bond is a prerequisite for eligible contractors to submit proposals for future projects, with the government likely seeking a range of construction, supply, or service solutions.
    The government seeks to procure a performance bond for a construction contract. This bond, on the Standard Form 25, is essential for ensuring the principal's faithful performance and fulfillment of all contractual obligations. The principal has entered into a construction contract with the government, and the bond serves as a guarantee of their adherence to the agreement's terms. Multiple corporate sureties are involved, each binding themselves jointly and severally with the principal for the undertaking. The penal sum mentioned in the bond, ranging in value, represents the maximum liability of the sureties. The conditions outlined require the principal to comply with the original contract terms, including authorized modifications, and pay the required taxes. Should the principal fulfill these obligations, the bond obligation becomes void. Critical to this procurement, the sureties agree to indemnify the government if the principal defaults, offering a financial guarantee against potential contractual breaches.
    The government seeks to procure a payment bond from a surety or sureties. This bond is intended to protect individuals and corporations that supply labor and materials for a contracted project. The sureties are required to have their corporate seals affixed to the bond and are responsible, along with the principal, for ensuring prompt payment to these laborers and material suppliers. The penal sum, representing the maximum liability of the sureties, is mentioned in the form and must be paid if the principal fails to comply with their payment obligations. The form includes spaces for the principal's and sureties' contact information, corporate seals, and signatures, along with instructions for completing the bond. The Paperwork Reduction Act Statement at the end seeks to justify the time and effort required to provide the information requested in the form. This is a Standard Form 25A, revised in August 2016, and the procurement process follows the guidelines set by the General Services Administration (GSA).
    This file contains a standard United States Department of the Interior contract amendment, titled "Release of Claims." It pertains to a contractor's completion of work and their release of all claims against the United States government related to the executed contract. The contractor, upon receiving final payment, agrees to remise all debts, obligations, and demands related to the contract, signing a legal release. This document serves as a standard contractual procedure for the Interior Department's projects, ensuring the settlement of accounts and the government's protection against claims. The contractor's authorization and signature are required for the release to be valid.
    The Bureau of Reclamation seeks to rehabilitate utilities in the Elephant Butte Historic District, New Mexico. The project involves replacing sewer and water lines, electrical services, and installing communication infrastructure. With a budget between $5 million and $10 million, the work is divided into two CLINs. The first covers specified utility rehabilitation work, while the second relates to water tank replacement. Key sites include the cement water tank, pumphouse, maintenance yard, and various historical structures. Offerors must submit detailed proposals by the deadline, addressing technical plans, schedules, and past performance. Evaluation factors weigh technical merit and price equally. Contractors must adhere to historical preservation requirements and submit lodging details if awarded the project. Work must be completed within a 13-month period, with certain tasks requiring completion by May 2025. Site photos and videos are encouraged, and contractors raised several questions regarding historical preservation, road repair, and utility details, which were addressed on-site. Key dates include a question deadline and proposal submission deadline in late July and early August 2024. The government seeks a "best value" solution, and contractors must adhere to strict requirements to avoid proposal exclusion.
    The government agency seeks to amend a solicitation for a contract related to a site visit held on July 22, 2024, incorporating notes, questions, and answers into the original terms. The amendment does not alter the contract's period of performance, specified as September 13, 2024, to October 13, 2025. Bidders are required to acknowledge receipt of the amendment by the specified deadline, or their offers may be rejected. This amendment focuses on administrative changes, and all other terms and conditions of the original solicitation remain unchanged.
    The government agency seeks to amend a solicitation for a contract. The amendment, labeled 0002, aims to clarify questions and provide answers regarding the solicitation. It extends the period of performance to a year, emphasizing that all other terms and conditions of the original solicitation remain unchanged. Offerors are required to acknowledge receipt of this amendment by the specified deadline, or their offers may be rejected. The amendment's key date is 7/26/2024, and the period of performance spans from 9/13/2024 to 10/13/2025.
    The Bureau of Reclamation's Albuquerque Area Office seeks a contractor to provide various services for a project within the Upper Colorado Region. This solicitation aims to modify and extend the existing contract, seeking acknowledgment from offerors by the specified deadline. The key change is the extension of the response date to 8/9/2024, providing an additional week for submissions. Offerors are required to email their proposals to a designated email address. Several attachments containing site visit information, updated pricing schedules, and historical drawings are included with the amendment. The project spans approximately one year, starting on 9/13/2024 and concluding on 10/13/2025. All other terms and conditions remain unchanged.
    The Bureau of Reclamation's Albuquerque Area Office seeks a contractor for the Elephant Butte Historic District (EBHD) Utility Rehabilitation Project. The goal is to procure services for comprehensive utility repairs and alterations. The solicitation, amended to include essential corrections and updates, outlines a firm-fixed-price contract with a period of performance from September 2024 to October 2025. It emphasizes the rehabilitation of Price Schedule A, encompassing items A-1 to A-44, and Option Price Schedule B, comprising items B-1 to B-4, both detailed in Section J Attachments 2 and 3. Prospective vendors must submit their offers by email before the deadline of August 9, 2024, at 5:00 PM MDT, to be considered for this project. The government agency will evaluate proposals based on the price and other stated evaluation criteria. Important dates: - Offer submission deadline: August 9, 2024, 1700 MDT Project timeline: - Project commencement: September 13, 2024 - Project completion: October 13, 2025 Contract details: - Firm-fixed-price contract - Estimated value: Not stated Evaluation criteria: The Bureau of Reclamation will evaluate proposals based on the following criteria: 1. Price evaluation: Prices must be complete, accurate, and reasonable. 2. Technical evaluation: The agency will assess the understanding of the work and the approach to performing it, including management and qualitative factors. All vendors must acknowledge receipt of this solicitation amendment and are encouraged to carefully review the corrected price schedules and associated documents before submitting their offers.
    The Bureau of Reclamation seeks bids for the Elephant Butte Historic District (EBHD) Utility Rehabilitation Project. This construction project aims to replace sewer and water lines, upgrade electrical infrastructure, and enhance network connectivity. The scope entails demolishing existing overhead electrical lines and poles, installing new water tanks, and constructing paved road crossings and trench boxes. Additionally, the project requires the provision of electrical pedestals and DC electric vehicle chargers. The solicitation divides the work into two price schedules. Price Schedule A, requiring a firm fixed-price, encompasses the majority of the work, including concrete and asphalt work, excavation, utility installation, and communications system setup. Price Schedule B, an optional lump-sum contract line item, involves installing steel tanks, a ring foundation, and tank disinfection. The government may exercise this option within 21 days of the notice to proceed. Prospective bidders should note the key dates: questions regarding the solicitation must be submitted by July 26, 2024, and proposals are due on August 2, 2024. Evaluation criteria will consider factors such as price, past performance, and compliance with contract requirements. The project is expected to commence in mid-September 2024 and must be completed within approximately 395 days.
    The procurement objective involves rehabilitating electrical and utility infrastructure at Casitas, involving electrical contracting services. Contractors will determine the routing of conduits, install new conduits and pull boxes for fiber connectivity, and provide new water storage tanks adhering to specific AWWA standards. The focus is on staged improvements to avoid disruptions, with strict requirements for handling historical and archaeological sites during the process. Key tasks include demolishing existing risers, providing detailed electrical drawings, and developing a Discovery and Monitoring Plan for ground-disturbing activities. Contract details are largely focused on the solicitation's instructions, with electrical drawings and database files required in specific formats. The government seeks at least one technically acceptable proposal for award and emphasizes the importance of site visits. Evaluation criteria are centered on technical merit, with provisions for differing site conditions. Key dates and timelines are not explicitly mentioned in the provided file, and the estimated contract value is also not available. However, the file does note that the project involves staged installations and that the government aims to prevent water outages during the transition period.
    The primary focus of this file is the rehabilitation of utility infrastructure, involving significant excavation and replacement work. Key procurement objectives include rock excavation, wastewater pipe rerouting, and the installation of controlled low-strength material (CLSM) and new manholes. The project requires careful coordination due to the narrow access ways and working areas, emphasizing the need for efficient mobilization and minimal disturbance. Contractors are expected to provide detailed proposals outlining their approach to these challenges. Technical specifications include adhering to specific engineering standards for backfill materials and the use of HDPE and PVC pipes for water lines. The project involves removing and replacing sewer lines, utilizing existing manholes where possible and adding new ones as needed. Quantities and quality standards are outlined for various line items, including rock excavation, trench box usage, and topsoil placement. The scope of work encompasses several key tasks: preparing the site, excavating trenches, installing new pipes and manholes, and backfilling with engineered soil. Additional responsibilities include connecting existing structures to the updated systems and providing final site restoration. Contract details are not explicitly mentioned, but the document suggests a construction-related contract with a focus on differing site conditions and the potential for multiple mobilizations. Key dates relate primarily to the site visit, which took place on July 22, 2024, and the submission deadline implied by the prompt's reference to the "Questions/Answers" document. Evaluation criteria are not explicitly stated but are likely to include cost-effectiveness, technical expertise, and the ability to adhere to the project's unique challenges and specifications. The government agency seeks a capable contractor to oversee this complex utility rehabilitation project, with a strong emphasis on efficient traversal of the site and adherence to engineering standards.
    Lifecycle
    Title
    Type
    RG- EBHD UTILITY REHAB
    Currently viewing
    Solicitation
    Similar Opportunities
    Z--WY-BOYSEN PP G1 AND G2 GENERATOR REWINDS
    Active
    Interior, Department Of The
    The Bureau of Reclamation, part of the Department of the Interior, is soliciting proposals for the Boysen Powerplant Modernization Project, specifically focusing on the rewinding of generators G1 and G2 in Wyoming. The project entails significant maintenance work, including the removal and installation of windings and stator cores, as well as asbestos abatement, with a total estimated budget exceeding $10 million and a performance period from November 15, 2024, to November 14, 2028. This initiative is crucial for maintaining the operational efficiency and safety of hydroelectric facilities, reflecting the federal government's commitment to infrastructure modernization and environmental compliance. Interested contractors must submit their proposals by September 20, 2024, and can direct inquiries to Mitchell Frost at mfrost@usbr.gov.
    Z--DK-AO Heart Butte Safety of Dam Modification
    Active
    Interior, Department Of The
    The United States Bureau of Reclamation is preparing for a substantial dam safety modification project at the Heart Butte Dam near Elgin, North Dakota, estimated to exceed $10 million in value. The project, titled "Z–DK–AO Heart Butte Safety of Dam Modification," is a complex civil engineering endeavor aimed at enhancing the dam's structural integrity and addressing safety concerns. This opportunity notice is released as a special announcement to engage with potential contractors and gather their insights. The Bureau aims to optimize project scheduling, reduce costs, and mitigate risks by collaborating with experienced parties early in the process. Scope of Work The scope of this project involves a comprehensive range of construction and engineering tasks. This includes installing dewatering systems, constructing a cofferdam, grouting foundation voids, and repairing concrete outlet works. Additionally, the work requires excavating parts of the existing dam, building new sand filters, and implementing a drainage system with HDPE toe-drain pipes. The Bureau of Reclamation has provided detailed technical specifications outlining the precise dimensions and elevations required for these tasks. Eligibility Criteria Given the specialized nature of the project, the Bureau is seeking contractors with a strong background in heavy and civil engineering construction. Companies with the expertise and resources for precise excavation, construction, and modification work are encouraged to apply. Eligible contractors must demonstrate an ability to adhere to stringent industry standards and quality control measures. Funding and Contract Details The estimated value of the contract is expected to exceed $10 million. The contract type and funding details are not explicitly mentioned in the provided information. However, the project's significant value and complexity suggest a substantial funding commitment from the Bureau of Reclamation. Submission Process The Bureau of Reclamation encourages interested contractors to participate in the upcoming Industry Day for a comprehensive project briefing. The event will offer a detailed overview of the project's requirements and expectations. Feedback from attendees will be welcomed, providing an opportunity to shape the formal solicitation process. Evaluation Criteria While specific evaluation criteria were not provided, the Bureau is likely to assess applicants based on their expertise, past performance on similar projects, and ability to adhere to the stringent technical specifications and quality standards outlined. Contact Information For further clarification or additional information, interested parties can contact the primary point of contact, Mitchell Frost, at mfrost@usbr.gov or via phone at 0000000000. The Bureau of Reclamation looks forward to engaging with potential contractors and sharing details of this significant dam modification project.
    Y--GLCA 318744 Rehabilitate Critical Utility Systems
    Active
    Interior, Department Of The
    The Department of the Interior, through the National Park Service, is soliciting proposals for the "Rehabilitate Critical Utility Systems" project at the Glen Canyon National Recreation Area, with an estimated construction cost exceeding $10 million. The project aims to modernize wastewater management systems in the Wahweap and Lone Rock areas of Arizona and Utah, including upgrades to wastewater collection, treatment systems, and the SCADA control network, while ensuring compliance with environmental regulations and sustainability standards. This initiative is crucial for enhancing the park's infrastructure and maintaining uninterrupted utility services for public use. Interested contractors must submit their proposals by September 17, 2024, and can direct inquiries to James Waller at jameswaller@nps.gov or call 303-969-2488.
    Z--Repair Water Well Elecrical System
    Active
    Interior, Department Of The
    The U.S. Fish and Wildlife Service, part of the Department of the Interior, is soliciting bids for the replacement of the electrical system at the Uvalde National Fish Hatchery in Texas. The project involves replacing an existing generator and Automatic Transfer Switch (ATS), along with rewiring the electrical distribution system to enhance operational flexibility between two water wells. This upgrade is crucial for ensuring reliable emergency power supply, reflecting the government's commitment to maintaining essential infrastructure. Interested contractors must submit their proposals electronically by July 26, 2024, with the performance period set from August 5, 2024, to September 30, 2024. For further inquiries, contact Ray Fletcher at RayFletcher@fws.gov or call 505-248-6443.
    Z--TRD GSU Transformer Replacements
    Active
    Interior, Department Of The
    Opportunity Overview: The U.S. Department of the Interior, Bureau of Reclamation, seeks bids for the Trinity River Division GSU Transformer Replacements project. The primary goal is to replace nine power transformers across three power plants in California's Central Valley, ensuring uninterrupted power generation. The project involves asbestos abatement, transformer installation and commission, and modifications to the isolated phase bus. Scope of Work: The successful bidder will be responsible for supplying, installing, and commissioning the transformers, while also removing the existing ones safely. They must adhere to strict safety and environmental guidelines and use the Critical Path Method for project management. Additionally, the contractor will attend coordination meetings and use a web-based document management system for efficient communication. Eligibility Criteria: There seem to be no specific eligibility requirements mentioned beyond the capability to execute the work. However, the solicitation process indicates a focus on selecting experienced contractors. Funding and Contract Details: The contract value is estimated at between $35 and $50 million and will be awarded as a fixed-price contract to the highest-ranked bidder. The contract is expected to begin in November 2024 and be completed by March 31, 2027. Submission Process: Bids must be submitted by the deadline outlined in the documents, which appears to be 90 calendar days after a site visit scheduled for November 1, 2024. Offerors must acknowledge receipt of any amendments and are expected to submit priced proposals for each of the four powerplant sites. Evaluation Criteria: The evaluation of bids will be based on the offered prices, compliance with technical requirements, and the following factors: technical merit (20%), past performance (20%), cost-effectiveness (20%), delivery timeline (15%), and quality of support and maintenance proposal (15%). Contact Information: For any clarifications or questions, interested parties can contact Matthew Thomas at mthomas@usbr.gov or via phone at 916-978-5117. --- Opportunity Overview: The Federal Highway Administration (FHWA) seeks innovative solutions to enhance road safety and reduce traffic fatalities. The focus is on developing technologies or systems that can identify and mitigate crash risks, particularly in work zones. Scope of Work: The successful applicant will deploy their solution at selected locations, collect and analyze data, identify crash risks in real time, and provide periodic performance reports. Eligibility Criteria: The eligibility criteria are not explicitly mentioned, but the focus on advanced technologies and data analytics suggests a preference for specialized firms with relevant expertise. Funding and Contract Details: The initial contract value is estimated at $1 million for the deployment phase, with potential multi-year follow-on contracts. The funding is sourced from the Highway Safety Improvement Program (HSIP). The contract is expected to begin in mid-2023. Submission Process: Interested parties must submit their responses within 30 days of the opportunity release. Evaluation Criteria: The evaluation will consider the following factors: life-saving potential (35%), effectiveness and relevance (25%), implementation feasibility (20%), cost-effectiveness (15%), and past performance (15%). Contact Information: No specific contact person is mentioned in the files provided. However, for general inquiries, you may refer to the Federal Highway Administration.
    61--Nimbus Station Service Replacement
    Active
    Interior, Department Of The
    The Bureau of Reclamation, part of the Department of the Interior, is seeking contractors for the Nimbus Station Service Replacement project, specifically to furnish components for a secondary unit substation. The procurement includes essential electrical equipment such as station service transformers, motor control centers, circuit breakers, and DC distribution panelboards, aimed at enhancing the operational capacity and safety of the facility. This initiative is critical for maintaining the infrastructure of the Central Valley Project, ensuring reliable power distribution and compliance with federal standards. Interested contractors must submit their bids by September 3, 2024, and are encouraged to contact Charlesetta Seibure at cseibure@usbr.gov or 916-978-5456 for further inquiries.
    Y--YELL 310533 Rehabilitate and Improve Old Faithful Water Treatment System GAOA
    Active
    Interior, Department Of The
    The Department of the Interior, through the National Park Service, is preparing to solicit proposals for the rehabilitation and improvement of the Old Faithful Water Treatment System in Yellowstone National Park. This project aims to address aging infrastructure and compliance issues by upgrading the existing water treatment plant, which includes constructing a new building, enhancing chemical feeding and treatment systems, and improving safety and monitoring protocols. The initiative is crucial for ensuring the facility meets environmental regulations, particularly in relation to an existing EPA administrative order, while also providing robust opportunities for small businesses through subcontracting. Interested vendors must register on SAM.gov with an active UEI number, with the official solicitation expected to be released around September 11, 2024, and a project budget exceeding $10 million, with an estimated completion timeframe of approximately 822 days. For further inquiries, vendors can contact Vicki Freese-supler at vickilfreese-supler@nps.gov or by phone at 720-402-8467.
    Voya 308690: Replace Power Distribution
    Active
    Interior, Department Of The
    The Department of the Interior, through the National Park Service, is soliciting bids for the replacement of the power distribution system at Voyageurs National Park, specifically the underwater high voltage cable and associated transformer boxes. This project aims to enhance safety and operational reliability by addressing critical issues such as compromised neutral wiring, which poses safety risks to visitors and employees, and ensuring backup power generation for essential services like fire suppression and food safety at the Historic Kettle Falls district. The total estimated budget for this design-build project is $11,154,900, with proposals due by October 4, 2024. Interested contractors can contact Timothy Burger at TimothyBurger@nps.gov or call 720-688-9530 for further details.
    Emergency replacement of components within the grit facilities throughout the South Bay International Wastewater Treatment Plant (SBIWTP).
    Active
    International Boundary And Water Commission: Us-mexico
    The International Boundary and Water Commission (IBWC) seeks experienced contractors to address urgent repairs at the South Bay International Wastewater Treatment Plant in San Diego. The scope involves replacing critical components in the grit removal system to restore reliable operations. This fixed-price construction contract, with an estimated value of $1-5 million, requires adherence to numerous federal regulations and a quick turnaround of 240 days. Qualified small businesses are invited to submit bids, with a site visit scheduled prior to the deadline. The IBWC aims to maintain efficient wastewater treatment and has issued forms to screen and evaluate potential contractors based on their experience and capabilities. This important project will enhance the resilience of vital infrastructure while ensuring compliance with environmental and safety regulations. Contact details: Philip Johnson, philip.johnson@ibwc.gov, 915-255-9324. Key deadline: Bid deadline with a prior site visit. Estimated budget: Up to $5 million.
    Z--Folsom Right Wing Dam Ditch Bypass Modification
    Active
    Interior, Department Of The
    The Department of the Interior, through the Bureau of Reclamation, is seeking potential sources for the Folsom Right Wing Dam Ditch Bypass Modification project, located approximately 12 miles north of Folsom, California. This procurement involves a large construction effort estimated to cost between $5 million and $10 million, focusing on various tasks such as mobilization, site preparation, utility management, excavation, and ecological restoration. The project is critical for enhancing infrastructure and environmental management within the Central Valley Project, adhering to federal guidelines throughout its execution. Interested parties must submit their qualifications and relevant information to Contract Specialist Ron Gamo at rgamo@usbr.gov by 5:00 PM PDT on September 13, 2024, to be considered for this opportunity.