INDU 305176 - Marquette Greenway Trail Constructio
ID: 140P2024R0155Type: Solicitation
Overview

Buyer

INTERIOR, DEPARTMENT OF THENATIONAL PARK SERVICEDSC CONTRACTING SERVICES DIVISIONDENVER, CO, 80225, USA

NAICS

Other Heavy and Civil Engineering Construction (237990)

PSC

MAINTENANCE OF HIGHWAYS/ROADS/STREETS/BRIDGES/RAILWAYS (Z1LB)

Set Aside

8(a) Set-Aside (FAR 19.8) (8A)
Timeline
    Description

    The Department of the Interior, through the National Park Service, is soliciting bids for the construction of the Marquette Greenway Trail at Indiana Dunes National Park, Indiana. The project involves developing a nearly 2.5-mile multi-use trail, featuring a ten-foot-wide asphalt path with gravel shoulders, and includes the installation of a prefabricated multi-use bridge. This initiative aims to enhance regional connectivity while protecting sensitive dune ecosystems, reflecting the government's commitment to sustainable infrastructure and public access to natural resources. Interested contractors must submit their proposals by October 3, 2024, with an estimated construction cost ranging from $1 million to $5 million; for inquiries, contact Brenda Smith at brenda_smith@nps.gov or call 720-315-2035.

    Point(s) of Contact
    Files
    Title
    Posted
    The National Park Service (NPS) issues a pre-solicitation notice for the Marquette Greenway Trail project in Indiana. NPS seeks a capable contractor to convert a gravel trail into a formal, paved multi-use trail, adding asphalt and gravel shoulders. The project also entails replacing a pedestrian bridge. It's anticipated that a firm-fixed-price contract will be awarded based on a best-value determination. The estimated contract value falls between $1 million and $5 million, with a projected period of performance of 382 calendar days. The actual solicitation is expected around August 17, 2024, with key dates and submission deadlines to be specified then. Interested parties should prepare to register on SAM.gov and be ready to respond promptly when the solicitation is issued.
    The Marquette Greenway construction project at Indiana Dunes National Park focuses on the development of a multi-use trail extending nearly 2.5 miles from the Paul H. Douglas Center for Environmental Education to County Line Road in Gary, Indiana. The project aims to enhance connectivity within the regional trail system and to protect sensitive dune ecosystems from visitor impact. Key components of the project include the construction of a ten-foot-wide asphalt trail with adjacent gravel shoulders and the replacement of an existing pedestrian bridge with a wider vehicle and pedestrian bridge. The contract stipulates comprehensive environmental protection measures, resource management, and adherence to substantial safety and quality standards during construction. Permitting responsibilities and proper coordination with local authorities are emphasized to minimize disruption to public access. The document outlines specifications for project management, scheduling, and procurement procedures, alongside clear goals for ecological preservation and efficient work practices. Overall, it delineates the National Park Service's commitment to sustainable infrastructure development within a historically significant area.
    The document pertains to infrastructure specifications relevant to federal and local grants and RFPs focusing on construction techniques and materials for a project involving a structural bridge or similar construction. Key details include dimensions, material specifications (such as helical piles and timber decking), and structural elements (such as beams, trusses, and safety rails). The document outlines specific engineering criteria, including the required load capacities for various components and installation guidelines for safety features. It emphasizes compliance with regulatory standards, ensuring both structural integrity and safety of the designs proposed. This document serves as a critical resource for contractors and engineers involved in responding to government infrastructure project bids, clarifying necessary standards and project requirements.
    The government document outlines a contract price schedule for a project managed by the National Park Service (NPS) at the Indiana Dunes National Park, identified by solicitation number 140P2024R0155. The primary focus of the project is the Marquette Greenway Trail, which includes two main contract line items (CLINs): a pedestrian trail and a pedestrian and vehicle bridge, both categorized as "LS" (lump sum) with a quantity of one for each. Details pertaining to the total base price of the project can be found in the specifications section related to the definition of contract line items. This document serves as a formal solicitation for contractors and provides critical pricing and project components necessary for bidding, aimed at improving the park's infrastructure and accessibility for visitors. It reflects the federal government's initiatives to enhance public spaces and environmental stewardship through structured contracting processes.
    The document outlines wage determinations for construction projects in Indiana, specifically addressing the counties of La Porte, Lake, Porter, and St. Joseph. It includes requirements under the Davis-Bacon Act and various Executive Orders that stipulate minimum wage rates for various classifications of workers in building, heavy, and highway construction projects. Notably, contracts initiated or renewed after January 30, 2022, are subject to a minimum wage of at least $17.20 per hour, while older contracts necessitate a minimum of $12.90. The document categorizes laborers, electricians, equipment operators, and other key trade positions, presenting wage rates and fringe benefits. It includes specific classifications for tasks such as asbestos removal, boiler making, and various forms of masonry and flooring work. The detailed tables illustrate distinct rates and fringe benefits per labor type, emphasizing their relevance to compliant work on federally funded or assisted projects. This guidance is integral to ensuring fair compensation and adherence to labor regulations in government contracting and construction projects across the specified Indiana counties.
    The government document outlines the Project Experience Questionnaire associated with Solicitation 140P2024R0155. Offerors are required to provide detailed responses regarding their past project experience relevant to the solicitation's evaluation parameters. Key components include a request for project information, contractor details, and specific project experience queries. Each offeror must list the project title, location, owner, and point of contact for both the project owner and agency, along with contractor roles and financial information tied to the project. Additionally, a set of questions prompts the offeror to describe the contractual work completed, identify relevant experience elements, explain any budgetary or scheduling changes, address problems encountered and resolutions implemented, and elaborate on successful performance methods employed. The document is structured as a questionnaire allowing for expanded responses to ensure comprehensive details are provided. This format emphasizes the importance of prior project experience and its alignment with the proposal to demonstrate capability for the desired contract. Overall, the purpose of this solicitation section is to evaluate an offeror's previous project experience to ensure they possess the necessary skills and insights for successful execution of the contract in question. Proper responses will help establish credibility and align with federal and local grant expectations.
    The Past Performance Questionnaire for solicitation No. 140P2024R0155 is a crucial document used in assessing contractors’ qualifications and past achievements in government contracts. It instructs offerors to fill out their details and provide information on previous projects, including contract specifics and descriptions of work performed. References are required to evaluate the contractor's performance across various categories—such as quality, schedule adherence, cost control, management, small business subcontracting, and regulatory compliance—marking them from "Exceptional" to "Unsatisfactory." Comments supporting these ratings are encouraged to provide insights into the contractor's capabilities and challenges faced. The completed questionnaire is to be returned to specific contracting officers by September 26, 2024. This document serves to ensure that contractors are evaluated thoroughly based on real-world performance, guiding the selection process for potential government projects.
    The memorandum from the United States Department of the Interior's National Park Service pertains to Solicitation 140P2024R0155 concerning the Marquette Greenway Trail. It serves as a response from a financial institution regarding a specific company that has established banking relationships since a noted date. Key financial data provided includes the number and types of accounts held by the company, an average balance range, and credit availability specifics. The memorandum requests details about any overdrafts and past due notices, as well as the bank's financial assessment of the company based on the Risk Management Association's criteria. The document emphasizes the importance of thorough financial evaluation for potential contractors responding to government RFPs, enhancing the decision-making process for awarding federal grants or contracts.
    The document outlines details related to Contract Number 140P2024R0155, designated as an 8(a) set-aside for federal construction services. The prime contractor currently has not invoiced any amounts against the contract, which permits a performance period of 382 calendar days after the notice to proceed. It specifies that up to 85% of the contract can be subcontracted to non-similarly situated subcontractors, yet there are no recorded payments to either similarly situated subcontractors (SSS) or non-similarly situated subcontractors (NSS) at this stage. The report emphasizes the necessity for compliance with limitations on subcontracting, particularly for small businesses, outlining specific participation percentages depending on the type of service or construction involved. Non-compliance with these restrictions would require the prime contractor to submit a corrective action plan. This documentation serves to ensure adherence to federal guidelines for small business participation in government contracts, aiming to promote equitable distribution of contracting opportunities and support for disadvantaged business groups.
    The document outlines the Solicitation No. 140P2024R0155 for the Marquette Greenway Trail project, a federal initiative under the National Park Service. The project aims to construct a two-and-a-half-mile multi-use trail, including a ten-foot-wide asphalt path with two-foot gravel shoulders and the replacement of an existing pedestrian bridge with a new prefabricated structure, located in Indiana Dunes National Park, Gary, IN. Key sections in the solicitation define the bid schedule, specifications, contractor responsibilities, and clauses relevant to the contract. Significant clauses include requirements for performance timelines, quality inspection protocols, contractor qualifications, and restrictions on subcontracting to ensure compliance with federal guidelines. Moreover, the document emphasizes the role of key personnel in project execution, the importance of adhering to the specified construction standards, and mechanisms for payment processing through the Invoice Processing Platform System. The solicitation underscores adherence to regulations regarding contractor conduct and compliance in federal projects, highlighting the government’s commitment to safety, quality, and environmental management. This solicitation reinforces robust legal and operational frameworks guiding federal construction projects and their execution.
    The document provides a detailed inventory of trees observed along various locations, particularly focusing on the landscape along a trail and near the Grand Blvd bridge. The survey includes the tree's quantity, location, and diameter measurements, along with notes about their status, indicating if they are on an existing trail and specifying their condition, such as whether they are dead or leaning. The trees are categorized by sections, including pull-offs, the east and west sides of the Grand Blvd bridge, and areas between Grand Blvd and another reference point, presumed to be a District of Columbia parking lot. Specific locations where trees are either alive or dead are also noted, including the presence of scrub trees and leaning branches. This analysis of the tree inventory suggests an evaluation for potential removal, trimming, or other maintenance actions, likely under a government project aimed at enhancing environmental safety and trail usability. The data may serve as a foundation for an RFP or grant application focused on environmental restoration or urban forestry management.
    The document appears to outline a navigational guide or information resource pertaining to hiking trails and natural areas within the Indiana Dunes National Park (IDNP). Key points include notable locations such as the John Merle Coulter Nature Preserve and various hiking trails like the Dune East Trailhead. The document may serve as a tool for promoting awareness and accessibility to recreational areas, possibly supported by federal or local grants aimed at enhancing community engagement with natural resources. This aligns with the broader government purpose of promoting public access to outdoor spaces, supporting health and wellness through outdoor activities. Overall, the document encapsulates essential information for hikers while indicating a commitment to preserving and promoting local natural landscapes.
    The document addresses a Request for Information (RFI) regarding the Marquette Greenway Trail project, providing clarifications on several aspects of construction requirements and contractor responsibilities. Critical discussions include tree removal, where the National Park Service (NPS) performed a preliminary assessment, yet the contractor must determine actual removal needs and methods. The contractor need not hire a botanist since one is already employed by the NPS for plant salvage operations. Discussions on acceptable materials clarify that Air Cooled Blast Furnace Slag and recycled crushed concrete are not acceptable as aggregate for the pathway. Furthermore, although changes in INDOT specifications regarding asphalt cement grades were noted, PG 64-22 remains the required grade for this project. The document outlines the contractor's responsibilities for quality control and fire safety measures, specifying that they can determine their methods without mandated standpipe requirements. Additionally, structural design and geotechnical report inquiries reveal that the provided designs are complete, but contractor qualifications for helical pile installation are necessary. Access points for construction and the use of Montgomery Street are confirmed permissible, contingent on local jurisdiction compliance. Overall, the purpose of this RFI is to clarify ambiguities and outline expectations before the project begins, ensuring smooth procurement and execution processes.
    The solicitation document (No. 140P2024R0155) pertains to the construction of the Marquette Greenway Trail at Indiana Dunes National Park, Indiana. It outlines project specifications for a ten-foot-wide asphalt trail with gravel shoulders, extending nearly 2.5 miles, and includes the installation of a prefabricated multi-use bridge. The proposal emphasizes compliance with multiple contracting standards, including bidding procedures, the performance of inspections, and contract administration details. Bidders must submit a detailed price schedule while ensuring their offers comply with the solicitation’s requirements. The document stresses the importance of quality inspection, performance timelines, and the implications of delays, including potential liquidated damages. Special requirements for key personnel, along with provisions aimed at ensuring compliance with small business participation and labor standards, are also detailed. Additional clauses related to environmental regulations and guidelines against using specific telecommunications equipment reinforce the government’s commitment to security and compliance. Overall, this solicitation reflects the federal government's structured approach to contracting, ensuring transparency, accountability, and effective project execution through a detailed framework that governs the bidding and construction processes within public safety and regulatory compliance standards.
    The document pertains to the Request for Information (RFI) and clarifications regarding the Marquette Greenway Trail project under Solicitation 140P2024R0155. It addresses inquiries from potential contractors about eligibility, material specifications, site preparation, and safety procedures related to the project. Key topics include confirmation of small business qualifications under federal standards, specifications for the aggregate base material—designated as limestone only, and contractor responsibilities for tree removal and utility identification. Additionally, it outlines the process for submitting questions and clarifications, with the expectation that contractors familiarize themselves with project parameters detailed in the plans and specifications. The emphasis is placed on adhering to provided engineering plans, ensuring compliance with safety and environmental regulations, and recognizing the contractor's role in verifying site conditions prior to construction. This RFI serves as an essential resource for small businesses interested in bidding while ensuring that all contracting requirements and project parameters are transparent and well communicated.
    The document is an amendment (No. 1) to a federal solicitation for a contract related to the National Park Service. The amendment details the necessary steps contractors must follow to acknowledge receipt of the amendment—a crucial requirement to maintain their proposal's eligibility. Contractors can acknowledge through various methods, including completing copies of the amendment, issuing separate letters, or electronic communications that reference the relevant solicitation and amendment numbers. The primary purpose of this amendment is to post Attachments 9-12 while maintaining all other terms and conditions of the original solicitation. The amendment specifies the importance of timeliness in acknowledging changes, as late submissions may lead to rejection of proposals. Additionally, it reiterates that a contractor's signature may be required and should be returned in specified quantities to the issuing office. This amendment reflects the administrative necessity of keeping all involved parties informed and compliant with the stipulations of the contract, showcasing the procedural rigor typical of government RFP processes aimed at ensuring transparency and fairness in contractor selection.
    The document details Amendment Two to solicitation 140P2024R0155 from the NPS, DSC Contracting Services Division, which modifies the existing solicitation terms. The main changes include the extension of the proposal due date to October 3, 2024, at 5:00 PM MT, and the addition of Attachment 13 RFI, dated September 24, 2024. The amended document also revises Solicitation Sections B-M and adjusts the timeline for submitting questions from a minimum of 10 calendar days to 7 calendar days prior to the due date, now allowing questions to be sent via email only. All other terms and conditions remain unchanged. The amendment emphasizes the importance of acknowledging receipt of this amendment to avoid rejection of offers submitted, outlining methods for contractors to confirm acknowledgment. The purpose of the amendment is primarily to clarify, update, and extend the offer timeline while retaining existing solicitation requirements, reflecting ongoing coordination and communication expectations in government contracting processes.
    The document outlines a federal solicitation for a construction project titled "Marquette Greenway Trail" at Indiana Dunes National Park, with solicitation number 140P2024R0155. The project is organized as a competitive 8(a) set-aside under NAICS code 237990, which pertains to Other Heavy and Civil Engineering Construction, with a small business size standard of $45 million. The estimated construction cost ranges from $1 million to $5 million. The solicitation provides essential information for bidders, including requirements for performance bonds, proposal submission guidelines, and the expected timeline for project commencement after award. It states that the project is currently unfunded but expects funding soon, leading to contract award. A site visit and question-and-answer section is referenced in other sections of the solicitation to facilitate bidder preparation. Offerors must adhere to strict timelines and submit sealed bids by the designated date. The communication information for an inquiry is provided, alongside reminders about securing necessary guarantees for work completion. This document serves as an invitation for qualified contractors to participate in the bidding process for a pivotal infrastructure project, reflecting the government's commitment to enhancing public recreational access and environmental stewardship.
    Similar Opportunities
    Y--LAKE 318673; 324894; 332529 Extend Public Launch R
    Active
    Interior, Department Of The
    The Department of the Interior, through the National Park Service, is soliciting bids for the construction project titled "Extend Public Launch Ramp at Hemenway Harbor" in Lake Mead National Recreation Area, Boulder City, Nevada. The project involves extending a public launch ramp by 529 feet, requiring excavation, grading, and the installation of precast concrete panels to enhance recreational access as lake levels decline. This initiative is crucial for maintaining public access to recreational facilities while adhering to environmental regulations and best management practices to protect local wildlife and water quality. Interested contractors must submit sealed offers by November 12, 2024, and can direct inquiries to Contracting Officer Dayna Omiya at daynaomiya@nps.gov or by phone at 720-910-0477. The expected contract magnitude exceeds $10 million, with a performance period from December 1, 2024, to December 1, 2026.
    Y--ROMO 327127 Bridge Preservation
    Active
    Interior, Department Of The
    The Department of the Interior, through the National Park Service, is soliciting proposals for the "Y--ROMO 327127 Bridge Preservation" project, aimed at preserving multiple bridges within Rocky Mountain National Park. The project encompasses various preservation tasks, including concrete repairs, masonry work, and scour countermeasures, with an estimated contract value between $1,000,000 and $5,000,000. This initiative is critical for maintaining infrastructure integrity and ensuring public safety while adhering to environmental regulations within the park. Interested contractors should submit their proposals by November 8, 2024, at 2 PM MT, and can direct inquiries to Shellie Murphy at shelliemurphy@nps.gov or call 720-610-2690.
    Y--Source Sought Notice
    Active
    Interior, Department Of The
    The Department of the Interior, through the National Park Service, is seeking proposals for the rehabilitation of the Painted Desert Community Complex located within Petrified Forest National Park. The project aims to address structural deficiencies, restore historical features, and upgrade facilities to meet current standards, with an estimated construction cost exceeding $10 million. This initiative reflects the federal government's commitment to preserving national landmarks while enhancing visitor experiences and public engagement. Interested contractors must submit their proposals by November 15, 2024, and can direct inquiries to James Waller at jameswaller@nps.gov or by phone at 303-969-2488.
    OR NPS CRLA 2018(1), Cleetwood Trail and Marina Improvements
    Active
    Transportation, Department Of
    The Department of Transportation, through the Federal Highway Administration, is seeking contractors for the Cleetwood Trail and Marina Improvements project at Crater Lake National Park in Oregon. The project involves the rehabilitation of a 1.1-mile trail, rockfall mitigation, replacement of a failed marina bulkhead, and upgrades to restroom facilities, with a focus on enhancing visitor access and safety while adhering to environmental standards. This initiative underscores the federal commitment to maintaining national park infrastructure, with an estimated contract value between $30 million and $40 million, and a tentative completion date set for Fall 2027. Interested vendors can contact the Contracts G. Office at WFL.contracts@dot.gov or by phone at 360-619-7520 for further details, and should monitor SAM.gov for solicitation updates anticipated in winter 2024/2025.
    GLCA 210865 Replace Wahweep Government Dock
    Active
    Interior, Department Of The
    The Department of the Interior, through the National Park Service, is seeking qualified firms for the replacement of the Wahweep Government Dock at Lake Powell, identified as project GLCA 210865. This procurement involves the design and construction of a new dock structure to replace the existing dock, which is over 40 years old and has suffered from environmental degradation. The project is significant for maintaining safe and functional access to the lake, with an estimated cost ranging from $7 million to $12 million and a performance period from February 2025 to February 2026. Interested parties must demonstrate relevant experience in design-build projects, submit responses by November 18, 2024, and ensure registration in SAM.gov; contact Zaira Lupidi at zairalupidi@nps.gov for further inquiries.
    MABI 32684 - MBRNHP KIOSK MANSION ACCESS SHUTTLE
    Active
    Interior, Department Of The
    The Department of the Interior's National Park Service is seeking qualified contractors for the MABI 32684 project, which involves enhancements at the Marsh-Billings-Rockefeller National Historical Park in Woodstock, Vermont. The project includes the removal and reconstruction of pathways to the Mansion and Platt Garden, the construction of an information kiosk at the park's main entrance, and the establishment of a shuttle shed for an electric vehicle, all while ensuring minimal disruption to visitors and preserving the site's historic integrity. The anticipated construction budget ranges from $500,000 to $1,000,000, with a project completion timeline of 120 calendar days and proposals expected to be solicited in Summer 2025. Interested parties must submit their qualifications and experience by November 22, 2024, to Rachel Dyer at racheldyer@nps.gov.
    Y--GATE 317659 Apply Maintenance Treatment to Atlantic Avenue and Hartshorne Avenue
    Active
    Interior, Department Of The
    The Department of the Interior, through the National Park Service, is seeking qualified contractors for a project titled "Y--GATE 317659 Apply Maintenance Treatment to Atlantic Avenue and Hartshorne Avenue" within the Gateway National Recreation Area in New Jersey. The project aims to apply preventative maintenance treatments, including pavement improvements such as overlays, crack filling, and the installation of traffic controls, guardrails, curbs, and gates, with a construction budget estimated between $5 million and $10 million. This initiative is crucial for maintaining the safety and accessibility of park roadways while minimizing disruption to visitors during operational hours. Interested businesses are encouraged to submit their qualifications, bonding capacity, and relevant experience by November 12, 2024, and can contact Dane Cooper at danecooper@nps.gov for further information.
    ID BOR SRAO TCROWN(1), Crown Point Trail and Parking Area
    Active
    Transportation, Department Of
    The Department of Transportation's Federal Highway Administration seeks contractors for the Crown Point Trail project in Idaho, involving extensive trail construction and repairs. This small business set-aside project, valued between $700,000 and $2 million, requires expertise in highway construction and will be awarded through a sealed bid process. The upcoming procurement, anticipated in early 2025, aims to enhance a 2.7-mile trail stretch with resurfacing, slope repairs, and new construction, accessible for physical inspection now before snow sets in.
    Vicksburg National Military Park
    Active
    Transportation, Department Of
    The Department of Transportation, specifically the Federal Highway Administration, is soliciting bids for construction work at the Vicksburg National Military Park in Mississippi, under Solicitation Number 693C73-25-B-000002. The project involves essential slide repairs on Grant Avenue and Union Avenue, including tasks such as roadway excavation, embankment construction, and installation of engineered structures to stabilize the affected areas. This initiative is crucial for maintaining the park's infrastructure and ensuring visitor safety, with an estimated project cost ranging from $5 million to $10 million. Interested contractors should prepare to submit their bids electronically by the specified deadline, with bid documents expected to be available around October 23, 2024. For further inquiries, contact Emily McCleary or C. Shawn Long at EFLHD.Contracts@dot.gov.
    Y--DEVA 335272 - TITUS CANYON ROAD CONSTRUCTION
    Active
    Interior, Department Of The
    The National Park Service (NPS) is seeking qualified contractors for the Titus Canyon Road Construction project located in Death Valley National Park, California and Nevada. This project involves repairing 13.5 miles of road that has been severely damaged by storms in 2022 and 2023, rendering it impassable for all vehicles larger than a bicycle. The roadway is a historic cultural resource, and the construction will require protective measures to preserve its historical aspects while addressing significant erosion and washout issues caused by extreme weather events. Interested businesses are invited to submit their qualifications and bonding capacity by November 22, 2024, with anticipated construction costs ranging from $1,000,000 to $5,000,000 and a project completion timeline of 200 calendar days, factoring in potential weather-related delays. For further inquiries, contact Rachel Dyer at racheldyer@nps.gov.