The Department of Energy, specifically the Western-Rocky Mountain Region, is soliciting bids for the construction of the Sand Creek Switching Station. This project involves the establishment of a new 115-kV switching station, which includes the construction of a three-breaker ring bus on the Erie – Hoyt – Willoby transmission lines, along with the installation of associated electrical equipment, structures, foundations, and a prefabricated control building foundation. The work also encompasses site development and the installation of 0.3 miles of 115-kV transmission line, as well as the removal of an existing 0.3 miles of transmission line and fiber optic installation, including splicing and related equipment. This procurement is set aside for small businesses, and interested parties can reach out to John W. Pratt at jpratt@wapa.gov or by phone at 720-962-7166 for further details.