Z1DA--MINOR-CONST 528-809 NEW EMERGENCY DEPARTMENT ALBANY VAMC
ID: 36C24224R0071Type: Solicitation
Overview

Buyer

VETERANS AFFAIRS, DEPARTMENT OFVETERANS AFFAIRS, DEPARTMENT OF242-NETWORK CONTRACT OFFICE 02 (36C242)ALBANY, NY, 12208, USA

NAICS

Commercial and Institutional Building Construction (236220)

PSC

MAINTENANCE OF HOSPITALS AND INFIRMARIES (Z1DA)
Timeline
    Description

    The Department of Veterans Affairs is seeking qualified contractors for the construction of a new Emergency Department at the Samuel S. Stratton VA Medical Center in Albany, NY, under Project No. 528-809. The project involves comprehensive site preparation, including demolition, excavation, and the construction of a facility that meets stringent safety and operational standards, with a focus on enhancing healthcare services for veterans. This initiative is critical for modernizing the medical infrastructure and ensuring compliance with federal regulations, with an estimated contract value between $20 million and $50 million. Interested contractors must submit their proposals by September 4, 2024, and can direct inquiries to Contracting Officer Michael A. Spivack at MICHAEL.SPIVACK@va.gov or Edward Kostolansky at Edward.Kostolansky@va.gov.

    Point(s) of Contact
    Michael A SpivackContracting Officer
    MICHAEL.SPIVACK@va.gov
    Files
    Title
    Posted
    The document outlines the specifications for the design of a new emergency department at the Samuel S. Stratton VA Medical Center, designated as VA Project No. 528-809. It includes an extensive table of contents detailing various critical divisions and sections required for the project, ranging from general requirements and existing conditions to specifics related to structural components, mechanical systems, and finishes. The project encompasses a comprehensive approach to construction, emphasizing quality control, safety requirements, and environmental controls. Each section outlines specific methods, materials, and standards to adhere to throughout the development process. Key areas of focus include site surveys, demolition, HVAC, plumbing, electrical installations, and exterior improvements. This documentation serves as a guideline for contractors and builders, ensuring compliance with the Department of Veterans Affairs and promoting safety and efficiency in the design and construction of facilities that support veteran healthcare needs.
    The document outlines the design plans for a new Emergency Department at the Samuel S. Stratton VA Medical Center, designated as VA Project No. 528-809, dated May 1, 2020. It provides a comprehensive list of drawing sheets that form part of the contract, detailing various aspects of the project's design and construction. The drawings include site plans, demolition plans, utility plans, and multiple details related to architectural, structural, mechanical, electrical, and plumbing systems. Specific attention is given to safety and compliance aspects, such as life safety plans and asbestos abatement considerations. Various alternatives are listed, indicating options for construction methods like crawl space and slab on grade. The document emphasizes systematic planning and coordination in the construction process, ensuring adherence to regulations and effective integration of necessary upgrades, ultimately supporting the VA's goal to enhance medical infrastructure for veterans. It serves as a crucial reference for contractors, engineers, and various stakeholders involved in the project, highlighting the project's complexity and scope.
    The Samuel S. Stratton VA Medical Center is undertaking a project to design a new Emergency Department, which necessitates detailed specifications for metal fabrications. This document outlines the requirements for items fabricated from structural steel, including supports for wall and ceiling-mounted elements, frames, loose lintels, safety nosings, ladders, railings, and steel pipe bollards. It emphasizes quality assurance, requiring all products to be standardized, durable, and compliant with applicable codes. Additionally, significant focus is placed on submission protocols for shop drawings and product data to ensure adherence to specified standards. Materials must comply with various ASTM standards, and installation processes require precise methods to ensure structural integrity. The document also outlines protective measures against corrosion and mandates proper fastening techniques for secure assemblage. The intent of this specification is to ensure that all metal fabrication elements are executed with the highest safety and quality standards in mind, thereby contributing to the successful construction of a compliant and functional emergency department. This aligns with the broader context of government RFPs and grants, promoting transparency, regulatory compliance, and the highest standards in federal contracting.
    The Samuel S. Stratton VA Medical Center is planning the design of a new emergency department, incorporating modified bituminous sheet waterproofing for exterior below grade and wall cavity applications. The document outlines specifications for the waterproofing system, referencing federal standards such as Fed. Spec. UU-B-790A and various ASTM International guidelines, ensuring compliance and quality. Key sections discuss product submittal procedures, installer qualifications, storage and handling, and installation methods, emphasizing proper surface preparation and environmental conditions during application. The warranty stipulates a 10-year coverage against defects in material and workmanship. Quality assurance processes include testing and field inspections to certify water-tightness before covering. This detailed guidance aims to uphold construction standards, mitigate water damage risks, and enhance the durability of the new facility in accordance with federal project requirements.
    The document outlines the specifications for the design and installation of the Exterior Insulation and Finish Systems (EIFS) for the new Emergency Department at Samuel S. Stratton VA Medical Center. It details the types of systems to be used, including Direct Exterior Finish Systems (DEFS) and EIFS, and emphasizes adherence to various ASTM standards for materials and installation. Key sections cover product specifications, installation guidelines, and quality assurance measures, ensuring that materials are suitable for the environmental conditions and structural requirements. Quality control is a significant focus, requiring warranties on materials and the installer’s qualifications. The installation process involves preparation of substrates, meticulous application of insulation boards, base coats, and finishes, with guidelines on control joint placements, sealant installations, and overall environmental considerations to prevent damage. This project underscores the VA’s commitment to building a compliant and durable facility through rigorous standards and precise workmanship in response to federal requirements for health and safety in government construction projects.
    The document details specifications for the design and installation of aluminum-framed entrances and storefronts for the New Emergency Department at the Samuel S. Stratton VA Medical Center. It outlines the requirements for materials, product standards, and performance criteria to ensure compliance with safety and architectural standards. Key topics include preinstallation meetings, submittals, materials standards, and quality assurance measures, mandating that installations adhere to specifications related to wind resistance, blast protection, water and air infiltration, and thermal movement. Specifically, the document emphasizes the importance of using registered design professionals for calculations and ensuring installations accommodate specified blast resistance levels. Additionally, it outlines warranties, delivery, handling procedures, and requirements for certifications verifying product compliance. The document reflects the government's initiative to enhance healthcare infrastructure while ensuring security and durability within strict regulatory frameworks. This comprehensive approach is critical for maintaining safety standards in federal construction projects, illustrating the government's commitment to delivering resilient healthcare facilities.
    The document outlines specifications for door hardware as part of the design for a new emergency department at the Samuel S. Stratton VA Medical Center under Project No. 528-809. It lists detailed requirements for various hardware components, including wire harnesses, electric hinges, emergency exit hardware, magnetic locks, and safety sensors. The operational description specifies that the doors will remain locked and latched, unlocking upon valid card access, and automatically operate thereafter. Additionally, it notes provisions for emergency situations, such as power loss or fire alarms, which will allow for immediate egress. The detailed cataloging of hardware components reflects the adherence to safety and accessibility standards integral to VA facilities, underscoring the project's focus on function and security in high-stakes environments.
    The document outlines specifications for the glazing and glass installation for the new emergency department at the Samuel S. Stratton VA Medical Center, covered under VA Project No. 528-809. It details the types of glass, performance requirements, installation guidelines, and safety standards relevant to the project. Key components include the use of thermal, ballistic, and blast-resistant glazing, which must comply with specific ANSI, ASTM, and UL codes. Additional sections cover related work, temporary and permanent labeling, and warranties for various glazing types. The contract emphasizes rigorous adherence to mounting, sealing, and safety standards to ensure structural integrity and security against potential hazards. Each glass type specified must meet minimum thickness requirements and is subject to rigorous testing for compliance with performance metrics related to strength, fire resistance, and impact resistance. Overall, the document serves to ensure that the glazing systems installed contribute to the safety and functionality of the medical facility, reflecting the VA's commitment to providing secure healthcare environments.
    The document details the planned construction of a new emergency department at the Stratton VA Medical Center, with a focus on infection control and safety measures during the project. Key components include a phased approach to construction, spanning several months, which includes mobilization, demolition, and the new building's construction. The project emphasizes minimizing airborne dust and contamination through stringent infection control precautions tied to various risk classes. Moreover, it outlines detailed plans for erosion and sediment control, as well as utility and landscaping arrangements. The document is structured with numerous drawings and specifications essential for contractors, architects, and engineers, all complying with the standards of the U.S. Department of Veterans Affairs. The project aims to enhance the facility's capability to serve veterans while ensuring patient safety and regulatory compliance. This summary encapsulates the project's significance, emphasizing its adherence to safety protocols and stakeholder collaboration throughout the construction process.
    The document outlines the design and planning details for the new Emergency Department at the Stratton VA Medical Center, which is part of the U.S. Department of Veterans Affairs. The project focuses on modernizing the facility with essential upgrades such as an enhanced fire protection system and electrical layouts on multiple levels, including basement and first floors. It aims to ensure compliance with safety standards, particularly through fully sprinklered systems and effective electrical and communication setups throughout the new wings of the hospital. Key construction notes and details illustrate the architects' and engineers' roles in coordinating these efforts, ensuring the structure meets contemporary healthcare facility requirements. The project represents a crucial investment in improving services and patient care while adhering to federal construction guidelines.
    The document presents the electrical and structural planning for the new Emergency Department at the Stratton VA Medical Center, highlighting the organization's commitment to modernizing healthcare facilities for veterans. It includes detailed electrical plans for various specialized examination rooms (resuscitation, bariatric/isolation, and SANE exams) and outlines the associated power requirements. The project, overseen by Hyman Hayes Associates and direction from the U.S. Department of Veterans Affairs, emphasizes a fully sprinklered environment to enhance safety standards. Additionally, it specifies infrastructure requirements such as power panels, fire alarm systems, data drops, and lighting equipment. The document illustrates a comprehensive approach to facility design, indicating the planned phases of construction and the collaborative efforts between architects and engineers to ensure compliance with safety codes and veteran care standards. This project is a significant investment in enhancing emergency medical services, aligning with the VA's ongoing efforts to improve healthcare environments while adhering to federal guidelines and regulations.
    The document outlines the project specifications for the New Emergency Department at the Stratton VA Medical Center in Albany, NY. It includes detailed plans for construction, highlighting critical components such as building layouts, safety features, and compliance with health and safety standards. The project is fully sprinklered, ensuring fire safety according to government codes. Key details include various construction phases and design elements, particularly in life safety measures tailored for healthcare settings, such as clear egress paths, smoke barriers, and minimum corridor widths. The document emphasizes the need for accurate coordination among contractors to meet deadlines and maintain a clean work environment. Architectural plans involve the removal of certain existing structures and integration of new systems while meeting regulatory standards. The comprehensive approach ensures that all materials, installations, and practices align with recognized industry standards and local regulations. This project exemplifies the federal commitment to enhancing healthcare facilities for veterans, focusing on safety, accessibility, and service continuity.
    The document outlines the architectural and engineering plans for the new Emergency Department at the Stratton VA Medical Center located in Albany, NY. The design includes detailed specifications for the roof plan, ceiling plans, wall sections, equipment placement, and overall structural integrity adhering to VA standards. Key elements include the specification of pathway pads for roof access, requirements for insulation, vapor barriers, and construction specifics for both interior and exterior walls to ensure energy efficiency and compliance with health regulations. Additionally, the document establishes clear guidelines for equipment installation, highlighting coordination among various contractors and service providers to meet operational needs. The project's framework emphasizes construction safety, compliance with federal regulations, and the integration of modern health technologies. Overall, it reflects the government's commitment to enhancing healthcare infrastructure for veteran services through meticulous planning and execution.
    The document contains detailed architectural and engineering plans for the new Emergency Department at the Stratton VA Medical Center in Albany, NY. It includes enlargements of floor plans, sections, and interior elevations, highlighting the design and specifications of various areas including patient rooms, nursing stations, and support spaces. The plans involve specific measurements and instructions for plumbing, electrical outlets, and finishes, ensuring adherence to safety codes and VA standards. The project emphasizes functionality and compliance with health regulations, showcasing features like bariatric facilities, specialized exam rooms, and durable materials like porcelain tiles. The emphasis on accessibility, including clear height requirements and necessary accommodations, reflects the VA's commitment to providing high-quality medical services. This comprehensive design not only aims to enhance the operational capacity of the facility but also prioritizes patient safety and comfort, demonstrating a strategic approach to modern healthcare infrastructure in alignment with federal guidelines.
    The document outlines construction specifications for the new Emergency Department at Stratton VA Medical Center in Albany, NY. It includes detailed drawings and notes focused on structural features such as fireproofing, wall constructions, and specific material requirements for interior finishes. The design emphasizes the installation of resilient and mold-resistant materials to meet health and safety standards, especially in high-traffic areas where durability is critical. Key sections detail the installation of structural steel, fireproofing measures, and the use of predefined materials for walls, flooring, and information on soundproofing through acoustic panels. It also includes a comprehensive finish schedule specifying types of flooring, wall bases, and protective wall coverings for both aesthetic and functional purposes. Overall, the document serves as a technical guide for contractors involved in the bidding and construction process, ensuring compliance with VA construction standards and local regulations, while promoting a safe and functional environment for patients and staff.
    The document outlines structural engineering plans for a new emergency department to be built on Holland Avenue in Albany, NY, under the supervision of the U.S. Department of Veterans Affairs. It includes detailed specifications for foundation and framing, emphasizing concrete slabs and steel reinforcements to ensure structural integrity. Key design elements involve the use of various steel sections, such as W12 and W18 beams, with reinforced connections to support significant loads. It includes instructions for temporary shoring, seismic joints, and specific monitoring of construction activities, indicating a comprehensive approach to comply with engineering standards and safety regulations. Additional notes highlight the need for coordination among different trades, with detailed elevations and structural relationships defined. The document also mandates compliance with federal and state standards, reflecting its purpose within the frameworks of government RFPs and grants. This illustrates the VA's commitment to enhancing healthcare facilities while ensuring structural safety and adherence to regulatory frameworks. The overall focus is on efficiency, safety, and effective project management through precise calculations and well-defined structural requirements.
    The document outlines the structural specifications and detailing for a new emergency department project at the U.S. Department of Veterans Affairs facility in Albany, NY. It includes detailed drawings of various structural components such as columns, brace connections, and framing, with emphasis on materials like HSS (Hollow Structural Sections) and W (Wide Flange) beams. Specific installation notes and connections are provided to ensure compliance with industry standards, including guidelines for seismic provisions and structural integrity. The files detail careful calculations required from a licensed professional engineer, focusing on the connections and braced frames necessary to uphold safety during seismic events. The document's structure is methodical, presenting clear drawings, connection details, and a comprehensive schedule for the structural columns. Such meticulous detailing aids contractors in understanding the project requirements for structural support, safety, and effective coordination in execution. The primary purpose of this file is to ensure that the construction aligns with the federal standards and expectations for infrastructure development, highlighting the importance of precision in engineering and design for a critical healthcare facility. This aligns with governmental projects emphasizing infrastructure resilience and safety, particularly in healthcare settings.
    The document pertains to the project for the construction of a new emergency department at the Stratton VA Medical Center, part of the U.S. Department of Veterans Affairs. It provides essential details related to the engineering and architectural designs, including schematic diagrams and schedules for various systems like air handling units, hot water controls, and plumbing specifications. Key dates include a project issue date of December 16, 2022, with all drawings marked as 100% for bid, indicating readiness for contractor engagement. The document emphasizes the project's compliance with safety standards through a fully sprinklered design, noting specific control systems and equipment requirements. It is structured to present a comprehensive overview of project components, demonstrating meticulous planning and collaboration among architectural and engineering teams. This project not only aims to enhance healthcare infrastructure for veterans but also showcases stringent adherence to safety and quality regulations essential for government-funded construction initiatives. Overall, it reflects the government’s ongoing commitment to improving healthcare services through modernized facilities.
    The document outlines the project specifications and requirements for the new Emergency Department at the Stratton VA Medical Center, aimed at modernizing healthcare facilities for veterans. It details the plumbing and fire protection systems, indicating the construction needs for domestic water, medical gas piping, and fire safety measures, including sprinkler systems. The project is fully sprinklered and includes specific notes for plumbing layouts, sanitary piping plans, and emergency systems, ensuring compliance with safety regulations. The document serves as a comprehensive blueprint for contractors and engineers, detailing the architect's required standards and relevant plans. Overall, it emphasizes the importance of safety, functionality, and adherence to federal guidelines within the context of a government-funded healthcare initiative.
    The document pertains to a project by Hyman Hayes Associates related to the construction of a new emergency department at the Stratton VA Medical Center. It outlines the project details including drawings, specifications for seismic bracing of various structures, and requirements for an acoustically conditioned ceiling grid. Key elements involve the installation of fire protection piping, ductwork, and other mechanical systems, ensuring compliance with safety standards. Additionally, the document highlights the role of the Office of Construction and Facilities Management within the U.S. Department of Veterans Affairs, indicating the importance of adhering to federal construction regulations. Overall, this project aims to enhance emergency health services at the facility through meticulous planning and implementation of critical infrastructure improvements.
    The Fellenzer Engineering, LLP has prepared a comprehensive project proposal for the design of a new Emergency Department at the Samuel S. Stratton VA Medical Center in Albany, NY, under VA Project No. 528-809. The document outlines the specifications for the construction process, emphasizing the requirement for safety, quality control, and adherence to VA standards. Key sections contain detailed requirements across various construction divisions, including general requirements, existing conditions, concrete work, masonry, mechanical systems, electrical installations, and environmental controls. The contractor is responsible for site preparation, demolition, and all necessary installations, ensuring minimal disruption to the functioning of the medical center. Bid submissions will include various alternates allowing the contractor to specify options such as basement design changes and construction of a pneumatic tube system. Security and safety measures are crucial, with strict guidelines for employee access and material handling. The project aims to enhance healthcare services for veterans by modernizing existing facilities while ensuring compliance with established safety and environmental protocols throughout the construction period.
    The document outlines the requirements for designing a new Emergency Department at the Samuel S. Stratton VA Medical Center in Albany, NY (VA Project No. 528-809). It primarily focuses on the responsibilities of contractors in conducting site surveys, demolition work, and the abatement of asbestos-containing materials (ACM) in adherence to federal, state, and local regulations. Key sections mandate the submission of survey drawings that comply with ALTA-ACSM standards and lay out the procedures for conducting boundary and utility surveys. Furthermore, the document specifies the methods for safe demolition, including hazards management, safety procedures, and environmental protection measures. Asbestos abatement protocols detail preparation, removal, and disposal of ACM, ensuring contractor compliance with all relevant codes and guidelines, including training and medical evaluations for personnel. The document highlights the necessity for coordination with VA representatives during the project and emphasizes maintaining a safe working environment by following strict safety measures and regulatory compliance. Overall, this RFP illustrates the VA's commitment to providing quality healthcare infrastructure while establishing thorough procedures to safeguard public health and safety during construction activities.
    The document serves as a comprehensive Submittal Register for the design of the new Emergency Department at the Samuel S. Stratton VA Medical Center in Albany, NY. It outlines the requirements for various construction phases, including pre-mobilization, pre-demolition, pre-construction, pre-commissioning, and pre-closeout. Each section lists specific items to be submitted, specifying sources of documentation such as shop drawings, product data, and safety reports, ensuring adherence to federal and local standards. The emphasis is on providing detailed and organized submissions for review, including complete systems information to facilitate thorough evaluations. The submittals must pertain to the materials intended for use, excluding generic product lines. Regulatory compliance is highlighted through safety and quality control measures, encompassing accident prevention plans and ongoing communication with regulatory agencies. The structure promotes efficient project management by requiring dates for submissions, reviews, and revisions between architects, engineers, and the VA. Overall, this document underscores the importance of collaboration and precision in the construction process, reflecting the government's commitment to delivering high-quality healthcare infrastructure.
    The document outlines a Request for Proposal (RFP) from the Department of Veterans Affairs (VA) for a construction project to build a New Emergency Department at the Samuel S. Stratton VA Medical Center in Albany, NY. It specifies that the project has a total set-aside for small businesses, with an estimated cost between $20 million and $50 million. Proposal submissions are due by August 26, 2024, with an emphasis on a firm-fixed-price contract. Contractors must provide performance and payment bonds, evidence of safety compliance, and demonstrate relevant experience. Submission materials must follow specified formats and include key components, such as technical capability, past performance, a detailed construction schedule, and pricing information. A significant evaluation will focus on technical capabilities and schedule management, followed by past performance and pricing, with the government adopting a "Best Value" tradeoff approach to determine the most advantageous offer. The RFP encourages innovation and includes a mandatory site visit to familiarize bidders with project details. This procurement process emphasizes safety, efficiency, and compliance with federal contracting regulations to ensure quality and accountability in delivering the construction project.
    The document serves as an amendment to a solicitation issued by the Department of Veterans Affairs, specifically Network Contracting Office 2, regarding contract 36C24224R0071. The amendment addresses vendor questions related to the installation details and requirements for lighting fixtures and a lightning protection system. Key clarifications include that each cluster of Q light fixtures must contain three fixtures, contrary to an earlier document suggesting four fixtures. Additionally, technical directives outline that the new lightning protection system should be standalone, with specific bonding and grounding instructions to ensure compliance with safety standards. Overall, the amendment emphasizes the importance of adherence to defined specifications while maintaining the original contract's terms and conditions. The document also underscores procedural requirements for acknowledgment by contractors to ensure offer submission timelines are met. This reflects a commitment to transparency and accuracy in project execution within government contracting.
    The document is an amendment to a solicitation for a contract managed by the Department of Veterans Affairs, specifically the Network Contracting Office 2. It outlines procedural requirements for vendors responding to the solicitation, including the deadlines for submitting Requests for Information (RFIs) and past performance questionnaires. Vendors must submit RFIs by August 19, 2024, and all completed questionnaires need to be emailed to the Contract Specialist by noon EST on August 26, 2024. Additionally, the amendment adds two documents to the solicitation: a sample transmittal letter and a past performance questionnaire. It reiterates that other terms and conditions of the solicitation remain unchanged, emphasizing the importance of adhering to the specified submission guidelines to avoid rejection of offers. Overall, this amendment plays a critical role in ensuring transparency and clear communication between the government and potential contractors.
    This document serves as an amendment to a solicitation for a construction project overseen by the Department of Veterans Affairs (VA), specifically under Project Number 36C24224R0071. The amendment addresses key inquiries from vendors regarding project specifications, including the necessity of AISC certification for fabricators, which remains mandatory. Furthermore, it clarifies discrepancies in the Bid Form regarding the number of deduct alternates listed, confirming that only three are to be included despite the original design containing five. Additionally, the amendment rectifies omissions in the table of contents by attaching specifications for Modified Bituminous Sheet Waterproofing and Metal Building Systems, which were previously missing but are now outlined for reference. The document maintains that all other terms and conditions of the original solicitation remain unchanged, ensuring that parties involved understand the requirements and parameters of the proposal submission. Overall, this amendment is critical in providing clarifications that support vendor compliance and promote transparency in the procurement process for this VA project.
    The document serves as an amendment to an existing solicitation for the New Emergency Department project at the Albany Veterans Affairs Medical Center (VAMC). It addresses vendor inquiries concerning project specifications, construction details, and material requirements. Key topics include revisions related to construction methods for soldier pile walls, structural modifications, and updated material specifications that take into account changes from previous solicitations. Specifics include adjustments to the specifications of water vapor-reducing admixtures, clarifying product availability, and defining the expected performance of proposed materials. The document iteratively reviews responses to Requests for Information (RFIs), covering essential topics such as patient lift systems, nurse call integration, fire alarm device clarifications, and requirements for blast resistance. Additionally, it outlines responsibilities regarding supply and installation, updates on existing and future electric systems, as well as guidelines on security and access control systems. Emphasizing compliance with the VA's standards, the amendment highlights ongoing coordination between various subcontractors and the need for third-party inspections on construction-related activities. This comprehensive addendum ensures clarity on project expectations and facilitates a smoother bidding process for contractors while aligning with government procurement standards.
    This document is an amendment to a solicitation issued by the Department of Veterans Affairs, specifically from the Network Contracting Office (NCO) 2. The amendment modifies solicitation number 36C24224R0071, extending the deadline for offers to August 26, 2024, at 12:00 EST. A key detail included is the posting of a sign-in sheet for a walkthrough event that occurred on August 1, 2024. All other terms and conditions of the original solicitation remain unchanged and valid. The amendment emphasizes the importance of acknowledging receipt by the offerors to prevent rejection of their offer if changes are submitted. Michael Spivack is noted as the contracting officer responsible for this amendment. Overall, this document serves to inform potential bidders of important changes regarding the submission timeline and procedures associated with the solicitation process.
    The document outlines an amendment to a solicitation issued by the Department of Veterans Affairs, specifically from Network Contracting Office 2 in Cheektowaga, NY. This amendment extends the submission deadline for proposals from August 26, 2024, at 12:00 EST to September 4, 2024, at 11:00 EST. It specifies the updated contact for proposal submissions as Edward Kostolansky instead of Michael Spivack. Additionally, the amendment states that no new Requests for Information (RFIs) will be accepted after August 22, 2024, and that all received RFIs will be answered by August 27, 2024. Furthermore, the amendment includes supplemental drawings for seismic bracing details and Access Control Card Readers, as requested by vendors, emphasizing the importance of these updates for compliance and project specifications. All other terms and conditions of the solicitation remain unchanged. This document serves as a critical communication tool to ensure clarity and compliance among potential contractors regarding the RFP process.
    This document is an amendment to a solicitation related to a construction project overseen by the Department of Veterans Affairs, specifically for the Albany VAMC Emergency Department project. It encompasses responses to various Requests for Information (RFIs) submitted by vendors. Key updates include the clarification of specifications regarding metal-panel cladding grounding for lightning protection, the use of specific water vapor-reducing admixtures in concrete, and amendments to finish schedules for floors and doors. The amendment addresses the qualifications, including waiving AISC certification requirements for fabricators and detailing signage standards. Furthermore, it includes responses to discrepancies in material specifications, and guidance on compliance with VA standards. Overall, the document reflects the proactive approach of the VA to ensure project clarity, compliance with specifications, and responsiveness to vendor inquiries, thereby promoting transparency and efficiency in the procurement process. This emphasizes the government's commitment to maintaining high safety and quality standards in public infrastructure projects.
    The document contains a site visit sign-in sheet related to the U.S. Department of Veterans Affairs' solicitation 36C24224R0071, concerning the construction of a new emergency department at Albany VAMC. Attendees, including various contractors and companies, signed in with their names, companies, phone numbers, and email addresses. The list highlights the diversity of interested businesses participating in the federal procurement process. It showcases the significance of open communication and collaboration among contractors involved in government projects. This sign-in sheet serves as a record of the engagement level and potential competition for this specific RFP, which aims to enhance the healthcare services provided to veterans in the Albany region. Through this solicitation, the VA emphasizes its commitment to improving facilities for veteran care, adhering to federal regulations and procurement standards.
    The document outlines the federal Requests for Proposals (RFPs) and grants available for various projects impacting state and local levels. It emphasizes the need for organizations to align proposals with federal guidelines to secure funding effectively. Key points include the eligibility criteria for applicants, outlining the required qualifications, financial disclosures, and project descriptions. Timelines for proposal submissions and the evaluation process are discussed, underlining the importance of adherence to deadlines and presentation of detailed project plans. The document further highlights the priority areas for funding, including public health initiatives, infrastructure development, and community engagement projects. Overall, it serves as a comprehensive resource to guide entities in navigating the complexities of federal grants and RFPs while facilitating the procurement of government funding for local initiatives.
    The document outlines the general requirements for the construction of a new Emergency Department at the Samuel S. Stratton VA Medical Center, under Project No. 528-80901-01-21. It entails the comprehensive preparation of the construction site, including demolition, construction tasks, and the necessary compliance with safety and security protocols mandated by the Department of Veterans Affairs (VA). The document details multiple bid items, including options for general construction and various alternatives that modify specific features and structures, which contractors can quote for. Key aspects include stringent safety measures, such as obtaining permissions from VA security and maintaining access control to protect sensitive areas and personnel. There are detailed provisions for preservation and protection of existing structures, utilities, vegetation, and adherence to environmental standards. The document mandates the contractor to provide thorough operational documentation, including as-built drawings, during and after construction, along with a warranty management plan for post-construction support. This comprehensive guidance is essential for ensuring that the construction meets all regulatory compliance requirements and operates seamlessly within the ongoing medical facility's environment, aptly illustrating the government’s objective of enhancing veteran care facilities while ensuring safety and efficiency during construction activities.
    The Samuel S. Stratton VA Medical Center is designing a new emergency department, emphasizing essential signage requirements outlined in various specifications. The document specifies interior and exterior signage, detailing materials, quality assurance, installation processes, and applicable standards to ensure safety, functionality, and aesthetics. Signage encompasses room identification, directional indicators, and code-required displays and temporary signs. It mandates adherence to various standards such as ASTM and ANSI for materials like aluminum, acrylic, and polycarbonate, ensuring durability and visibility. Additionally, the sections on cubicle curtain tracks and wall/door protection products elaborate on their respective specifications, including installation instructions, types of materials, and associated guidelines. Warranties and compliance with federal construction guidelines are also highlighted, reflecting a commitment to quality and safety in healthcare settings. Overall, the document serves as an essential guide for contractors and suppliers involved in the procurement and installation of these critical components within the new facility, aligning with federal regulations and enhancing the user experience for patients and staff.
    The document outlines the procedures and requirements for site surveys and demolition related to the design of a new Emergency Department at the Samuel S. Stratton VA Medical Center (VA Project No. 528-809). It includes guidelines for boundary, topographic, and utility surveys, emphasizing compliance with standards set by the ALTA-ACSM and FGDC. The document stipulates necessary submissions, such as survey drawings and electronic files, and establishes quality assurance criteria for licensed land surveyors. It details the execution of surveys, including preparation tasks and specific surveying requirements, such as establishing benchmarks and understanding project site boundaries. Furthermore, the demolition section addresses safety protocols, utility disconnection, and site clean-up, emphasizing hazard prevention and structural integrity during demolition. Additional focus is on asbestos abatement processes, including pre-abatement activities, removal procedures, and the necessity of compliance with federal, state, and local regulations. Overall, the document serves as a critical framework for ensuring adherence to health, safety, and environmental standards throughout the project’s lifecycle, reflecting the VA's commitment to regulatory compliance and worker safety in the construction environment.
    The Samuel S. Stratton VA Medical Center is planning the design and commissioning of a new emergency department, focusing on efficient fire suppression systems. The project follows strict guidelines established in multiple sections of the provided documentation, detailing the commissioning process and related responsibilities. The main topic centers on the commissioning of fire suppression systems, ensuring they meet the National Fire Protection Association (NFPA) standards. This involves inspection, pre-functional checklists, and systems functional performance testing, all to be supervised by a Commissioning Agent appointed by the VA. Key points include requirements for submittals, documentation, and thorough training of VA personnel about the newly installed systems. Emphasis is placed on coordination between contractors and the Commissioning Agent to facilitate timely inspection and testing, as well as detailed training agendas for VA staff. The overall goal is to enhance safety protocols within the medical facility, reflecting compliance with government regulations and the commitment to maintain high operational standards in healthcare environments. This initiative demonstrates the VA's focus on upgrading critical infrastructure to ensure safety and efficiency for patients and staff alike.
    The document details the specifications for the steam and condensate heating piping to be installed at the Samuel S. Stratton VA Medical Center as part of the design for a new emergency department. It outlines the general requirements, applicable codes, related work sections, and quality assurance measures necessary for the successful installation of steam systems. A comprehensive list of materials, including pipes, fittings, valves, and insulation, is provided to ensure compliance with industry standards. Key responsibilities include submitting necessary documentation such as manufacturer’s data, coordinating with related HVAC systems, and conducting rigorous testing and commissioning of installed systems. The specifications emphasize the importance of compliance with ASME codes and the quality of welding practices, detailing qualifications required for welders and the necessity for non-destructive testing of welds. Additionally, the document mandates the installation of various system components like strainers, expansion joints, and steam traps to promote efficient operation and maintenance. The emphasis on detailed as-built documentation further supports operational readiness and long-term system viability. This document is part of broader federal project regulations that ensure projects meet safety, functionality, and regulatory compliance standards, reflecting the VA's commitment to providing high-quality healthcare infrastructure.
    The document outlines the specifications and requirements for the electrical installations of the new Emergency Department at the Samuel S. Stratton VA Medical Center, specifically focusing on overcurrent protective device coordination studies, medium-voltage cables, and low-voltage electrical power conductors. It emphasizes the necessity of conducting a comprehensive overcurrent protective device coordination study, including short-circuit, coordination, and arc flash analysis to ensure device performance and safety. Key elements include compliance with industry standards by IEEE and NFPA, quality assurance measures, licensing requirements for engineers, and submission of certifications before final inspection. Additionally, the specifications detail the materials needed, installation procedures, and testing requirements for medium- and low-voltage cables, emphasizing the use of copper and guidelines for splicing and terminations. The document supports the goal of enhancing patient safety and operational efficiency by outlining stringent protocols and standards to be adhered to throughout the installation process, ensuring the project meets all federal and local regulations.
    The document pertains to the construction specifications for cast-in-place concrete as part of the design of a new emergency department at the Samuel S. Stratton VA Medical Center. It outlines the requirements for materials, testing, tolerances, and quality assurance procedures specific to concrete work. Key sections include the description of products, regulatory requirements such as compliance with ACI standards, and details regarding formwork, reinforcement, and mixing methods. Emphasis is placed on ensuring proper concrete mix design and quality through a pre-construction meeting to coordinate responsibilities among contractors and testing agencies. The specifications also stipulate rigorous testing and material certification protocols to achieve high structural integrity. Detailed methods for curing, placing, finishing, and protecting concrete are provided, including the use of vapor barriers, waterproofing measures, and weather protection strategies during the construction period. Overall, this document serves as a comprehensive guideline for contractors to ensure that the concrete work meets the required standards for durability, safety, and performance, inline with federal regulations that govern such projects.
    The document outlines specifications for the design and construction of the new Emergency Department at the Samuel S. Stratton VA Medical Center, emphasizing masonry work. It includes detailed sections on masonry mortaring, grouting, and unit masonry, specifying materials such as Portland cement, hydrated lime, and aggregates, each adhering to various ASTM standards. Key requirements involve quality assurance procedures, including preconstruction testing, proper delivery, storage, and handling of materials, and compliance with technical publications. Tolerances for construction dimensions, mock-up requirements, and installation guidelines ensure structural integrity and aesthetic quality. Additionally, the document stresses the need for certifications and test reports for materials used, thereby reinforcing the project’s compliance with federal government standards and local regulations pertinent to RFPs and grants. The overarching purpose of this document is to ensure successful execution of the construction project while maintaining safety, quality, and efficiency standards mandated in government construction practices.
    The Samuel S. Stratton VA Medical Center’s project to design a new Emergency Department outlines specifications for structural steel framing, steel decking, composite metal decking, cold-formed metal framing, and metal fabrications. Key sections detail required materials, applicable publications, and installation procedures. Compliance with strict standards from organizations like AISC, AWS, and ASTM is mandated to ensure quality and safety. Structural steel and related components must demonstrate sufficient load resistance, proper fabrication, and stringent testing certifications. The design emphasizes the integration of sustainable construction practices, aiming for a minimum of 30% recycled content in materials. Project submissions must include detailed shop drawings, material certifications, and quality assurance documentation. The comprehensive specifications serve as a guide for contractors and engineers to meet project goals while adhering to federal contracting requirements, ensuring safety and durability in the constructed facility.
    The document outlines specifications for rough carpentry involved in the design of a new emergency department at the Samuel S. Stratton VA Medical Center (VA Project No. 528-809). It details the materials, installation methods, and quality assurance measures required for wood components, including procedures for submittals, product delivery, grading, and storage conditions. Key sections cover protections against moisture, required wood treatments, and compliance with industry standards, such as those set by the American Forest and Paper Association and the American Society of Mechanical Engineers. The specifications underscore the necessity for using treated materials to enhance fire resistance and durability while stipulating the experience required from contractors. Additionally, the document references related work involving finish carpentry, gypsum sheathing, and applicable building standards. This comprehensive guide aims to ensure quality construction practices that comply with federal standards and enhance the facility's functionality in serving veterans. This clarity and structure support the broader goals of government RFPs, which prioritize safety, compliance, and efficiency in public health infrastructure projects.
    The Samuel S. Stratton VA Medical Center's project focuses on the design and construction of a new Emergency Department. Key elements include specifying modified bituminous waterproofing systems, various insulation types, and roofing components. The document outlines technical requirements for materials and installation procedures, emphasizing compliance with established federal specifications and standards, such as ASTM and AHA criteria. It details submittal requirements, quality assurance measures, and the need for installer qualifications with proven experience. Essential sections address thermal insulation, roof and deck insulation, TPO roofing, and fluid-applied air barriers to ensure a comprehensive, energy-efficient building envelope. The document underscores the importance of delivering durable, weather-resistant construction while adhering to warranties and maintenance instructions, signifying the project’s alignment with federal standards and commitment to safety and efficacy in healthcare facilities.
    The document outlines the specifications for the design and construction of the new Emergency Department at the Samuel S. Stratton VA Medical Center. It primarily focuses on the installation of hollow metal doors and frames, interior wood doors, access doors and frames, and ICU sliding glass doors. Key sections detail the materials, performance requirements, and applicable standards for these components, encapsulating fire and smoke resistance, reinforcement specifications, and installation procedures to ensure safety and functionality. The document emphasizes compliance with various standards such as the National Fire Protection Association (NFPA), American National Standards Institute (ANSI), and Underwriters Laboratories (UL). It also mandates thorough quality assurance through submissions of manufacturer literature, test reports, and installation qualifications. The necessity for robust protective measures and warranties further underscores the project’s commitment to resilience and security. In summary, this document epitomizes the government’s rigorous standards for constructing critical infrastructure within healthcare settings, ensuring safety, durability, and adherence to regulatory requirements throughout the project lifecycle.
    The document outlines specifications for subsurface preparation and finishing systems for the new Emergency Department at Samuel S. Stratton VA Medical Center, Project No. 528-809. It details the requirements for assessing concrete moisture, pH levels, and necessary remediation techniques, such as moisture remediation coatings and self-leveling underlayments. Key sections include testing protocols in accordance with established ASTM standards, delivery and storage guidelines, and applicable publications governing the products used. The document is structured into various parts, covering general information, product specifications, and execution processes highlighting environmental requirements, surface preparation methods, and installation criteria. The emphasis on compatibility with other flooring and underlayment materials, as well as a clear requirement for maintaining strict performance standards, reflects the project's commitment to quality and adherence to health and safety regulations. This summary situates itself within the context of government contracts and requests for proposals (RFPs) by providing precise guidelines necessary for contractors to ensure compliance with federal standards when developing healthcare facilities. The comprehensive nature of the document reinforces the government's focus on improving healthcare infrastructure while maintaining necessary safety and performance criteria.
    The document outlines the requirements for communications installations at the Samuel S. Stratton VA Medical Center as part of the design for a new emergency department (VA Project No. 528-809). It emphasizes the provision of fully functioning communications systems in compliance with various federal regulations and standards, including VAAR and FAR clauses. The section includes numerous references to industry-specific abbreviations, acronyms, and standards that must be adhered to during installation. Key considerations include the coordination of installations, the specification of equipment and materials, and the responsibilities of project managers and installers. The document mandates the submission of detailed documentation, including layout plans, product data, and warranties, to ensure quality assurance and compliance with industry standards. It lays out thorough procedures for installations, testing, and maintenance protocols. The document serves as a comprehensive guide to ensure the effective implementation of the communications infrastructure critical for the functionality of the hospital's emergency services, reflecting the VA's commitment to maintaining high standards within its facilities.
    The document outlines specifications for earthwork related to the design of a new emergency department at the Samuel S. Stratton VA Medical Center. It encompasses the necessary provisions for site preparation, excavation, grading, filling and backfilling, and disposal of unsuitable soil materials. Key definitions include suitable materials for filling, the categorization of earthwork activities (e.g., building earthwork, trench earthwork), and guidelines for handling unsuitable materials based on specified criteria. The document emphasizes the importance of proper compaction, measurements for excavation, and the need for testing and inspection during construction. It also lays out requirements related to drainage control and protection of existing utilities. Moreover, related work sections reference additional requirements for erosion control, subsurface investigations, and paving. Overall, the specification serves as a comprehensive guideline to ensure that earthmoving activities align with project goals while adhering to safety, quality assurance, and ecological considerations. The careful planning indicated reflects the VA's commitment to establishing a functional and compliant facility beneficial to public health.
    The document serves as a sample transmittal letter that facilitates the evaluation of a firm's past performance in relation to a proposal submitted to the Department of Veterans Affairs (VA). It emphasizes the importance of feedback from references listed by the firm to aid the VA's assessment process, in compliance with Federal Acquisition Regulations (FAR). The letter requests recipients to complete an attached questionnaire, highlighting the need for candidness and thoroughness while assuring confidentiality of the responders' identities. It instructs that completed questionnaires should be sent directly to a specified email address rather than to the firm itself, underscoring the preferred method of submission. This structure is intended to streamline the evaluation process for government contracts, ensuring that performance evaluations are based on accurate and honest feedback from previous clients, which is crucial in the context of government Request for Proposals (RFPs) and grants.
    The Department of Veterans Affairs (VA) is seeking information through a Past Performance Questionnaire as part of their procurement process for the New Emergency Department project at Albany VAMC. Contractors are instructed to complete their respective sections and ensure references provide feedback regarding their performance on past projects. The questionnaire evaluates contractors on various criteria such as quality of management, timeliness, compliance with federal regulations, and infection control practices. References are asked to rate the contractor’s performance on a scale from 0 (Neutral) to 5 (Exceptional) while providing explanations for their ratings. This document aims to gather essential data about a contractor's previous performance to inform the VA’s decision-making process for awarding the contract. The structure consists of instructions for both contractors and reference contacts, performance metrics, and fields for all necessary contact information, culminating in an overall performance rating and remarks section for further insights. This initiative underscores the VA's commitment to selecting qualified contractors through rigorous assessment of past performance in line with federal contracting principles.
    The "Buy American Certificate" provision, as outlined in FAR 52.225-2, mandates that Offerors certify the domestic status of end products within federal procurement processes. Offerors must declare that all products, except those specified as foreign, are domestic and contain critical components. The provision also requires a list of foreign products manufactured in the U.S. that do not qualify as domestic and specifies whether these have over 55% domestic content. Furthermore, definitions relevant to this provision, such as "commercially available off-the-shelf (COTS) item" and "critical component," are referenced in the associated clause. The evaluation of offers will adhere to policies set forth in part 25 of the Federal Acquisition Regulation. This provision is significant in ensuring that federal purchases prioritize American-made goods, supporting domestic manufacturing and compliance with national economic policies.
    The document outlines structural and environmental assessments related to the expansion of the Emergency Department at the Stratton VA Medical Center. It includes project details such as location, key stakeholders, and compliance requirements. The document specifies asbestos abatement procedures necessary for the basement area, detailing the removal and disposal of various materials such as caulk, thermal systems insulation, and floor tiles that contain asbestos. Each task is quantified with typical measurements indicating the extent of the abatement needed. The report emphasizes adherence to regulatory standards set by the U.S. Department of Veterans Affairs’ Office of Construction and Facilities Management, underlining the importance of environmental safety and health risks associated with the presence of hazardous materials. Overall, this project aims to facilitate safe construction practices while enhancing the medical facility's capacity and services, reflecting the government's commitment to veterans' health care needs.
    The document outlines the access control details for the new emergency department at the Stratton VA Medical Center. It specifies the security measures, primarily focusing on the installation of a card reader system for single-door access management. The engineering entity responsible for the project is Engineering LLP, based in Poughkeepsie and Middletown, New York. The reference number SK-ES-802.1 is assigned for the electrical requirements associated with the card reader detail. This summary indicates the initiative aims to enhance security protocols, aligned with government standards for facility security, particularly in healthcare settings. Overall, it emphasizes the importance of integrating advanced access control systems to ensure safety and compliance within VA facilities.
    Guldmann Inc. has outlined specifications for the installation of ceiling lift systems at the Albany Stratton VAMC under Project ID 103177. The document emphasizes the importance of structural integrity to support specified loads, electrical requirements, and protocols for minor modifications during installation. Liability issues are addressed regarding possible damage from non-visible conduits. Signed approval of installation drawings is mandatory before proceeding. Key details include that systems will be tested to exceed their specified capacities, ensuring safety and reliability: a 770 lbs. hoist will be tested to 1155 lbs., and an 1100 lbs. hoist to 1650 lbs. The file also details technical specifications including rail systems, transformer requirements, and installation procedures, ensuring compliance with safety regulations. The extensive data ensures all installations are executed correctly, prioritizing patient safety, operational functionality, and alignment with governmental standards for healthcare facilities.
    The project involves the design and implementation of pile caps for the Veterans Administration Hospital in Albany, NY, as part of a larger construction initiative. The document outlines detailed specifications for steel plates, including dimensions, reinforcement, and layout for various pile caps. It includes essential structural information, highlighting the coordination of columns, elevations, and other critical aspects of construction. Each pile cap is meticulously specified with dimensions, materials, and structural reinforcements necessary to meet engineering standards. The revisions and details provided emphasize compliance with safety regulations and the architectural integrity required for federal projects. This initiative reflects a commitment to providing a robust infrastructure to support the hospital's operational needs while adhering to the high standards required in government-funded projects. The careful detailing ensures that contractors can execute the plans with precision, facilitating a well-organized construction process aligned with federal guidelines.
    The document details the federal wage determination for construction projects in New York, specifically for the counties of Albany, Columbia, Fulton, Greene, Montgomery, Rensselaer, Saratoga, Schenectady, Schoharie, and Washington. It outlines the minimum wage rates that contractors must adhere to under the Davis-Bacon Act and relevant Executive Orders. For contracts initiated or renewed after January 30, 2022, the minimum pay is set at $17.20 per hour, while older contracts must ensure at least $12.90 per hour, unless higher rates are applicable from the wage determination. The wage determination specifies various construction classifications, including rates and fringe benefits for workers such as boilermakers, electricians, and laborers, along with provisions for hazardous material handling. The document also emphasizes the necessity of compliance with worker protection laws, including paid sick leave under Executive Order 13706, and offers a detailed appeals process for any discrepancies in wage classifications. As a service to ensure fair labor practices, this information supports contractors and workers involved in federal and state-local construction projects, guiding them on necessary legal obligations and workforce compensation.
    Similar Opportunities
    C1DZ--652-323 Improve Surgical Access (Construction) (VA-24-00021839)
    Active
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is soliciting proposals for the construction project titled "C1DZ--652-323 Improve Surgical Access" at the Richmond VA Medical Center in Virginia. The project aims to expand and modernize surgical operating facilities, including the construction of approximately 16,000 square feet to accommodate advanced operating rooms and support spaces, with an estimated cost between $10 million and $20 million. This initiative underscores the VA's commitment to enhancing healthcare infrastructure for veterans, ensuring compliance with federal regulations and labor standards, including adherence to the Davis-Bacon Act for wage determinations. Interested Service-Disabled Veteran-Owned Small Businesses (SDVOSBs) must submit their proposals electronically by October 29, 2024, at 12:00 PM EDT, and are encouraged to attend a mandatory site visit on October 8, 2024. For further inquiries, bidders can contact Contract Specialist Arianne De Los Reyes at Arianne.DeLosReyes@va.gov or Jennifer L. Salerno-Diciuccio at jennifer.salerno-diciuccio@va.gov.
    Y1LZ--Expand Medical Center Site Saginaw Minor Construction
    Active
    Veterans Affairs, Department Of
    The Department of Veterans Affairs (VA) is seeking proposals for a Firm-Fixed-Price contract to undertake minor construction aimed at expanding the Saginaw VA Medical Center in Michigan. The project encompasses comprehensive site preparation across approximately 25 acres, which includes demolition of existing structures, utility rerouting, and the installation of new infrastructure, all in compliance with local and national codes. This initiative is part of the VA's commitment to enhancing facilities that serve the veteran community and is specifically set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB). The anticipated award date is between late September and early October 2024, with a construction magnitude estimated between $5 million and $10 million, and a projected completion timeline of approximately 551 days from the Notice to Proceed. Interested parties should direct inquiries to Contract Specialist Dawn Schydzik via email at Dawn.Schydzik@va.gov.
    Z2DA--589-22-885 Expand Sterile Processing Service Space to Meet Requirements
    Active
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is soliciting proposals for the project titled "Expand Sterile Processing Service Space to Meet Requirements" at the Kansas City VA Medical Center. This initiative aims to renovate approximately 18,000 square feet of space to enhance the Sterile Processing Services, which is critical for maintaining infection control and supporting surgical operations within the facility. The project involves comprehensive construction activities, including demolition, installation of new systems, and upgrades to existing infrastructure, all while adhering to strict safety and health regulations due to the active medical environment. Interested contractors, particularly those who are Service-Disabled Veteran-Owned Small Businesses (SDVOSBs), must submit their proposals by October 22, 2024, and can direct inquiries to Contract Specialist David S. Sterrett at david.sterrett@va.gov. The estimated contract value ranges between $10 million and $20 million.
    Y1DZ--626-22-700 EHRM Infrastructure Upgrades Construction Nashville
    Active
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is soliciting bids for the Electronic Health Record Modernization (EHRM) Infrastructure Upgrades project at the Nashville VA Medical Center. This initiative aims to enhance the facility's electrical, communication, HVAC, and physical security systems, ensuring compliance with VA standards while improving healthcare delivery for veterans. The project is critical for modernizing healthcare infrastructure, with an estimated cost between $20 million and $50 million, and is exclusively set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB). Interested contractors must submit their bids by November 19, 2024, and can contact Contract Specialist Samuel I Cornwell at samuel.cornwell@va.gov for further information.
    Y1DA--Project Number: 561A4-21-101 Replace RF Unit Site Prep - Rm. 48 Lyons VAMC
    Active
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is soliciting bids for Project Number 561A4-21-101, which involves the replacement of the RF Unit and site preparation in Room 48 at the Lyons VA Medical Center in New Jersey. The project encompasses extensive construction tasks, including demolition, installation of new mechanical systems, plumbing, electrical work, and fire protection, all while ensuring minimal disruption to the facility's 24/7 operations. This initiative is critical for modernizing healthcare technology and improving operational efficiency within the VA system. Interested contractors, particularly Service-Disabled Veteran-Owned Small Businesses, must submit their bids by October 8, 2024, at 10:00 AM EST, via email to the designated contracting officers, with the anticipated contract value ranging between $500,000 and $1,000,000.
    Y1DA--FY25: NRM (PROJ: 673-21-149) BB Convert 6 West to Private Patient Rooms
    Active
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is soliciting proposals for a construction project aimed at converting the 6th-floor West Wing of the James A. Haley VA Hospital in Tampa, Florida, into private patient rooms. The project involves extensive renovations, including the complete demolition of existing structures, upgrades to mechanical, electrical, and plumbing systems, and minor asbestos abatement, all while adhering to strict safety and operational protocols to minimize disruption to hospital services. This initiative is crucial for enhancing the healthcare environment for veterans, ensuring compliance with federal regulations and safety standards throughout the construction process. The anticipated contract value ranges between $5 million and $10 million, with proposals due by 2:00 PM EST on November 4, 2024. Interested contractors, particularly Service-Disabled Veteran-Owned Small Businesses, should contact Contract Specialist David M Hernandez at David.Hernandez1@va.gov for further details.
    Z1DA-- 529-22-101 Replace Bldg. #7 Master Control Panel
    Active
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is soliciting proposals for the replacement of the Master Control Panel in Building 7 at the Butler VA Medical Center, designated as Project 529-22-101. The procurement aims to select a contractor to provide comprehensive construction services, including demolition and installation, while adhering to strict safety, environmental, and regulatory standards. This project is critical for maintaining operational efficiency and safety within the facility, ensuring that services to veterans are not disrupted during the upgrade process. Proposals must be submitted electronically by November 1, 2024, at 3:00 PM EST, with an estimated contract value between $5 million and $10 million. Interested contractors can contact Amanda M. Murphy at amanda.murphy5@va.gov for further details.
    J059--THREE-YEAR ELECTRICAL INSPECTING AND TESTING – ALBANY STRATTON VA MEDICAL CENTER
    Active
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is soliciting bids for a three-year contract to provide Electrical Inspecting and Testing services at the Albany Stratton VA Medical Center in Albany, New York. The selected contractor will be responsible for comprehensive inspections and testing of critical electrical components, including primary disconnects, transformers, and low voltage circuit breakers, ensuring compliance with safety standards set by the National Fire Protection Association (NFPA) and OSHA. This contract is vital for maintaining the reliability and safety of electrical systems within a healthcare environment, emphasizing the need for qualified personnel with appropriate certifications and experience. Interested small businesses must submit their proposals, including a detailed pricing structure, by 12:00 PM ET on October 16, 2024, and can direct inquiries to Contracting Officer Levi Russin at Levi.Russin@va.gov.
    Z2DA--506-21-705 EHRM Infrastructure Upgrades - Ann Arbor, MI - Construction (VA-25-00001864)
    Active
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is seeking bids for the EHRM Infrastructure Upgrades project at the Ann Arbor VA Medical Center, focusing on significant enhancements to the facility's mechanical, plumbing, and electrical systems. This construction initiative, set aside exclusively for Service-Disabled Veteran-Owned Small Businesses (SDVOSBs), aims to modernize the healthcare infrastructure in compliance with VA standards and local regulations, ensuring improved operational efficiency and patient safety. The total project cost is estimated between $10 million and $20 million, with bids due electronically by September 23, 2024, and a mandatory pre-bid site visit scheduled for September 4, 2024. Interested contractors can contact David Mark at david.mark2@va.gov or Sheila Vickers at sheila.vickers@va.gov for further information.
    Z1DZ--523A5-24-010 Expansion Joint Corrections
    Active
    Veterans Affairs, Department Of
    The Department of Veterans Affairs is preparing to solicit bids for the "523A5-24-010 Expansion Joint Corrections" project at the VA Medical Center in Brockton, MA. The project entails the removal of existing expansion joints and the installation of new epoxy expansion joints, along with necessary flooring repairs in designated tunnel areas. This initiative is crucial for maintaining the structural integrity and safety of the facility, reflecting the government's commitment to enhancing services for veterans while supporting veteran-owned businesses. Interested contractors, particularly Service-Disabled Veteran-Owned Small Businesses (SDVOSBs), should note that the estimated construction cost ranges from $500,000 to $1 million, with a bid bond requirement of at least 20% of the bid price, not exceeding $3 million. The invitation for bids is expected to be issued around October 9, 2024, and all relevant documents can be accessed via the SAM.gov website. For further inquiries, potential bidders may contact Contract Specialist Scott Doucette at scott.doucette@va.gov or by phone at 978-833-6051.