Stokes Hardening Project
ID: 47PF0025R0015Type: Solicitation
Overview

Buyer

GENERAL SERVICES ADMINISTRATIONPUBLIC BUILDINGS SERVICEPBS R5 ACQUISITION MANAGEMENT DIVISIONCHICAGO, IL, 60604, USA

NAICS

Commercial and Institutional Building Construction (236220)

PSC

REPAIR OR ALTERATION OF OFFICE BUILDINGS (Z2AA)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)
Timeline
  1. 1
    Posted Mar 7, 2025, 12:00 AM UTC
  2. 2
    Updated Apr 17, 2025, 12:00 AM UTC
  3. 3
    Due Apr 23, 2025, 5:00 PM UTC
Description

The General Services Administration (GSA) is seeking proposals for the Stokes Hardening Project, aimed at enhancing security at the Carl B. Stokes U.S. Courthouse in Cleveland, Ohio. The project involves the installation of security glazing on ground-level windows and the replacement of exterior and entry doors to improve protection against unauthorized access. This procurement is particularly significant as it addresses the need for heightened security measures in federal facilities, ensuring the safety of court operations while maintaining functionality during construction. Interested small businesses must submit their proposals by April 23, 2025, and can direct inquiries to Rhonda Booker at rhonda.booker@gsa.gov or by phone at 216-339-9934. The estimated construction cost ranges from $1,000,000 to $2,000,000, with a performance period of 173 calendar days upon receipt of the Notice to Proceed.

Files
Title
Posted
Apr 17, 2025, 5:08 PM UTC
The document is an amendment to the solicitation for RFP 47PF0025R0015, which pertains to the Stokes Hardening Project. Issued by the General Services Administration in Cleveland, OH, the amendment is effective as of April 3, 2025. Key changes include the incorporation of the SF 24-23a Bid Bond, which must be submitted with the proposal package. All other terms and conditions of the original solicitation remain unchanged. The amendment outlines the importance of acknowledging its receipt to avoid rejection of offers. This document highlights the procedural aspects of government contracting, emphasizing necessary compliance for bidders in federal procurement, particularly related to construction projects. It serves to ensure clarity and adherence to contract requirements while facilitating the bid submission process for contractors.
Apr 17, 2025, 5:08 PM UTC
The document is an Amendment of Solicitation for the Stokes Hardening Project, issued by the General Services Administration (GSA) with an effective date of April 7, 2025. This amendment specifically extends the deadline for submitting offers from April 8, 2025, to April 18, 2025, to allow bidders additional time to address technical inquiries and prepare competitive pricing. The amendment underscores that all other terms and conditions of the original solicitation remain unchanged, maintaining the contract's integrity. Contractors are required to acknowledge receipt of this amendment to ensure their offers are considered. The document emphasizes the necessity for compliance with the amendment guidelines to avoid rejection of proposals, highlighting the structured yet flexible nature of government procurement processes.
Apr 17, 2025, 5:08 PM UTC
This document is an amendment to the solicitation RFP 47PF0025R0015 for the Stokes Hardening Project issued by the General Services Administration (GSA). It specifies that the point of contact for this project is Curtis Gilliland from Norshield. The effective date of the amendment is April 17, 2025, and it extends the deadline for proposal submissions from April 18, 2025, to April 23, 2025. All other terms and conditions of the original solicitation remain unchanged. The amendment requires contractors to acknowledge receipt by various means, detailing measures for submission recognition to avoid rejection of offers. The document illustrates standard procedures around amendments and modifications within government contracting frameworks, ensuring that related updates are effectively communicated and adhered to. This amendment reflects the government’s ongoing commitment to clear communication in its procurement process.
Apr 17, 2025, 5:08 PM UTC
Apr 17, 2025, 5:08 PM UTC
The government-issued document outlines detailed requirements for a construction project involving the build-out of a facility using standard tenant improvement systems. Contractors must survey existing conditions, verify dimensions, and ensure compliance with various building codes, including safety and accessibility standards. Key aspects include the installation of panic bar hardware on doors, reports of discrepancies in design, and adherence to security measures such as forced-entry resistance ratings. Moreover, the construction work must be phased to avoid disruption to ongoing operational activities, with protections in place for historic materials during construction. The project emphasizes coordination with stakeholders like the GSA and local marshals for security considerations. The plan addresses necessary demolition, interior glazing, door installations, and exterior enhancements while maintaining the facility's aesthetic and functional integrity.
Apr 17, 2025, 5:08 PM UTC
The document outlines the qualifications and financial information required from contractors seeking federal contracts through the General Services Administration (GSA). It includes a comprehensive form that contractors must fill out, detailing their business structure, financial status, ownership information, government-related debts, and banking relationships. Key sections cover organizational details such as type, establishment date, taxpayer ID, and a comprehensive ownership breakdown. Financial statements, including balance sheets and income statements, must be provided to assess their economic health. It also addresses any delinquency on federal debts and prior bankruptcies or liabilities. The document aims to ensure contractors can meet financial and contractual obligations before receiving government awards, thereby maintaining fiscal integrity in public projects. Overall, this form is critical in evaluating contractor reliability and eligibility for government contracts and grants and reinforces the importance of financial transparency and accountability for participants in federal projects.
Apr 17, 2025, 5:08 PM UTC
The government document outlines a solicitation for a construction project at the Stokes Courthouse in Cleveland, Ohio, focusing on the hardening of the facility. The solicitation number is 47PF0025R0015, and it was issued by the R5 AMD Repair & Alterations Contracting Branch. The contractor is required to commence work within a specified timeframe, providing performance and payment bonds as needed. Offers must be submitted in sealed envelopes, including an offer guarantee and adherence to specified work requirements. The performance period for the project spans from April 28, 2025, to February 27, 2026, with a firm fixed-price contract type. The document emphasizes compliance with government regulations and outlines necessary acknowledgments of amendments to the solicitation. Overall, it serves as a formal invitation for bids to fulfill government needs for construction and repair services while ensuring adherence to guidelines and timelines.
Apr 17, 2025, 5:08 PM UTC
The government file presents a Bid Bond form, which serves as a guarantee for contractors submitting bids on federal projects. It outlines the responsibilities of the Principal (the contractor) and Surety(ies) (the bond provider), binding them to the United States for a specified penal sum. The bond is valid if the Principal executes required contracts and bonds upon acceptance of the bid; otherwise, it is liable to cover additional costs incurred by the government due to the Principal's failure. The document specifies conditions under which the bond becomes void, emphasizes that Sureties accept liability even with bid acceptance extensions, and mandates specific signatures and seals for validation. The instructions detail the requirements for completing the bond, including the need for corporate sureties to be approved and the use of an Affidavit for individual sureties. It also clarifies the implications for negotiated contracts, distinguishing terms such as "bid" and "bidder" as inclusive of proposals. The form is essential for ensuring financial security and commitment from contractors participating in government solicitations, thereby reinforcing integrity in procurement processes.
Apr 17, 2025, 5:08 PM UTC
The Stokes Courthouse Hardening Project's Past Performance Questionnaire assesses contractor performance in areas including budget adherence, schedule management, staffing adequacy, and administrative responsiveness. It evaluates whether the contractor completed the project within the original contract budget and schedule, with options for rating performance from excellent to poor. Key points of evaluation include the contractor's management of subcontractors, sensitivity to tenant and client concerns, and overall project outcomes. Additionally, the questionnaire seeks feedback on the qualifications of key personnel and the effectiveness of communication and coordination with stakeholders. Overall, it aims to gather insights into the contractor's reliability and competency for future projects, determining if the contractor would be rehired based on performance. This performance assessment is crucial for ensuring quality and efficiency in government contracting, vital for facilitating decision-making in future RFPs and grant allocations.
Apr 17, 2025, 5:08 PM UTC
The Stokes Courthouse Hardening project, managed by the GSA, aims to enhance security at the Stokes Federal Building and U.S. Courthouse in Cleveland, OH. A pre-proposal conference on March 11, 2025, will familiarize potential bidders with the project and site. Proposals are due by April 8, 2025, with a strict protocol for submitting questions only to the GSA. The project, funded by the Judiciary RWA in 2022, focuses on limiting unauthorized access and will be conducted overnight to avoid disrupting court operations. Key personnel include the Contracting Officer, who oversees contractual obligations, and the Property Manager, who coordinates site access. Compliance with various construction and safety standards, such as GSA P100, ABA, and OSHA, is mandatory. Following a notice to proceed, completion is required within 173 days, emphasizing the critical nature of maintaining court functionality during construction.
Apr 17, 2025, 5:08 PM UTC
The GSA Solicitation No. 47PF0025R0015 pertains to the Stokes Hardening Project focused on enhancing security features within a government facility. Key inquiries from contractors clarify work hours, phasing of facility access, and project-specific requirements. Notably, all construction activities must occur during unoccupied hours from 6:00 PM to 6:00 AM, and BIM coordination or COBie requirements are not mandatory. Contractor responsibilities include responding to door specifications that must meet forced entry standards, with specific materials and testing requirements outlined. Additionally, coordination with the existing control systems for lockdown buttons is emphasized. The document clarifies that an official scope of work is provided within the bid documents, negating the necessity for further official outlines. Current design protocols and materials must align with project intentions, such as non-ballistic-rated installations. Overall, the solicitation underscores the importance of compliance with security measures while allowing flexibility in contractor design choices, reflecting a methodical approach to federal procurement in enhancing facility safety.
Apr 17, 2025, 5:08 PM UTC
The document outlines a Request for Proposal (RFP) from the U.S. General Services Administration (GSA) for a construction contract related to the Carl B. Stokes U.S. Courthouse Hardening Project in Cleveland, Ohio. The RFP, designated as Solicitation No. 47PF0025R0015, aims to promote participation among small businesses. The document specifies critical dates, including an issue date of March 7, 2025, and a closing date for proposals on April 8, 2025. The scope of the solicitation includes required proposal contents and formats, evaluation criteria emphasizing price reasonableness and past performance, and submission instructions. It highlights the necessity for bidders to complete their proposals with accurate certifications and qualifications, including bonding and financial capability. Significant attention is given to compliance with federal provisions, including the Buy American Act, affirmative action employment requirements, and security protocols for managing controlled unclassified information. The document serves as a formal invitation to small business contractors to participate in a federal project that enhances courthouse security while aligning with federal guidelines on construction practices and procurement. Emphasis on compliance and detailed submission requirements underscores the structured approach the government employs in soliciting competitive bids.
Apr 17, 2025, 5:08 PM UTC
The document outlines the Bid Bond form required when submitting a bid for government contracts, detailing the obligations of the Principal and Surety(ies) to the U.S. Government. It specifies that upon acceptance of the bid, the Principal must execute contractual documents and provide any required bonds within the stipulated timeframe. Failure to do so may result in the Surety paying the Government for any additional costs incurred due to the Principal's failure. Corporate Sureties must be approved by the U.S. Treasury, and bonds can represent a percentage of the bid price with a maximum amount stated. The instructions emphasize the need for proper execution, including seals and identification of all parties involved, ensuring compliance with federal contract regulations. This form serves as a safeguard for the government against the risk of contractor default on bid contracts in both federal and local contexts.
Apr 17, 2025, 5:08 PM UTC
The Stokes Courthouse Hardening Study Project focuses on enhancing security at the Carl B. Stokes Federal Building and U.S. Courthouse in Cleveland, Ohio. Key components include the installation of security glazing on ground-level windows, as well as replacing exterior and entry doors to strengthen protection against unauthorized access. Managed through a traditional delivery method, the project is designed by AECOM, with a Contracting Officer to be determined. The document outlines coordination requirements for contractors, emphasizing the need for collaboration to prevent disruption of ongoing operations, as the courthouse will remain occupied throughout construction. It specifies policies regarding site logistics, work hour restrictions, contractor responsibilities for ensuring safety, and proper waste management practices. Additionally, procedures for submitting change orders and payment requests are detailed, ensuring compliance with federal regulations throughout project execution. The comprehensive approach aims to balance construction objectives with operational continuity and security improvements, affirming the government’s commitment to safeguarding its facilities.
Apr 17, 2025, 5:08 PM UTC
The document outlines the wage determination for building construction projects in Cuyahoga County, Ohio, under the Davis-Bacon Act. It specifies the minimum wage rates and fringe benefits for various construction classifications, stating that contracts entered after January 30, 2022, are subject to Executive Order 14026, requiring a minimum wage of $17.75 per hour. For contracts awarded between January 1, 2015, and January 29, 2022, the minimum wage is set at $13.30 per hour under Executive Order 13658. The file includes detailed prevailing wage rates for specific job classifications, such as Asbestos Workers, Electricians, and Plumbers, along with their corresponding fringe benefits. Compliance information regarding paid sick leave as stated in Executive Order 13706 is also noted, emphasizing the requirement for contractors to provide paid sick leave to employees working under covered contracts. A section on the appeals process is provided, detailing how parties can seek review and reconsideration of wage determination decisions. This document serves to ensure fair wages and labor standards are upheld in federal construction projects, reflecting the government's regulatory framework within RFPs and grants.
Lifecycle
Title
Type
Stokes Hardening Project
Currently viewing
Solicitation
Presolicitation
Similar Opportunities
Eagleton Courthouse Fire Alarm Replacement
Buyer not available
The General Services Administration (GSA) is soliciting proposals for the replacement of the fire alarm system at the Eagleton Courthouse in Saint Louis, Missouri. This opportunity is specifically available to small business contractors who currently hold a contract with the GSA Region 6 Small Business Multiple-Award, Design Build Indefinite Delivery Indefinite Quantity (IDIQ) Task Order Contract for Construction Services within the St. Louis area. The project is crucial for ensuring the safety and compliance of the courthouse's infrastructure, reflecting the importance of maintaining secure public buildings. Interested contractors should contact Sandra Gant at sandra.gant@gsa.gov for access to the solicitation documents, as only the official Point of Contact for eligible contract holders will be granted access.
Houlton Sector HQ, Replacement Windows and Radio Room Upgrade
Buyer not available
The General Services Administration (GSA) is conducting market research for the replacement of windows and an upgrade to the radio room at the Houlton Sector Headquarters in Hodgdon, Maine. The project involves construction renovations that include interior remodeling, exterior window and storefront replacement, and the installation of new security devices, with a base bid focusing on the radio room and an option for additional window and door replacements. This procurement is significant for enhancing the facility's functionality and security, with an estimated contract value between $1,000,000 and $5,000,000. Interested small businesses, particularly those classified as SDVOSB, HUBZone, WOSB, or 8(a), are encouraged to submit a capabilities package by 2:00 PM EST on May 1, 2025, to Sotheavy Khon at sotheavy.khon@gsa.gov.
Install Pedestrian Gate, USBP Swanton Sector HQ
Buyer not available
The General Services Administration (GSA) is seeking a contractor to install a new pedestrian gate at the Swanton Sector Headquarters of the U.S. Border Patrol in Vermont. The project involves the installation of the gate within the existing chain link fence adjacent to an automated vehicle gate, facilitating egress from the fenced area behind the main building. This procurement is significant as it enhances security and access for personnel at the facility. The estimated cost for this project ranges from $25,000 to $100,000, and it is exclusively reserved for small businesses under the Total Small Business Set-Aside program. Interested parties should note that the solicitation package will be available on or about April 29, 2025, and can direct inquiries to Lyska Bishop Benitez at lyska.bishopbenitez@gsa.gov or by phone at 617-531-2635.
Elevator Modernization- Grand Rapids, MI
Buyer not available
The General Services Administration (GSA) is soliciting proposals for the Elevator Modernization Project at the Gerald R. Ford Federal Building & U.S. Courthouse in Grand Rapids, Michigan. This project aims to upgrade the existing passenger and service elevator systems to enhance safety, accessibility, and operational efficiency, with a total estimated cost between $3.5 million and $4.5 million. The modernization will involve the demolition of outdated equipment, installation of new gearless machines, and compliance with all applicable safety and fire regulations, ensuring minimal disruption to building operations during the phased construction. Interested small businesses must submit their proposals by May 21, 2025, and can contact Joseph E. Daniero at joe.daniero@gsa.gov or 616-283-0305 for further information.
New United States Courthouse, Chattanooga- Construction Manager as Constructor (CMc)
Buyer not available
The General Services Administration (GSA) is seeking a qualified Construction Manager as Constructor (CMc) for the design and construction of a new U.S. Courthouse in Chattanooga, Tennessee, with an estimated construction cost between $172 million and $182 million. The project aims to create a modern facility of approximately 190,701 gross square feet, which will include seven courtrooms, nine chambers, and secure parking, addressing the operational needs of federal courts and related agencies through 2031, with provisions for future expansion by 2051. This initiative is critical for enhancing judicial infrastructure and ensuring compliance with updated federal building standards, including achieving LEED Gold and SITES Silver certifications. Interested firms must submit their qualifications by May 9, 2025, and participate in a virtual conference on April 10, 2025, to discuss the procurement process. For further inquiries, contact Dellice McElroy at dellice.mcelroy@gsa.gov or Joseph Ardoin at joseph.ardoin@gsa.gov.
Exterior Railing and Wall Painting, Robert F. Peckham Federal Building, 280 S. First St., San Jose, CA 95113
Buyer not available
The General Services Administration (GSA) is seeking bids for a firm fixed-price contract to repaint the exterior railings and wall sections of the Robert F. Peckham Federal Building located at 280 S. First St., San Jose, CA. The project aims to enhance the building's exterior aesthetics and maintain its structural integrity, with a total estimated cost ranging from $0 to $25,000. This opportunity is set aside for small businesses, reflecting the federal government's commitment to supporting such firms in construction contracts. Proposals are due by 4:00 PM PDT on May 8, 2025, following a mandatory site visit scheduled for April 25, 2025, at 10:00 AM PDT. Interested parties should direct inquiries to David White at david2.white@gsa.gov.
Z--GAOA - Browns Park NWR Butler Storage Building Reh
Buyer not available
The U.S. Department of the Interior, through the U.S. Fish and Wildlife Service, is soliciting proposals for the rehabilitation of the Butler Storage Building at Browns Park National Wildlife Refuge in Maybell, Colorado. The project aims to enhance the building's functionality, safety, and energy efficiency, involving significant renovations such as replacing bay doors, updating lighting and ventilation systems, and installing safety features like emergency showers and GFCI outlets. This initiative underscores the government's commitment to maintaining and upgrading federal facilities to meet modern standards. Interested contractors must submit their proposals by May 8, 2025, with a budget range of $250,000 to $500,000, and can direct inquiries to Samantha LaGue at samanthalague@fws.gov or by phone at 413-253-8349.
2306 Bannister IRA Project
Buyer not available
The General Services Administration (GSA) is soliciting proposals for the 2306 Bannister IRA Project, which falls under the Public Buildings Service and is a task order off the Region 6 Design Build IDIQ contract. This project involves commercial and institutional building construction, specifically focusing on the repair or alteration of office buildings in Kansas City, Missouri. The successful contractor will be responsible for executing the project in accordance with the established guidelines, and access to project documents is restricted to holders of the Region 6 Design Build IDIQ contract, requiring coordination with prime contractors for subcontractors. Interested parties can reach out to Julie Vo at julie.vo@gsa.gov or Mike Flanigan at michael.flanigan@gsa.gov for further information, and should allow 24-48 hours for document access approval.
USAO Fiber Optic Cabling Installation at the Robert E. Coyle Federal Building, 2500 Tulare St., Fresno, CA 93721
Buyer not available
The General Services Administration (GSA) is seeking bids for the installation of new fiber optic cabling at the Robert E. Coyle Federal Building located at 2500 Tulare St., Fresno, CA 93721. The project aims to enhance the infrastructure of the United States Attorney's Office by installing fiber optic cabling in accordance with the attached Statement of Work dated December 4, 2024. This procurement is part of the government's commitment to upgrading federal facilities and ensuring compliance with federal acquisition regulations, including Buy American requirements. Proposals are due by May 1, 2025, at 4:00 PM PDT, with a site visit scheduled for April 21, 2025, at 11:00 AM PDT. The estimated project price range is between $0 and $25,000, and interested bidders should contact David White at david2.white@gsa.gov for further information.
Coburn Gore LPOE CMc Solicitation
Buyer not available
The General Services Administration (GSA) is seeking qualified contractors for the construction of a new Land Port of Entry (LPOE) in Coburn Gore, Maine, utilizing a Construction Manager as Constructor (CMc) delivery method. The project aims to modernize and expand the existing facility, enhancing operational capabilities and infrastructure while adhering to historical preservation standards and sustainability guidelines. This initiative is crucial for improving border security and operational efficiency for U.S. Customs and Border Protection (CBP), with an estimated construction cost between $90 million and $100 million. Interested parties must submit their Phase I Technical Proposals by May 27, 2025, and can direct inquiries to James M. Adamo at james.adamo@gsa.gov or Caitlyn Egan at caitlyn.egan@gsa.gov.