Operation & Maintenance of the South Bay Wastewater Treatment Plant
ID: FY26OMSBIWTPType: Sources Sought
Overview

Buyer

INTERNATIONAL BOUNDARY AND WATER COMMISSION: US-MEXICOINTERNATIONAL BOUNDARY AND WATER COMMISSION: US-MEXICOINTERNAT BOUNDARY AND WATER COMMEl Paso, TX, 79902, USA

NAICS

Sewage Treatment Facilities (221320)

PSC

MAINTENANCE OF SEWAGE AND WASTE FACILITIES (Z1ND)

Set Aside

No Set aside used (NONE)
Timeline
    Description

    The International Boundary and Water Commission (IBWC) is seeking qualified contractors for the operation and maintenance (O&M) of the South Bay International Wastewater Treatment Plant (SBIWTP) located in San Diego, California. The contract will encompass full-service O&M, including management, labor, and materials necessary for the plant's operation, compliance with environmental regulations, and coordination with Mexican authorities for wastewater treatment. This procurement is critical for maintaining the plant's capacity to treat wastewater from Tijuana, Mexico, and ensuring compliance with the National Pollutant Discharge Elimination System (NPDES) permit requirements. Interested parties must submit proposals electronically via a secure SharePoint portal by December 22, 2025, and can direct inquiries to Philip Johnson at philip.johnson@ibwc.gov or Seone Michael Jones at seone.jones@ibwc.gov.

    Point(s) of Contact
    Files
    Title
    Posted
    The International Boundary and Water Commission (IBWC) issued Amendment 0001 to Solicitation 191BWC26R0001 for Non-Personal, Hybrid, Firm-Fixed Price (FFP), Time and Materials (T&M), and Cost Reimbursable (CR) Services for the South Bay International Wastewater Treatment Plant (IWTP) Operation and Maintenance. The amendment primarily changes the pre-proposal site visit date to November 7, 2025, at the USIBWC San Diego Field Office. Prospective offerors must RSVP by November 3, 2025, and attend the scheduled visit, as no alternative dates will be provided. The site visit allows offerors to assess project conditions, ask questions, and discuss operational matters. Written questions regarding the solicitation are due by November 17, 2025. All other terms and conditions of the original solicitation remain unchanged.
    Amendment 002 to Solicitation 191BWC26R0001, issued by the International Boundary and Water Commission (IBWC), updates clauses and provisions related to the South Bay IWTP O M Services contract. This amendment extends the due date for questions to November 26, 2025, changes the SharePoint Access Request deadline to December 5, 2025, with the upload window opening on December 8, 2025, and extends the solicitation closing and offer due date to December 22, 2025, at 05:00 MT. The solicitation outlines requirements for a Hybrid, Firm-Fixed Price (FFP), Time and Materials (T&M), and Cost Reimbursable (CR) Services contract. Offerors must submit proposals electronically via a secure SharePoint portal, adhering to strict naming conventions for technical and pricing volumes. The document also details various FAR clauses, certifications, and instructions for proposal composition, including a mandatory pre-proposal site visit and specific evaluation factors like past performance, technical competence, staffing, safety, financial stability, phase-in plan, and SCADA experience.
    This government solicitation (191BWC26R0001) is for Operations and Maintenance (O&M) services at the South Bay International Wastewater Treatment Plant (SBIWTP) in San Diego, California. The contract uses a hybrid structure: Firm-Fixed-Price (FFP) for routine O&M, Time-and-Materials (T&M) for emergency repairs, and Cost-Reimbursable (CR) for variable costs like chemicals. The contract spans a base year (April 2026 - March 2027) with four option years, extending potentially until March 2031. It outlines detailed requirements for performance, invoicing via the Invoice Processing Platform (IPP), and contract administration, emphasizing regulatory compliance and efficient plant operation.
    This government file outlines a comprehensive submittal register (SOMs) for a federal project, detailing required documentation, reports, and plans with specific frequencies and deadlines. Key submittals include a Contractor Quality Control Plan, Preventative Maintenance Inspection program, certifications for personnel, a physical inventory of real property, and a Site Safety Plan. The document also mandates various operational plans like a Laboratory Quality Control & Management Plan and a Continuity of Operations Plan (COOP), alongside environmental compliance reports such as the SWPP storm water pollution plan and NPDES monitoring. Financial and asset management reports, including a 5-Year Capital Plan and Deferred Maintenance & Repair Report, are required annually. Regular submissions cover daily inspections, monthly O&M reports, and as-needed updates for items like the EAMS reports and As-Builts, ensuring comprehensive oversight and operational adherence for the project.
    The 2026 Quality Assurance Surveillance Plan (QASP) outlines the United States Section, International Boundary and Water Commission (USIBWC)'s approach to monitoring the contractor's performance for the Operation and Maintenance of the South Bay International Wastewater Treatment Plant and Facilities. The QASP details performance management strategies, roles and responsibilities of the Contracting Officer (CO) and Contracting Officer's Representative (COR), and methodologies for monitoring performance, including reports and customer feedback. It emphasizes an outcome-focused approach, moving away from traditional process-based quality assurance. The document also describes quality assurance reporting procedures, analysis of monitoring results, and consequences for performance failures, which can include deductions from payment or contract termination. The USIBWC will use performance-based measures and acceptable quality levels (AQLs) to evaluate the contractor, with potential price adjustments based on performance. Customer satisfaction is a key indicator, and complaints will be investigated by the COR. The plan aims to ensure services meet contract requirements and encourages continuous improvement from the contractor.
    The FY26 O&M for South Bay IWTP Contract outlines the performance metrics and incentive structures for operating and maintaining a wastewater treatment plant and collection system. Key responsibilities include ensuring continuous and safe sewage collection, treatment, and disposal, compliance with regulatory discharge permits, and coordinating with Mexican pumping stations to maintain an average daily/monthly inflow of 25 million gallons per day. The contract details various required services, acceptable quality levels (AQL), and methods of surveillance, including reports, inspections, and meetings. It also specifies financial incentives, both positive and negative, for meeting or failing to meet performance standards, covering areas such as staffing levels, equipment maintenance, chemical management, spill reporting, and timely submission of various operational and environmental reports. Penalties are outlined for non-compliance, including fines, deductions from monthly payments for negligence, unaddressed staffing shortages, and failure to complete specific tasks like canyon collector cleanings or accurate data submission.
    The California Regional Water Quality Control Board, San Diego Region, issued Order No. R9-2021-0001 (as amended by Order No. R9-2023-0009) to the United States Section of the International Boundary and Water Commission (USIBWC) for the South Bay International Wastewater Treatment Plant. This order, effective March 8, 2023, and expiring June 30, 2026, sets forth waste discharge requirements and serves as a National Pollutant Discharge Elimination System (NPDES) permit for secondary-treated wastewater discharge into the Pacific Ocean via the South Bay Ocean Outfall. It includes detailed effluent limitations for various parameters (e.g., flow, CBOD5, TSS, pH, metals, and organic compounds), discharge specifications to protect marine life, and receiving water limitations for bacterial, physical, chemical, and biological characteristics. The order also mandates a Spill and Transboundary Flow Event Prevention and Response Plan, outlining measures for different types of transboundary flow events and spills.
    The South Bay International Wastewater Treatment Plant (SBIWTP) and its associated facilities, Hollister and Goat Canyon, are subject to a comprehensive list of permits and fees for their operations. This includes an annual permit fee for wastewater discharge requirements from the SWRCB, starting at $93,010.00, and an annual permit fee for stormwater, though no invoice is currently available. Various APCD permits are required for operating at SBIWTP, Hollister, and Goat Canyon, with starting costs ranging from $1,095.00 to $2,282.00 as of FY2019. Additionally, the County of San Diego levies hazardous materials fees for each location, with starting costs from $469.00 to $1,640.00 in FY2019. The facilities also operate under a Multi Sector General Permit (MSGP) for stormwater discharges associated with industrial activities, for which no invoice is currently known. This document outlines the regulatory and financial obligations for the ongoing operation of these wastewater treatment facilities.
    The provided government file details an extensive inventory of assets across several critical infrastructure systems: Canyon Collectors IBWC, Municipal Lift Stations IBWC (Goat Canyon Pump Station and Hollister Pump Station), and the Municipal Wastewater Treatment Plant (Biological-Carbon Aeration Basin Drainage, Influent Channel, and Aeration Basins Systems). The document meticulously lists various components within these systems, including collectors, pumps, meters, control panels, electrical equipment, odor reduction systems, and associated piping and valves. The inventory specifies asset IDs, descriptions, locations, manufacturers, models, and serial numbers where applicable. This comprehensive listing serves as a detailed record of equipment and infrastructure, crucial for operational management, maintenance planning, and potential procurement within these federal and municipal water and wastewater management facilities.
    The International Boundary Water Commission Wastewater Treatment Facility in San Diego, California, underwent a condition assessment in October 2023, with the report issued on January 30, 2024. The assessment, conducted by the Asset Management team and site staff, evaluated all major plant assets, categorizing their condition with scores from 1 (new/excellent) to 5 (failed). The report identifies numerous assets with scores of 3 or 4, indicating significant wear, operation below design functionality, or being out of service. Key issues include pumps and Variable Frequency Drives (VFDs) needing replacement or upgrades, PLCs requiring upgrades, structural problems like roof leaks and water leaks, and various components with "a lot of wear" or in need of general maintenance. Several assets are explicitly listed as "out of service" or "in need of replacement," with packages submitted for approval or scheduled for replacement in Q1 2024. The report emphasizes proactive maintenance and capital planning based on these condition ratings to enhance reliability and mitigate risks.
    The document details a comprehensive PM Schedule for various operations, primarily focusing on Waste Water Treatment Plants (WWTP) and Lift Stations. It lists numerous specific PM (Preventative Maintenance) tasks, each identified by a unique "IBW-PM-" code. The overwhelming majority of these tasks are associated with WWTPs, covering a broad range of maintenance activities within these facilities. A smaller, but significant, number of PM tasks are dedicated to Lift Stations, indicating scheduled maintenance for these critical infrastructure components. The file, likely part of a government RFP or internal operational plan, systematically outlines recurring maintenance procedures crucial for the continuous and efficient operation of wastewater management infrastructure.
    The document details urgent repairs and planned projects at the SBIWTP, including federal grants and state/local RFPs, to restore performance and add redundancy to the process. Key completed actions include repairing an influent flow meter, cleaning PSTs #1-4 and #1-5, and addressing junction box and USST valve issues. Ongoing projects involve replacing backup pumps and motors, repairing grit chambers, installing backup influent pumps, rehabilitating belt filter presses, and repairing the Hollister Street Pump Station. Future initiatives include rehabilitating the grit facility, replacing the Silva Drain, and rehabilitating the Hollister and Goats Pump Station. The total cost for these urgent repairs is $34,294,795. The International Boundary and Water Commission (IBWC) is also focusing on continuing urgent repairs for redundancy, the SBIWTP Expansion/Rehabilitation, monitoring Mexico's projects under Minute 328, and addressing Tijuana River Flows, particularly concerning PBCILA.
    The provided data details monthly chemical dosage, solids quantity, solids quality, and non-potable water usage from March 2024 to March 2025. Chemical dose data for various locations (PST, Belt Press, Odor Control, Reclaim Water Chlorine) shows fluctuating consumption of Ferric Chloride, Cationic Polymer, Sodium Hypochlorite, Sodium Hydroxide, and Sulfuric Acid, with Anionic Polymer and Lime consistently at zero consumption. Solids quantity reports the number of trucks and weight in tons for grit/screening and solids hauling, along with the average daily trucks. Solids quality presents monthly minimum, maximum, and average pH, raw sludge, unstabilized sludge, and stabilized sludge percentages. Non-potable water usage includes monthly average, minimum, maximum, and a 6-month moving average in gallons. Overall, the data illustrates operational metrics for a wastewater treatment facility, highlighting trends in chemical use, waste disposal, sludge characteristics, and water consumption over a thirteen-month period.
    The provided government file details daily inspections of five drains (Stewart's Drain, Silva Drain, Del Sol, Smuggler's Gulch, and Goat Canyon) from March 1st to March 31st, 2025. The inspections record system IDs, locations, dates, inspection times, weather conditions, Goat Canyon rain gauge readings, and total daily visits. Key data points include whether collectors are in service, indications of sewage overflow, the need for border grate cleaning, presence of flow from Mexico, flow rates, occurrence of transboundary spill events, bypass dimensions and flow, amount of debris on collector screens, and buildup of trash or sediment on border grates. Remarks frequently cite rain events, sand buildup, and collector closures for cleaning or repairs, particularly for Silva Drain where the drain line has collapsed, causing flow to bypass the collector. The data indicates a recurring need for maintenance, especially after rain events, to manage debris and sediment and ensure proper collector function.
    The 2024 Annual Biosolids Report for the South Bay International Wastewater Treatment Plant details the chemical composition of biosolids and stabilized solids. The report includes extensive data on metals like Antimony, Arsenic, Barium, Cadmium, Calcium, Chromium, Cobalt, Copper, Iron, Lead, Lithium, Magnesium, Manganese, Mercury, Molybdenum, Nickel, Potassium, Selenium, Silver, Thallium, Vanadium, and Zinc, all measured in mg/Kg. It also covers chlorinated pesticides, organophosphorus pesticides, herbicides, benzidines, tributyl tin, and various chlorinated and non-chlorinated phenols. Additionally, the report lists halomethane purgeable compounds and base/neutral compounds. Key parameters like pH, Volatile Suspended Solids (%VS), and Percent Total Solids (%TS) are provided. The file also includes monthly weights of stabilized solids and grit/rags for the year 2024, indicating the plant's operational output and compliance with regulatory limits.
    This document, Volume 1 of 4 of the "Operation and Maintenance Manual" for the South Bay International Wastewater Treatment Plant, details the plant's processes, equipment, and operational procedures. The manual covers various facilities including headworks, primary and secondary sedimentation, activated sludge, chlorination/dechlorination, non-potable water, and sludge handling (thickening, storage, dewatering, conveyance, and lime stabilization). It also outlines primary and final effluent structures, standby power generation, and collection/conveyance facilities. The document is structured to provide descriptions of controls, step-by-step start-up and shutdown procedures, alarm and status annunciations, and daily operational checks for each major component of the plant. This comprehensive manual is crucial for the efficient and compliant operation of the wastewater treatment plant.
    The International Boundary and Water Commission (IBWC) has developed a comprehensive System Security Plan for the South Bay International Wastewater Treatment Plant (SBIWTP) Supervisory Control and Data Acquisition (SCADA) System. This plan outlines the security controls and procedures to protect the system, which is critical for monitoring and controlling wastewater treatment processes. The SBIWTP SCADA system is classified with a FIPS 199 Criticality Watermark of High, emphasizing the severe impact of any disruption. The document details management, operational, and technical controls, including annual security assessments, continuous monitoring, risk assessments, and incident response protocols. The plan highlights the use of a highly segmented network architecture and independent third-party assessments to ensure the system's availability, integrity, and confidentiality, adhering to federal laws and NIST guidelines. Key contacts for the system, including the Authorizing Official, are also provided.
    NIST Special Publication 800-171r3, published in May 2024, outlines security requirements for protecting Controlled Unclassified Information (CUI) in non-federal systems and organizations. Developed under FISMA 2014, this publication serves as a guideline for federal agencies to incorporate CUI protection into contracts with non-federal entities. It assumes CUI holds consistent value and requires a moderate confidentiality impact level across federal and non-federal systems. The document details 17 security requirement families, including Access Control, Awareness and Training, and Audit and Accountability. It emphasizes the need for robust security measures, such as account management, access enforcement, information flow control, least privilege, and comprehensive auditing. The publication also provides a methodology for tailoring security controls from NIST SP 800-53, ensuring that non-federal organizations meet necessary safeguards without overextending their security posture. Appendices include acronyms, a glossary, tailoring criteria, and a change log. This document is crucial for ensuring the confidentiality of sensitive government information when handled by external organizations.
    The International Boundary and Water Commission (US and Mexico) issued a memorandum dated May 19, 2025, informing vendors that plans and drawings for the SBIWTP and Pump (lift) stations are available upon request. Due to the large file size of these documents, vendors must submit an email request to the contracting officer or Acquisition point of contact to obtain them. This notice is likely part of a federal government RFP or grant process, ensuring that all potential vendors have access to necessary project documentation.
    The provided document, likely part of a government RFP or grant, focuses on geographical information related to the South Bay International Water Treatment Plant (SBIWTP) in San Diego, CA. It includes two detailed maps. The first map identifies the SBIWTP, the Tijuana River Valley, and provides a 1000 ft scale. The second map highlights the SBIWTP Pump Stations, specifically noting Smuggler's Gulch and the Tijuana River Valley Campground, with a 2000 ft scale. Both maps include directional indicators and image credits to Airbus and Vexcel Imaging US, Inc. The document's purpose is to provide precise location details and surrounding topographical information relevant to the SBIWTP and its associated pump stations.
    FIPS Publication 199 establishes federal standards for the security categorization of information and information systems, mandated by the Federal Information Security Management Act of 2002 (FISMA). Its primary purpose is to provide a common framework for federal agencies to categorize information and systems based on potential impact levels, thereby promoting effective security management and consistent reporting. The standards apply to all unclassified federal information and information systems, excluding national security systems. It defines three security objectives—confidentiality, integrity, and availability—and three potential impact levels: LOW, MODERATE, and HIGH. Information types are categorized by assessing the potential impact on each security objective, while information systems are categorized using the highest impact values from all resident information types. This framework ensures appropriate security measures are applied based on the potential adverse effects on organizational operations, assets, or individuals.
    The South Bay International Wastewater Treatment Plant (SBIWTP) in San Ysidro, CA, treats 25 million gallons per day of sewage from Tijuana, Mexico, discharging liquid waste into the Pacific Ocean and sending biosolids back to Mexico. This document, the Sequence of Operation (SOO), outlines the procedures for operating and maintaining the plant, particularly its relevance to the SCADA system. Key operational areas covered include influent flow management at Junction Box 1 (JB-1), headworks equipment such as slide gates, bar screens, and influent pumps (including exercise and rotation procedures), and detailed start-up and shut-down protocols for headworks odor control systems, grit removal equipment, and Non-Potable Water (NPW) pump stations. The document also addresses primary sedimentation tank operations, emphasizing start-up and shut-down sequences, and the application of ferric chloride and anionic polymer for treatment, with dosages controlled by the SCADA system based on influent flow.
    The document outlines a federal grant or contract opportunity, likely an RFP, for services or products. It details specific requirements, including general provisions, technical specifications, and administrative clauses. Key areas cover pricing structures, terms and conditions, and proposal submission guidelines. The document emphasizes compliance with federal acquisition regulations, quality assurance, and reporting. It also includes sections on contract administration, modifications, and dispute resolution. The overall structure suggests a comprehensive request for proposals or bids, aiming to procure services or goods while ensuring adherence to government standards and procedures.
    The document outlines the requirements and timeline for various operational and maintenance plans associated with the SBIWTP (Sewage and Biosolid Infrastructure Wastewater Treatment Plant) contract. It includes a list of specific plans such as the Preventative Maintenance Inspection program, Site Safety Plan, and a Continuity of Operations Plan, along with the expected frequency of submissions (e.g., daily, monthly, annually, as needed). Key reports like the Condition & Risk Assessment Report and Deferred Maintenance & Repair Report are noted for their annual submission, while certification and inventory requirements are to be executed post-contract award. The document emphasizes the importance of maintaining accurate records for five years, updating standard operating procedures, and ensuring compliance with environmental regulations. It requires coordination with various offices, including Safety and Environmental offices, highlighting the structured management necessary for effective contract execution. The overarching goal of these requirements is to ensure operational integrity, safety, and compliance with applicable federal and state regulations in the wastewater management domain.
    The Quality Assurance Surveillance Plan (QASP) for the Operation and Maintenance of the South Bay International Wastewater Treatment Plant outlines procedures for evaluating contractor performance on behalf of the USIBWC. The QASP emphasizes a performance management approach that prioritizes outcome-based evaluations over compliance with processes. Responsibilities are clearly defined, with the Contracting Officer and designated representatives accountable for monitoring and assessing contractor performance through various surveillance methods, including customer feedback and periodic inspections. The plan stipulates acceptable quality levels (AQLs) to incentivize contractor performance, utilizing performance metrics to determine necessary adjustments in payments based on work outcomes. Regular reporting mechanisms, including monthly summaries of contractor performance and any customer complaints, ensure transparency and accountability. Failure to meet performance standards can result in payment deductions or contract termination, with clear notification procedures established. The overall goal of the QASP is to ensure that contracted services align with the defined performance standards within the Performance Work Statement, while maintaining flexibility for contract improvement and customer satisfaction.
    The FY26 Operations and Maintenance (O&M) contract for the South Bay International Wastewater Treatment Plant (IWTP) outlines required performance metrics and standards for efficient wastewater management. The contractor's responsibilities include safe wastewater collection, treatment, and disposal while adhering to regulatory discharge permits. Key performance indicators involve regular reporting, staffing levels, maintenance of equipment, and compliance with health regulations. Surveillance methods include periodic inspections and monitoring of operator attendance. Incentives for performance improvement and penalties for non-compliance are structured within a firm-fixed-price model, emphasizing accountability. The document specifies fines for various infractions, such as failure to report spills and inadequate maintenance, ensuring the contractor meets all requirements. The contract also mandates participation in bi-national meetings and the timely submission of monthly and annual reports. This comprehensive outline highlights the importance of quality service in wastewater management, emphasizing adherence to regulatory standards and proactive engagement in environmental and health-related compliance.
    The document outlines the Waste Discharge Requirements (WDRs) for the South Bay International Wastewater Treatment Plant, operated by the United States Section of the International Boundary and Water Commission (USIBWC), discharging secondary-treated wastewater into the Pacific Ocean via the South Bay Ocean Outfall. The order, effective from March 8, 2023, includes operational standards, monitoring protocols, and performance goals critical to maintaining water quality in compliance with California’s water regulations and the federal Clean Water Act. Key elements include specific effluent limitations for various pollutants, with mandatory reporting and compliance schedules, as well as requirements for handling potential transboundary flow events from the Tijuana River. The document emphasizes the monitoring of effluent effects on marine life and the enforcement of bacterial standards in harvested shellfish areas. Additionally, it stipulates penalties for non-compliance and provides clarification on processes for public input and ongoing regulatory standards. This comprehensive regulatory framework serves to protect environmental integrity while ensuring public health and safety in the affected watersheds.
    The document details the permits and fees associated with the South Bay International Wastewater Treatment Plant (SBIWTP), including various annual costs for wastewater and stormwater discharge operations, along with hazardous materials fees from the County of San Diego. The State Water Resources Control Board (SWRCB) mandates an annual permit fee for wastewater, starting at $93,010, and, while no known invoices exist for stormwater permits, additional APCD permits are listed with starting costs ranging from $1,095 to $2,282. The document also includes hazardous materials fees, detailing amounts for different operational sites under the County's jurisdiction: $1,640 for SBIWTP, $484 for Hollister, and $469 for Goat Canyon. A mention of the Multi Sector General Permit indicates a regulatory requirement for stormwater discharges associated with industrial activities, albeit without an associated cost listed. This file serves as a financial overview of regulatory compliance expenses for wastewater treatment facilities, crucial for budgeting and operational planning in context with government RFPs and grants at both federal and local levels.
    The document catalogues various assets related to the Canyon Collectors and Municipal Lift Stations managed by the International Boundary and Water Commission (IBWC). It details equipment such as collectors, pumps, meters, and control panels used in the Canyon Collectors system and surrounding pump stations, including Goat Canyon and Hollister Pump Stations. Each entry includes unique identifiers such as Asset IDs, descriptions, manufacturing details, and specific locations. The document serves to inventory critical infrastructure related to waste management and water treatment processes, facilitating maintenance, operational checks, and compliance with federal and local standards. This extensive database aids in ensuring the effective management of municipal wastewater treatment and stormwater systems, which is crucial for public health and environmental preservation in the regions served by these facilities.
    The International Boundary Water Commission's Condition Assessment Report evaluates the operational status and maintenance requirements of the Wastewater Treatment Facility in San Diego, California. Conducted between October 9-13, 2023, the report highlights that while overall asset conditions were satisfactory, several discrepancies were noted requiring attention. The assessment process involved a systematic review of major plant assets, scoring them based on their performance, safety, and reliability, where scores ranged from 1 (new) to 4 (failed). Key findings include numerous assets needing repairs or replacements, such as pumps, variable frequency drives (VFDs), and structural components, with maintenance recommendations established for high-priority items. Notably, several pumps and blowers are currently out of service, while upgrades are in progress for others. The report emphasizes the importance of maintaining asset functionality to ensure compliance with operational standards and preparing for future budgeting and capital planning. The effective management of these assets is crucial in safeguarding the plant’s performance and mitigating possible operational risks.
    The document outlines the project management schedule for Water Wastewater Treatment Plants (WWTP) and lift stations, identified by various reference codes (IBW-PM-XXXX). It lists numerous project codes along with their respective initiations, suggesting a structured framework for the systematic management of related projects. Key aspects include the categorization of projects based on operational areas (WWTP and lift stations) and multiple iterations of identified project codes, implying continuation or multiple phases of project development. This schedule serves as a guideline for project timing and resource allocation, critical for maintaining the efficiency and compliance of water management systems. The series of project codes indicates a comprehensive and ongoing commitment to improving infrastructure and service delivery within the wastewater treatment sector. Each code likely correlates with specific tasks, goals, or funding needs relevant to the federal grants and local/state request for proposals (RFPs). In summary, the document is a foundational tool for planning and executing essential projects in wastewater management, demonstrating the government's dedication to enhancing public service through strategic project management.
    The government document outlines urgent repair initiatives at the South Bay International Wastewater Treatment Plant (SBIWTP) aimed at restoring functionality and ensuring system redundancy. Key repairs include the replacement of influent flow meters, cleaning of primary sedimentation tanks, and rehabilitation of various facilities, with total costs amounting to approximately $34.3 million. Significant projects include the rehabilitation of grit facilities and installation of backup pumps, driven by emergency needs due to extreme weather events and flooding in the region. The timeline for completion of these tasks varies, with some designed to be completed by late 2025 and others by 2026. Additionally, the IBWC is engaged in ongoing efforts to ensure permit compliance, monitor Tijuana River flows, and address infrastructure expansions related to these projects. Ultimately, this initiative underscores the critical investment in wastewater infrastructure and compliance following weather-related challenges and environmental regulations, reflecting federal and state support for local water management systems.
    The document outlines monthly chemical dosing, solids quantity, and water usage statistics from March 2024 to March 2025, focusing on the operation of water treatment facilities. It provides detailed measurements for various chemicals, including Ferric Chloride, Cationic Polymer, and Sodium Hydroxide, highlighting their dosages and applications in treatment processes. Additionally, it summarizes the quantity of sludge disposed of by truck, including weight and daily averages. Solids quality is tracked, with pH levels and percentages of raw, unstabilized, and stabilized sludge presented in min, max, and average formats monthly. Non-potable water usage (NPW) is recorded with averages, minimums, and maximums for a six-month moving period. The document serves as a comprehensive data collection intended to guide decisions regarding water treatment processes, chemical use, and resource management, relevant to federal and state environmental regulations. This information is crucial for monitoring operational efficiency, environmental impacts, and compliance with governance framework requirements for water safety and management.
    The document outlines a series of inspection reports concerning various drainage locations, including Stewart's Drain, Silva Drain, Del Sol, Smuggler's Gulch, and Goat Canyon, across multiple dates in March 2025. Each entry details the respective inspector's observations on flow conditions, weather, and debris buildup. The inspections reveal issues such as the presence of standing water, sewage overflow, and sediment buildup, which triggered various maintenance actions, including screen cleaning and collector closures due to rain events. The report emphasizes the importance of monitoring these drainage systems to prevent overflow and maintain environmental health, particularly in relation to flows from Mexico. Regular inspections and prompt responses to identified issues are essential to manage the flow and quality of water in these drainage systems, forming a critical aspect of compliance within governmental environmental monitoring efforts.
    The 2024 Annual Biosolids Report for the South Bay International Wastewater Treatment Plant (WWTP) details the management and analysis of biosolids generated at the facility. The document includes a comprehensive set of data on various metals, pesticides, and other constituents measured in biosolids across four reporting periods—January, April, July, and October. Key findings indicate the levels of metals such as arsenic, lead, and mercury, along with organic compounds and herbicides, measured against regulatory limits set by 503 and Title 22. The report presents results in terms of minimum, maximum, and average concentrations, often showing non-detectable (ND) results for many of the contaminants tested, suggesting compliance with safety standards. A summary of the biosolids' physical characteristics, such as pH levels, volatile suspended solids, and total solids percentages, is presented alongside the weight of stabilized solids collected during the year. The report indicates a systematic approach to monitoring biosolids' quality, standing as a protocol essential for maintaining environmental safety and regulatory compliance. Overall, the report is pivotal in ensuring public health and environmental safety by monitoring and managing waste products effectively, underscoring the commitment of the commission to uphold standards in wastewater management.
    The document is the Operations and Maintenance Manual for the South Bay International Wastewater Treatment Plant (SBIWTP), produced by the International Boundary and Water Commission. It serves as a comprehensive guide outlining the operational procedures for the wastewater treatment facility, which plays a crucial role in managing wastewater for communities near the international border between the U.S. and Mexico. The manual provides an introduction to the facility’s purpose, followed by detailed descriptions of various treatment processes such as headworks, primary and secondary sedimentation, activated sludge processes, chlorination and dechlorination, and sludge management. Each chapter outlines necessary procedures from daily operations to emergency protocols, ensuring the facility operates within safety and regulatory standards. Outlining controls, design criteria, and alarms for various systems, the manual emphasizes the importance of a methodical approach to wastewater treatment management. This document is vital not only for operational efficiency but also for compliance with federal environmental regulations. By detailing systematic processes, the manual underscores the relevance of structured maintenance and operational strategies in maintaining public health and environmental safety.
    The System Security Plan for the South Bay International Wastewater Treatment Plant (SBIWTP) Supervisory Control and Data Acquisition (SCADA) System outlines security protocols and management controls to safeguard operational integrity. It categorizes the system as a General Support System with a high criticality watermark, reflecting significant importance due to its role in wastewater treatment. The document details roles, responsibilities, and the organizational structure involving the International Boundary and Water Commission (IBWC). The plan includes regular security assessments, risk management strategies, and continuous monitoring to ensure compliance with federal laws and regulations, including various NIST publications. Emphasis is placed on incident response, configuration management, and personnel security to mitigate risks from unauthorized access or disruptions. The document serves as a comprehensive framework for protecting the SCADA system's confidentiality, integrity, and availability, while ensuring necessary checks such as audits and authorizations are conducted regularly for sustained compliance. This security plan is essential for managing the complexities of water resource management and safeguarding public health, reflecting the agency's commitment to environmental integrity and service continuity.
    NIST Special Publication 800-171r3 outlines essential security requirements for protecting Controlled Unclassified Information (CUI) within nonfederal systems and organizations. This document emphasizes the significance of safeguarding CUI to support federal agencies' missions and mandates uniform practices across governmental bodies, as established by Executive Order 13556. It provides a framework of security requirements organized into 17 families covering aspects such as Access Control, Audit and Accountability, and Awareness and Training. The guidelines are intended for federal agencies to include in contracts with nonfederal organizations, ensuring consistent protection of CUI regardless of the processing environment. Additionally, it highlights the application of organization-defined parameters, allowing customization of requirements based on specific operational needs. This publication underscores the importance of systematic compliance and accountability in maintaining CUI confidentiality while encouraging feedback from stakeholders involved in information security practices. By adhering to these guidelines, agencies can mitigate risks associated with unauthorized disclosure and modification of sensitive information, fostering a secure information-sharing environment.
    The International Boundary and Water Commission (IBWC) has issued a memorandum regarding the availability of plans and drawings for the San Diego Border Infrastructure Water Treatment Plant (SBIWTP) and associated lift stations. Vendors interested in obtaining these documents are instructed to submit an email request to the designated contracting officer or acquisition contact. The memorandum emphasizes that the files are of significant size, thereby requiring specific requests for access. This initiative is part of the IBWC’s efforts to facilitate collaboration with vendors and ensure that all interested parties can acquire necessary documentation to participate in related projects. Overall, this communication underscores the importance of vendor engagement in the management of cross-border water infrastructure.
    The document outlines the South Bay International Water Treatment Plant (SBIWTP) located in San Diego, California, which plays a critical role in managing water resources in the Tijuana River Valley. It includes maps indicating the plant's layout, including pump stations and proximity to significant landmarks, such as Smuggler's Gulch and the Tijuana River Valley Campground. The imagery used in the document suggests a focus on spatial planning and operational infrastructure. The presentation of this information aligns with federal initiatives aimed at improving water management and environmental protection in border areas, potentially indicating connections to broader RFPs and grants related to water treatment and environmental sustainability. The document serves as a reference for stakeholders involved in relevant governmental projects, highlighting geographic features and operational elements of the SBIWTP essential for compliance and effective management of the area's water resources.
    FIPS Publication 199 outlines the standards for security categorization of federal information and information systems, mandated by the Federal Information Security Management Act (FISMA) and the Information Technology Management Reform Act. Its primary purpose is to establish a framework for categorizing information based on the potential impact of security breaches concerning confidentiality, integrity, and availability. The document defines three potential impact levels—LOW, MODERATE, and HIGH—for breaches affecting organizational operations and individuals. It emphasizes that all federal information, excluding classified data, should adhere to these security categorizations, which also serve as guidance for state, local, and tribal entities as well as private sector organizations involved in national infrastructure. The categorization process considers specific information types and applies a "high water mark" principle to determine the security category of information systems based on the most critical information types they hold. This approach promotes a consistent understanding and ensures effective management and oversight of federal information security, aiding agencies in meeting their security obligations and facilitating coherent reporting to oversight bodies. Overall, this publication is vital for enhancing federal information security management practices across government agencies and their partners.
    The South Bay International Wastewater Treatment Plant (SBIWTP) in San Ysidro, CA, is designed to process sewage from Tijuana, Mexico, with a current capacity of 25 million gallons per day, extendable to 100 million. This document details the standard operating procedures (SOP) for operation and maintenance of the facility, focusing on influent flow management, safety precautions, and equipment handling. Key sections include startup and shutdown procedures for headworks and influent pumps, along with odor control systems, ensuring compliance with air quality standards. Additional procedures are provided for grit removal and wastewater treatment processes, highlighting the importance of safety equipment and monitoring systems. The aim is to ensure efficient and safe operations, minimizing contamination risks and enabling future water recycling for irrigation. This documentation is pertinent for government compliance, as it outlines operational standards which may inform federal and state RFPs related to wastewater management and environmental protection investments.
    The document appears to be corrupted, displaying a combination of non-readable characters, which limits the ability to extract coherent information. It is likely intended to include details related to government Requests for Proposals (RFPs), federal grants, and state/local funding opportunities. However, due to the file's corrupted state, the specific topics, key ideas, or structure were not discernible. Consequently, it cannot be accurately summarized or analyzed for content regarding RFPs or other governmental funding processes. For valid insights and data extraction, a functional version of the document is needed, as it is crucial for understanding the intended information concerning government initiatives and grant proposals.
    The Performance Work Statement (PWS) outlines the requirements for the operation and maintenance (O&M) of the South Bay International Water Treatment Plant (SBIWTP), its canyon collectors, and pump stations. This contract, projected for five years, covers all personnel, equipment, materials, and supervision necessary for full O&M, including compliance with permits and regulations like the NPDES Permit. Key responsibilities include 24/7 plant operation, coordination with Mexican authorities for wastewater inflow and solids disposal, providing all treatment chemicals and fuel, and maintaining a robust data management system. The scope also encompasses canyon collector cleaning, SCADA system maintenance and upgrades, laboratory testing, and various monitoring and reporting obligations such as monthly O&M reports, annual condition assessments, and a Five-Year Capital Plan. The Contractor is responsible for all preventive, predictive, and corrective maintenance, as well as supporting the Government’s Enterprise Asset Management program.
    Lifecycle
    Title
    Type
    Similar Opportunities
    Translation Services
    Buyer not available
    The International Boundary and Water Commission (IBWC) is seeking proposals from qualified Women-Owned Small Businesses (WOSB) for translation services, specifically for Spanish to English and occasional English to Spanish translations, to be performed at their El Paso headquarters. The contractor will be responsible for translating various documents, including technical reports and international agreements, while adhering to specific formatting and procedural guidelines, and ensuring a one-day turnaround for priority items. This contract is crucial for facilitating communication and documentation between the U.S. and Mexico, particularly in engineering and scientific contexts. Interested parties must submit their quotes by December 12, 2025, at 3:00 PM MST, and can direct inquiries to Angelica Baca at angelica.baca@ibwc.gov.
    Trash Disposal Services
    Buyer not available
    The Department of Homeland Security, specifically the U.S. Customs and Border Protection (CBP), is seeking market information for Trash Disposal Services to be provided at a minimum of 20 locations within the San Diego Sector. The procurement aims to identify industry capabilities for a service contract that encompasses management, supervision, labor, transportation, supplies, and equipment necessary for effective trash disposal, while ensuring compliance with EPA and local regulations. This Request for Information (RFI) is crucial for informing CBP's acquisition strategy and performance specifications, as the contractor will be responsible for all aspects of trash removal, including adherence to a quality control plan and safety standards. Interested parties should submit their responses via email to Contract Specialist Starla VanWinkle by December 17, 2025, at 2:00 p.m. ET, as this RFI is for planning purposes only and does not guarantee a contract award.
    Y--YOSE 215363 - Replace Tuolumne Meadows WWTP
    Buyer not available
    The Department of the Interior, through the National Park Service, is soliciting proposals for the replacement of the Tuolumne Meadows Wastewater Treatment Plant (WWTP) at Yosemite National Park in California. This project aims to construct a new facility adjacent to the existing plant, which has been in operation for over 50 years, and is critical for managing wastewater for various park facilities, including campgrounds and visitor centers. The contract, valued at over $10 million, requires completion within 2,190 calendar days, with proposals due by January 7, 2026. Interested contractors should direct inquiries to Mark Barber at markbarber@nps.gov or call 721-621-7310 for further details.
    Cannon AFB - Operation and Maintenance of Wastewater Treatment Plant
    Buyer not available
    The Department of Defense, through the 27th Special Operations Contracting Squadron, is seeking proposals for the operation and maintenance of the Wastewater Treatment Plant (WWTP) at Cannon Air Force Base (AFB) in New Mexico. This procurement, designated as a Total Small Business Set-Aside, requires comprehensive non-personal services, including management, tools, supplies, equipment, and certified personnel to ensure 24/7 operation, maintenance, inspection, and repair of the WWTP, which has a capacity of approximately 1.5 million gallons per day. Proposals must demonstrate technical capability, past performance, and pricing, with a focus on technical and past performance factors being significantly more important than price. Interested vendors should submit their proposals by January 7, 2026, at 12:00 P.M. MST, and are encouraged to attend site visits scheduled for December 4 and 11, 2025. For further inquiries, contact Karina Bala at karina.bala@us.af.mil or Iris Rangel Bermudez at iris.rangelbermudez.1@us.af.mil.
    Z--DEVA 318717 - Rehab Furnace & Cow Creeks WTP/WWTP
    Buyer not available
    The National Park Service (NPS) is soliciting proposals for the rehabilitation of the Furnace Creek and Cow Creek water and wastewater treatment systems at Death Valley National Park, under Solicitation No. 140P2025R0082. The project aims to modernize critical infrastructure, addressing frequent service interruptions and ensuring the availability of potable water while mitigating health, safety, and environmental risks. This significant undertaking, with a construction magnitude exceeding $10 million, includes the replacement of wastewater laterals, upgrades to treatment facilities, and the installation of new water mains and lift stations. Interested contractors must submit proposals by January 14, 2026, and are encouraged to attend a pre-proposal site visit on November 5, 2025, to gain a comprehensive understanding of the project scope. For further inquiries, contact Amber Hughes at amberhughes@nps.gov.
    Glycerin Supply and Delivery
    Buyer not available
    The U.S. International Boundary and Water Commission (USIBWC) is seeking qualified vendors to supply and deliver crude glycerin to the Nogales International Wastewater Treatment Plant (NIWTP) in Rio Rico, Arizona. The procurement aims to secure a reliable source of crude glycerin, which will serve as a supplemental carbon source for the plant's biological nutrient removal (BNR) denitrification process, with an estimated monthly usage of approximately 15,500 gallons. This contract, which is set aside for small businesses, will be awarded based on the lowest evaluated price of proposals that meet the technical requirements and past performance criteria, with a total projected usage of 193,100 gallons per year. Interested parties must submit their offers by December 8, 2025, and direct any questions to Seone Michael Jones at seone.jones@ibwc.gov.
    Service and maintenance of the AmeriWater Reverse Osmosis (RO) Water Treatment System and VIQUA Ultraviolet {UV) Water Disinfection System at the Naval Medical Center San Diego
    Buyer not available
    The Defense Health Agency (DHA) is soliciting bids for the service and maintenance of AmeriWater Reverse Osmosis (RO) and VIQUA Ultraviolet (UV) Water Treatment Systems at the Naval Medical Center San Diego, specifically for the Ophthalmology Department. The procurement requires contractors to provide comprehensive maintenance services, including preventive and corrective maintenance, water quality testing to AAMI ST-108 standards, and adherence to various regulatory requirements. These systems are critical for ensuring safe and effective water treatment in a medical setting, underscoring the importance of reliable service and maintenance. Interested contractors must submit their quotes by October 20, 2025, at 10:00 AM Pacific, including a technical capabilities statement and past performance references, and can contact Elliott Penetrante or Isaac Don Willies for further information.
    Y--YELL 326133 REHABILITATE CANYON VILLAGE WASTEWATER
    Buyer not available
    The Department of the Interior, specifically the National Park Service (NPS), is soliciting proposals for the "YELL 326133 Rehabilitate Canyon Village Wastewater Treatment Systems" project at Yellowstone National Park, Wyoming. This federal contract involves extensive rehabilitation and upgrade work on wastewater treatment facilities, including the demolition of existing structures and the construction of new facilities, with a project magnitude exceeding $10 million. The contractor is expected to commence work within 10 calendar days of receiving the notice to proceed and complete the project within 975 calendar days, with a projected completion date of November 30, 2028. Interested parties must submit their proposals by December 19, 2025, and can direct inquiries to Vicki Freese-Supler at vickilfreese-supler@nps.gov or by phone at 720-402-8467.
    Oily Wastewater Treatment Service
    Buyer not available
    The Department of Defense, specifically the Department of the Navy, is soliciting proposals for Oily Wastewater Treatment Services at Commander, Fleet Activities Yokosuka (CFAY) in Japan. The contract, identified as N6264926QB002, requires the contractor to provide comprehensive services for the collection, purification, recycling, and disposal of oily wastewater, ensuring compliance with Japanese and U.S. environmental regulations, particularly concerning hazardous materials and PFAS contamination. This competitive, unrestricted Indefinite Delivery Indefinite Quantity (IDIQ) contract has a minimum guarantee of $9,000 and a maximum value of $9,000,000, with a performance period from January 30, 2026, to January 29, 2027. Interested vendors should submit their proposals by December 17, 2025, and may contact Yukako Hishikura or Maria Mallari for further information.
    Wastewater & Water Treatment Plant Chemicals
    Buyer not available
    The Department of Defense, specifically the Department of the Navy through NAVFACSYSCOM Southeast, is seeking contractors to provide chemicals for operational support at the domestic wastewater treatment plant and potable drinking water treatment facility located at Naval Air Station Corpus Christi, Texas. This procurement aims to ensure the effective treatment and management of wastewater and drinking water, which are critical for maintaining operational readiness and environmental compliance at the facility. Interested vendors can reach out to Kimberly Drymala at kimberly.y.drymala.civ@us.army.mil or by phone at 361-961-5219, or to LCDR Dylan Bush at dylan.l.bush.mil@us.navy.mil or 361-961-2156 for further details regarding the contract requirements and submission process.