P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA
ID: N6247324R5227Type: Solicitation
Overview

Buyer

DEPT OF DEFENSEDEPT OF THE NAVYNAVFACSYSCOM SOUTHWESTSAN DIEGO, CA, 92132-0001, USA

NAICS

Power and Communication Line and Related Structures Construction (237130)

PSC

CONSTRUCTION OF OTHER UTILITIES (Y1NZ)
Timeline
  1. 1
    Posted Apr 22, 2024, 12:00 AM UTC
  2. 2
    Updated Apr 2, 2025, 12:00 AM UTC
  3. 3
    Due May 15, 2025, 9:00 PM UTC
Description

The Department of Defense, through the Naval Facilities Engineering Command Southwest, is soliciting proposals for the design and construction of a 10 MW Battery Energy Storage System (BESS) at the Marine Corps Air Ground Combat Center (MCAGCC) in Twentynine Palms, California. This project aims to enhance grid stability and energy resilience by integrating BESS with existing solar photovoltaic systems, ensuring compliance with cybersecurity protocols and promoting sustainable energy practices. The total construction cost limitation is set at $43 million, with a proposal submission deadline of May 22, 2024, and a construction period of 913 calendar days. Interested contractors should contact Kathryn Cranford at kathryn.r.cranford.civ@us.navy.mil or Jaime Flores at jaime.r.flores4.civ@us.navy.mil for further details.

Files
Title
Posted
Apr 2, 2025, 2:04 PM UTC
The document outlines the amendment of a solicitation for a design-build military construction project, specifically for a 10 MW Battery Energy Storage System at the Marine Corps Air Ground Combat Center in Twentynine Palms, California. Key amendments include extending the proposal submission deadline to May 22, 2024, and adjusting proposal submission guidelines. The project involves a firm-fixed price contract and demands the submission of comprehensive proposals demonstrating technical approach, past performance, and safety measures. Technical submissions include organizational structure, past relevant construction experience, and safety records over the past five years. The evaluation will focus on the offeror's technical capabilities, experience with similar projects, and compliance with safety standards, with a clear emphasis on deliverables and adherence to Department of Defense requirements. Additionally, specific guidelines are established for the proposal format, submission method via DoD SAFE, and the necessity of accurate past performance evaluations to ascertain the contractor's reliability. This solicitation reflects the government's commitment to advancing energy resilience and enhancing grid stability through strategic project investments.
Apr 2, 2025, 2:04 PM UTC
The document represents Amendment 0002 for the solicitation N6247324R5227 concerning the design-build military construction project P-1238, focused on the installation of a 10 MW battery energy storage system at the Marine Corps Air Ground Combat Center in Twentynine Palms, California. Key changes include updates to the contact point for inquiries and proposal submission requirements, shifting oversight from Sheena Hess to Kathryn Cranford. Additionally, specifications regarding the battery storage capacity have been revised, reducing the total power output from 10 MW to 8.5 MW across two sites. The requirements for proposal submissions have expanded to include additional documentation such as Offeror’s Team Consent Forms and Financial Questionnaires, aligning submissions with financial institutional reviews. The amendment emphasizes that the government will not respond to inquiries made less than ten days before the proposal deadline, and contractors must acknowledge receipt of all amendments to maintain compliance. Overall, the amendment aims to clarify procedures and requirements, ensuring a transparent and structured bidding process for contractors interested in participating in this federal project.
Sep 20, 2024, 10:42 PM UTC
Apr 2, 2025, 2:04 PM UTC
The document is an amendment for the solicitation N6247324R5227, concerning the construction of Battery Energy Storage Systems (BESS) for the Marine Corps Air Ground Combat Center in Twentynine Palms, California. It specifies updates to proposal submission requirements, evaluation criteria, and contract terms. The amendment requires electronic submissions through the DoD SAFE platform, aligning the proposal format with structured tabs detailing technical approach, experience, past performance, and safety records. Offerors must provide project details illustrating their relevant construction and design experience while ensuring compliance with safety metrics over the past five years. Notably, the procurement allows for small business participation by providing substantial preference to HUBZone Small Business concerns. Comprehensive evaluation criteria balance technical capabilities against pricing, emphasizing that submissions lacking specific details or compliance with outlined requirements will be deemed ineligible. Overall, the document aims to ensure competitive bidding processes that facilitate high-quality project execution while adhering to federal regulations and standards.
Apr 2, 2025, 2:04 PM UTC
The document is an amendment to a solicitation under the federal procurement process, specifically related to the contract identified as N6247324R5227. Its primary purpose is to initiate discussions with all offerors regarding the ongoing evaluation process. The amendment requests offerors to review a provided evaluation notice and respond accordingly. It emphasizes the importance of acknowledging this amendment, which must be submitted before the specified deadline of 2:00 PM Pacific Standard Time on January 29, 2024. The document outlines the conditions under which submissions can be modified or acknowledged, ensuring all offerors understand the consequences of not adhering to the submission requirements. Issued by NAVFAC Southwest, this document reflects standard practices in government request for proposals (RFPs), ensuring transparency and adherence to established procurement protocols. Overall, this amendment maintains continuity in the bidding process while inviting further engagement from future contractors.
Apr 2, 2025, 2:04 PM UTC
This document is an Amendment of Solicitation (Contract ID: ACQR6037927), specifically Amendment No. 0005, issued by NAVFAC Southwest, regarding the final review of proposals (FRPs) for a project. The amendment officially concludes Phase One discussions and establishes a deadline for FRPs submission by 2:00 PM PST on January 29, 2025. Proposals must acknowledge previous amendments (0004 and 0005) and be submitted via DoD Safe, with requests for Drop Off Requests directed to the Contract Specialist of record. Failure to acknowledge receipt of the amendment by the specified time may result in proposal rejection. The amendment emphasizes necessary administrative changes and reaffirms that all prior terms remain in effect, guiding contractors in compliance and response to the solicitation process aligned with federal and naval regulations. The systematic structure includes essential details such as dates, identification codes, and contact information, ensuring clarity and coherence in the amendment's purpose and requirements.
Apr 2, 2025, 2:04 PM UTC
The document outlines a form designed for Offerors to detail their team composition and management regarding the design-build proposal for Federal RFP N62473-24-R-5227. It requires the listing of each primary member within the proposed team, specifying their roles, contractual relationships, and involvement in contract performance. The form includes sections for multiple team members, allowing for a detailed description of their responsibilities and contributions. It emphasizes the necessity for clarity on the team arrangement's rationale. This structured approach is essential in evaluating the technical approach of bidders in federal, state, and local RFP processes. The aim is to ensure that the proposed team's capabilities and collaborative dynamics are adequately assessed for successful project execution.
Apr 2, 2025, 2:04 PM UTC
The document serves as a Construction Experience Project Data Sheet for an Offeror responding to solicitation N62473-24-R-5227, detailing requirements for submitting project information to demonstrate relevant experience. It requires Offerors to provide data on up to five construction projects that align with the solicitation criteria, focusing on meaningful involvement in contract performance. Each submission includes vital details such as contractor information, project specifics, contract types, client information, and a comprehensive project description. The structure includes sections for identifying the contractor's role, project dates, award amounts, and the nature of the work performed. Offerors must illustrate how their contributions are relevant, particularly in design-build or design-bid-build contexts, emphasizing previous involvement in construction or design efforts. This documentation is critical for evaluating the Offeror’s experience and suitability for the project. This data is essential within the context of government RFPs, ensuring that only qualified organizations demonstrate pertinent experience and commitment to performance standards required for federal and state contracts. The meticulous documentation process aligns with government requirements for transparency and accountability in selecting contractors for public projects.
Apr 2, 2025, 2:04 PM UTC
The NAVFAC/USACE Past Performance Questionnaire (PPQ-0) is designed for contractors to provide essential information about their previous projects, which is necessary for federal contracting processes. It consists of sections where contractors must detail their firm information, project specifics, contractual details, and relevance to the proposed project. Additionally, a client completes sections on their identity and feedback regarding the contractor's performance. The questionnaire includes aspects like project complexity, types of contracts (e.g., Firm Fixed Price), original versus final contract prices, and actual completion dates. Clients are encouraged to complete and submit the form directly to the contractor, ensuring accuracy and authenticity. The purpose of the PPQ-0 is to verify past performance, thereby aiding in the evaluation of proposals submitted for federal opportunities, thus enhancing credibility and accountability within the procurement process. This structured feedback loop plays a pivotal role in maintaining quality standards in government contracts.
Apr 2, 2025, 2:04 PM UTC
The document is a Safety Data Sheet related to the federal government RFP N62473-24-R-5227, focusing on the safety performance metrics that offerors must provide as part of their proposal. Offerors, including Joint Ventures or Small Business subcontractors, are instructed to submit their safety data over the past five calendar years, including the Department of Labor's OSHA Days Away from Work, Restricted Duty, or Job Transfer (DART) rates, along with Total Case Rates (TCR). The form requires explanations for any concerning rates and details on corrective actions taken to address negative trends. Furthermore, it emphasizes that only full year data is valid for evaluation. The overall goal is to assess safety management and performance as part of the broader scope of each offeror’s qualifications in the bidding process. This ensures adherence to safety standards and risk management protocols within the federally funded projects. The structure is organized into blocks that guide the offeror through necessary safety data submissions and explanatory requirements.
Apr 2, 2025, 2:04 PM UTC
Exhibit E of the N62473-24-R-5227 RFP requires all offerors to provide detailed information regarding their historical small business utilization for projects submitted under Factor 2, Experience. This form serves to evaluate small business participation across various contract categories and mandates that all subcontracting details be reported in a standardized format. Offerors must provide project specifics including contract numbers, project titles, and whether they acted as prime contractors, subcontractors, or JV members. Actual subcontracting values and corresponding percentages must be reported alongside any established goals. If goals are unmet, detailed explanations are required for each instance, ensuring accountability in small business engagement. The document emphasizes uniformity in data submission and precludes alternative formats or attachments. Essential terms such as Total Project Dollar Value, Self-Performed Value, and Total Subcontract Value are clearly defined. This meticulous approach echoes the government’s commitment to supporting small businesses within federal contracts and underscores the importance of reporting and accountability in achieving established socioeconomic objectives.
Apr 2, 2025, 2:04 PM UTC
The document is the Small Business Participation Commitment Document (SBPCD) associated with RFP N62473-24-R-5227 for a design-build military construction project at the Marine Corps Air Ground Combat Center in Twentynine Palms, California. It requires all offerors, regardless of size, to delineate their commitment to subcontracting with small businesses, outlining the minimum participation requirement of 17% of the total contract value. The SBPCD provides a structured format for submitting necessary information, including offeror size, subcontracting breakdown, and specifics about small business participation, necessitating firm commitments from identified subcontractors. Offerors must provide a rationale if unable to meet the 17% requirement or if no subcontractors are included in their proposals. The form emphasizes that submissions must adhere strictly to the provided format and that alternative formats or additional attachments will not be evaluated, underscoring the importance of small business engagement in government contracting processes.
Apr 2, 2025, 2:04 PM UTC
The document outlines requirements for submitting information regarding the composition and management of a proposed design-build team in response to the federal RFP N62473-24-R-5227. Offerors must detail primary team members, including their names, roles, contractual relationships, and responsibilities in executing the contract. Specifically, the form allows for listing multiple team members and calls for a description of their meaningful involvement as defined in the solicitation guidelines. Additionally, Offerors must justify the rationale for their team arrangement. This structured format ensures clarity in understanding each member's contribution and collaboration towards successful project execution, essential for federal contracting. Overall, this form is a critical component for assessing offers based on technical approach and team composition in federal design-build contracts.
Apr 2, 2025, 2:04 PM UTC
The document outlines the requirements for submitting project data sheets as part of the federal RFP N62473-24-R-5227, specifically for construction, design, and controls experience. Offerors must complete a separate form for each relevant project, detailing aspects such as the contractor's role (e.g., prime contractor or subcontractor), project specifics (contract number, award date, location), type of contract, client information, and a comprehensive project description. The focus is to demonstrate the Offeror's hands-on involvement with relevant projects that align with solicitation criteria, as submissions are limited to five projects. All submitted projects must not exceed two pages, and non-compliance with the required format or the failure to show meaningful participation in the project will render submissions ineligible for evaluation. This RFP emphasizes the importance of past experience and relevant qualifications in securing future contracts, aligning with governmental objectives for accountability and effectiveness in project execution.
The document outlines the requirements for submitting construction experience data sheets as part of the RFP N62473-24-R-5227. Offerors must provide detailed information on up to five relevant projects that align with the solicitation’s parameters, submitting one project sheet per project and limiting responses to two pages each. Key sections include the contractor's information, project details like the contract number, award and completion dates, project costs, contract type, client information, and specific project descriptions. The document emphasizes that any firm involved must demonstrate meaningful participation to be considered relevant. It includes specific data sheets for construction, design, and controls experience, requiring a comprehensive overview of work performed while excluding administrative roles. This structure supports the evaluation of an offeror's experience and ability to meet the project’s needs, which is essential for government contracts and adherence to federal and state RFP standards.
Apr 2, 2025, 2:04 PM UTC
The NAVFAC/USACE Past Performance Questionnaire (Form PPQ-0) serves to gather essential contractor information as part of the federal contracting process. Contractors must complete sections detailing their firm’s information, contract specifics, and description of the work performed, whether as a prime contractor, subcontractor, or in another capacity. Key details include contract type, award dates, completion timelines, and financials including the original and final contract prices. Additionally, the form requires client information to ensure the client's perspective on the contractor's performance in the project. Clients are encouraged to submit the completed questionnaire directly to the offeror, though they may also send it directly to NAVFAC. This document aims to verify contractor qualifications cited in proposals, allowing NAVFAC to assess past performance as a critical factor in future project solicitations. This structured approach emphasizes the importance of thorough vetting in government contracts and maintains accountability among all parties involved. The completion of the questionnaire is a necessary step in navigating the federal RFP process, ensuring transparency and reliability in contractor evaluations.
Apr 2, 2025, 2:04 PM UTC
The document outlines the requirements for submitting safety data as part of the federal government Request for Proposal (RFP) process, specifically for project N62473-24-R-5227. Offerors, particularly those in joint ventures or partnerships, must provide detailed safety information concerning their operations over the past five years using Department of Labor metrics, namely the Days Away, Restricted, or Transferred (DART) Rate and the Total Case Rate (TCR). Offerors are required to fill in specific safety metrics for each year from 2019 to 2023, along with explanations for any high rates or negative trends, and corrective actions implemented. The form emphasizes the exclusion of safety data for subcontractors, with certain conditions for small businesses. The structured approach ensures a thorough review of offerors' safety performance, reflecting the federal government's focus on safety standards in construction and related contracts, promoting accountability, and improving workplace safety outcomes.
Apr 2, 2025, 2:04 PM UTC
This document outlines the requirements for Exhibit E, part of the RFP N62473-24-R-5227, which focuses on historical small business utilization within federal contracts. It mandates all offerors, regardless of size, to report their historical small business achievements for projects submitted under experience criteria. Key instructions include completing project details such as contract numbers, offeror size, and subcontracting plans, alongside actual and goal values for total project, self-performed, and subcontracted amounts. Offerors must also provide breakdowns of subcontracting by various small business categories, and explanations for any unmet goals or instances of no small business subcontracting achievement. Essential definitions clarify project value metrics. The document's structure guides users through form completion, emphasizing clarity and completeness to ensure accurate evaluation of small business participation in government contracting. This information aims to promote small business utilization and monitor compliance with established goals within federal contracts.
Apr 2, 2025, 2:04 PM UTC
The document is the Small Business Participation Commitment Document (SBPCD) related to the RFP N62473-24-R-5227 for a design-build military construction project at the Marine Corps Air Ground Combat Center in Twentynine Palms, CA. It outlines the requirements for all offerors regarding small business participation in subcontracting. Offerors must indicate their business size and applicable socioeconomic categories, detailing the total contract value, self-performed work, and subcontracted amounts. A minimum small business participation rate of 17% is mandated, and the document emphasizes the necessity of firm written commitments between the prime contractor and small businesses included in their proposals. Offerors are also instructed to provide detailed explanations in cases where they do not meet this minimum requirement or if no subcontractors are identified. The structure ensures uniformity in submissions, aiding evaluation based on small business utilization and participation. Overall, the SBPCD serves as an integral part of the solicitation process, encouraging the inclusion of small businesses in federal projects to promote economic diversity and support to disadvantaged sectors within the business community.
Apr 2, 2025, 2:04 PM UTC
The financial questionnaire is a critical component for assessing the business and financial integrity of prospective contractors for a Navy contract, specifically N62473-24-R-5227, issued by the Naval Facilities Engineering Command Southwest. This document requests detailed financial information from the contractor’s financial institution to evaluate their financial stability and creditworthiness. The questionnaire specifically inquires about the contractor’s account types, average balances, lines of credit, and the nature of their relationship with the bank. It mandates that the completed questionnaire be submitted directly to the Navy's designated contact, along with a separate sheet for any additional comments regarding the contractor's reputation. The information obtained is intended to inform the contracting decision by providing insight into the contractor's financial health and ability to fulfill contractual obligations, thereby ensuring the responsible allocation of federal funds in accordance with government procurement processes.
Apr 2, 2025, 2:04 PM UTC
The document provides instructions on how to access the "Interested Vendors List" for a specific solicitation on the Contract Opportunities platform. To view this list, users must first create an account on Beta.SAM.gov and log in. Once logged in, they should return to the solicitation page, where the link to the "Interested Vendors List" will appear in the left-hand menu. If the link is not visible, it indicates missing information in the user’s profile. Instructions to update the profile are provided, emphasizing the importance of completing all fields and saving changes. This process ensures users can adequately access and review potential vendors for government requests for proposals (RFPs), thereby facilitating transparency and engagement in the federal contracting process. Ensuring a complete profile is necessary for effective participation in government procurement activities.
Apr 2, 2025, 2:04 PM UTC
This document details Amendment 0006 to the solicitation N6247324R5227 for a Design-Build Military Construction (MILCON) project focused on the construction of a 10 MW Battery Energy Storage System at the Marine Corps Air Ground Combat Center in Twentynine Palms, California. The amendment initiates Phase Two of the Request for Proposals (RFP) after concluding Phase One, extending the proposal submission deadline to May 15, 2025. Key revisions in this phase include updated submission instructions for proposals to be sent via the Department of Defense Secure Access File Exchange (DoD SAFE). The evaluation process will assess submissions based on technical solutions, small business participation, and pricing, with an emphasis on maximizing small business opportunities. Offerors are required to present a comprehensive technical narrative, conceptual drawings, and a clear plan for utilizing small businesses. The ultimate award will be made to the offeror providing the best value to the government, balancing both price and non-price factors. The document underscores the strategic importance of integrating advanced energy storage systems for improved grid stability and resilience, aligning with broader military energy management goals.
Apr 2, 2025, 2:04 PM UTC
Amendment 0008 to Solicitation No. N6247324R5227 pertains to the Design-Build Military Construction Project P-1238, focusing on the construction of a 10MW Battery Energy Storage system at the Marine Corps Air Ground Combat Center in Twentynine Palms, California. This amendment primarily updates the site visit schedule, rescheduling it to April 08, 2025, from the previously announced date of April 03, 2025. The site visit will occur immediately following the pre-proposal conference. The document reaffirms that all other terms and conditions remain unchanged and emphasizes that offerors must acknowledge receipt of this amendment as part of their proposal submission. This amendment is part of the ongoing solicitation process to ensure proper contractor engagement and compliance with designated timelines for the bidding process.
Apr 2, 2025, 2:04 PM UTC
The file outlines a Request for Proposal (RFP) for the construction of a 10 MW Battery Energy Storage System at the Marine Corps Air Ground Combat Center (MCAGCC) in Twentynine Palms, CA. This unrestricted competitive procurement invites firms to submit proposals under the NAICS code 237130, with a cost limitation of $30,111,570. Key requirements include performance of work starting within 15 days post-award, completion within 913 calendar days, and necessary performance and payment bonds. Price evaluation preference will favor HUBZone Small Business firms. Bidders must submit sealed offers by May 22, 2024, detailing their technical approach, experience, past performance, and safety records, with specific submission guidelines provided. The procurement includes a base item and two options, focusing on integrating Battery Energy Storage Systems into an electrical distribution microgrid and complying with cybersecurity protocols. The evaluation will occur in two phases, with technical and price factors assessed for "best value." Proposals should conform to the solicitation terms, with a defined commitment to small business participation and sustainable practices, emphasizing project relevance and past performance to ensure successful contract execution. The document exemplifies federal procurement protocols aimed at enhancing energy resilience, sustainability, and compliance with regulatory standards.
Apr 2, 2025, 2:04 PM UTC
The document is an amendment (0007) to the solicitation N6247324R5227 regarding the design-build military construction project P-1238, which involves the construction of a 10MW battery energy storage facility at the Marine Corps Air Ground Combat Center in Twentynine Palms, California. The amendment primarily revises the site visit requirements outlined in the 'Instructions to Offerors'. Specifically, it changes the acceptable forms of identification for site visit participants, clarifying that a federal compliant identification such as a Real ID or a passport is necessary. Additionally, it maintains requirements for vehicle registration and insurance for those driving onto the installation. The offeror must acknowledge receipt of this amendment, and all other terms and conditions of the original solicitation remain unchanged. This amendment is issued under the regulations specified by the FAR, highlighting the ongoing evolution of government contracting processes in response to logistical needs and security requirements.
Apr 2, 2025, 2:04 PM UTC
The Offeror's Team Consent Form facilitates the release of past and present performance information regarding subcontractors and teaming partners to the prime contractor during the government's source selection process for solicitation N62473-24-R-5227. Due to privacy regulations, consent from these entities is essential for disclosing their performance data, as prime contractors are treated as private parties by the government. The form requires details such as the entity's name, address, contact information, and the signatory's authority. By signing, the subcontractors or teaming partners acknowledge the evaluation of their performance will aid the government in assessing performance relevancy and confidence in the selection process. This consent is pivotal for transparency and informed decision-making in federal contracting and grants, ensuring compliance with established procurement regulations.
The Request for Proposal (RFP) N62473-24-R-5227 addresses the design and construction of a 10 MW Battery Energy Storage System (BESS) at the Marine Corps Air Ground Combat Center in Twentynine Palms, California. The contract will cover a Firm-Fixed Price structure for two cogeneration sites, integrating BESS with solar photovoltaic systems to enhance energy resilience, reduce costs, and support utility power. The project is expected to be completed within 913 calendar days, with significant financial elements including a Construction Cost Limitation of $43 million and stipulations for liquidated damages for any delays. Proposals must be submitted electronically through the Department of Defense SAFE platform, adhering to strict submission timelines and requirements, including pre-proposal meetings and site visits. Compliance with federal wage rates, bonding, and insurance requirements is emphasized. The document outlines the contractor's obligations, eligibility for options, and adherence to various codes and regulations, portraying the government’s commitment to sustainability and energy management in military installations.
The document outlines a Request for Proposal (RFP) for Phase Two of a contract concerning the design and construction of a 10 MW Battery Energy Storage System (BESS) at the Marine Corps Air Ground Combat Center in Twentynine Palms, California. The project involves two cogeneration sites, totaling 10 MW/40MWh capacity, with modular units connecting to existing solar photovoltaic systems. The goal is to enhance grid stability and energy resilience, with a focus on cybersecurity for control systems. The construction period spans 913 calendar days, with a Construction Cost Limitation (CCL) set at $43 million for the base item. Proposals must adhere to strict pricing and submission guidelines through the Department of Defense Secure Access File Exchange. A pre-proposal conference and site visit are scheduled, and inquiries concerning the RFP are due by April 17, 2025, with final proposals required by May 15, 2025. Contract requirements include compliance with wage rates, bonding, insurance obligations, and adherence to numerous applicable codes and standards. Failure to meet deadlines may incur daily liquidated damages. Overall, this RFP represents a significant investment in energy infrastructure aimed at improving facility energy management while ensuring safety and compliance with regulatory standards.
Apr 2, 2025, 2:04 PM UTC
The Request for Proposal (RFP) N62473-24-R-5227 outlines a Design-Build contract for a Battery Energy Storage System (BESS) project at the Marine Corps Air Ground Combat Center in Twentynine Palms, California. The contract includes the construction of a total capacity of 10 MW/40MWh, divided between two sites for better grid stability and energy resiliency. Key components include high-energy density batteries, bidirectional inverters, and cyber-secure controls, linked to solar photovoltaic arrays and the installation's microgrid. The project schedule spans 913 calendar days with specific financial stipulations, including a base construction cost limitation of $43 million. Proposals must be submitted electronically via the Department of Defense (DoD) Secure Access File Exchange to ensure compliance and timely receipt. A pre-proposal conference and site visit are scheduled for April 8, 2025, aimed at clarifying project requirements and facilitating contractor participation. Liquidated damages are outlined for delays in completion, and strict requirements for bonding, insurance, and adherence to applicable codes are mandated. Overall, the RFP emphasizes the integration of BESS, sustainable energy practices, and rigorous contracting standards in line with federal initiatives.
Apr 2, 2025, 2:04 PM UTC
The document outlines a Request for Proposal (RFP) for the design and construction of a 10 MW/40 MWh Battery Energy Storage System (BESS) at Two Nine Palms MCAGCC. The base bid includes the design, procurement, construction, testing, and commissioning of the BESS, integration with existing systems, and related infrastructure work. The project aims to enhance grid stability and resiliency by installing a new fiber optic cable, adding monitoring capabilities to existing photovoltaic systems, and modifying control systems for improved microgrid operation. Additionally, the RFP offers two optional bid items to expand capacity to 4 MW/16 MWh and 6 MW/20 MWh, respectively. Each option includes all necessary labor, materials, and incidental costs. The comprehensive nature of the proposal requires bidders to provide pricing for both base and option items, adhering to specific formatting guidelines and submission timelines, with proposals valid for 90 days from receipt. The document reinforces the government's commitment to enhancing energy infrastructure while ensuring compliance with federal guidelines. Emphasis is placed on the importance of accurate pricing and acknowledgment of any amendments, with the potential for rejection of non-compliant proposals. The intended project underlines a strategic approach to modernize energy management in military operations.
Apr 2, 2025, 2:04 PM UTC
The document outlines the Request for Information (RFI) process related to the federal solicitation N62473-24-R-5227 for the Design-Build Military Construction (MILCON) Project P-1238, focused on creating a 10 MW battery energy storage system at the Marine Corps Air Ground Combat Center in Twentynine Palms, California. It facilitates clarifications from bidders (KTRs) by documenting questions and responses regarding different technical aspects, such as architectural, civil, electrical, and mechanical engineering needs, as well as environmental considerations. Each RFI is complemented by a section for the government’s response, detailing the impact on cost and schedule. The structured format allows for organized tracking of inquiries, categorized by different sections of the proposal, ensuring clarity in communication between the government and prospective contractors. This document supports the overarching goal of successful project execution by effectively addressing potential concerns and ambiguities in the bidding phase, emphasizing the importance of transparency and detailed technical requirements in government contracting.
The document outlines the minimum wage rates and classifications for various construction trades involved in residential projects across multiple California counties, regulated under the Davis-Bacon Act. It specifies wage rates per hour for contractors and workers, citing relevant Executive Orders (14026 and 13658) that dictate these rates based on contract award dates. The document includes detailed classifications for laborers, carpenters, electricians, and others, along with corresponding wage rates and fringe benefits. Each trade's wage structure is tailored to specific counties and types of work, including additional pay for hazardous conditions, premium locations, and classifications. The document aims to ensure compliance with federal wage regulations to protect workers' rights and establish fair compensation for construction contracts funded by federal government programs. Overall, the summary serves as a critical resource for contractors bidding on federally funded residential construction projects, ensuring adherence to labor laws and wage standards across specified California regions.
Apr 2, 2025, 2:04 PM UTC
The document outlines the Request for Proposals (RFP) N62473-24-R-5227 for a design-build military construction project focused on establishing a 10 MW battery energy storage system at the Marine Corps Air Ground Combat Center in Twentynine Palms, California. It captures several Requests for Information (RFIs) from contractors seeking clarification on project requirements, including proposal submission timelines, experience qualifications, and documentation needed for phases one and two of the solicitation. Key clarifications include that the Phase One proposal is due by May 22, 2024, and not May 15, as previously suggested. The Government confirmed that experience criteria for projects—set at a minimum final construction cost of $20 million—remains unchanged to promote competitive bidding among contractors. Specific technical issues, such as discrepancies in the project's MW descriptions and necessary documentation like the Surety Form, were addressed accurately with corrections noted in amendments to the original solicitation. Overall, the document emphasizes the need for precise compliance with submission guidelines and operational requirements while facilitating communication between the government and prospective contractors to enhance the project's successful execution and construction integrity.
Apr 2, 2025, 2:04 PM UTC
The document pertains to the solicitation N62473-24-R-5227, which involves a design-build military construction (MILCON) project for the construction of a 10 MW battery energy storage system at the Marine Corps Air Ground Combat Center in Twentynine Palms, CA. Dated April 22, 2024, it serves as a framework for contractors (KTR) to submit clarification requests concerning various project components, including architectural, civil, electrical, and mechanical engineering aspects. Each request for information (RFI) must indicate potential impacts on cost and schedule, as well as the nature of the clarification sought. The structure enables systematic communication between the contractors and the government, ensuring all parties have clear access to necessary project details and requirements. The document emphasizes a collaborative approach to resolving questions regarding project execution and aims to streamline the bidding process while adhering to regulatory standards.
Apr 2, 2025, 2:04 PM UTC
The government document addresses RFI (Request for Information) clarifications related to the Design-Build MILCON Project P-1238, aimed at constructing a 10 MW battery energy storage at the Marine Corps Air Ground Combat Center in Twentynine Palms, CA. The solicitation specifies submission dates for proposals, with Phase One due by May 22, 2024, contrary to an earlier date mentioned. The government clarifies that a separate timeline for Phase Two will be provided later. Several RFIs discuss requirements for contractor experience, notably the minimum project cost threshold for relevant construction and design experience, which the government maintains at $20 million and $500,000 respectively, rejecting requests to lower these criteria to facilitate small business participation. The need for distinct project data sheets for construction and design submission is emphasized to ensure clarity. The document serves as a guideline for prospective bidders, outlining evaluation processes and clarifying ambiguities in the RFP, ensuring that contractors understand project expectations and compliance requirements. Overall, it reflects the government's commitment to transparency and structured communication in the procurement process for federal projects.
The document describes the requirements for Offerors submitting proposals for government contracts, specifically highlighting the importance of completing Section 00 45 00 of the RFP and ensuring registration in the System for Award Management (SAM). Offerors must provide a unique entity identifier and certify compliance with various federal representations and certifications, including small business statuses. It outlines the implications of the National Defense Authorization Act, particularly regarding telecommunications equipment and preventing the acquisition of products involving forced labor in the Xinjiang region. Additionally, it covers responsibilities related to the reporting of employment of veterans and compliance with financial accounting principles for performance-based payments. Overall, the document serves as a guideline for Offerors to navigate procurement processes while ensuring compliance and eligibility for federal contracts and grants. It accentuates accountability and the necessity for accurate and honest reporting throughout the procurement lifecycle to maintain integrity in federal operations.
Apr 2, 2025, 2:04 PM UTC
The document is a Surety Form (N62473-24-R-5227) intended for use by contractors looking to submit proposals for federal projects, requiring proof of bonding capacity. It collects essential information from the surety company and the contractor, such as names, contact details, and bonding history. Key elements include the bond limits for individual projects and cumulative projects, the surety's opinion of its relationship with the contractor, any history of project completions on behalf of the contractor, and the existence of complaints regarding non-payment to subcontractors or suppliers. This form is critical for assessing the financial reliability and qualifications of contractors seeking government contracts, ensuring that they can meet project obligations and maintain good relations with subcontractors. The structured form facilitates a thorough review process by emphasizing bonding capacity, contractor performance, and any significant issues related to project execution.
Apr 2, 2025, 2:04 PM UTC
The document outlines prevailing wage rates and classifications for construction and related activities in San Bernardino County, California, under the Davis-Bacon Act. The rates are effective for contracts awarded after specified dates and detail minimum hourly wages for various labor classifications. Notably, Executive Orders 14026 and 13658 govern wage rates, with $17.20 per hour as the minimum for new contracts in 2024, whereas older contracts may have lower minimums based on their award dates. Additionally, it lists detailed wage rates for specific labor categories such as asbestos workers, electricians, laborers, operators, and truck drivers, among others. Each classification includes both hourly rates and fringe benefits, which vary by type of work and location. The document also emphasizes requirements for contractors to comply with federal wage determinations and outlines provisions for premium pay on military bases and hazardous material environments. Overall, this document serves as a critical reference for federal, state, and local contractors to ensure compliance with wage laws while participating in government-funded construction projects.
Similar Opportunities
Energy Resiliency PV Arrays and Battery Storage
Buyer not available
The Department of Defense, specifically the Tennessee Air National Guard, is seeking qualified contractors for the Energy Resiliency PV Arrays and Battery Storage project at the Memphis ANG Base in Tennessee. The objective is to construct photovoltaic generation systems and battery storage solutions to enhance power resiliency for on-base facilities, including the installation of inverters, performance monitoring equipment, and compatible energy management meters. This initiative aligns with federal goals to promote sustainable energy solutions and is expected to be a Firm Fixed Price contract, with a bonding requirement between $5 million and $10 million under NAICS Code 237130. Interested small businesses, including those classified as Section 8(a), HUBZone, and SDVOSB, must submit their intent to quote by April 23, 2025, along with the required documentation to Christopher Rhyne at christopher.rhyne.1@us.af.mil.
P-1241 Low Altitude Radio Communication System (LARCS) Communication Towers Contract for Marine Air Ground Task Force Training Command (MAGTFTC), Twentynine Palms, CA
Buyer not available
The Department of Defense, through the Naval Facilities Engineering Command Southwest, is soliciting proposals for the P-1241 Low Altitude Radio Communication System (LARCS) Communication Towers contract at the Marine Air Ground Task Force Training Command in Twentynine Palms, California. This procurement involves a Firm-Fixed-Price Design-Build contract for constructing new communication towers and modernizing existing ones, primarily located on remote mountaintops that lack utility access, necessitating helicopter transport for logistics. The project is critical for enhancing military communication capabilities and operational readiness during training exercises, with a total estimated construction cost of $42 million. Interested contractors must submit their proposals by April 24, 2025, and can direct inquiries to Victor Mariscal at victor.m.mariscal.civ@us.navy.mil or Lauren Steigerwald at lauren.e.steigerwald.civ@us.navy.mil.
Construction of a Microgrid System at the Conroe Army Reserve Center (ARC) in Conroe, TX
Buyer not available
The Department of Defense, through the U.S. Army Corps of Engineers, is soliciting proposals for the construction of a microgrid system at the Conroe Army Reserve Center in Conroe, Texas. The project aims to enhance energy resilience by implementing an automated energy control and generation storage management system, which includes a 388kW photovoltaic solar array and a 340kW natural gas backup generator. This initiative is part of a broader federal effort to modernize military infrastructure and ensure operational reliability through sustainable energy solutions. Interested contractors must submit their proposals electronically by April 30, 2025, with an estimated contract value between $10 million and $25 million. For further inquiries, contact Alex Hamilton at alex.j.hamilton@usace.army.mil.
Proj No.: 95170, Construct a 10MW Generation Plant, with Microgrid Controls
Buyer not available
The Department of Defense, through the U.S. Army Corps of Engineers (USACE) Savannah District, is soliciting bids for the construction of a 10MW generation plant with microgrid controls at Fort Stewart, Georgia, under project number 95170. This project aims to enhance energy resilience and sustainability by integrating natural gas generators and existing solar assets into a modern microgrid system, with a total estimated construction cost between $25 million and $100 million. The procurement is a 100% small business set-aside under NAICS code 237130, and interested contractors must submit sealed bids in compliance with FAR Part 14 guidelines, ensuring they are registered in the System for Award Management (SAM) and the Procurement Integrated Enterprise Environment (PIEE). For further inquiries, contractors can contact Gerard Leo at gerard.f.leo@usace.army.mil or David Lione at david.j.lione@usace.army.mil, with the period of performance set for 1,080 calendar days following the notice to proceed.
Install 440V/200 Amp Service For Southern Section, 1009, Navy Boat Dock, Range Management
Buyer not available
The Department of Defense, through the Naval Facilities Engineering Systems Command Mid-Atlantic, is soliciting proposals for the installation of a 440V/200 Amp electrical service at the Southern Section, 1009, Navy Boat Dock located at MCAS Cherry Point, North Carolina. This project, identified as Project No. 7444338, aims to ensure minimal disruption to ongoing operations while adhering to strict safety and compliance standards, including the Davis-Bacon Act and regulations regarding forced labor. The estimated project cost ranges from $25,000 to $100,000, with proposals due by April 9, 2025, and the contract expected to be completed within 90 days post-award. Interested contractors, specifically those listed as M&R MACC contractors, should direct inquiries to Joanna Miller or Ericka J. Bishop via the provided contact details.
PROVIDE BACKUP POWER FOR STORMWATER REMOVAL PUMPS, BLDG 304, DAM NECK ANNEX
Buyer not available
The Department of Defense, through the Naval Facilities Engineering Systems Command Mid-Atlantic, is soliciting proposals for the installation of backup power systems for stormwater removal pumps at Building 304, Dam Neck Annex, Virginia Beach, Virginia. The project involves the installation of a new Standby Diesel Generator and an Automatic Transfer Switch to ensure operational integrity during power outages at two pump stations. This initiative is critical for enhancing the resilience of stormwater management systems, particularly during adverse weather conditions. Proposals are due by September 6, 2024, at 2:00 PM, and interested contractors should contact Jessica Grosso at jessica.m.grosso.civ@us.navy.mil or call 757-433-3623 for further information.
MEDDAC UPS Battery Replacements
Buyer not available
The Department of Defense, through the Department of the Army, is soliciting proposals for the replacement of 80 Lead Acid UPS Batteries at the Evans Army Community Hospital. The contractor will be responsible for shipping, removal, disposal, installation, and testing of the new batteries, which must be compatible with the existing Schneider Electric Galaxy VS UPS system. This procurement is crucial for maintaining uninterrupted power supply systems, ensuring operational reliability in critical healthcare settings. Interested vendors should note that a site visit is recommended on April 7, 2025, with all questions due by April 8, 2025, and the solicitation closing on April 10, 2025. For further inquiries, contact Duane Howell at duane.j.howell.civ@army.mil or call 719-526-2682.
Construction of a KC-46 Two-Bay Hangar at March Air Reserve Base (ARB), CA
Buyer not available
The Department of Defense, through the U.S. Army Corps of Engineers, is soliciting bids for the construction of a KC-46 Two-Bay Maintenance/Fuel Cell Hangar at March Air Reserve Base in California. This Design-Bid-Build project aims to enhance military infrastructure by providing essential maintenance facilities for the KC-46A aircraft, which includes various construction tasks such as site preparation, demolition, and installation of specialized systems. The estimated project cost ranges from $100 million to $250 million, with a focus on compliance with federal regulations, environmental standards, and safety protocols throughout the construction process. Interested contractors must submit their proposals electronically by April 17, 2025, and can direct inquiries to Lindsay Lawrence at lindsay.b.lawrence@usace.army.mil.
P158 BACHELOR ENLISTED QUARTERS AND SUPPORT FACILITY, MARINE BARRACKS WASHINGTON, DC AMENDMENT P00001
Buyer not available
The Department of Defense, through the Naval Facilities Systems Command, is soliciting proposals for the P158 Bachelor Enlisted Quarters and Support Facility project at Marine Barracks in Washington, D.C. This large-scale construction project, identified by solicitation number N40080-25-R-7071, involves the construction of a multi-rise, mixed-use facility that will include Unaccompanied Enlisted Housing, a dining hall, and a fitness center, with a budget ranging from $100 million to $250 million and a completion timeline of 979 days from the Notice to Proceed. The procurement process emphasizes a competitive evaluation based on price and past performance, with proposals accepted only from selected contractors on the list of MACC holders, and electronic submissions due by February 25, 2025. Interested parties should direct inquiries to Lindsay Brown or Damila Adams, with a pre-proposal conference scheduled for January 29, 2025, and compliance with wage determinations and bonding requirements is mandatory.
BEQ Repair AS4212
Buyer not available
The Department of Defense, through the NAVFAC Mid-Atlantic office, is soliciting proposals for the repair of Barracks AS4212 at Marine Corps Base Camp Lejeune, North Carolina. This project, designated as N40085-25-R-2620, requires qualified General MACC Contractors to undertake construction activities that adhere to strict safety and quality standards, with an estimated cost between $10 million and $25 million, to be completed within 730 days post-award. The procurement emphasizes compliance with federal guidelines, including the Davis-Bacon Act for wage determinations, and mandates the use of the Naval Facilities Engineering Command’s Electronic Construction Management System for project management. Interested contractors must submit their proposals by April 9, 2025, and can direct inquiries to Edward Pelser at edward.e.pelser.civ@us.navy.mil or Lauren Loconto at lauren.f.loconto.civ@us.navy.mil for further clarification.