Y--HAFC FOMA EXHIBITS
ID: 140P2124R0078Type: Combined Synopsis/Solicitation
Overview

Buyer

INTERIOR, DEPARTMENT OF THENATIONAL PARK SERVICEWASHINGTON CONTRACTING OFFICELAKEWOOD, CO, 80225, USA

NAICS

Custom Architectural Woodwork and Millwork Manufacturing (337212)

PSC

CONSTRUCTION OF EXHIBIT DESIGN (NON-BUILDING) (Y1PB)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)
Timeline
    Description

    The Department of the Interior, specifically the National Park Service, is seeking proposals for the planning, design, fabrication, transportation, and installation of exhibit elements at the Hot Springs National Park's Hot Springs Mountain Tower under Solicitation Number 140P2124R0078. This opportunity is set aside for small businesses and focuses on creating engaging interpretive experiences that highlight the park's historical and environmental significance, adhering to accessibility standards and compliance with federal regulations. The total budget for this project is estimated between $198,000 and $228,000, with proposals due via email by September 9, 2024, and questions to be submitted by August 22, 2024. Interested contractors should contact Shelia Bender at Dee_Dee_Bender@nps.gov or by phone at 304-535-6227 for further details.

    Point(s) of Contact
    Files
    Title
    Posted
    The National Park Service (NPS) document outlines the standards and specifications for exhibit planning, design, and fabrication, focused on ensuring accessibility and quality in conveying interpretive content. Key sections address definitions related to exhibit components, project management requirements, processes for exhibit development, and protocols for travel, meetings, and evaluations. The document emphasizes a team-based, iterative approach through phases such as Pre-Design, Schematic Design, Design Development, Production, and Installation, ensuring that each step builds on the previous one for effective result delivery. Emphasis is placed on accessibility compliance, evaluation methods to gauge audience interaction, and the importance of documentation and communication between contractors and NPS representatives. Detailed requirements for each phase ensure projects adhere to specified standards, budget constraints, and timelines, ultimately aiming to create engaging and educational experiences in national parks. The guidelines also cover maintenance and training for park staff to manage and uphold the exhibits post-installation.
    The Wind Cave National Park project involves the planning and design of new museum exhibits, with an emphasis on content development and visitor experience enhancement. Key components include various exhibit types, such as structures (ST), graphic layouts (GL), custom elements (CE), and electronic programs (EP). The project outlines a comprehensive approach to exhibit planning, featuring components like welcome panels, visitor center orientation, and interactive features, all categorized for streamlined organization and a clear understanding of their roles. Reports will track progress, manage inventories of components, and catalog resources like images and electronic equipment. The project also includes detailed descriptions of materials and design elements, focusing on accessibility and engagement through tactile models and audio programs (e.g., prairie sounds). The structured approach ensures that exhibits not only inform but also create an interactive experience for visitors, aligning with the mission of federal grants and RFPs for museum development. This initiative signifies an investment in cultural education and heritage preservation, aimed at enhancing visitor engagement through carefully curated exhibits that connect audiences with nature and history.
    The document is an Interpretive Media Asset Inventory Cost Summary for the Valor in the Pacific National Monument, focusing on the Pearl Harbor Historic Sites in Hawaii. It outlines various components necessary for the project, including structures, cases, lighting systems, electronic programs, and graphic layouts. Each section is associated with specific content group IDs, tracking numbers, costs, and installation details. The summary includes total costs for project management and specific fabrication costs for each type of asset, such as custom elements and electronic equipment. Additionally, it details compliance with accessibility and NPS identity standards. Key financial figures include an awarded contract amount of $25.00 for general conditions and a total replacement fabrication cost of $38.00. The document systematically categorizes inventory, emphasizing collaborative entries for materials, design specs, and compliance requirements. The intent of the document is to support federal grant applications and requests for proposals (RFPs) by providing a clear financial overview and structural plan necessary for implementation, ensuring all elements are documented for future reference and funding purposes.
    The document serves as an Interpretive Media Asset Inventory Cost Summary for a project involving the Fordyce Bathhouse Exhibits and the Valor in the Pacific National Monument. It consolidates detailed components necessary for exhibit installations, including tracking numbers, descriptions, quantities, and estimated costs, emphasizing various exhibit elements such as wayside panels, bases, structures, graphic layouts, and electronic programs. Most entries list replacement costs, which are currently set to zero, reflecting potential budget adjustments. Requirements are categorized for each item, indicating whether specific components are mandatory or not. The document includes a system for organizing exhibits, ensuring appropriate planning and tracking for project management and fabrication costs in compliance with government standards. It also includes guidelines for additional data entries, component specifications, and accessibility compliance, emphasizing meticulous documentation necessary for grant applications and RFPs. Overall, the purpose is to streamline exhibit planning, support budget estimation, and establish a thorough inventory for future references in government-funded displays.
    The Art Documentation Form serves as a crucial tool for the Art Resources Management Office of the U.S. Department of the Interior, specifically under the National Park Service. This form facilitates the systematic documentation and accountability of individual pieces of artwork, ensuring that proper data is entered into the HFC Image Management System. Each artwork must be accompanied by a separate form that includes details such as the artist or company name, total contract price, size, medium, and any copyright restrictions. The documentation is mandatory for the acceptance of art into the repository, reinforcing procedural transparency. Additionally, the file outlines the Receipt for Property formalities, which requires individuals to acknowledge personal responsibility for the property listed, and the potential for financial liability in cases of loss or damage due to negligence. Both elements highlight the importance of meticulous record-keeping and responsibility as part of government asset management processes. In sum, this documentation underscores the government's commitment to preserving and managing artistic resources effectively while ensuring compliance and due diligence within the framework of federal regulations.
    The document serves as an installation guide for iBeacons and audio streaming hardware related to the Descriptive Exhibit Tour (DET) Interior Exhibit Module (IEM) App. It outlines the necessary steps for installing Bluetooth beacon devices, which trigger audio descriptions as visitors engage with exhibits. Key topics include pre-installation planning, beacon placement considerations, on-site testing, and post-installation documentation. In the planning phase, a floorplan is reviewed for optimal beacon placement, ensuring a minimum 10-foot separation to avoid signal interference. During the on-site phase, testers must validate beacon responses and make adjustments based on proximity and signal strength. The guide also emphasizes the importance of securely mounting beacons while allowing for battery access. Additional sections detail the setup for audio streaming hardware and the requirements for the DET-IEM equipment. The guide specifies equipment needed for streaming audio descriptions and outlines operational requirements for compatibility with Apple and Listen Technologies products. This installation guide is essential for ensuring a successful implementation of the audio description system, which aims to enhance accessibility in visitor centers, aligning with federal grant initiatives aimed at improving public engagement and inclusion.
    The document outlines the exhibit space allocation plan for Fort Matanzas, detailing room dimensions and existing installations, including an AV screen, closets with shelving, and existing benches. It emphasizes compliance and viewshed considerations for new wayside exhibits. Notably, the plan specifies the proposed locations of various waysides, such as a low-profile wayside near the fort, two along the river trail, and several upright displays at strategic junctions and visitor access points. The layout aims to enhance visitor experience while ensuring compliance with park regulations. This outline serves as a framework for future installation and visitor engagement, illustrating the government's initiative to improve educational and recreational access within the park. The document is part of a broader effort connected to federal RFPs and grants aimed at environmental and cultural preservation in state and local contexts.
    The Foundation Document for Fort Matanzas National Monument delineates the park's mission, core components, and strategic planning needs to safeguard its cultural and natural resources. Established in 1924, the monument encompasses approximately 300 acres, preserving the 18th-century Spanish fort and its surrounding coastal ecosystem. The document emphasizes the significance of the fort as a unique example of Spanish military architecture in the U.S. and its role in defending St. Augustine. Key themes highlight the fort's historical context, the soldier experience, and the park's natural environment. The document analyzes current conditions, identifies threats such as coastal erosion and climate change, and outlines planning and data needs, including a visitor use management plan and climate change adaptation strategies. It calls for improved infrastructure and interpretive programs to enhance the visitor experience while protecting park resources. The overarching purpose is to ensure ongoing stewardship and resource protection through comprehensive planning, thus enabling future generations to appreciate the monument's historical and ecological significance. This foundational guide seeks to align management efforts with the park's established mission and significance statements to optimize both preservation efforts and visitor education.
    The Long-Range Interpretive Plan for Fort Matanzas National Monument, developed by the National Park Service, outlines strategies for enhancing visitor experiences and interpretive offerings over the next 5-7 years. The plan identifies seven key goals, including improving inclusivity for diverse communities, expanding educational programs for underserved youth, and enhancing relationships with local Hispanic communities. It employs a S.C.O.T. analysis to assess strengths, such as knowledgeable staff, and challenges, including inadequate visitor infrastructure. Recommendations prioritize communication of untold stories, particularly those of Native Americans and Hispanic populations, and include increasing accessibility in both programs and exhibits. The plan emphasizes interactive and technologically advanced exhibits to enhance visitor engagement and proposes outreach initiatives to involve local communities and military groups in park activities. By incorporating diverse narratives into interpretive media, the plan aims to deepen connections between visitors and the historical significance of Fort Matanzas. Overall, this initiative reflects a commitment to evolving the park’s narrative to meet modern public interests while fostering a richer understanding of American history and culture.
    The Fort Matanzas (FOMA) Exhibit Planning and Design document outlines labor costs and direct expenses associated with different phases of an exhibit project. Each phase, including planning, design development, production, and installation, lists labor hours, travel requirements, materials, and direct expenses, with many sections currently marked with zero hours and costs. Key phases involve activities such as pre-design, schematic design, accessibility workshops, and final installations, indicating a meticulous process for developing exhibits that meet standards for quality and compliance. Notably, only a few phases, like the Accessibility Workshop and Building Preparation, demonstrate allocated hour counts, emphasizing planning and logistics over immediate expenditures. This document serves as a foundational framework for the contract proposal process, highlighting the project's structured approach to budgeting and resource allocation, aligning with government request-for-proposals (RFPs) related to cultural and historical exhibitions.
    The 2018 HFC Editorial Style Guide serves as a resource for the Harpers Ferry Center (HFC) of the National Park Service (NPS) in formatting publications aimed at the general public. It supplements The Chicago Manual of Style, offering guidance on specific terms related to the National Park System, simplifying language for better public understanding, and ensuring editorial consistency across materials. The guide emphasizes the use of "Plain Language" principles, encouraging clear communication devoid of jargon. It establishes a hierarchy of style references and provides recommendations for further reading. Additionally, it outlines specific editorial preferences on grammar, terminology, and style, such as capitalization rules, the avoidance of certain phrases, and preferred terms for diverse groups. The document also stresses the importance of accessibility in communications, particularly for people with disabilities. Ultimately, this guide embodies the NPS's commitment to effective communication and public engagement, ensuring materials reflect clarity, respect, and inclusivity while meeting the standards necessary for federal publishing.
    The National Park Service’s Exhibit Conservation Guidelines provide a detailed roadmap for integrating conservation principles into the planning, design, and production of museum exhibits. Key elements of the guidelines include a comprehensive checklist for conservation involvement throughout the exhibit development and production phases, emphasizing collaboration among conservators, curators, designers, preparators, and registrars. Important considerations encompass object selection, case design, environment controls, and financial planning for conservation needs. The document outlines specific conservation criteria for exhibit features, offering a structured approach to addressing physical, fire, pest, and light environmental controls. The guidelines also detail preservation features for both exhibit areas and display cases, categorizing them by levels of protection, from minimal to maximum security and environmental control. Furthermore, it provides practical tools and forms for monitoring object conditions, maintenance schedules, and pest incident responses. These guidelines serve as a crucial resource for federal and local agencies seeking funding through RFPs to ensure that conservation is an integral part of exhibit planning, ultimately enhancing the longevity and integrity of displayed artifacts while fulfilling regulatory requirements in heritage preservation.
    The Architectural Barriers Act (ABA) Standards (2015) outline accessibility requirements for federal facilities built, altered, or leased with federal funds. Key federal agencies, including the Department of Defense, General Services Administration, and U.S. Postal Service, adopt these standards to ensure compliance, which includes provisions for outdoor areas and emergency housing. The standards encompass specific requirements across various chapters, addressing accessible dimensions, routes, and facilities such as parking, restrooms, and recreational areas. Notably, the document covers scoping requirements for new constructions, alterations, and facilities serving multiple uses, with specific provisions for existing buildings and historic sites. Additionally, exceptions outline scenarios where compliance may not be mandatory, acknowledging operational constraints and exceptions for temporary structures, single-occupant facilities, and certain specialized areas. The outlined procedures aim to promote inclusivity, enhance usability for individuals with disabilities, and set a baseline for accessibility in federal projects. This framework reflects the government's commitment to improving accessibility within the built environment while aligning with regulations pertinent to federal RFPs, grants, and local initiatives.
    The "Programmatic Accessibility Guidelines for National Park Service Interpretive Media" outlines critical standards to ensure accessibility for visitors with disabilities to interpretive media, including publications, exhibits, and audiovisual programs. It emphasizes the need for compliance with laws such as the Rehabilitation Act of 1973, directing NPS superintendents and the Harpers Ferry Center to ensure all programs and media accommodate diverse abilities. Key components include interpretive planning, guidelines for audiovisual and exhibit accessibility (e.g., captions, audio descriptions, tactile elements), and comprehensive evaluation methods to assess effectiveness. The document outlines practical steps for creating accessible interpretive media, such as universal design principles, budgeting for accessibility from the outset, and incorporating feedback from disability organizations. Appendices provide additional resources and laws relevant to accessibility design. Overall, the guidelines serve as a framework for enhancing the visitor experience while fulfilling legal obligations, showcasing the NPS's commitment to inclusivity in parks.
    The National Park Service's document outlines the standard specifications for planning, design, production, and installation of electronic programs, with specific focus on audiovisual and digital interactive projects. Key sections include definitions of terms such as "accessible," "audiovisual programs," and "assistive listening systems," along with guidelines for project management roles and responsibilities. The guidelines emphasize project phases: pre-production planning, production, and post-production, detailing tasks like script development, media acquisition, and compliance with accessibility standards outlined by the Americans with Disabilities Act and the Architectural Barriers Act. Accessibility is a critical focus, ensuring that all materials meet established standards for individuals with disabilities through captions, audio descriptions, and assistive listening devices. The document also outlines requirements for submittals, rights acquisitions for media use, and the contractor's responsibilities in adhering to the National Park Service's identity and technical specifications. Overall, the document provides a comprehensive framework aligning with government RFPs, emphasizing quality, accessibility, and effective project management while showcasing the commitment to enhancing visitor experiences in national parks.
    The document outlines the Content Management Data Fields Guidelines for the National Park Service's Exhibit Planning and Design projects. It describes a systematic approach to managing exhibit elements via a database that categorizes various components, such as Accessioned Objects (AOs), Cases (CAs), Custom Elements (CEs), Electronic Equipment (EE), Electronic Programs (EP), Graphic Layouts (GLs), Images (IMs), and Labels (LAs). Each category has specific data fields to document essential information, including physical attributes, sources, conditions, and related exhibit elements, ensuring comprehensive tracking and organization throughout the exhibit development process. The guidelines are designed to support contractors in creating exhibits that meet preservation standards and enhance visitor engagement while utilizing tools like the Museum Exhibit Planner (MEP) template in FileMaker Pro or alternatives chosen by the contractors. This framework reinforces the importance of accuracy, thorough documentation, and compliance with established specifications, underscoring the federal government's commitment to cultural heritage preservation and public education through effective exhibit practices.
    The document outlines the Intellectual Property Guidelines for Harpers Ferry Center, focusing on copyright, patents, trademarks, and trade secrets related to interpretive media. It serves as a resource for addressing common intellectual property issues encountered in government contracts, emphasizing the importance of obtaining appropriate rights and licenses. Key points include the distinctions of copyright protection, the process for acquiring rights in data produced under contracts, and the implications of different license agreements. Contractors are identified as authors of their produced works, necessitating clear contractual terms to define ownership and usage rights to avoid infringement. Fair use exceptions are explained, highlighting their application to government use of copyrighted materials. Provisions related to software acquisition and various rights-in-data clauses, such as transferring rights of use and limitations of liabilities, are covered. The guidelines emphasize compliance with federal laws while securing implications of public domain works, donated content, privacy rights, and the necessity of documentation in compliance with legal frameworks. This framework reflects federal and local governments' commitment to effectively manage intellectual property in the execution of contracts and project development.
    The document is a Sample Use Rights Letter designed for contractors working with the National Park Service (NPS) to request permission from copyright owners for image use in new exhibitions. It specifies the required elements, including the identification of the desired image, its intended dimensions in the exhibition, and instructions for crediting the copyright owner. The letter emphasizes that written permission is necessary for the images' use throughout the exhibition's life. It also contains contact details for inquiries and requests the copyright owner to sign and return the letter to grant permission. This standard procedure is crucial within the context of government Requests for Proposals (RFPs) and grants, ensuring legal compliance and respect for intellectual property rights while enhancing NPS exhibits. The letter's clear structure establishes protocols for usage rights, fostering collaboration between the NPS and image copyright holders.
    This document serves as a combined synopsis and solicitation for a Request for Proposal (RFP) under Solicitation Number 140P2124R0078. It seeks quotes for services related to the planning, design, fabrication, transportation, and installation of exhibit elements at the Hot Springs National Park's Hot Springs Mountain Tower. This acquisition is specifically set aside for small businesses under the NAICS code 337212 for Custom Architectural Woodwork and Millwork Manufacturing, with a size standard of 500 employees. The government intends to award one firm-fixed price contract based on best value. The solicitation requires adherence to instructions and includes several applicable Federal Acquisition Regulation (FAR) clauses, which are available online. Contractors are advised that proposals are due via email by September 9, 2024, with specific guidelines for submission to be followed. Questions must be submitted to the designated contracting officer by August 22, 2024. Additionally, all offerors must be registered in the System for Award Management (SAM) to be eligible for the contract. This solicitation exemplifies the federal government's efforts to procure services while supporting small businesses and ensuring compliance with procurement regulations.
    The document details Amendment 0001 to Solicitation Number 140P2124R0078, issued by the government for a project at Fort Matanzas National Monument. The amendment outlines the procedure for contractors to acknowledge receipt of the amendment and provides responses to questions raised regarding the solicitation. Key points include the government's confirmation that the awarded contractor can utilize the park’s ferry service for transport of personnel and materials to the fort site. Additionally, it specifies that while direct imbedded concrete footings are unsuitable for the sandy location, stabilization fins will be required for the outdoor exhibits. The document emphasizes administrative changes related to the original solicitation while maintaining all other terms and conditions. This amendment serves to clarify logistical aspects of the project, ensuring contractors are informed of available resources and requirements as they prepare their proposals.
    The government document outlines a Request for Proposal (RFP) for exhibit planning, design, fabrication, and installation services at the Fort Matanzas National Monument in Florida. The National Park Service (NPS) seeks a contractor to create new interpretative experiences, including interior and exterior exhibits that convey the fort's history and the coastal environment. The project spans three key phases: planning, design development, and production. The contractor must engage in comprehensive research, collaborate with NPS staff, and deliver accessible, high-quality exhibits showcasing historical military strategies and technologies. Emphasis is placed on universal design and compliance with relevant accessibility standards. Moreover, the contractor will manage communications, quality control, and project schedules, ensuring alignment with the park's long-term interpretive goals. A budget between $198,000 to $228,000 is allocated for this project, covering all necessary materials, fabrication, and installation costs. This RFP demonstrates the government’s investment in enhancing visitor engagement and education through effective exhibit design, underlining the importance of preserving historical narratives while making them accessible and relevant to a diverse audience.
    Lifecycle
    Title
    Type
    HAFC FOMA EXHIBITS
    Currently viewing
    Combined Synopsis/Solicitation
    Similar Opportunities
    Y--Source Sought Notice
    Active
    Interior, Department Of The
    The Department of the Interior, through the National Park Service, is seeking proposals for the rehabilitation of the Painted Desert Community Complex located within Petrified Forest National Park. The project aims to address structural deficiencies, restore historical features, and upgrade facilities to meet current standards, with an estimated construction cost exceeding $10 million. This initiative reflects the federal government's commitment to preserving national landmarks while enhancing visitor experiences and public engagement. Interested contractors must submit their proposals by November 15, 2024, and can direct inquiries to James Waller at jameswaller@nps.gov or by phone at 303-969-2488.
    Y--ROMO 327127 Bridge Preservation
    Active
    Interior, Department Of The
    The Department of the Interior, through the National Park Service, is soliciting proposals for the "Y--ROMO 327127 Bridge Preservation" project, aimed at preserving multiple bridges within Rocky Mountain National Park. The project encompasses various preservation tasks, including concrete repairs, masonry work, and scour countermeasures, with an estimated contract value between $1,000,000 and $5,000,000. This initiative is critical for maintaining infrastructure integrity and ensuring public safety while adhering to environmental regulations within the park. Interested contractors should submit their proposals by November 8, 2024, at 2 PM MT, and can direct inquiries to Shellie Murphy at shelliemurphy@nps.gov or call 720-610-2690.
    Y--ELMA-CREATE UNIVESALLY ACCESSIBLE TRAIL
    Active
    Interior, Department Of The
    The Department of the Interior, through the National Park Service, is soliciting proposals for the construction of a universally accessible trail at El Malpais National Monument in Grants, New Mexico. The project aims to enhance accessibility by creating a 0.75-mile trail, installing an ABAAS-compliant boardwalk, and constructing an amphitheater, with a total project value estimated between $1 million and $5 million. This initiative is crucial for improving visitor access and experiences in national parks while adhering to federal regulations and environmental standards. Interested small businesses must submit their sealed bids by the specified deadline, with the contract performance period set from January 6, 2025, to October 3, 2025. For further inquiries, potential bidders can contact Claire Roberson at ClaireRoberson@nps.gov or by phone at 505-795-2009.
    Y--YELL 310533 Rehabilitate and Improve Old Faithful
    Active
    Interior, Department Of The
    The Department of the Interior, through the National Park Service, is soliciting proposals for the rehabilitation and improvement of the Old Faithful Water Treatment System at Yellowstone National Park (Solicitation No. 140P2024R0050). The project aims to construct a new water treatment facility, including advanced water treatment technology, while adhering to environmental protection standards and minimizing disruptions to park activities. This initiative is crucial for maintaining essential infrastructure within the park, ensuring compliance with federal regulations, and safeguarding natural resources. Interested contractors must submit their proposals by December 4, 2024, at 2:00 PM MT, with questions accepted until November 18, 2024. For further inquiries, contact Vicki Freese-supler at vickilfreese-supler@nps.gov or call 720-402-8467.
    Y--MALU 293291 Rehabilitate the Visitor Center and
    Active
    Interior, Department Of The
    The Department of the Interior, National Park Service, is soliciting proposals for the rehabilitation of the Visitor Center and Headquarters at the Martin Luther King Jr. National Historical Park in Atlanta, Georgia. The project aims to enhance the facility through comprehensive renovations, including interior remodels, roof repairs, HVAC and electrical updates, and site improvements, all while ensuring compliance with safety and environmental standards. This initiative is crucial for preserving the historical integrity of the site and improving visitor experience. The estimated contract value ranges between $5 million and $10 million, with a performance period from March 1, 2025, to May 31, 2026. Interested contractors must submit their proposals by November 15, 2024, and can contact John Babcock at johnbabcock@nps.gov or 303-969-2626 for further information.
    SEKI 342662 Demolish Ranger Station, Sequoia & Kin
    Active
    Interior, Department Of The
    The Department of the Interior, through the National Park Service, is soliciting proposals for the demolition of the Ranger Station at Sequoia & Kings Canyon National Parks in California, under solicitation number 140P2025Q0001. The project aims to safely remove the structure, including any hazardous materials, and restore the site for future use, emphasizing compliance with safety and environmental regulations. This initiative reflects the government's commitment to maintaining public health standards and ecological integrity within national parks. Interested contractors, particularly small businesses, must submit their proposals by the specified deadline, and for further inquiries, they can contact Mark Barber at markbarber@nps.gov or call 721-621-7310.
    Z--Teton Dam 50th Commemoration Overlook Project
    Active
    Interior, Department Of The
    The U.S. Department of the Interior, through the Bureau of Reclamation, is seeking qualified small businesses for the Teton Dam 50th Commemoration Overlook Project, which involves the construction of a new concrete overlook and associated site improvements in Fremont County, Idaho. The project includes demolishing the existing asphalt overlook, installing a new restroom building, picnic tables, and various site enhancements such as guardrails and informational kiosks. This opportunity is significant as it aims to enhance visitor experience and commemorate the historical importance of the Teton Dam. The estimated contract value ranges from $1,000,000 to $5,000,000, with the solicitation expected to be issued in November 2024. Interested contractors should contact Jason Baldwin at jbaldwin@usbr.gov or by phone at 208-378-6217 for further information.
    Y--BICY 229154
    Active
    Interior, Department Of The
    The Department of the Interior, specifically the National Park Service, is soliciting proposals for the construction of a fire station at the Big Cypress National Preserve Headquarters Complex in Florida. This project, designated as solicitation number 140P2024R0084, is set aside for women-owned small businesses and has an estimated budget ranging from $1 million to $5 million. The fire station will serve as a critical facility for emergency services, enhancing fire response capabilities within the national preserve while ensuring compliance with various federal and state regulations. Interested contractors must submit their proposals by December 2, 2024, and are encouraged to participate in a pre-bid site visit scheduled for November 13, 2024. For further inquiries, potential bidders can contact John Babcock at johnbabcock@nps.gov or by phone at 303-969-2626.
    Z--CRLA 245275 - Intelligent Transportation System
    Active
    Interior, Department Of The
    The National Park Service (NPS) is seeking qualified contractors for the CRLA 245275 project, which involves the installation of an Intelligent Transportation System at Crater Lake National Park in Oregon. The project aims to enhance visitor experience and safety through the installation of solar-powered roadway signs, a turnout for a portable sign, and web cameras to monitor wait times, with an estimated budget between $250,000 and $500,000 and a project duration of approximately 120 days. This initiative reflects the government's commitment to improving public infrastructure while fostering participation from small businesses, as the opportunity is set aside for total small business participation. Interested firms must submit their qualifications, including bonding capacity and relevant experience, by noon Mountain Time on November 14, 2024, to Brenda Smith at brendasmith@nps.gov.
    Y--LAKE 318673; 324894; 332529 Extend Public Launch R
    Active
    Interior, Department Of The
    The Department of the Interior, through the National Park Service, is soliciting bids for the construction project titled "Extend Public Launch Ramp at Hemenway Harbor" in Lake Mead National Recreation Area, Boulder City, Nevada. The project involves extending a public launch ramp by 529 feet, requiring excavation, grading, and the installation of precast concrete panels to enhance recreational access as lake levels decline. This initiative is crucial for maintaining public access to recreational facilities while adhering to environmental regulations and best management practices to protect local wildlife and water quality. Interested contractors must submit sealed offers by November 12, 2024, and can direct inquiries to Contracting Officer Dayna Omiya at daynaomiya@nps.gov or by phone at 720-910-0477. The expected contract magnitude exceeds $10 million, with a performance period from December 1, 2024, to December 1, 2026.